Top Banner

of 323

Thuat Ngu Ky Thuat Dang Kiem Va Dong Tau Anh Viet

Oct 14, 2015

Download

Documents

dinhvantuanhn
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Thut ng k thuit ng kim v ng tu anh -vit

    1

    Ph Lc

    STT Ch u Trang1. A 22. B 203. C 364. D 705. E 886. F 1047. G 1258. H 133

    9. I 14410. J 159

    11. K 161

    12. L 162

    13. M 175

    14. N 189

    15. O 195

    16. P 204

    17. Q 227

    18. R 228

    19. S 246

    20. T 288

    21. U 304

    22. V 308

    23. W 313

    24. X 323

    25. Y 323

    26. Z 323

  • Thut ng k thut ng kim v ng tu anh - vit

    2

    A class division : Khu vc kt cu (chng chy) cp AA.C generator : My pht xoay chiuAbaft : Pha sau, pha ui tuABS (American Bureau of Shipping) : ng kim MAbjorb : Hp th, ht

    Abient temperature : Nhit mi trng xung quanhAbnormal : Khc thng, bt thngAbnormality : (S) khc thng/ ngoi lAbove-mentioned : nu trn, ni trnAbrasion : (S) mi mn, ch b mn, tnh mnAbrasion resistance : (S) chu mi mn, tnh chng mnAbrasion test : Th mi mnAbrupt change : (S) thay i t ngtAbscissa : Honh

    ~ of centre gravity : Honh trng tm tu~ of centre of waterline : Honh trng tm din tch ng nc

    Absence : (S) vng mt, (s) thiuAbsolute equilibrium pressure of saturated vapour : p sut cn bng tuyt i cahi bo haAbsolute pressure : p sut tuyt iAbsolute temperature : Nhit tuyt iAbsolute vapour pressure : p sut hi tuyt iAbsorbab heat energy : Nng lng nhit hp thAbsorbed energy : Nng lng hp thAbsorption : (S) hp thAcceleration : Gia tc, (s) tng tcAcceleration of gravity : Gia tc trng trngAccelerator : my gia tc (cc ht tch in), cht xc tcAcceptable : Chp nhn c, c th chp nhn cAcceptance inspection : (S) kim tra chp nhnAccess : (S) tip cn/truy cp; Li i vo, li i tiAccess door : Np (l) quan stAccess ladder : Cu thang ln xungAccess ladder : Thang leo vo, thang dn ti

  • Thut ng k thuit ng kim v ng tu anh -vit

    3

    Access manhole : L ngi chui voAccess means : Phng tin tip cn, phng tin dn tiAccess opening : L chui vo, l dn tiAccess trunk : ng hm/ ging chui vo ; Li kn i vo, li dn tiAccessibility : Kh nng ti c/ vo c/ tip cn cAccessible : C th n c/ ti c/ tip cn cAccessible position : V tr c th ti c/ tip cn cAccessories : ph tng, vt thm vo, ph kinAccessory : Ph tng, ph kin ; Ph trAccessory arrangement plan : Bn v/ s b tr cc ph tngAccessory layout plan : Bn v b tr/ lp t cc ph tngAccessory line : ng ng phAccident prevention : phng tai nnAccident signal means : Phng tin tn hiu bo tai nnAccidental : Ngu nhin, bt thng, v Accidental escape : Thot s cAccommodation ladder : Cu thang phng , cu thang khu vc sinh hotAccommodation space : Phng , khu vc sinh hotAccumulate, to : Tch ly, tch t, cht ng, tip tc tngAccumulation : (S) tch ly, tch t, cht ng, tip tc tngAccumulation- test : (S) th kh nng tch t hiAccumulator : c qui, thanh ghi trong my tnhAccumulator battery : c qui, t c quiAccuracy : chnh xc, (s) chnh xcAcid batterie : c quy axtAcid steel : Thp chu a xtAcidic : Mang tnh a xtAcidproof : Chu a xt, chng a xtAcidproof coating : Lp ph chu a xt, lp ph chng a xtAcidproof paint : Sn chu a xt, sn chng a xtAcidproof painting : Sn chu a xt ; (S) sn chu/ chng a xtAcknowlegement : (S) xc nhnAcoustic Insulation : (S) cch mAcquisition : (S) thu nhn

  • Thut ng k thut ng kim v ng tu anh - vit

    4

    Acting point : im tc dngAction : Hnh ng, tc dngActual condition : iu kin thc t, trng thi thc tActual status : Nguyn trng, tnh trng thc tActual thickness : Chiu dy thc, chiu dy hin tiActuating device : C cu khi ng, thit b khi ng, c cu thc hinActuator : C cu dn ng/ tc ngAdapter : B i in mt chiu, b nn in; u ni, khp niAdaption : (S) lm thch ngAdded weight : Trng lng b sungAdditional character : K hiu b sungAdditional heating : Gia nhit b sungAdditional requiriment : Yu cu/ qui nh b sungAdditional stress : ng sut b sungAdditional test : Th nghim b sung, cuc th b sungAdditional water pressure : p lc nc b sungAdditive : Cht ph giaAddtional safeguard : Thit b bo v ph trAdequacy : (S) thch ng/ y Adequate : Thch ng, y Adequately : Mt cch thch ng/ y , mt cch tng xngAdhere to the law of nature, to : Theo qui lut t nhinAdhere to the rules, to : Theo cc qui tcAdhere to, to : Dnh cht vo ; Tun th, theoAdhesion : (S) dnh, keoAdhesion : Tnh kt dnh, cht kt dnhAdhesive : DnhAdjacent : K, nm cnhAdjacent space : Khng gian bn cnh, khng gian lin kAdjoining : (S) gn viAdjoining space : Khng gian lin kAdjust, to : iu chnh, chnhAdjustable range of time : Khong thi gian c th iu chnh c, di thi gianiu chnh

  • Thut ng k thuit ng kim v ng tu anh -vit

    5

    Adjusted pressure : p sut c iu chnhAdjusting piece : Tm (cn) iu chnhAdjustment : (S) iu chnhAdminister a medicine, to : Pht thucAdminister, to : Qun l cng vic, ban phtAdministration : (S) qun l ; Chnh quyn, chnh quyn nh ncAdministrative Committee : y ban hnh chnhAdmiralty : Thuc v hi qun

    ~ anchor : Neo hi qun~ constant or ~ coefficent : H s hi qun (khi tnh gn ng lc cn ca tu)

    Admission : (S) tha nhn, thu nhnAdmitted : c tha nhn, c thu nhnAdopt, to : Chp nhn, thng quaAdoption : (S) chp nhn, thng quaAdvance : (S) tin b, tin lnAdvancement : (S) thc y, tin bAerial : ng tenAerial converting equipment : Thit b chuyn mch ng tenAerosol particle : Phn t kh bay hiAffected zone : Vng b nh hngAffix, to : Gn vo, ng cht voAffloat : Ni, tri niAfloat : trng thi niAfore-mentioned : Nu trn, a ra trn, cp trnAft escape hatch : Ca thot s c ui tuAft heavy : Qu ti pha uiAft region : Vng ui (tu c gia cng i bng)Aft wall : Vch sau (ca lu)Aft(er) draught : Chiu chm/ mn nc ui (tu)Aft(er) end : Phn uiAft(er) end bulkhead : Vch (mt) uiAft(er) half-length : Chiu di na pha sauAft(er) perpendicular : ng vung gc uiAft(er)-peak (water) tank : Kt (nc) khoang ui

  • Thut ng k thut ng kim v ng tu anh - vit

    6

    Aft(er)-peak bulkhead : Vch khoang uiAfter (aft) peak : Khoang uiAfter bottom block : Phn on y vng uiAfter construction : Kt cu vng ui, kt cu pha sauAfter peak : Khoang uiAfter peak bulkhead : Vch uiAfter perpendicular (AP) : ng vung gc uiAfter side : Mn ui tuAfter wall : Vch ngn/ tng pha sau (ui)After-body : Thn sauAftermost : Gn ui tu nhtAg(e)ing : (S) ha giAg(e)ing effect : Hu qu ca ha giAg(e)ing in air bomb : (S) ha gi trong bnh hiAg(e)ing in air oven : (S) ha gi trong l hpAg(e)ing in oxygen bomb : (S) ha gi trong bnh xiAge : TuiAge of ship : Tui tuAge-hardening : (S) tng cng theo thi gian (theo tui)Ageing : Tnh lo ha, (s) ha giAggreement : Tha thun, tha c, s ng Aggregate capacity : Sn lng (cng sut) t myAggregated sectional area : Tit din hp nhtAhead shaft horsepower : Cng sut trn trc khi chy tinAhead turbine : Tua bin pha trcAhead-astern test : Th tin-liAir : Khng khAir : Kh, khng kh ; Compressed ~ : Kh nnAir and drainage holes: L thot nc v khAir bottle : Bnh kh nn, chai giAir bubble : Bt kh (x phng)Air chamber : Bung kh, khoang khAir charging valve : Van np khAir circuit breaker : B ngt mch kiu kh, b ngt mch h

  • Thut ng k thuit ng kim v ng tu anh -vit

    7

    Air compressor : My nn khAir conditioning machinery : iu ha khng khAir cooler : Thit b lm lnh khng khAir cushion : m khAir cushion vehicle : Tu m khAir duct : ng/ knh dn kh (thng gi)Air foam nozzle : u phun hn hp bt-khng khAir heater : Bu hm khng khAir hole : L thng hiAir hole : L thot khAir inlet : ng dn kh voAir inlet valve : Vanht/ xu pp np, van dn kh voAir inlet : L ht khng kh voAir intake : Ca np kh, ca ht kh vo,ng np khng khAir leakage rate : T l r khAir lock : Kha (nt) khAir lock compartment : Ngn kn khAir passage : (S) chuyn trng thi khAir (eascape) pipe : ng thot khAir pollution : nhim khng khAir pollution hazard : Lm (gy) nhim khng khAir port : Sn bayAir preheater : Thit b hm nng s b khng khAir pressure : p sut khng khAir receiver : Bnh cha khAir reservoir : Bnh cha khng kh nn, chai giAir seal : Kha khAir search radar : Rada khng luAir stagnation : (S) ng kh, (s) tc nghn khAir stratification: (S) phn tng khAir stream : Lung khAir supply source : Ngun cung cp khAir tank : Bnh cha khAir test : (Cuc) th kn kh

  • Thut ng k thut ng kim v ng tu anh - vit

    8

    Air tight test : Th kn khAir-conditioner : My iu ha khng khAir-conditioning : S iu ha khng khAir-conditioning machinery : My iu ha khng khAir-cooled : Lm mt bng khng khAir-cooled rectifier : B chnh lu lm mt bng khng khAir-cooled type : Kiu lm mt bng khng khAir-cooler : Sinh hn khAir-cooler coil : ng ng cun ca sinh hn khAir-cooling installation : Thit b lm mt bng khAir-driven type : Kiu dn ng bng khAir-lock : Kha khng kh (theo kt cu bung cch li hai lp ca), lp chn kiukh, ngn m kn khAir-pressure test : (Cuc) th p lc khAirtight : (S) kn khAirtight bulkhead : Vch kn khAirtight door : Ca kn khAirtight packing : Jong kn khAirtight test : (Cuc) th kn khAirtightness : Kn khAlarm : (S) bo ng; Thit b bo ng,Alarm bell : Chung bo ngAlarm circuit : Mch bo ngAlarm device : Thit b bo ng, c cu bo ngAlarm lamp : n bo ngAlarm system : H thng bo ngAlcohol : Ru, cnAlert navogator : S quan cnh gii (hng hi)Alignment : (S) nh tm, ng tm (h trc)Alignment of bearing : nh tm Alignment of joint : thng ca mi niAlkali : Cht kim (Baz)Alkaline (storage) battery : c qui kimAlkaline : Kim

  • Thut ng k thuit ng kim v ng tu anh -vit

    9

    Alkaline accumulator battery : c qui kimAlkaline batterie : c qui kimAll conceivable condition : Tt c cc trng thi c th c cAll purpose dredger : Tu no vt vn nng/ tu quc vn nngAll water screening system : H thng mn ncAlleyway : Li i, hnh langAllowable angle : Gc cho phpAllowable axial compressive stress : ng sut nn dc trc cho phpAllowable buckling stress : ng sut un dc cho phpAllowable compressive stress : ng sut nn cho phpAllowable current : Dng in cho phpAllowable maximum radius : Bn knh ln nht cho phpAllowable pressure : p sut cho phpAllowable stress : ng sut cho phpAllowable tangential load : Ti trng tip tuyn cho phpAllowable tank filling limit : Gii hn np y kt cho phpAllowable temperature : Nhit cho phpAllowable temperature for conductor : Nhit cho php ca dy dn inAllowable value : Tr s cho phpAllowable working load : Ti trng lm vic cho phpAllowance : Lng d tr, lng cho php ; Corrosion ~ : Lng d tr n mnAlloy : Hp kimAlloy coating : Lp ph hp kimAlloy lead : Ch hp kimAlloy(ed) steel : Thp hp kimAlloy(ed) steel pipe : ng thp hp kimAlteration : (S) hon ci, (s) bin i, (s) thay th ; Xoay chiuAlterative means : Phng tin thay i nhau, phng tin thay th tng ngAlterative measures : Bin php thay i nhau, bin php thay th tng ngAlternately : Lun phin, xen k, so leAlternating current : Dng in xoay chiuAlternating current circuit : Mch in xoay chiuAlternating current generator : My pht in xoay chiu

