Activity ID Activity Name Baseline StartBaseline FinishStart
Finish Schedule %CompleteCost %CompleteTotalFloatCONSTRUCTIO
CONSTRUCTION, COMPLETION & MAINTENANCE 15-Oct-14 13-Oct-16
15-Oct-14 A 13-Oct-16 19.13% 21.39% 0MAJOR MILEST MAJOR
MILESTONE15-Oct-14 13-Oct-16 15-Oct-14 A 13-Oct-16 0% 0% 0KEY
MILESTON KEY MILESTONE25-Jul-15 08-Sep-15 01-Aug-15 09-Sep-15 0% 0%
400ENGINEERING ENGINEERING08-Apr-15 06-Dec-15 26-Mar-15 A 10-Nov-15
0% 0% 178MATERIAL SU MATERIAL SUBMITTAL & APPROVAL08-Apr-15
23-Nov-15 01-Apr-15 A 29-Oct-15 0% 0% 188ARCHITECTU
ARCHITECTURAL25-Jul-15 22-Oct-15 25-Jul-15 A 29-Oct-15 0% 0%
188INTERNAL PA INTERNAL PAINT25-Jul-15 02-Sep-15 01-Aug-15
09-Sep-15 0% 0% 53ENG.MS.AR.12 Material Submittal - Internal Paint
25-Jul-15 09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0% 53ENG.MS.AR.19
Material Approval - Internal Paint 10-Aug-15 02-Sep-15 17-Aug-15
09-Sep-15 0% 0% 53EPOXY PAINT EPOXY PAINT10-Aug-15 19-Sep-15
17-Aug-15 01-Oct-15 0% 0% 67ENG.MS.AR.15 Material Submittal - Epoxy
Paint 10-Aug-15 25-Aug-15 17-Aug-15 01-Sep-15 0% 0% 67ENG.MS.AR.24
Material Approval - Epoxy Paint 26-Aug-15 19-Sep-15 02-Sep-15
01-Oct-15 0% 0% 67CARPET MAT CARPET MATERIALS25-Jul-15 02-Sep-15
01-Aug-15 09-Sep-15 0% 0% 127ENG.MS.AR.40 Material Submittal -
Carpet 25-Jul-15 09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0%
101ENG.MS.AR.42 Material Approval - Carpet 10-Aug-15 02-Sep-15
17-Aug-15 09-Sep-15 0% 0% 127MIRRORS & A MIRRORS &
ACCESSORIES22-Aug-15 06-Oct-15 29-Aug-15 13-Oct-15 0% 0%
150ENG.MS.AR.51 Material Submittal - Mirrors 22-Aug-15 06-Sep-15
29-Aug-15 13-Sep-15 0% 0% 91ENG.MS.AR.53 Material Approval -
Mirrors 07-Sep-15 06-Oct-15 14-Sep-15 13-Oct-15 0% 0% 150WOOD CHIPS
WOOD CHIPS MULCHING07-Sep-15 22-Oct-15 14-Sep-15 29-Oct-15 0% 0%
146ENG.MS.AR.60 Material Submittal - Wood Chips Mulching 07-Sep-15
22-Sep-15 14-Sep-15 05-Oct-15 0% 0% 146ENG.MS.AR.61 Material
Approval - Wood Chips Mulching 29-Sep-15 22-Oct-15 06-Oct-15
29-Oct-15 0% 0% 146CRUSHED LI CRUSHED LIMESTONE07-Sep-15 22-Oct-15
25-Jul-15 A 18-Oct-15 0% 0% 198ENG.MS.AR.62 Material Submittal -
Crushed Limestone 07-Sep-15 22-Sep-15 25-Jul-15 A 05-Oct-15 0% 0%
167ENG.MS.AR.63 Material Approval - Crushed Limestone 29-Sep-15
22-Oct-15 02-Aug-15 A 18-Oct-15 0% 0% 198ROAD MARK ROAD MARKING,
SIGNAGES & ACCESSORIES07-Sep-15 22-Sep-15 29-Sep-15 15-Oct-15
0% 0% 167S O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N
D2015 201628-Aug-15,01-Aug-15,01-Aug-15,01-Aug-15
