Page 1: Thrissur railway station development 2

THRISSUR RAILWAY STATION DEVELOPMENT

NAISON P SUNNY ROLL NO 12

Page 2: Thrissur railway station development 2

INTRODUCTION• Thrissur Railway Station – commenced on June

2, 1902 • A-1 category railway station located in Thrissur

City.• It lies on the busy Shoranur – Cochin Harbour

section.• Also connects to the temple town of Guruvayur.• 65 pairs of trains passes through the station on

an average day. • Have a traffic of 20,000 passengers per day.

Page 3: Thrissur railway station development 2

NEED ANALYSIS • Growth of passenger traffic.• New trains are coming – Budget 2013.• Ernakulam - Thrissur MEMU will start running.• 3rd and 4th rails have been started using.• Passengers have to cross the rail to reach 4th

platform.• Passengers have to walk a lot of distance to get

bus towards North stand or Sakthan stand.

Page 4: Thrissur railway station development 2

SUMMARY• Development of Thrissur railway station.• To supply necessary facilities for the comfort of

increasing passengers.• To provide platform facilities for increasing

number of trains and passengers.

Page 5: Thrissur railway station development 2

OBJECTIVES• Development of 4th platform

▫ Shops and Benches▫ Flooring▫ Structure▫ Roofing▫ Lighting▫ Drinking Water Supply▫ Cctv cameras▫ Announcement System

• Foot over bridge• Bus service

Page 6: Thrissur railway station development 2

First and Second platform, of Thrissur Railway Station

Fourth Platform

Page 7: Thrissur railway station development 2
Page 8: Thrissur railway station development 2

TECHNICAL FEASIBILITY

• Foot over bridge from fourth platform can be connected to the existing bridge.

• Buses doesn’t have a much difference in their travel distance and time.

Page 9: Thrissur railway station development 2

SOCICAL FEASIBILITY• No need of acquiring land.

• Useful for People

Page 10: Thrissur railway station development 2

FINANCIAL FEASIBILTY• Source of income – Palghat Railway division• Secondary source - Budget

Page 11: Thrissur railway station development 2

BUDGET AND DURATION• Estimated Cost = 2 Crore• Estimated Time = 10 Months

5%

75%

15%

5%

Page 12: Thrissur railway station development 2

Work Cost(Lakhs)

Design 10

Bus service system 10

Shops and Benches 10

Flooring Works 30

Plumbing Works for water supply 10

Foot Over bridge Construction 30

Roofing Works, Structure 80

Lighting, Announcement sys,CCtv 20

Total 200

Page 13: Thrissur railway station development 2

Activity Work Time in months

A Design of Overall Plan 2

B Approval 1

C Tender 2

D Bus service system 2

E Shops and Benches 2

F Flooring Works 2

G Plumbing Works for water supply 2

H Foot Over bridge Construction 2

I Roofing Works, Structure 4

J Lighting, Announcement sys,CCtv 1

MASTER SCHEDULE

Page 14: Thrissur railway station development 2

GANTT CHART

0 1 2 3 4 5 6 7 8 9 10

TIME IN MONTHS

WORK PACKAGES

Approval (B)

Plumbing Works(G)

Structure, Roofing Works(I)

Lighting, CCtv(J)

Bus service (D)

Design of Overall Plan (A)

Over bridge (H)

Tender (C)

Shops and Benches(E)

Flooring Works(F)

Page 15: Thrissur railway station development 2

WORK BREAK DOWN STRUCTURE

Development Project

Over bridgeConstruction

Bus Service

Shops and Benches

ProjectDevelopment

Platform Construction

Data collection Waiting Shed

Flooring,Plumbing

Structure,Roofing

Lighting, Cctv, Announcement sys.

Analysis

Feasibility study

Structure

Roof

Approval

Sanction

Tender

Page 16: Thrissur railway station development 2

General Manager(Southern Railway)

Electrical engineer

Civil engineer

Finance officerSupervisor

Chief Administrative Officer

Project Committee

Administrative manager

Office staff

Assistants

supervisor

WorkersOffice staffWorkers

Ex. Engineer

PROJECT ORGANISATION STRUCTURE

Project Manager

Page 17: Thrissur railway station development 2

ADVANTAGES• A new development for the station.• Improves comfort of passengers.• Improves safety of passengers.

Page 18: Thrissur railway station development 2

CONCLUSION• Simple• Executable

Page 19: Thrissur railway station development 2