  • Thut ng k thut ng kim v ng tu anh - vit

    10

    Alternating current machine : My in xoay chiuAlternating current power equipment : Thit b cng sut dng dng in xoaychiuAlternating current testing : (S) th dng in xoay chiuAlternative source of power : Ngun nng lng d phng (lun phin)Alternative steering position : V tr li d phng (lun phin)Alternator : My pht in xoay chiuAluminium ; aluminum : NhmAluminium alloy : Hp kim nhmAluminium alloy casting : Vt c hp kim nhmAluminium alloy plate : Hp kim nhm tm/ tm hp kim nhmAluminium treated fine-grained steel : Thp thm nhm ht mnAluminium treatment : Nhit luyn nhmAmbient condition : iu kin bin mi trngAmend, to : B sung, sa iAmendment : (S) b sung, sa iAmendment : (S) sa i, (s) b sungAmenity : (S) trong lnh (ca mi trng), (s) d chuAmines : AminAmmeter : Ampe kAmmonia solution : Dung dch amnicAmount of deformation : Lng bin dngAmount of dislocation : Lng x dch (v tr)Ampere - hour meter : Thit b o ampe gi, am pe k, cng t mtAmplifier : Ci ampli, my khuych i (m thanh/ tn hiu)Amplitude : Bin (dao ng)Amplitude of roll : Bin lc ngang, bin trng trnhAnalysis : (S) phn tch, tnh ton

    Fatigue ~ : Tnh ton miAnalytical tool : Dng c phn tch, thit b phn tchAnchor : (Ci) neoAnchor arm : Cnh neoAnchor cable : Xch neo, lnAnchor crown : u neo

  • Thut ng k thuit ng kim v ng tu anh -vit

    11

    Anchor davit : Cu neoAnchor fluke : M neoAnchor handling appliances : Thit b ko/ nng neoAnchor heaving : (S) ko neoAnchor housing : Hc neoAnchor ring : Vng neoAnchor shackle : Ma n neoAnchor shaft : Trc neoAnchor shank : Thn neoAnchor stock : Cn neo, thanh ngng ca neoAnchor, to : Neo, cm neo, th neoAnchorage : (S) neoAnchoring : (Vic) neoAnemometer : Dng c o sc gi, phong tc k, my o giAnemoscope : Kh c ch hng gi, phong nghimAngle : Gc, gc ; Thp gc

    Herical ~ : Gc xon~ of teeth : Gc rngHelix ~ : Gc xonPressure ~ of teeth : Gc p lc rngRake ~ : Gc nghing (ky tu)Pitch ~ : Gc bcRudder ~ : Gc b li

    Angle clip : Np sng hngAngle of bend : Gc unAngle of bending : Gc un congAngle of encounter : Gc gp, gc chpAngle of entrance : Gc vo nc (pha trc ng nc)Angle of flooding : Gc vo ncAngle of heel/ heeling angle : Gc nghingAngle of immersion : Gc nhng ncAngle of inclination : Gc nghingAngle of inclination indicator : My o gc nghingAngle of lag : Gc tr

  • Thut ng k thut ng kim v ng tu anh - vit

    12

    Angle of lead : Gc dn hngAngle of obliquity (of action) : Gc xinAngle of repose : Gc dng, gc nghAngle of roll : Gc chng chnh ngangAngle of trim : Gc chiAngle of twist : Gc xon/ vnAngle of vanish : Gc ln, gc (ca th n nh)Angle steel : Thp gcAngular acceleration : Gia tc gcAngular deflection : lch gcAngular velocity : Vn tc gcAnhydrous ammonia : Amnic khanAniline : Anilin (ha cht lm thuc nhum)Anneal, to : Annealed copper wire : Dy ng c Annealing : (S) Anniversary date : Ngy n nh kim tra hng nmAnnual survey : Kim tra hng nmAnnular construction : Kt cu vng/ khung knAnnular space : Khng gian hnh vngAnnular space around funnel : ng khi c tit din hnh vngAnnunciator : My bo hiu, dng c ch boAnnunciator lamp : n bo hiuAnode : A nt, cc dngAnode treated coating : Lp ph bo v dng ccAnodic protection : (S) bo v dng cc/ bo v a ntAntenna : ng tenAnti - corrosion device : Thit b chng n mnAnti - flotation arrangement : Thit b chng tri dtAnti - vulcanizing : Chng lu haAnti rolling system : H thng lm gim chng chnh (lc ngang)Anticorrosive treatment : (S) x l chng n mnAnticorrosive treatment : X l chng gAntidote : Thuc gii c

  • Thut ng k thuit ng kim v ng tu anh -vit

    13

    Antifreeze : Cht h thp im ng bng ca ncAntiknock compound : Hp cht chng kch nAntimony : ng ti moan (kim loi)Anti-slip : Chng trtAnvil : Ci eApart from : Ngoi raAperture : K hApparatus : My mc, thit bAppearance : V ngoi, mt ngoi, s xut hinAppearance : Hnh dng bn ngoiAppliance : Thit b, phng tin ; Closing ~ : Thit b ngApplicable provision : iu khon p dngApplication : Phm vi p dng, (s) p dng ; n yu cu, n xin, n nghApplication factor : Yu t p dngApplication for classification and survey : n ngh kim tra v phn cp tuApplication for examination : n ngh kim traApplication for issue of the convention certificate : n yu cu cp giy chngnhn theo cng cApplication for re-issue of the convention certificate : n yu cu cp li giychng nhn theo cng cApplication for rewriting of the convention certificate : n yu cu vit li giychng nhn theo cng cApplication for survey : n yu cu kim traApplied load : Ti trng c s dng, ti trng tc dngAppropriate : Thch hp, ph hpAppropriate arrangement : Trang b thch hp, b tr ph hpAppropriate loaded condition : iu kin ti trng thch hpAppropriately : Mt cch thch hp/ ph hpApproval : (S) duyt, xt duyt, chp nhn, cng nhnApproval number : S duytApproval test : (Cuc) th cng nhnApproval test of welding method : (Cuc) th cng nhn phng php hnApproval tests for welding procedure : Th cng nhn quy trnh hnApproved electrode : Que hn in c cng nhn

  • Thut ng k thut ng kim v ng tu anh - vit

    14

    Approved product : Sn phm c cng nhnApproved type : Kiu c cng nhnApproved working pressure : p sut lm vic c cng nhnApproved works : C s (sn xut)/ nh my c cng nhnApron : Tm chn, che, (tm g cong gn bn trong sng mi tu g)Arc : H quang, cungArc chute : ng trt hnh vng cungArc energy : Nng lng h quangArc welding : Hn h quangArcing : (S) pht h quangArcing contact piece : Mu tip xc h quang, ming ly la hn h quangArea : Din tch, min, vng, phm vi

    Developed ~ : Din tch khai trinContact ~ : Din tch tip xc

    Area of navigation : Vng hot ngArithmetic(al) mean : Gi tr trung bnh s hcArm : Cnh tay, nhnh cy, tay n

    Righting ~ : Tay n phc hiArm of bracket : Cnh lin kt ca mArm of dinamical stability : Cnh tay n n nh ngArm of statical stability : Cnh tay n n nh tnhArm of windage area : Tay n mt hng giArmature : Li st, ctArmature winding : Cun dy phn ng, cun dy r toArmour : o gip, v stArms of form stability : Cnh tay n n nh hnh dngArrange, to : Sp xp, b trArrangement : (S) sp xp, b tr, trang b, thit b, h thng

    ~ of foundation bolts : B tr bu lng b myIgnition ~ : Thit b nh laOverride ~ : Thit b xo b tc ng an tonDrainage ~ : Thit b x ncVenting ~ : H thng thng giBy pass ~ : Van ph, thit b ph

  • Thut ng k thuit ng kim v ng tu anh -vit

    15

    Locking ~ : Thit b khaPositive ~ : Thit b cng bcBrake ~ : Thit b hm/ chnOverride ~ : Thit b xa b tc ng an tonFuel oil filling ~ : Thit b np du tMooring ~ : Thit b chng buc

    Arrangement of crank : (S) b tr cc khuuArrangement of fitting for examination : B tr cc thit b kim traArrangement plan : Bn v b trArrangement plan of cable installation : Bn v b tr lp t cp inArrangement to resist panting : B tr chng va ( vng mi tu gy ra do hintng slamming)Arrangements of lashing and fixing : Trang b chng bucArrangements to resist panting : Gia cng chng vaArrest, to : Bt gi, ngngArrival condition : Trng thi cp bn, v bnArticulation : Ni bng khpAs a rule : Thng thngAs close thereto as practicable : Kn n mc c th c, gn n mc c th cAs fabricated condition : Nh iu kin c ch toAs far as applicable : n mc c th p dng cAs far as possible : n mc c th ucAs far as practicable : n chng mc c th thc hin c/ c th lm cAs necessary : Nu cn, khi cnAs rolled : Khi cn (thp)Asbestos - PVC : Nha/ cht do amingAsbestos : Aming, cht chng chy lm t amingAscend or descend, to : Ln (thng) hoc h xungAscending : (S) ln/ thng caoAscertain, to : Bit chc chn, xc minh, xc nhnAsh shoot : Mng nghing dn troASME (The American Society of Mechanical Engineers) : Hip hi k s c kh caMAsh-chute : Mng x tro

  • Thut ng k thut ng kim v ng tu anh - vit

    16

    Aspect ratio : H s hngAssemble : Lp rp, lp ghpAssembly : (S) lp rp

    Sectional ~ : Mt ct lp rpAssembly drawing : Bn v lp rp (my)Assigment to : (S) n nh, xc nhAssigning the freeboard : n nh mn khAssignment : (S) ch nh, phn cngAssignment of load lines : (S) nh ng ncAssistance : (S) tr gipAssociate requirement : Yu cu hp nhtAssociated installation : Thit b lin quan/ i kmAssume, to : Gi thit, cho rngAssumed failure : H hng gi nhAssumed ice pressure : p lc bng gi nhAssumed temperature : Nhit gi nhAssumption : (S) gi s, gi thitAstern gear : C cu (bnh rng) liAstern power : Cng sut chy liAstern shaft horsepower : Cng sut chy li trn trcAstern speed : Tc liAstern test : (Cuc) th chy liAstern turbine : Tua bin chy liAsymmetrical : Khng i xngAt an over-pressure : trng thi qu pAt anchor : ang neo, khi neoAt one's option : Theo la chn (ca ai)At random : Mt cch ngu nhinAt sea : Trn binAt the discretion : Theo , t la chnAt the discretion of the surveyor : Theo ca ng kim vinAt the rear : pha sauAthwardship section : Mt ct ngang thn tuAthwart direction : Hng ngang

  • Thut ng k thuit ng kim v ng tu anh -vit

    17

    Athwartship : Ngang qua tuAthwartship direction : Hng ngang tuAthwartship section : Mt ct ngang tuAthwartship section modulus : M un chng un mt ct ngang thn tuAthwartship shore connection : Ni ti b qua tuAtmosphere : Kh quynAtmospheric pressure : p sut kh quynAtmospheric temperature : Nhit kh quynAtomic powered ship : Tu nng lng nguyn tAttachment : (S) gn vo, vt gn voAttachment for insulation : C nh lp cch lyAttendance : (S) c mt, tham giaAttendant : Ngi phc v, ngi tham giaAttenuation : (S) suy gimAttenuator : (S) suy gim, cht pha longAudible : Nghe thy cAudible alarm : Bo ng bng m thanhAudible alarm device : Thit b bo ng bng m thanhAudible signal : Tn hiu m thanhAudible trouble signal : Tn hiu s c bng m thanhAustenite : stennitAustenitic steel : Thp stennitAuthority : C quan quyn lc, chnh quyn hnh chnhAuthorization : (S) y quynAuthorize, to : y quynAutomatic alarm system : H thng bo ng t ngAutomatic and remote control : iu khin t ng v t xaAutomatic arc welded pipe : ng c hn h quang t ngAutomatic charging device : Thit b np t ngAutomatic circuit breaker : Cu dao ngt mch t ng, b ngt mch t ngAutomatic closing control : iu khin ng kn t ngAutomatic combustion system : H thng iu khin chy t ngAutomatic control : iu khin t ngAutomatic control device : Thit b iu khin t ng

  • Thut ng k thut ng kim v ng tu anh - vit

    18

    Automatic control gear : C cu iu khin t ngAutomatic control system : H thng iu khin t ngAutomatic float type : Kiu ni t ngAutomatic float type reading level gauge : Thit b ch bo mc kiu ni t ngAutomatic non-return valve : Van mt chiu t ngAutomatic operation : Vn hnh t ng, thao tc t ngAutomatic radar plotting aid (ARPA) : Thit b t ng v biu s liu ra aAutomatic remote control system : H thng iu khin t ng t xaAutomatic shut-off of filling : (S) ngt t ng khi np yAutomatic sprinkler system : H thng phun nc t ngAutomatic starter : B khi ng t ngAutomatic steering : (S) li t ngAutomatic stopping device : Thit b dng t ngAutomatic stopping device at low pressure : Thit b dng t ng khi p sut thpAutomatic synchronizer : Thit b ha ng b ha t ngAutomatic temperature indicator : Thit b ch bo nhit t ngAutomatic temperature recorder : Thit b ghi nhit t ngAutomatic tripping : (S) vt t ngAutomatic type : Kiu t ngAutomatic valve : Van t ngAutomatic voltage regulator : My n p t ng, thit b iu chnh in p tngAutomatic welding : Hn t ngAutomatically : Mt cch t ngAutomatically controlled valve : Van iu khin t ngAutomation : S t ng haAutomobile carrier : Tu ch tAutomobile ferry : Ph ch tAutopassenger ferry : Ph ch t v khchAuto-pilot : Thit b li t ngAuto-steerer : Li t ngAutotransformer : Bin th t ngAuxiliaries : My ph, thit b phAuxiliary : Ph, ph tr

  • Thut ng k thuit ng kim v ng tu anh -vit

    19

    Auxiliary apparatus : Thit b ph, c cu phAuxiliary audible alarm system : H thng bo ng m thanh phAuxiliary boiler : Ni hi phAuxiliary bus bar : Thanh dn phAuxiliary circuit : Dng in phAuxiliary contact : Cng tc phAuxiliary engine : ng c/ my phAuxiliary machinery : My phAuxiliary machinery seat : B my phAuxiliary machinery seat : B my phAuxiliary ship : Tu ph trAuxiliary steering gear : Thit b li ph, my li phAuxiliary tank : Kt phAvailable : C snAverage : S trung bnh, lng trung bnh, trung bnhAverage absorbed energy : Nng lng hp th trung bnhAverage maximum demand : Lnh cc i trung bnhAverage value : Tr s trung bnhAverage water level : Mc nc trung bnhAWS (The American Welding Society) : Hip hi hn ca MAxial compressive stress : ng sut nn dc trcAxial direction : Hng dc trcAxial force : Lc dc trcAxis : ng tm trc, ng tmAxis : Trc

    Major ~ : Trc diMinor ~ : Trc ngnVertical ~ : Trc thng ng

    Axis of rotation : ng tm quay, trc quayAxle : Trc, trc quayAxle weight : Ti trng trc

  • Thut ng k thut ng kim v ng tu anh - vit

    20

    B class division : Khu vc kt cu (chng chy) cp BB class panel : Tm (chng chy) cp BB/O (Bulk/oil) carrier : Tu hng ri/du (tu B/O)B/O carrier : Tu ch x qungBack chipping : o mt sau, ty mt sau

    Back connection : Ni ngcBack connection type : Kiu ni ngcBack flow : Dng ngcBack plate : Tm (sau), tm chnBack pressure : p sut ngc, p sut mt sau, p sut phn hiBack side : Mt sau, pha sauBack up navigator : Tr l hng hiBackfire arrester : B hm nh la ngc, tm chn la lan ngcBacking ring : m vngBacking strip : m tmBacklash : Khe h (bnh rng)Back-up (circuit) breaker : B ngt mch d phngBack-up : D phng, d tr, (s) h trBack-up welding : Hn pBackward : Lc hu, ngc liBackward motion : Chuyn ng ngcBad smell : Mi kh chuBafflet : Ca ngnBalance : (S) cn bngBalance weight : i trngBalanced girder : Dm i trng, dm cn bngBalanced load : Ti trng cn bngBalanced rudder : Bnh li cn bngBalancer : Thit b cn bng/ b cn bngBalancing test : (Cuc) th cn bngBale cargo : Hng bao giBall bearing : cu, biBall joint : Mi ni cu, khp cuBallast : Dn

  • Thut ng k thuit ng kim v ng tu anh -vit

    21

    Ballast coil : Cun dy n ngBallast compartment : Khoang dnBallast displacement : Lng chim nc trng thi dnBallast lamp : n ngBallast piping : ng ng nc dnBallast piping system : H thng ng ng dnBallast pump : Bm dnBallast space : Khoang dnBallast system : H thng dnBallast tank : Kt dnBallast tube : ng dnBallast water line (BWL) : ng nc dnBallast water tank : Kt/ khoang nc dnBallast waterline : ng nc chy dnBallasted condition : Trng thi/ iu kin dnBallasted voyage : Chy dn, chy balatBallasting : (S) dnBalsa : G nh vng nhit i Nam M (dng lm m hnh)Band : Di

    Scatter ~ : Di phn tnBand brake : Phanh aiBand steel : Thp l, thp diBar stem : Sng mi dng thanh (tit din ch nht hoc trn)Bar thermometer : Nhit k dng thanhBarber shop : Ca hiu ct tcBarcol's hardness : cng BarcolBare conductor : Dy dn khng bcBare live-part : Phn khng bc c dng in chy qua, b phn trn mang inBarge : S lanBarge loading dredger : Tu quc kiu s lan, tu quc c khoang cha tBarges : S lan

    Steel~ : S lan thpUnmanned~ : S lan khng c ngi iu khinSpecial purpose ~ : S lan chuyn dng

  • Thut ng k thut ng kim v ng tu anh - vit

    22

    Barge-type drilling unit : Phng tin khoan kiu s lanBarometer : Kh p k, phong v biuBarred speed range : Vng tc cm/ vng tc cng hngBarrier : Lp chn, hng ro chnBase : C s, nn, , yBase freeboard : Mn kh c sBase line : ng chun, ng c s, ng c bnBase load : Ti trng chun, ti trng c sBase metal : Kim loi gc, kim loi c bn, kim loi c sBase plate : Tm b, taBase structure : Kt cu c bnBasic design : Thit k c sBasic line : ng c bn, ng chunBasic oxygen converter : B bin i xi c bnBasic property : Tnh cht c bnBasic requirement : Yu cu c bnBasic steel : Thp BazBasis : C s, nn tngBasket weave armour : V thp bc kiu li, v bc li thpBatch test : (Cuc) th theo l/ m sn phmBath room : Bung tmBatten : Vn lt, vn pBattery : c quiBattery capacity : Dung lng c quiBattery room : Bung c quiBattery tray : Khay c quiBattery voltage : in p c quiBeacon light : nh n hiu, nh n mcBeam : Dm, x, tia sngBeam : X boong

    Longitudinal~ : X dc boongTransverse ~ : X ngang boongHatch end~ : X ngang u ming khoang

    Beam bracket : M x

  • Thut ng k thuit ng kim v ng tu anh -vit

    23

    Beam knee : Ke x, khuu xBeam sea : Chm tiaBeam shelf : Thanh u xBearing : , trc, gc phng v

    Connecting rod ~ : thanh truyn/ thanh truyn bottomEnd ~ : u di/ bc lt diTop end ~ : u trn/ bc lt trnBall ~ : biRoller ~ : aMain ~ : trc chnhMain thrust ~ : chn chnhRoller thrust ~ : chnShaft bracket ~ : trc trong gi Stern tube ~ : trong ng bao trcThrust ~ : chnWater-lubricated ~ : c bi trn bng ncOil-lubricated ~ : c bi trn bng du

    Bearing lining : ng lt trcBearing material : Vt liu trcBearing part : Phn Bearing pressure : p lc trn Bearing surface : B mt Bearing wear down : mi mn ca ( sp pali)Beat frequency : Tn s va chm, tn s mch pBedplate : myBedplate : Tm mt (b my), Bell : ChungBellmounting : Loe, dng ming chungBell-mouth : Ming chungBellow : ng xp, ng qut (thng gi)Belt : ai, bng, di, bng chuynBelt drive : (S) truyn ng bng ai, (s) dn ng bng aiBelt pulley : Bnh ai

  • Thut ng k thut ng kim v ng tu anh - vit

    24

    Bench vice : t bnBend : Ch un, khuu ng niBend test : Th unBending : un cong, (s) unBending deformation : Bin dng unBending moment : M men unBending moment curve : Biu m men unBending rigidity : cng chng unBending strength : bn/ sc bn unBending stress : ng sut unBending test : (Cuc) th unBending test specimen : Mu th unBent pipe : ng b unBessemer steel : Thp (luyn bng l) BesmeBetween poles : Gia cc ccBetween positive and negative poles : Gia cc dng v cc mBevel gear : Bnh rng nn, bnh rng cnBevelling : (S) ct vt, (s) xn vtBiennial survey : Kim tra 2 nm 1 lnBilge : Hng/ rnh hng ; Nc y tuBilge block : k hng, phn on hngBilge ceiling : Vn lt hng (trong khoang hng ca tu)Bilge diagram : S ng ht nc y tuBilge discharge system : H thng x nc y tuBilge distribution chest : Hp van phn phi nc y tuBilge drainage : (S) x nc y tuBilge filter : B lc nc y tuBilge hat : Np hngBilge hopper : Hng tuBilge hopper tank : Kt hngBilge keel : Vy gim lcBilge longitudinal : Dm dc hngBilge longitudinal frame : Dm dc hng

  • Thut ng k thuit ng kim v ng tu anh -vit

    25

    Bilge pipe : ng ht kh, ng dn nc y tuBilge piping : ng ng ht khBilge piping system : H thng ng ht kh, h thng ng dn nc y tuBilge pump : Bm nc y tuBilge strake : Di tn hngBilge suction pipe : ng ht nc y tuBilge suction piping : ng ng ht nc y tuBilge suction port : L ht nc y tuBilge suction pump : Bm ht nc y tuBilge suction well : H t nc y tuBilge water : Nc y tuBilge water arrangement : Thit b nc y tuBilge water holding tank : Kt gi nc y tuBilge way : ng dn nc y tuBilge well : H t nc y tu/ h t nc la canhBilged compartment : Khoang cha nc y tuBillet : PhiBilobe : (Dng) hai vng lng vo nhau, Dng hai vng khuyn lng vo nhau (Tukh ha lng)Bimetal : Lng kimBinder : u ni dy, thanh ging, cht lin ktBinding agent : Cht gn, cht dnh ktBinding wire : Dy buc, dy chngBioaccumulation : (S) tch t, (s) cht ng sinh hcBitt : Ct bchBituminous : (Thuc) bitum, nha ngBlade : Cnh (chn vt), li dao, tm, bn

    Highlyskewed propeller ~ : Cnh chn vt c nghing lnMoving ~ : Cnh di ngStationary ~ : Cnh c nh

    Blade tip : Mt cnh, nh cnhBlank flange : Bch rngBlank flanged : c ni bng bch rngBlank space : Khong trng, khong cha in ch

  • Thut ng k thut ng kim v ng tu anh - vit

    26

    Blanking cover : Np kha, np ngBleeding : (S) chy mu, (s) tho, (s) xBlend, to : Trn, phi liuBlending procedure : Qui trnh trnBlending proportion : T l pha trnBlending quantity : Lng pha trnBlind cover : Np chnBlind flange : Bch chn (bch tt)Blind sector : Gc khutBlister steel : Thp xmentit d hnBlock : Khi, con ln/ puli, phn tng on (thn tu)

    Michell type thrust ~ : chn kiu MichelThrust ~ : chn

    Block coefficient : H s bo th tchBlock dimension : Kch thc ch yu ln nhtBlockage : (S) chn, (s) khaBlocked up : B chnBloom : Thp cn thBlow of seas : Gi binBlow off system : H thng xBlow off valve : Van xBlower : My qut gi, qut giBlower impeller : Cnh qutBlowhole : Bt kh, r kh, l kh (khuyt tt hn)Blowing-out characteristics : c tnh si khun (sau khi rt kim loi chy)Blowoff : (S) x (kh), (s) tho (nc)Blowoff capacity : Sn lng xBlowoff cock : Vi xBlowoff condition : Trng thi xBlowoff pipe : ng xBlowoff piping : ng ng xBlowoff pressure : p sut xBlowoff quantity : Lng x

  • Thut ng k thuit ng kim v ng tu anh -vit

    27

    Blowoff test : Th xBlowoff valve : Van xBlowout : (S) thng (xm, lp), (s) phun (kh)Blowout capacity : Sn lng phunBlowout cock : Vi phunBlowout condition : Trng thi phunBlowout pipe : ng phunBlowout piping : ng ng phunBlowout pressure : p sut phunBlowout preventer : Thit b bo him phunBlowout test : Th phunBlowout valve : Van phunBlunt bow : Mi tBoard : Bn, tm vn, banBoat chock : Gi gi () xungBoat davit : Cu xungBoat deck : Boong xung (cu sinh)Boat hook : Mc xungBoat (handling) gear : Thit b (nng) xungBoat test : (Cuc) th xungBoatswain's store : Kho thy th trngBob (weight) : Qu diBody : Vt th, thn th, ct, khungBody of revolution : Thn quayBody plan : Bn v ng snBody portion : Phn thn (tu)Boiler : Ni hi

    Steam ~ : Ni hi ncHot water ~ : Ni nc nngEssential auxiliary ~ : Ni hi ph thit yuExhausted gas ~ : Ni hi kh xForced circulation ~ : Ni hi tun hon cng bcOnce-through ~ : Ni hi dng thngSmall size ~ : Ni hi c nh

  • Thut ng k thut ng kim v ng tu anh - vit

    28

    Water tube ~ : Ni hi ng ncBoiler (room) opening : L quan st (bung) ni hiBoiler : Ni hiBoiler bearer : Ct chng ni hi, gi ni hiBoiler blower : Qut ni hiBoiler burner : L t ni hiBoiler casing : V ni hiBoiler drum : Tang trng ni hiBoiler fittings : Ph tng ni hiBoiler foundation : B ni hiBoiler front : Mt trc ni hiBoiler mountings : B ni hi, (s) lp t ni hi, cc thit b ca ni hiBoiler plate : Tn ni hiBoiler room : Bung ni hiBoiler seating : Mt ni hiBoiler shell : V ni hiBoiler space : Khng gian ni hiBoiler steel : Thp ni hiBoiler stool : ni hi, tm y ni hiBoiler survey : Kim tra ni hiBoiler test : Th ni hiBoiler trial : Chy th ni hiBoiler tube : ng ni hiBoiler water : Nc ni hiBoiler water circulating pump : Bm tun hon nc ni hiBoiler water take-off valve : Van tho nc ni hiBoiler water tester : Thit b th nc ni hiBoiling point : im siBoil-off gas : Kh bay hiBoil-off vapour : Hi thot raBollard : Tr neo tu, bch, ct bchBolt : Bu lng

    Foundation ~ : Bu lng b myBlade fixing ~ : Bu lng c nh cnh chn vt

  • Thut ng k thuit ng kim v ng tu anh -vit

    29

    Bolt head : u bu lngBolt hole : L bu lngBolt point : Mi nhn vt cyBolted blank flange : Mt bch bt bu lngBolted bonnet : M bu lngBolted joint : Mi ni bng bu lngBond : (S) lin kt, (s) niBond, to : Lin kt, niBonded connection : Mi lin kt, mi niBonding (cohesive strength) : Gn, lin kt ; Tnh lin kt ( bn kt dnh)Bonnet : Np, m chpBoom : Ct cn cu, tm vi (cn cu) ; Hng ro ni ngn du trn ; Thn cn cudy gingBoot topping paint : Sn ph v bcBore : (S) khoan, (s) khot, (s) t thng, l khoan ; ng knh lBore of suction pipe : ng knh trong ca ng htBoss : C, may , vu, g li

    Propeller ~ : C chn vt, may chn vtBoss of propeller post : Thnh tr chn vt ( sng ui)Boss part : Phn may , phn g liBoss plate : Tn lm may Boss portion : Phn cBossing : C (chn vt, sng ui)Botom discharge dredger : Tu quc t qua y tuBottle : Bnh/ chai

    Air ~ : Bnh kh nnBottom shell plating : Tn bao yBottom : y (tu)

    Combustion chamber ~ : y bung tDouble ~ : y i (trong) ca tuFlat ~ : y bngSingle ~ : y nSingle ~ vessel : Tu mt y

    Bottom aperture : L khot y

  • Thut ng k thut ng kim v ng tu anh - vit

    30

    Bottom ceiling : Vn lt y, vn snBottom construction : Kt cu yBottom corner : Gc diBottom corner fitting : (S) lp gc yBottom gudgeon : Cht di bnh liBottom land : Vng yBottom lifting : (S) nng yBottom longitudinal : Dm dc yBottom longitudinal frame : Sn/ dm dc yBottom mat : Tm lt yBottom member : C cu yBottom of longitudinal framing : y kt cu theo h thng dcBottom of thread : y ca ng renBottom of transverse framing : y kt cu theo h thng ngangBottom outside planking : Vn y ngoiBottom paint : Sn yBottom pintle : Cht y (ca bnh li)Bottom plate : Tm tn yBottom plating : Tn yBottom plug : Nt yBottom shell laminate (FRP ship) : (S) dt/ lp tm bao y (tu FRP)Bottom shell plating (steel ship) : Tn bao y (tu v thp)Bottom survey : Kim tra y tuBottom transverse (girder) : Khung (sng) ngang y, ngang yBottom-end bearing : B cui yBoundary : ng bin/ vnh Boundary bulkhead : Vch binBoundary condition : iu kin binBoundary penatrated : Thm qua binBoundary wall : Vch/ tng bao quanhBounded, to be : B gii hnBow : Mi tu, cung, vmBow door : Ca miBow draught : Mn nc mi, chiu chm mi

  • Thut ng k thuit ng kim v ng tu anh -vit

    31

    Bow form : Dng mi tuBow loading and unloading arrangement : Thit b bc xp hng miBow rudder : Bnh li miBow sona : My nh v thy m miBow thruster : Chn vt miBower anchor : Neo miBox : Hp

    Valve ~ : Hp vanBilge distribution ~ : Hp van phn phi nc y tuMud ~ : Hp x cnRose ~ : Hp li lcGastight stuffing ~ : Hp kn kh

    Box spanner : Cha vn hp, c l vn hpBox storing fire hoses : Vi rng cu ha cha trong hpBracing : (S) gia c, (s) lin kt, thanh chng, thanh gingBracket : M, gi trc (chn vt)Bracket at lower end : M u diBracket with curved free edge : M c mp t do congBracking : (S) hm, (s) phanhBraid : Dy ttBrake : PhanhBHP (Brake horse power) : M lc phanh, m lc hmBrake mean effective pressure : p sut hu hiu trung bnh ca phanhBrake test : (Cuc) th phanhBranch bilge suction pipe : ng nhnh ht nc y tuBranch circuit : S nhnhBranch connection box : Hp van ni nhnhBranch line : ng nhnhBranch pipe : ng nhnhBrand : Nhn, mcBrass : ng thauBrass bar : Thanh ng thauBrass pipe : ng ng thauBrass seamless pipe : ng ng thau lin, ng ng thau trn

  • Thut ng k thut ng kim v ng tu anh - vit

    32

    Brazing : (S) hn (bng) ngBreadth : Chiu rng, b rngBreadth extreme : Mp ngoi cng ca chiu rngBreadth for freeboard : Chiu rng ( tnh) mn khBreadth of ship : Chiu rng tuBreak down, to : Ph hyBreak of superstructure : Gy thng tngBreak, to : Lm t, lm gyBreakage : (S) gy, (s) hngBreakdown : (S) ph hyBreaking capacity : Kh nng ngt mch, kh nng ko tBreaking current : Dng in ngt mchBreaking current capacity : Dung lng dng in ngt mchBreaking load : Ti trng ko tBreaking speed : Tc (th) ko tBreaking test : Th ko tBreaking test load : Ti trng th ko tBreaking time : Thi gian (th ko) t, thi gian ngt mchBreast hook : Mc mi tuBreather valve : Van x khBreathing apparatus : Thit b th, thit b thng hiBreathing gas system : H thng dng sinhBridge : Bung li ; Cu dn tu duBridge gauge : Thit b bung liBridge house : Lu liBridge wing : Cnh g lu liBright line : Vch sngBrightness control : Kim tra bngBrine : Nc bin, nc mnBrine circulating pump : Bm tun hon nc binBrine cooler : Sinh hn nc binBrine pipe : ng dn nc binBrine pump : Bm nc binBrine side : Pha nc mui

  • Thut ng k thuit ng kim v ng tu anh -vit

    33

    Brine tank : Kt nc binBrine-cooling : Lm lnh bng nc binBrinell hardness : cng BrinenBrittle fracture : (S) gy ginBrittle material : Vt liu ginBrittleness : Tnh gin, ginBroadest part : Phn rng nhtBroadest part of hull : Phn rng nht ca thn tuBromide : BrmuaBronze : ng Brush : Chi in, bn chi, bt lngBrush holder : Gi chi inBrushes : Chi than ; Brush holder : Gi chi thanBubble : Bt kh, bt (x phng)Bubble tube type : Kiu ng bt khBucket : X, thng, guBucket cylinder : Xi lanh hnh thngBuckling : (S) cong vnh, (s) on, (s) mt bn n nhBuckling strength : bn n nhBuckling stress : ng sut mt n nhBuffer : Thit b/ b gim chn, gim rung, b gim m

    Spring ~ : B gim chn kiu l xoBuffer : B gim chnBuffer force : Lc gim chnBuilding contract : Hp ng ng tuBuilt up type : Kiu tho lp cBuilt-up crank shaft : Trc khuu ghpBuilt-up frame : Sn ghpBuilt-up pillar : Tr/ ct ghpBuilt-up propeller : Chn vt ghpBuilt-up type frame : Sn ghpBulb angle steel : Thp gc c m (Vit tt l BA)Bulb plate : Tm (thp) mBulbous bow : Mi qu l

  • Thut ng k thut ng kim v ng tu anh - vit

    34

    Bulk (in bulk) : Hng x/ hng ri (ch x/ ch hng ri), hng ha khng ng giBulk cargo : Hng ch x, hng ri, hng khng ng baoBulk cargo : Hng riBulk carrier : Tu ch x, tu ch hng riBulk or ore carrier : Tu ch x hoc ch qungBulkhead : Vch ngn, vch

    Pump room ~ : Vch bung bmBulkhead at end of superstructure : Vch mt thng tngBulkhead bounding a machinery space : Vch bao quanh bung myBulkhead corrugation : Hnh dng gn sng ca vch

    Corrugated bulkhead : Vch c ln sngFluted bulkhead : Vch c sng dpLongitudinal bulkhead : Vch dcFire resisting bulkhead : Vch chng chyMain bulkhead : Vch ngn chnhOiltight bulkhead : Vch kn duPartial bulkhead : Vch ngn b phnStuffing box bulkhead : Vch pha ui m hm trc khi sa chaSwash bulkhead : Vch chng sng snh (khi ch cht lng)Watertight bulkhead : Vch kn nc (vit tt WT)

    Bulkhead deck : Boong vchBulkhead door : Ca qua vchBulkhead girder : Sng vchBulkhead lamp : n (gn trn) vchBulkhead member : C cu vchBulkhead plate : Tm tn vchBulkhead plating : Tn vchBulkhead recess : Hm/ hc vchBulkhead step : Bc vchBulkhead stiffener : Np vchBulkhead valve : Van (t trn) vchBulky cargo : Hng ri, hng khng ng baoBulwark : Mn chn sngBulwark rail : Lan can mn chn sng

  • Thut ng k thuit ng kim v ng tu anh -vit

    35

    Bunch : B, tm, nmBunch together, to : B vi nhauBundle : B, chmBunker : Hm cha nhin liuBunker scuttle : L khot kt nhin liuBunsen burner : n BunsenBuoy tender : Tu lin lc gia cc phaoBuoyancy : Tnh ni, sc ni, lc nng

    Abscissa of centre ~ : Honh tm niBuoyancy curve : ng cong tnh ni

    Center of ~ : Tm ni, ng cong phn b lc ni (khi tnh sc bn)Buoyancy tank : Kt d tr tnh niBuoyant : Thuc tnh ni, thuc sc niBuoyant smoke signal : Tn hiu khi ni cBurner : M hn, m t, n xBurning property : Tnh cht t c, c tnh t cBurning system : H thng t nhin liuBurnt steel : Thp nung qu laBurst test : Th tng t ngt, th nBursting : (S) nBursting pressure : p sut nBurton system : H thng ph hyBurtoning : (S) ph hyBus (bar) : Thanh gp, thanh dnBush : Bc, ng ltBush bearing : trtBushing : ng lt, bc ltButt : (S) ni gip mp/ u uButt joint : Mi ni gip mp/ u uButt joint welded from both sides : Mi hn gip mp hai phaButt welded joint : Mi hn i u/ gip mpButt welding : Hn gip mp/ u uButterworth hatch : Ming khoang c h thng ButterworthButterworth pipe : ng ca h thng (ra khoang) Butterworth

  • Thut ng k thut ng kim v ng tu anh - vit

    36

    By-pass; by-path : Van trn, ng vng, rnh vng

    Cabin : Ca bin, bung liCable : Cp in, dy dn inCable clip : Kp cpCable duct : ng dn cpCable entry : u vo cp

    Cable holdfast : Mc ni xch neo, ci kp cp, thit b gi cp, kp gi cpCable layer : Tu t cpCable laying : (S) t dy cpCable splicing : Ni cpCable stopper : Mc chn cpCable tray : Mng cpCadmium copper : ng ct i miCage : Hp vanCage-rotor motor : ng c cm ng r to lng scCaisson : Hp kn nc ln (ngi ta nh chm v dng khi thi cng di nc)Calculating method : Phng php tnhCalculation : (S) Tnh ton

    ~ sheet : Bn tnhStrength ~ : Tnh ton bn

    Calculation sheet : Bn tnhCalibrate, to : Hiu chnhCalibrate, to : nh c, chia ; Hiu chnh, kim chunCalibration : (S) nh c, chia ; (S) hiu chnh, kim chun, hiu chun

    Span ~ : Khong thang chiaCalibration curve : ng cong hiu chnhCalibration of thermometer : Hiu chun nhit kCalibre : C, ca lpCalico : Vi th

  • Thut ng k thuit ng kim v ng tu anh -vit

    37

    Call point : Nt bo ngCamber : cong ngang (ca boong)Camber of weather deck : cong ngang boong ca boong thi titCamphor oil : Du long noCamshaft : Trc camCamshaft drive : Dn ng trc camCamshaft driving gear : C cu/ bnh rng dn ng trc camCancel, to : Hy, bCancellation : (S) hy, (s) bCandela : Caela (n v o sng)Cant : (S) nghing, nghingCant frame : Sn nghing, sn quayCantilever (beam) : Cng son, dm chaCantilever beam : X ngang cng sonCantilever tank : Kt cng sonCantilever type : Kiu cng sonCap : Mm, chp, np, chp, m ( cu), ui (n)

    Bearing ~ : Np Propeller ~ : cu u chn vtScrew ~ : Np chp c ren

    Capability : Cng sutCapable : C kh nngCapacitor : T inCapacity : Cng sut, dung tch, lu lng, dung lng (in), th tch, sc cha,sc nng

    ~ of tank : Dung tch ca ktDischarge ~ : Kh nng/ lu lng x

    Capacity of evaboration : Sn lng bay hiCapacity test : (Cuc) th sc cha/ nngCapped : y bng np chp, c np yCapsize, to : Lt, lt pCapsizing moment : M men ltCapstan : Ti, ti dngCaptain : Thuyn trng, i trng

  • Thut ng k thut ng kim v ng tu anh - vit

    38

    Captive : Gn giCar and passenger ferry : Ph ch t v khchCar deck : Boong ch tCar ferry : Ph ch tCarbolic oil : Du cacbonicCarbon : Cc bon, thanCarbon content : Hm lng cc bonCarbon dioxide : i xt cc bonCarbon dioxide extinguisher : Bnh cha chy i xt cc bonCarbon dioxide system : H thng CO2Carbon disulphide : i sun phua cc bonCarbon equivalent : ng lng cc bonCarbon molybdenum steel pipe : ng thp mlipen cc bonCarbon steel : Thp cc bonCarbon steel forging : Vt rn thp cc bonCarbon steel pipe : ng thp cc bonCarbon tetrachloride : Tetraclorua cc bonCarbonic acid gas : Hi a xt cc bon ncCarbon-manganese steel : Thp mangan cc bonCarburet(t)er; carburet(t)or : B ch ha khCargo : Hng

    ~ Handling : Thit b lm hng~ loading : D hng~ maintenance : Bo qun hng ha~ oil : Du hng~ space : Khoang hng, hm hngBale ~ : Hng bao, kinGeneral ~ : Hng tng hp

    General ~ : Hng bch haCargo area : Khu vc hng haCargo batten : Vn lt hngCargo block : Khi hng ; Rng rc nng hng, puli nng hngCargo carrying receptacle : Bnh cha hngCargo compressor : My nn (kh) hng (tu ch kh ha lng)

  • Thut ng k thuit ng kim v ng tu anh -vit

    39

    Cargo compressor room : Bung my nn hngCargo control room : Bung iu khin/ kim sot (lm) hngCargo control station : Trm iu khin/ kim sot (lm) hngCargo deck : Boong ch hngCargo derrick : Cn cu hng, cn trc dy ging, ti lm hngCargo fall : (S) ri hngCargo filling-up limit : Gii hn np y hngCargo gear : Thit b bc xp hng, thit b lm hmg, thit b nng hngCargo grating : Li lt hngCargo handling : Nng hng, lm hngCargo handling apparatus : Thit b nng hng, thit b lm hngCargo handling arrangement : Trang b nng hng, thit b lm hngCargo handling facilities : Phng tin nng hng, phng tin lm hngCargo handling machinery and gear : My v thit b nng hng, my v thit blm hngCargo handling operation : Hot ng/ thao tc nng hng, hot ng lm hngCargo handling system : H thng chuyn hng (tu kh ha lng, tu ha cht nguyhim)Cargo hatchway : Ming khoang hngCargo hold : Hm hng, khoang hngCargo hold hatch : Ming khoang hngCargo hook : Mc cu hngCargo hose : ng mm dn hngCargo hose connection : u ni ng mm dn hngCargo housing arragements : Trang b xp hng, trang b lm hngCargo intended to be loaded : Hng d nh nhn (ln tu)Cargo lamp : n lm hngCargo length area : Khu vc xp hng haCargo lift : My nng hngCargo loading station : Trm nhn hngCargo oil handling system : H thng (bm) chuyn du hngCargo oil hose : ng mm dn du hngCargo oil pipe : ng (dn) du hngCargo oil piping system : H thng ng du hng

  • Thut ng k thut ng kim v ng tu anh - vit

    40

    Cargo oil pump : Bm du hngCargo oil pump room : Bung bm du hngCargo oil pumping system : H thng ng bm du hngCargo oil suction pipe : ng ht du hngCargo oil tank : Kt du hngCargo oil tank outlet : u ra ca kt du hngCargo oil vapour outlet pipe : ng hi du hng raCargo plan : S xp hngCargo port : Ca hng ha, ca xp hngCargo ramps : Cu xeCargo record book : S nht k lm hngCargo refrigerating installations : H thng lm lnh hngCargo service space : Khoang cha hngCargo ship : Tu hngCargo Ship Safety Construction Certificate : Giy chng nhn an ton kt cu tuhngCargo Ship Safety Equipment Certificate : Giy chng nhn an ton trang thit btu hngCargo Ship Safety Radiotelegraphy Certificate : Giy chng nhn an ton VT botu hngCargo Ship Safety Radiotelephony Certificate : Giy chng nhn an ton VT thoitu hngCargo space : Khoang hngCargo storage plan : S cha hngCargo tank : Kt hng/ khoang hngCargo tank area : Khu vc kt hngCargo tank space : Khng gian kt hngCargo tank support : Gi kt hngCargo unloading system : H thng d hngCargo vapour detection : Pht hin hi hngCargo vapour : Hi hngCargo weight : Trng lng hngCargo winch : Ti lm hng, ti nng hngCargo wing tank : Kt hng hng tu/ kt hng cnh

  • Thut ng k thuit ng kim v ng tu anh -vit

    41

    Carling : Thanh gia cng (t c cu ny sang c cu kia)Carriage : (S) chuyn chCarriage in bulk : (S) ch x, ch hng riCarrier : Tu vn tiCarrier frequency : Tn s (sng) mangCarry, to : Ch

    ~ liquified gas : Ch kh ha lng~ dangerous chemical in bulk : Ch x ha cht nguy him

    Carry current, to : Mang in, dn inCarry in bulk, to : Ch xCarry out, to : Tin hnh, thc hinCarrying condition : iu kin chuyn chCartridge : ui (n), mm cpCartridge fuse : Cu ch kn, cu ch ngCartridge terminal : im cui mm cpCase hardening steel : Thp thm cc bonCase of machinery space : Thnh quy bung myCasing : V, lp p ; Vch quy/ vch lng/ vch hCast : Khun c, vt cCast iron : Gang, gang c

    Nodular graphite ~ : Gang grapht cuCast number : S hiu cCast steel : Thp cCast steel chain : Xch lm bng thp cCast steel element : Thnh phn thp cCast steel stern frame : Sng ui (tu) bng thp cCasting : (S) c, vt cCasting steel : Thp cCasting surface : B mt vt cCasualty : S c, tai nnCat head : L lun dyCatalysis : S xc tcCatalyst : Cht xc tcCatamaran : Tu 2 thn

  • Thut ng k thut ng kim v ng tu anh - vit

    42

    Catalytic combustion process : Qu trnh chy c xc tcCatalyzer : Cht xc tcCatastrophic failure : (S) ph v, h hngCategory : LoiCathode : Ca tt, cc mCathode-ray tube : ng tia m ccCathodic protection : Bo v ca ttCathodic protection device : Thit b bo v ca ttCats test speciment : Mu th cCaulk : Xm (bt kn k h tu g)Caulking : Xm (tu, thuyn)Caulking material : Vt liu lm knCaulking material : Vt liu xmCause : Nguyn nhn, (s) gy nn

    ~ fire : Gy ra chy/ gy ra ha honCause of ignition : Nguyn nhn chyCause, to : Gy raCaustic potash : Ptt n daCaustic soda : Xt n daCavitation : S to thnh l hng/ khe ntCavity : Hc, khe ntCedar : G tuyt tngCeil, to : Lm trn, chm trnCeiling : Vn lt trn/ snCeiling lamp : n trnCell - divide, to : Phn chia t bo, phn chia theo Cell content : Dung lng c quiCell structure : Cu trc t boCement : Xi mngCement chock : k bng xi mng, hp xi mngCement steel : Thp chu xi mngCement work : (Cng vic) gn xi mngCementing : Lng xi mngCenter of gravity : Trng tm tu

  • Thut ng k thuit ng kim v ng tu anh -vit

    43

    Center tank : Kt gia/ trung tmCentering : (S) nh tmCentr(e)ing : nh tmCentral fire alarm system : H thng bo (ng) chy trung tmCentral fire detecting system : H thng pht hin chy trung tmCentral gap : Khe h giaCentral ladder dredger : Tu cuc c khung gu chnh gia tuCentralize, to : Tp trung haCentralized control : Kim sot tp trungCentralized workstation : Trm lm vic tp trungCentre (line) keelson : Sng chnh yCentre distance : Khong cch tmCentre girder : Sng chnh y (y i)Centre girder (web) plate : Tm (thnh) sng chnh/ sng giaCentre girder : Sng chnh, sng giaCentre keelson : Sng chnh y (y n)Centre line : ng tmCentre line bottom girder : Sng chnh yCentre line bulkhead : Vch (dc) giaCentre line of hull : ng tm thn tuCentre of buoyancy : Tm niCentre of gravity : Trng tmCentre tank : Kt giaCentre : Tm, trung tmCentrifugal : Li tmCentrifugal pump : Bm li tmCertificate : Giy chng nhnCertificate for Approval for Special Voyage : Giy chng nhn ph chun chuyn ic bitCertificate for Refrigerating Installation : Giy chng nhn thit b lm lnhCertificate of Classification : Giy chng nhn phn cpCertificate of Test and Examination of Cargo Handling Machinery and Gear : Giychng nhn th v kim tra thit b nng hngCertified copy : Bn sao c chng nhn

  • Thut ng k thut ng kim v ng tu anh - vit

    44

    Certify, to : Chng nhnChafing : C xtChain : XchChain bar (steel) : Thp thanh trn lm xchChain cable : Dy xch, xch (neo)Chain cable compressor : C cu p (mt) dy xchChain cable controller : B kim sot (xp) dy xchChain case : Hp xchChain dredger : Tu quc c nhiu gu vn chuyn kiu xchChain drive : C cu dn xchChain for camshaft drive : Xch dn ng trc camChain link : Mt xchChain locker : Hm xchChain pipe : ng dn xchChain plate : Tm xchChain plate eye : L lun ca tm xchChain stopper : Hm xchChamfer, to : Vt cnh, vt gc, xoi rnhChange : (S) thay iChange of displacement per each cm immersion : S thay i lng chim nctrn 1 cm chiu chmChange-over : Chuyn qua, chuyn iChange-over arrangement : C cu chuyn quaChangeover facility : Thit b chuyn iChange-over switch : Chuyn mchChange-over test : Th chuyn mchChange-over valve : Van chuynChanging-over of field polarity : Chuyn qua trng phn cc, thay i cc ttrngChannel (bar) : Thanh (tit din) ch u/ lng mngChapter : ChngCharacteristic : Thuc c tnhCharacteristic curve : ng cong c tnhCharacteristic test : (Cuc) th c tnh

  • Thut ng k thuit ng kim v ng tu anh -vit

    45

    Character of classification : K hiu phn cpCharge : Ph ti, s np, phCharge, to : Np in, np liuCharge and discharge board : Bng ghi lng np v phngCharge board : Bng ghi lng npCharge number : S lng npCharge ratio : T s npCharge ratio by weight : T s np theo trng lng, b phn c np inCharged part with electricity : Phn np bng inCharged : c np, b thu (ph)Charging : (S) np in c quy, (s) cht tiCharging air : Khng kh npCharging current : Dng in npCharging device : Thit b npCharging facilities : Phng tin npCharging voltage : in p npCharpy : My th dai va p (Charpy)Charpy impact test : Th dai va p (Chapy)Chart display system : H thng biu th hi Chart room : Bung hi Chassis : Khung (xe)Check, to : Kim traCheck analysis : (S) phn tch kim traCheck calculation sheet : Bng tnh kim traChecklist : Danh mc kim traCheck digit : Ch s kim traCheck valve : Van kim traChecked plate : Tm kim traChecked steel plate : Tm thp kim traChemical (fire) extinguisher : Bnh cha chy bng ha chtChemical : (Thuc) ha hcChemical composition : Thnh phn ha hcChemical property : Ha tnhChemical reaction : Phn ng ha hc

  • Thut ng k thut ng kim v ng tu anh - vit

    46

    Chemical resistant : C kh nng chu c ha chtChemical resistivity : Sut in tr ha hcChequered plate : Tm k vung (kiu bn c)Chequered steel plate : Tm thp k vungChest : Hp, hm, t, kt

    Safety valve ~ : Hp van an tonChief engineer : My trngChief of testing laboratory : Trng phng th nghimChine : Tm vn hng trn tu gChip off, to : o bt, bo btChock (liner) : Cn, m (ng lt)Choked : c chn ; c tit luChopped mat : Tm si bm, tm lt, lp ltChopper : B to xungChord length : Chiu di si dy, chiu di dy cungChromium : Crm (Cr)Chronometer : ng h bm giyCircle : ng trn,vng trn, hnh trn, (s) tun hon, chu k, phm vi

    Pitch ~ : Vng trn chia/ vng chiaCircle diagram : Biu vng, s vngCirclet : Khoanh trnCircuit : Mch, s Circuit breaker : B ngt dng/ mchCircuit breaking capacity test : (Cuc) th kh nng ngt mchCircuit condition : Trng thi mchCircuit diagram : Gin mch, s nguyn l mchCircuit for shore connection : Mch ni in bCircuit is switched on and off : Mch in c ng v ngtCircuit potenial : in th mchCircuit voltage : in p mchCircular : Tun honCircular hatchway : Ming khoang hnh trnCircular heater : Thit b t nng hnh trn/ hnh trCircular plate : Tm hnh trn

  • Thut ng k thuit ng kim v ng tu anh -vit

    47

    Circular section : Tit din/ mt ct hnh trnCirculating air inducing trunk : ng ng cm ng khng kh tun honCirculating current : Dng tun honCirculating fan : Qut tun honCirculating pump : Bm tun honCirculating water : Nc tun honCirculation : (S) tun honCircumference : ng trn, vng trn, chu viCircumferential : (Thuc) ng trn, chu viCircumferential clearance : Khe h vngCircumferential direction : Hng vng trnCircumferential edge : Mp vng trnCircumferential joint : Mi ni vng trnCircumferential seam : ng hn vng trnCircumferential stress : ng sut tip tuyn trn vng trnCircumscribed circle : Vng trn chu viClad : Lp phClading metal : Kim loi phClamp screw : Vt xit chtClamping : (S) xit, kp cht, c nhClamping bolt : Bu lng xit chtClamping device : Thit b kp chtClasp : Mc ci, kha ciClass : Phn loi, cp (tu)

    ~ of pipe : Phn loi ngClass A ice strengthening construction : Kt cu gia cng chng bng cp AClass A insulation : Cch in cp AClass AA ice strengthening construction : Kt cu gia cng chng bng cp AAClass B ice strengthening construction : Kt cu gia cng chng bng cp BClass B insulation : Cch in cp BClass C ice strengthening construction : Kt cu gia cng chng bng cp CClass C insulation : Cch in cp CClass character : K hiu cp (tu)Class E insulation : Cch in cp E

  • Thut ng k thut ng kim v ng tu anh - vit

    48

    Class F insulation : Cch in cp FClass H insulation : Cch in cp HClass IA ice strengthening : Gia cng chng bng cp IAClass IA super ice strengthening : Gia cng chng bng cao cp IAClass IB ice strengthening : Gia cng chng bng cp IBClass IC ice strengthening : Gia cng chng bng cp ICClass maintenance : Duy tr cp tuClass notation : Du hiu cp tuClass survey : Kim tra cp tuClass termination : Rt cpClassification (of ship) : (S) phn cp (tu)Classification : (S) phn loi, (s) phn cp (tu)

    ~ of pressure vessel : Phn loi bnh cha p lcClassification character : K hiu phn cpClassification dimension : Kch thc ch yu phn cpClassification number : S phn cpClassification of ice strengthening : Phn cp gia cng chng bngClassification Socialty authorized by VR : T chc phn cp c V R y quynClassification Socialty recognized by VR : T chc phn cp c VR cng nhnClassification society : C quan phn cpClassification survey : Kim tra ln u ( phn cp), kim tra phn cpClassification survey after construction : Kim tra phn cp sau ng miClassification survey during construction : Kim tra phn cp trong ng miClassification survey of those not built under survey : Kim tra phn cp tu cng khng qua kim tra ca ng kimClassify, to : Phn loiClaw coupling : Khp ni vuClean ballast tank (CBT) : Kt dn schClean, to : Lm sch, lm v sinhCleaning : (S) lm sch, (s) lm v sinhClear area : Vng sng/ trongClear area through the mesh : Vng sng/ trong qua li mt coClear glass : Thy tinh trongClear off : Xa

  • Thut ng k thuit ng kim v ng tu anh -vit

    49

    Clear, to : XaClearance : Khe hClearance gauge : Dng c o khe hClear : R, r rngCleat : Thanh , thanh npClinometer : Thc o nghing ( dc)Clip : (S) kp, ci kp, vng kpClip washer : Vng m kpClockwise closing type : Kiu ng theo chiu kim ng h quayClog : (S) tcClog, to : Kt, ttClogged : B ktClogging : (S) tcClose and secure, to : ng v c nhClose ceiling : Trn knClose solid, to : ng kn cClose up, to : Tim cn n, tip cn nClose visual inspection range : Kim tra trong tm nhn gnClosed cell content : Dung lng ca c qui knClosed circuit systems : H thng tun hon knClosed cup test : Th trong cc knClosed cup test : Th cc knClosed on loss of power type : Kiu t ng khi mt nng lngClosed space : Khng gian knClosed superstructure : Thng tng knClosed type : Kiu knClosed-circuit current : Dng in mch knClosed-circuit current capacity : Dung lng dng mch knClosed-circuit current capacity test : (Cuc) th dung lng ca dng mch knClosed-up type : Kiu tip cnClosely spaced bolt : Bu lng t st nhauClose-up survey : Kim tra tip cn, kim tra ( c ly) gnClosing : (S) ng kn, khp kn, kha chtClosing appliance : Phng tin ng kn, thit b ng

  • Thut ng k thut ng kim v ng tu anh - vit

    50

    Closing coil : Cun dy knClosing device : C cu ng knClosing means : Phng tin ng knClosing piece : Mu/ ming bt knClosing plate : Tm che knClosure : (S) ng, tm chnCloth : Vi, khnClutch : Khp li hp, b ly hpClutch coupling : Khp ni li hpCoal : Than, than Coal bunker : Hm cha thanCoal carrier : Tu ch thanCoal hatchway : Np hm thanCoal port : Ca thanCoal tar naphtha : Phn chng nha thanCoal-burning boiler : Ni hi t bng thanCoaming : Thnh quy (ming khoang, ming l)Coaming for spill : Thanh quy chng trnCoaming of ventilator : Thnh ng thng giCoarse-grained killed steel : Thp lng ht thCoasting service : Hot ng ven binCoat with, to : Ph, sn lt, bc (bng)Coating : (S) sn/ ph, lp sn ph (bo v), lp ph, lp bc, lp ltCoating including zinc : Bc kmCoating or lining procedure : Quy trnh sn phCock : Vi nc, vanCode : B lut, mt m, qui tcCode for the Construction and Equipment of Ships carrying Dangerous Chemical inbulk : B lut v ch to v trang b ca tu ch x ha cht nguy himCoefficient : H s

    Material ~ : H s vt liuLoad magnification ~ : H s khuych i ti trngBlock ~ : H s bo

    Cofferdam : Khoang cch li, ngn cch ly ca tu

  • Thut ng k thuit ng kim v ng tu anh -vit

    51

    Cohesion : (S) dnh ktCohesion : Tnh kt dnhCoil : Cun dy nh la, cun ng xon, ng rut g, cun, vng, cun dy

    Heating ~ : ng xon hm (du)Coil-in-casing type : Kiu ng xon trong hpCoil-in-casting-type condenser : Bu ngng kiu ng rut g trong hpCoil-type consender : Bu ngng kiu ng rut gCoincide, to : Trng (khp)Cold flow : (S) chy lnhCold rolling : (S) cn nguiCold shortness : Tnh gin nguiCold spot inspection : (S) kim tra m lnh, kim tra (khuyt tt) trng thinguiCold starting device : Thit b khi ng trng thi lnhCold straining : Sc cng lnhCold test : Th chu lnhCold winding test : Th cun dy trng thi nguiCold working : (S) gia cng nguiCold-drawn : c ko nguiCold-finished : nh bng nguiCold-resisting : Sc chu lnhCollapse : (S) sp , s quCollar : Vng ai, vnh aiCollar :Vnh

    Thrust ~ : Vnh chn, vnh yCollar plate : Tm vin, tm m vnh, a vnh, mm vnhCollecting tank : Kt gomCollector ring : Vng gpCollision : (S) va chm, va pCollision bulkhead : Vch chng va, vch miCollision mat : Tm chng vaColorimetric standard solution : Dng c o mu chunColour code : Qui tc v mu scColour distortion : tn sc

  • Thut ng k thut ng kim v ng tu anh - vit

    52

    Coloured light filter : Phin lc muColumn : Ct, tr, ng

    Water ~ : ng thy tinhColumn stabilized drilling unit : Phng tin/ dn khoan c tr n nhCombination : (S) kt hpCombination carrier : Tu ch hn hpCombination of slop tank : H thng khoang lngCombination of stress : Cng ng sutCombined stress : ng sut tng hpCombined system : H thng tng hpCombuster : Bung tCombustible : Chy c, d chyCombustible cargo : Hng d chyCombustible gas : Kh d chyCombustible liquid : Cht lng d chyCombustible material : Vt liu d chyCombustible pressure : p sut chyCombustible range : Phm vi/ vng/ tm d chyCombustible : Cht t, nhin liuCombustion chamber : Bung tCombustion chamber bottom : y bung tCombustion gas : Kh t, kh chyCome off, to : Thnh cng, xut hinCome under, to : i xung diComfort : Thun li, thoi miCommence, to : Bt u, khi uCommencement : (S) bt u, khi uCommencement of construction work : Bt u vic xy dng/ ng miCommercial frequency : Tn sut thng mi, tn s thng dngCommissioning result : Kt qu y thcCommittee : y banCommon feeder : ng cp in chung, phi- chungCommon link : Mt xch thngCommon use : S dng thng thng

  • Thut ng k thuit ng kim v ng tu anh -vit

    53

    Communicating : TruynCommunication : Thng tin lin lcCommunication : (S) thng tin, s giao thngCommunication apparatus : Thit b thng tinCommunication cable : Cp thng tinCommunication circuit : Mch thng tin, ng dy thng tinCommunication pipe : ng thng tinCommunication system : H thng thng tinCommutation : (S) chuyn mchCommutator : B chuyn mch, c gpCommutator bar : Thanh chuyn mchCommutator riser : Trc chuyn mchCommutator : C gpCompanion : Bn ng hnh, bn ng nghipCompanion ladder : Thang i li, thang i kmCompanionway : Li i liCompanionway : Ming khot chi boongCompanionway opening : L khot li iCompanion-ways : Chi boongCompartment : Bung, ngn, gian, khng gian, khoang

    Refrigerating machinery ~ : Khoang my lnh, my lm lnhCompartment : KhoangCompartment flooding probability : Xc sut ngp khoangCompass : La bnCompass repeater : B lp la bnCompatibility : Tnh tng ng, tnh tng hpCompensate, to : n b, bi honCompensating ballast water : Nc dn bCompensating winding : Cun bCompensation : (S) n b, bi hon

    Local~ : Gia cng (bi thng) cc bCompensation winding : Cun bCompensator : B (t in) b, thit b b, c cu b chnhComplement : Thuyn b, nh bin

  • Thut ng k thut ng kim v ng tu anh - vit

    54

    Complete rating : Cng sut ton bComplete set : B hon chnhComplete survey : Kim tra hon chnhCompletely plated : c ph hon ton (bng tm kim loi)Completion : (S) hon thnhCompletion test : Th ng bCompliance : Ph hpComply with, to : Ph hp vi, tha mn viComponent : Chi tit, b phn, thnh phn, chi tit hp thnh, thnh phn, cm chititComponents of windage area : Cc thnh phn/ phn ca din tch hng giComposition : Thnh phn, hp phn, cht tng hpComposition mark : Du hp phn, du thnh phnComposition of cargo : Thnh phn ca hng haCompound (-wound) brake : Phanh qun hn hpCompound (-wound) generator : My pht mt chiu kch t hn hpCompound (-wound) motor : ng c mt chiu kch t hn hpCompound : Hp cht, hn hpCompound stress : ng sut hn hpCompound-wound generator : My pht kch t hn hpCompressed air : Khng kh nnCompressed air pipe : ng kh nnCompressed air system : H thng khng kh nnCompressibility factor : Yu t kh nn, tc nhn kh nn ; H s nnCompression : (S) nn, (s) pCompression joint : Mi ni pCompressive buckling strength : bn n nh nnCompressive force : Lc nnCompressive load : Ti trng p/ nnCompressive strength : bn nnCompressive stress : ng sut nnCompressor : My nn, my p

    Air ~ : My nn khEmergency air ~ : My nn kh s c

  • Thut ng k thuit ng kim v ng tu anh -vit

    55

    Compressor room : Bung my nn/ pComputation : (S) tnh tonComputer network : Mng my tnhComputerized : c my tnh haComputerized equipment : Thit b c my tnh haConcave side : Pha lmConcave surface : B mt lmConcentrate, to : Tp trungConcentrated load : Ti trng tp trungConcentration : (S) Tp trung

    Stress ~ : (S) tp trung ng sutConcentrically : ng tmConcern, to : Quan tm, lin quanConcurrently : Xy ra ng thi, trng nhauCondensatation : (S) ngng tCondensatation of moisture : Ngng t hi mCondensate : Phn ngngCondensate pump : Bm ngng tCondensate system : H thng ngng tCondense, to : Ngng tCondenser : Bu ngng

    Main ~ : Bu ngng chnhCondenser : B ngng tCondenser cooling water pump : Bm nc lm mt bu ngngCondenser tube : ng (ca b) ngng tCondenser vacuum : chn khng ca b ngng tCondensing plant : Thit b ngngCondensing system : H thng ngng tCondensor : Bu ngngCondition monitoring system : H thng theo di trng thiCondition monitored auxiliary : My ph c theo di trng thiCondition : iu kin, trng thi, quy nh

    Working ~ : iu kin lm vicDeadship ~ : Trng thi tu cht

  • Thut ng k thut ng kim v ng tu anh - vit

    56

    Transient ~ : Ch chuyn tip, thi gian chuyn tipPressurised ~ : Trng thi c tng pSevere restraint ~ : iu kin qu hn ch

    Condition for loading : iu kin xp hngCondition monitoring and diagnosis system : H thng theo di v chn on trngthiCondition of carriage : iu kin chuyn chCondition of connection : Trng thi/ iu kin lin ktCondition of damage : Trng thi/ iu kin tai nnCondition of loading : Trng thi/ iu kin xp hngCondition of service : Trng thi/ iu kin phc vConducting part : Phn dn inConductive screw : Vt dn inConductivity : dn, tnh dn (nhit, in)Conductor : Vt dn, cht dn, dy dnConductor resistance : in tr dy dnConduit (tube) : ng dnConduit : ng dn, ng dn, mng, cp inCone : Cn, chp nn, phuCone coupling : Mi ni dng cnConfidence : (S) tin cy, tin cyConfidence level : Mc tin cyConfiguration : Hnh dng, cu hnh, hnh th, hnh thc

    Alternate ~ : Ch lun phin/ xen kConfined space : Khong khng hn ch/ xc nhConfirm, to : Chng nhn, xc nhnConfirmation test : (Cuc) th xc nhnConform, to : Ph hp, tun theo, xc nhnConfusion : Ln xn, cu thConical shape : Hnh cnConnect, to : Ni, lin ktConnected load : Ti trng lin ktConnecting conductor : Dy dn lin ktConnecting lead : u ra/ ng dn lin kt

  • Thut ng k thuit ng kim v ng tu anh -vit

    57

    Connecting line : Dy niConnecting method : Phng php lin ktConnecting pipe : ng niConnecting point : Mi niConnecting rod : Tay binConnecting rod : Cn ni, thanh truyn, thanh ni, tay binConnecting terminal : u ni, mt niConnecting wire : Dy niConnection : Ni, lin kt, mi ni, lin h

    Boiler water sampling ~ : ng ni ly mu nc ni hiDetachable pipe ~ : Mi ni ng tho c

    Connection rod : Thanh truynConnexion box : Hp niConnexion by means of angle : Ni gcConnexion of cable : Ni cpConnexion opening : L niConnexion; connection : (S) mc, ni, ng (mch)Conning position : V tr iu khinConsecutive : Ni tip, lin tipConsecutive start : Khi ng lin tcConsider : Xem xtConsideration : (S) xem xtConspicuous : D thyConstant : Hng sConstant-current system : H thng dng in khng iConstitution : To nnConstitution of system : Cu trc ca cc h thngConstraint : (S) bt pConstruction : Ch to, kt cu, cu to

    Exploitation-proof ~ : Kt cu chng nSubstantial ~ : Kt cu vng chcRigid ~ : Kt cu cng vngNon-sparking ~ : Kt cu khng pht sinh tia la

    Construction for fire protection : Kt cu chng chy

  • Thut ng k thut ng kim v ng tu anh - vit

    58

    Construction inspection : (Cuc) kim tra kt cuConstruction plan : S kt cuConstruction profile : Bin dng/ mt ct/ tit din kt cu ; Kt cu c bnConstruction standard : Tiu chun kt cuConstruction survey : (S) kim tra kt cuConstruction test : (Cuc) th kt cuConsumable : C th chy cConsumable liquid : Cht lng d chyConsume, to : Tiu th, dngConsuming of liquid cargo : Nhn hng lngConsumption : (S) tiu thContact : (S) tip xc, cng tc

    Fair ~ : Tip xc tt~ face : B mt tip xc

    Contact area : Vng tip xcContact part : Phn tip xcContact piece : Mu tip xc, on tip xcContact point : im trip xcContact power : Cng sut tip xcContact pressure : p lc tip xcContact resistance : in tr tip xcContact spring : L xo tip xcContact surface : B mt tip xcContact with quay : Tip xc/ chm vo cu tuContacting pressure : p lc va chmContactor : Cng tc, b ng ngtContaiment of fire : (S) chn laContainer : Cng te n, thng chaContainer carrier : Tu ch cng te nContainer supporting arrangement : Kt cu cng te nContainment system : H thng ngn (hng)Contaminant : Cht gy nhimContamination : (S) nhim, (s) nhim bn, trn ln

    Accidental ~ : Trn ln tnh c

  • Thut ng k thuit ng kim v ng tu anh -vit

    59

    Content : Hm lng, ni dungOxygen ~ : Hm lng xy

    Contingent : Ngu nhin, c th xy raContinuation : (S) tip tcContinuation of classification : (S) tip tc phn cpContinuity : (S) lin tc, (s) tip tcContinuity of strength : (S) lin tc v bnContinuity of structural member : Tnh lin tc ca cc c cuContinuous : Lin tcContinuous deck : Boong lin tcContinuous load : Ti trng lin tipContinuous making and breaking test : Th ng ngt lin tcContinuous member : C cu lin tcContinuous rating : Cng sut lin tcContinuous reading : (S) c lin tcContinuous service : Phc v lin tcContinuous surface : B mt lin tcContinuous survey : (S) kim tra lin tcContinuous switching test : (Cuc) th ng m lin tcContinuous welding : Hn lin tcContinuously rated : Xp loi lin tcContour : ng vin, ng quanhContract : Hp ngContracting government : Chnh ph tham gia (Cng c)Contraction : (S) co li, thu nh li, rt gn liControl : iu khin, kim tra, kim sot

    Automatic ~ : iu khin t ngRemote ~ : iu khin t xaProgram ~ : iu khin theo chng trnhLocal ~ : iu khin ti chDirect manual ~ : iu khin trc tip bng taySequential ~ : iu khin theo trnh t~ purpose : Mc ch iu khin~ pitch propeller : Chn vt bin bc

  • Thut ng k thut ng kim v ng tu anh - vit

    60

    ~ room : Bung iu khin~ station : Trm iu khinEngine room ~ station : Trm iu khin bung my

    Control appliance : Thit b iu khinControl assembly : Cm iu khinControl board : Bng iu khinControl characteristic : c tnh iu khinControl circuit : Mch iu khinControl console : Bn iu khinControl device : C cu iu khinControl equipment : Thit b iu khinControl gear : C cu iu khinControl gear diagram : S c cu iu khinControl gear for motor : C cu iu khin ng cControl handle : Cn iu khinControl lever : Cn iu khinControl panel : Bn iu khinControl room : Bung iu khinControl space : Khoang iu khinControl stand : Ch iu khinControl station : Trm iu khinControl switch : Cng tc iu khinControl system : H thng iu khinControl valve : Van iu khinControl, to : Kim sot, iu khinControl gear : C cu iu khinControllable pitch propeller (CPP) : Chn vt bin bcControllable pitch propeller : Chn vt bin bcControlled : c iu khinControlled atmosphere system : H thng iu chnh thnh phn khng khControlled atmosphere zone : Vng c thnh phn khng kh c iu chnhControlled rolling : (S) chng chnh c iu khin/ c kim sotControlled subject : i tng c iu khinControlled variable : Tham s c iu khin

  • Thut ng k thuit ng kim v ng tu anh -vit

    61

    Controlled venting system : H thng thng gi c iu khinController : B iu khin, b iu chnhControlling : (S) iu khin/ kim sotControlling board : Bng iu khinControlling circuit : Mch iu khinControlling device : C cu iu khinControlling equipment : Thit b iu khinControlling gear : C cu iu khinControlling gear diagram : S c cu iu khinControlling handle : Tay iu khinControlling magnetic coil : Cun dy t iu khinControlling motor : ng c iu khinControlling panel : Bn iu khinControlling position : V tr iu khinControlling stand : Ch iu khinControlling system : H thng iu khinControlling valve : Van iu khinConvection : (S) i luConvention : Cng cConvention certificate : Giy chng nhn theo cng cConvention on loadline : Cng c mn khConversion : (S) hon ci, (s) chuyn iConverter : B bin iConverter steel : Thp l chuynConvex side : Pha/ mt liConvex surface : Mt liConvey, to : Vn chuynConveyance : (S) vn chuyn, (s) truyn tCooking appliances : Phng tin nuCooking circuit : Mch nuCooking equipment : Thit b nuCooking utensil : Dng c nu nCool down, to : Lm ngui, lm mtCooled air : Khng kh c lm mt

  • Thut ng k thut ng kim v ng tu anh - vit

    62

    Cooler : Bu lm mt, bu sinh hn, thit b lm mtCooling : (S) lm lnh, lm ngui, lm mt

    ~ oil : Du lm mt~ water : Nc lm mt~ air : Kh lm mt~ arrangement : Thit b lm mt~ uniform : Lm mt ng b~ space : Khoang lm mt

    Cooling air : Khng kh lm mtCooling air circulating fan : Qut tun hon khng kh lm mtCooling arrangement : Trang b lm mtCooling coil : ng ng xon lm mt (trong bu sinh hn), ng xon lm mtCooling device : Thit b lm mtCooling down : (S) lm ngui, lm mtCooling facilities : Phng tin lm mtCooling fresh water pump : Bm nc ngt lm mtCooling grid : Gin lm mtCooling pipe : ng lm mtCooling pipe grid : Mng ng lm mtCooling proceduce : Qui trnh lm mtCooling sea water pump : Bm nc bin lm mtCooling system : H thng lm mtCooling test : (Cuc) th lm mtCooling water : Nc lm mtCooling water jacket : o/ mn nc lm mtCooling water pump : Bm nc lm mtCooling water system : H thng nc lm mtCooper alloy tube: ng hp kim ngCooper nickel: ng ni kenCooper pipe : ng ngCooper plate : Tm ng, l ngCooper rope : Dy cp ngCooper sulphate : ng sun pht

  • Thut ng k thuit ng kim v ng tu anh -vit

    63

    Cooper tube : ng ngCooper wire : Si dy ngCoordinate : Ta Coordinated maximum demand power : Cng sut yu cu phi hp ln nhtCoordinated : c ly lm ta / h quy chiuCoordination : (S) phi hpCoordination test : Th phi hpCopper : ngCopper alloy : Hp kim ngCopper alloy casting : Vt c hp kim ngCord: Si dy, on ni ; n v o th tch bng 3.63 m3Core hat-type construction : Kt cu kiu m c liCore length : Chiu di li, chiu di ctCore material : Vt liu c liCore wire : Dy li, dy ctCorner : Gc, niCorner fitting : gc (ca cng te n), chi tit ni gc, ph tng niCorner of opening : Gc l khotCorner post : Ct lin kt, thanh ni, np lin ktCorrect, to : Hiu chnh, sa chaCorrection : (S) hiu chnhCorrection curve : ng cong hiu chnhCorrection factor : H s hiu chnh, yu t hiu chnhCorrection for free surface : Hiu chnh mt thongCorrelation : (S) tng quan, mi lin hCorrespond to, to : Tng ng viCorridor : Hnh langCorridor bulkhead : Vch hnh langCorrosion : n mnCorrosion allowance : Lng d tr hao mn ; Lng hao mn cho phpCorrosion control means : Phng tin kim sot n mnCorrosion cracking : Nt do n mnCorrosion fatigue : Mi do n mnCorrosion inhibited : n mn c hm li

  • Thut ng k thut ng kim v ng tu anh - vit

    64

    Corrosion margin : Gii hn n mn cho phpCorrosion pattern : Biu n mnCorrosion proof layer : Lp chng n mnCorrosion protected : (S) n mn c bo vCorrosion resistance : Tnh chng n mn, Tnh chu n mnCorrosion resisting : Chng n mnCorrosion Resisting coating : Ph cht chng n mn ; Bc cht chu n mnCorrosion resisting material : Vt liu chng n mn ; Vt liu chu n mnCorrosion resisting means : Phng tin chng n mn Corrosion resisting paint : Sn chng n mnCorrosion resisting painting : (S) sn chng n mn, sn chu n mnCorrosion resisting wire gauge : Li dy chng n mnCorrosion test : (Cuc) th n mnCorrosive : Cht n mn, n mnCorrosive aggression : Tnh tr i vi n mnCorrosive property : c tnh n mnCorrosiveness : (S) n mnCorrugate : Dng gn sngCorrugated bulkhead : Vch gn sng, vch (hnh) sngCorrugated expansion joint : Khp ni gin n (xi phng) hnh sngCorrugated form : Dng sng, hnh sngCorrugated furnace : Bung t hnh sngCorrugated header : Bu gp hnh gn sng, ng gpCorrugated part : Phn gn sng, phn c hnh gn sngCorrugation : (S) gp np, (s) lm gn sngCotton yarn : Si bngCount : (S) tnh, mCounter : Thnh ui tu, my mCounterflow : Dng chy ngc ; (S) chy ngc, i luCountermeasure : Bin php i phCouple : Ni

    Suction ~ : u ni ng ht, ch ni ng htLubricating oil sampling ~ : ng ni ly mu du

    Coupled by flange, to be : c ni bng mt bch

  • Thut ng k thuit ng kim v ng tu anh -vit

    65

    Coupling : (S) ni, n khp, khp ni~ bolt : Bu lng khp ni~ flange : Bch ni, bch khp niElectro-magnetic slip ~ : Khp ni trt kiu in t/ khp trt in tHigh elastic ~ : Khp n hi caoFlexible ~ : Khp ni mmRigid ~ : Khp ni cngIntegral flange ~ : Khp ni bch linSeparate ~ : Khp ni riSlip ~ : Khp trt

    Coupling bolt : Bu lng khp niCoupling excitation circuit : Mch kch thch ca khp ni in tCoupling flange : Bch niCover : Np, np phng, chp, v

    Cylinder ~ : Np xi lanhCover plate : Tm np, tm y, tm phCover, to : Che phCoverage : Vng hot ng, tm hot ng (ca h v tuyn hng hi)Coveralls : B qun o bo hCovering : Ph, y, cheCovering board : Vn mp boongCovering material : Vt liu ph, vt liu bcCowl : u loe (ming ng thng gi, u ng ni), u thng gi ; V che (cang c)Cowl head ventilator : u ng thng gi mt khCrack : Vt nt, s nt ; Khe hCrack detection : D vt ntCrack initiation characteristics : c tnh ban u ca vt ntCrack propagation characteristics : c tnh lan truyn ca vt ntCrane : Cu, cn trc, my trcCrank : Tay quay, khy

    ~ arm : Bn knh khuu trc~ web : M khuu~ throw : Khuu trc

  • Thut ng k thut ng kim v ng tu anh - vit

    66

    Crank chamber : Thng trc, thng trc khuu ; Cc teCrank journal : C trc khuu, c trc chnh (trc khuu)Crank throw : Khuu trcCrank web : M khuu, m trc khuuCrankcase : Thng trc, thng trc khuu, cc te

    ~ door : Ca thng trc/ ca cc teCrankcase door : Ca thng trc, np thng trcCrankcase relief valve : Van an ton thng trcCrankpin : Cht khuu, c bin (trc khuu)

    ~ bearing : c bin~ bolt : Bu lng c bin

    Crankshaft : Trc khuuSolid ~ : Trc khuu linBuilt-up ~ : Trc khuu lp rp/ ghp

    Crate : Mng li, li lcCredit : (S) tin cy ; (S) gi tin vo ngn hngCreep : (S) ro ; (S) t bin (kim loi)Creep property : c tnh ro ; c tnh t binCreepage : Khong cch inCreepage distance : Khong cch cch in, khong t binCrest value : Gi tr ti aCrevice : ng nt, k hCrew : Thy th on, thuyn b ; VtCrew accommodation space : Bung ca thy th, bung ca thuyn vinCrew space : Bung thy thCrew's quarter : Khu vc dnh cho thy th, khu vc ca thuyn vinCriteria : Thng s, tiu chunCross : Ngang ; Du cho, du thp, honh giao

    ~ section : Mt ct ngang~ head : u ch thp

    Cross bolt : Bu lng chn cn cu dy gingCross current : Dng chy ngangCross curve : ng honh giao, ng cong PantokarenCross curves of stability : ng cong Pantokaren (ng honh giao)

  • Thut ng k thuit ng kim v ng tu anh -vit

    67

    Cross flooding equipment : Thit b iu chnh cn bng ngangCross levelling pipe : ng dn iu chnh cn bng ngangCross section : Tit din ngang, mt ct ngangCross tie : Thanh ging ngang, thanh buc ngangCross tube : ng khuu ch thp, ng ch baCross weld test : Th mi hn ngang, th mi hn ct nhau (giao nhau)Cross-head : u ch thpCrosshead pin : Cht trc u ch thp, cht ngangCrosshead type : Kiu u ch thp, loi u ch thp, kiu con trt (ng c)Crosshead: u ch thp, chc ch thpCrossing point : im giao nhauCrossover header : ng gp nc kiu giao nhauCrowding of passenger on one side : Hnh khch dn v mt bn mnCrown : nh, Vnh (trn) ; C neo, u neo ; nh pt tng ; cong ngang (xngang boong) ; Hnh vnh khn

    Piston ~ : nh pittngSteel piston ~ : nh pittng bng thp

    Crown of machinery space : Trn bung myCrucible steel : Thp lm ni nu kim loiCrude oil : Du thCrude oil washing : (S) ra bng du thCrude oil washing system : H thng ra bng du thCruiser : Tun dng hmCruiser stern : ui tun dng hmCrushing test : Th nn/ pCryogenic liquefied nitrogen : Ni t c ha lng nhit thpCrystallization : (S) kt tinhC-type test specimen : Mu th kiu CCumulative effect : Hiu ng tch lyCure : (S) lu ha ; (S) bo dng, x lCure time : Thi gian x lCuring : (S) lu ha ; (S) bo dngCurrent (carrying) capacity : Tr s dng inCurrent : Dng in ; Dng chy

  • Thut ng k thut ng kim v ng tu anh - vit

    68

    Current carrying : C in, dn inCurrent carrying part : Phn c in, phn ang dn inCurrent carrying screw : Vt mang inCurrent carrying test : Th c inCurrent carrying time : Thi gian c in, thi gian mang inCurrent coil : Cun dngCurrent limiting characteristics : c tnh gii hn dngCurrent limiting fuse : Cu ch hn ch dngCurrent rating : Cng dng in, tr s dngCurrent transformer : Bin dngCurrent velocity : Tc dng chyCurvaline : ng congCurvature : (S) un cong, congCurve : ng cong, thCurve of displacement : ng cong lng chim ncCurve of stability : ng cong n nhCurved : B un cong, c un congCurved floor : ngang congCurved top : Nc cong (ca ng hm)Custody : (S) bo v, chm sc, (s) giam gi hng (ti cng)Cut end : u ct, mp ctCut off, to : Ct, ngtCutoff head : u ctCut-out slot : L khot c cu chui quaCutting : (S) ct, phayCycle : Chu k, chu trnh, th, kCycle of continuous making and breaking : Chu trnh ng ngt lin tcCyclic fatigue test : (Cuc) th chu trnh miCyclic test : (Cuc) th chu trnhCylinder : Xi lanh ; Bnh cha

    ~ cover : Np xi lanh~ jacket : Thn xi lanh~ liner : o lt xi lanh, ng lt xi lanh~ bore : ng knh xi lanh

  • Thut ng k thuit ng kim v ng tu anh -vit

    69

    Cylinder cover : Np xi lanhCylinder liner : S mi xi lanhCylinder lubricating pump : Bm bi trn xi lanhCylinder lubricator : Thit b bi trn xi lanhCylinder valve : Van hnh trCylindrical boiler : Ni hi hnh trCylindrical boiler with dry combustion chamber : Ni hi hnh tr c bung tkhCylindrical boiler with wet combustion chamber : Ni hi hnh tr c bung t tCylindrical bottom : y hnh trCylindrical furnace : Bung t hnh tr, l t hnh trCylindrical header : ng gp hnh trCylindrical rotor : R to hnh tr, r to hnh tang trngCylindrical section : Mt ct hnh trn, tit din hnh trnCylindrical shell plate : Tm v hnh trCylindrical steel plate : Tm thp hnh trCylindrical tank : Kt hnh trCylindrical tunnel : ng khi hnh trCylindrical type rotor : Kiu r to lng scCylindrical water gauge : ng h ch bo mc nc hnh trn

  • Thut ng k thut ng kim v ng tu anh - vit

    70

    Damage : Tai nn, h hng, tn tht, thit hiD.C generator : My pht mt chiuDamage case : Trng hp h hngDamage control plan : S kim sot tai nnDamage from the outside : H hng t bn ngoi

    Damage stability : n nh tai nnDamage survey : Kim tra tai nn, kim tra h hng, kim tra tn thtDamage survival capability : Kh nng chng chm khi tu b thngDamaged compartment permeability : H s ngp nc khoang b thngDamp heat test : Th nhit cao mi trng mDamper : Thit b gim chn, b gim chn ; Bu gim m ; Bm chn la, bphn lm m ; Van iu titDamper winding : Cun dy gim chnDanger : (S) nguy himDangerous : Nguy himDangerous cargo : Hng nguy himDangerous cargo carrier : Tu ch hng nguy himDangerous chemical : Ha cht nguy himDangerous enviroment : Mi trng nguy himDangerous gas : Kh nguy himDangerous goods : Hng nguy himDangerous space : Bung nguy him, khng gian nguy himDangerous substance : Cht nguy himDangerous vapour : Hi nguy himData : S liu, ti liu, h s ; D liu, d kin ; c tnh ; Thng tin ; Ta Date : Ngy (thng, nm)Date of build : Ngy (thng, nm) ngDate of commencement of the work : Ngy (thng, nm) bt u ng, ngy (thng,nm) bt u cng vic, ngy (thng, nm) bt u trin khaiDate of completion : Ngy (thng, nm) kt thc, ngy (thng, nm) hon thnhng tu, ngy (thng, nm) kt thc cng vicDate of issue : Ngy pht hnh, ngy cp giy chng nhnDate of keel laid : Ngy t ky, ngy t sng chnhDate of launch : Ngy h thy, ngy xung nc, ngy xung , ngy ra

  • Thut ng k thuit ng kim v ng tu anh -vit

    71

    Date of manufacture : Ngy sn xut, ngy ch toDate of test(ing) : Ngy thDatum : Chun, mc ; S hiu cho ; Chun s ; D kin, d liu ; Chun s 0 (su, cao)Datum line : ng c s, ng chun, ng mcDaylight signalling lamp : n tn hiu ban ngyDead end corridor : Hnh lang ctDead front type switchboard : Bng in kiu khng c in pha trc, bng inkiu khng m c pha trcDead load : Ti trng c ch, ti trng thun ; Hng c c nh ; Trng lngbn thn, trng lng khng k b ; Khng tiDead ship condition : Trng thi tu chtDead short circuit : Ngn mch khng tiDeadlight : Ca hp l bt cht ; L thng sng bt c nh ; Np chng bo caca hp lDeadweight (Capacity) : Trng ti ton phn, trng tiDeadwood : Tm mDeal with, to : Gii quyt, i phDecay : (S) phn r, suy bin, suy gim, tt dn ; (S) mc mn ; (S) phn ha,phn hyDeck : Boong ; Vn sn, vn mt cu ; Tng trnDeck beam : X ngang boongDeck cargo : Hng trn boongDeck composition : Lp ph (trn) boong, hp cht ph boongDeck construction : Kt cu boongDeck covering : Lp ph boong, lp lt boong, lp bc boongDeck edge point : Ta mp boongDeck girder : Sng dc boongDeck house : Lu li, cabinDeck line : ng boongDeck load : Ti trng boongDeck loaded : Ch hng trn boong, chu ti boongDeck machinery : My mc trn boong, my mc trn boongDeck machinery and equipment : My mc v thit b trn boongDeck opening : L khot trn boong

  • Thut ng k thut ng kim v ng tu anh - vit

    72

    Deck plan : Bn v boongDeck planking : Vn lt boongDeck plating : Tn boong, tm boongDeck portion : Ming khot trn boongDeck step : Bc boongDeck stringer : Tn mp boongDeck transverse : Sng ngang boong, x ngang boong (trong thnh phn khungngang)Deck with longitudinal beam : Boong c x dcDeck with transverse beam : Boong c x ngangDeckhouse : Lu, lu trn boongDeckhouse top : Boong (nc) luDecline : (S) gim, s h, s st ; S nghing i, s lch iDecomposition : (S) phn tch, phn ly ; (S) phn hyDecontamination : (S) kh nhim, (s) lm schDecontamination shower : Vi hoa sen kh nhim, vi hoa sen ra (mt)Decrease : (S) gim, (s) stDecrement : (S) gim, (s) suy gim ; suy gim ; Lng gimDeduct, to : Ly i, khu i, tr iDe-energized : B ngt ngun, b ngt dng, b mt ngunDeep (water) tank : Kt (nc) suDeep floor : ngang dng cao ( u v ui tu)Deep frame : Sn kheDeep hatch : Ming khoang thnh caoDeep oil tank : Kt su cha du, kt du lin vDeep slot squirrel cage motor : ng c in ngn mch rnh suDeep tank : Kt suDeep tank bulkhead : Vch kt suDeep well pump : Bm ging chmDe-excite, to : Kh kch thch, kh kch ngDefect : Khuyt tt, sai st, thiu st, (s) ht, () htDefect detecting ability : Kh nng pht hin khuyt ttDefinition : nh ngha, s xc nh ; r nt (hnh nh), r(m thanh)Deflection : (S) bin dng, sai lch

  • Thut ng k thuit ng kim v ng tu anh -vit

    73

    Crankshaft ~ : co bp m trc khuuDeflection criteria : Tiu chun vng, lchDeflexion (deflection) : (S) lch, lch ; S un cong, s vng, un, vngDeforesting arrangement : Thit b kh tuytDeformation : (S) bin dngDefrosting device : Thit b lm tan bngDefrosting means : Phng tin lm tan bngDefrosting test : Th kh tuytDegasser : B kh kh, b tch khDegassing : Kh khDegassing roller : Con ln kh khDegassing roller : Trc ln kh khDegassing tank : Kt kh khDegassing: Kh kh, tch kh ; S to chn khngDegree : , mc , bc, cpDegree of fire harzard : Mc nguy him v chyDegree of harzard : Mc nguy himDegree of opening : mDegree of superheat : qu nhitDegree of twist : xonDeicer : Thit b kh bng, thit b chng ng bngDelay characteristics : c tnh trDeleterious : C hi, c, c hiDeletion : (S) gch i/ xa i ; on khuyt ; (S) mt onDelivering capacity : Sn lng phn phi, kh nng phn phiDelivery : Phn phi, x ; Bn giao (tu)Delivery pipe : ng x, ng y, ng phn phiDelivery pressure : p sut y, p sut x, p sut phn phiDelivery side : Pha y, pha xDelivery valve : Van y, van x, van phn phiDelta connection : u dy hnh tam gicDemand : Nhu cu, yu cu, i hiDemand electric power : Cng sut in yu cuDemand factor : H s ph ti yu cu

  • Thut ng k thut ng kim v ng tu anh - vit

    74

    Demarcation for applycation of material : (S) phn chia ranh gii p dng vtliuDemister : Thit b chng ng sngDensity : Mt , t trng ; Cng Dent : Vt lm, vt dp ; RngDeoiler : B tch du, thit b tch du, kh duDeoxidation : (S) kh xiDeoxidation practice : Qui trnh k thut kh xyDeparture : (S) khi hnh, ri bnDeparture condition : Trng thi ri bnDepletion : (S) tho, rt, x ht ; (S) rt ht ra, (s) x ra, (s) lm cnDeposit : Cht lng, vt lng, cht kt ta, cn

    Salt ~ : Cn muiDeposit metal : Mu kim loi thaDeposited (weld) metal : Kim loi (hn) pDepth : su, chiu su ; Chiu cao (tu)Depth for strength computation : Chiu cao mn tu tnh sc bnDepth gauge : Thit b o suDepth of fusion : Chiu su nng chyDepth of hardened zone : su, dy ca vng c lm cngDepth of penetration : Chiu su thm thuDepth of ship : Chiu cao mn tuDepth sounder : My o chiu su bng siu mDepth thickness ratio : T s su theo chiu dyDepthwise direction : Hng theo chiu su/ chiu dyDerrick : Cu derick, cu dy ging ; Cu nDerrick boom : Cn ca cu derick/ dy gingDerrick boom stopper for dropping out : Thit b chng ri cnDerrick heel lug : Gi chn cn cu dy gingDerrick post : Tr/ ct cu dy gingDerrick post : Ct cu dy gingDescending : (S) ln xung theo chiu thng ng, h xungDescription : (S) m tDesiccation : (S) lm kh, kh m, sy kh.

  • Thut ng k thuit ng kim v ng tu anh -vit

    75

    Design : (Vic) thit k ; n thit kDesign criterion : Tiu chun thit k, chun thit kDesign features : c tnh thit kDesign ice pressure : p lc bng tnh tonDesign load : Ti trng thit kDesign principle : Nguyn tc, nguyn l thit kDesignation : (S) gi tn, nh danh, ch nhDesigned atmospheric temperature : Nhit kh tri thit kDesigned deadweight : Trng ti thit kDesigned load : Trng ti thit kDesigned load line : ng trng ti thit k, ng nc ch hng thit kDesigned maximum draught : Chiu chm/ mn nc thit k ln nhtDesigned maximum load : Ti trng thit k ln nhtDesigned maximum load line : ng nc ch hng thit k ln nhtDesigned point : im thit kDesigned pressure : p sut thit kDesigned speed : Tc thit kDesigned summer load line : ng nc ch hng thit k ma hDesigned temperature : Nhit thit kDesigned wind velocity : Tc gi thit kDestructible material : Vt liu khng b ph hyDestruction by fire : Ph hy/ tiu hy do chyDesuperheater : Thit b gim qu nhit, b x qu nhitDetachable : C th tho ra cDetachable coupling : Khp ni tho cDetachable propeller blade : Cnh chn vt tho cDetached superstructure : Thng tng bit lpDetail drawing : Bn v chi tit, bn v c thDetail plan : Bn v chi titDetailed calculation : Tnh ton chi titDetails : Chi titDetails of installation : Chi tit lp tDetails of welding procedure : Chi tit ca qui trnh hnDetect, to : Pht hin, d ra, tm ra

  • Thut ng k thut ng kim v ng tu anh - vit

    76

    Detecting capacity : Kh nng pht hinDetection : (S) pht hin, (s) d ra, tm raDetection : Pht hin

    Gas ~ : Pht hin kh (c, chy)Detector : Thit b ch bo, pht hin, , u d, my pht hin, ci cm bin

    Level ~ : Thit b ch boDetergent : Cht ty raDeteriorate, to : Lm h hng, lm xu i ; Ph hy, ph hoiDeterioration : (S) h hng, (s) ph hyDetrimental defect : Khuyt tt c hiDetrimental fume : Khi c hi, khi c, kh c hiDetuner : B chng rung/