01-Aug-15,01-Aug-15 01-Aug-15 31-Aug-15 31-Aug-15
23-Aug-15,09-Sep-15,09-Sep-15Date: 08-Aug-15 1/42 Start Date:
15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.MS.AR.64 Material Submittal - Road Marking
07-Sep-15 22-Sep-15 29-Sep-15 15-Oct-15 0% 0% 167MEP WORKS MEP
WORKS08-Apr-15 23-Nov-15 01-Apr-15 A 28-Oct-15 0% 0% 168M.V MATERIA
M.V MATERIAL & ACCESSORIES18-Apr-15 30-Sep-15 23-Apr-15 A
07-Oct-15 0% 0% 88M.V PANELS M.V PANELS 18-Apr-15 30-Sep-15
23-Apr-15 A 07-Oct-15 0% 0% 88ENG.MS.MV.1 Material Submittal to
Consultant - M.V Panels 18-Apr-15 03-May-15 23-Apr-15 A 13-Aug-15
100% 0% 55ENG.MS.MV.5 Material Approval from Consultant- M.V Panels
06-Aug-15 23-Aug-15 13-Aug-15 30-Aug-15 0% 0% 88ENG.MS.MV.9
Material Submittal to Kharama - M.V Panels 23-Aug-15 08-Sep-15
30-Aug-15 15-Sep-15 0% 0% 88ENG.MS.MV.12 Material Approval from
Kharama - M.V Panels 08-Sep-15 30-Sep-15 15-Sep-15 07-Oct-15 0% 0%
88FIBRE OPTICFIBRE OPTIC CABLES & ACCESSORIES 05-Jul-15
13-Sep-15 28-Jun-15 A 01-Sep-15 0% 0% 55ENG.MS.MV.3 Material
Submittal to Consultant - Fibre Obtic Cables05-Jul-15 26-Jul-15
28-Jun-15 A 16-Aug-15 100% 0% 55ENG.MS.MV.11 Material Submittal to
QTEL - Fibre Obtic Cables 11-Aug-15 27-Aug-15 28-Jun-15 A 26-Aug-15
0% 0% 55ENG.MS.MV.7 Material Approval from Consultant- Fibre Obtic
Cables26-Jul-15 11-Aug-15 29-Jun-15 A 23-Aug-15 34.29% 0%
55ENG.MS.MV.14 Material Approval from QTEL -Fibre Obtic Cables
27-Aug-15 13-Sep-15 29-Jun-15 A 01-Sep-15 0% 0% 55DEHUMIDIFIE
DEHUMIDIFIER & ACCESSORIES05-Sep-15 21-Oct-15 15-Jun-15 A
05-Sep-15 0% 0% 99ENG.MS.AC.15 Material Submittal - Dehumidifier
05-Sep-15 21-Sep-15 15-Jun-15 A 23-Aug-15 0% 0% 99ENG.MS.AC.16
Material Approval - Dehumidifier 21-Sep-15 21-Oct-15 22-Jun-15 A
05-Sep-15 0% 0% 99EXHAUST FA EXHAUST FAN & ACCESSORIES13-Oct-15
07-Nov-15 28-May-15A01-Sep-15 0% 0% 133ENG.MS.AC.20 Material
Approval - Exhaust Fan & Accessories 13-Oct-15 07-Nov-15
28-May-15A01-Sep-15 0% 0% 133CHILLED WA CHILLED WATER
PRESSURIZATION UNIT13-Oct-15 23-Nov-15 21-May-15A07-Sep-15 0% 0%
146ENG.MS.AC.27 Material Submittal - Pressurization Unit 13-Oct-15
29-Oct-15 21-May-15A27-Aug-15 0% 0% 129ENG.MS.AC.28 Material
Approval - Pressurization Unit 29-Oct-15 23-Nov-15
28-May-15A07-Sep-15 0% 0% 146CHEMICAL D CHEMICAL DOSING16-Aug-15
01-Oct-15 23-Aug-15 08-Oct-15 0% 0% 129ENG.MS.AC.29 Material
Submittal - Chemical Dosing 16-Aug-15 01-Sep-15 23-Aug-15 08-Sep-15
0% 0% 129ENG.MS.AC.30 Material Approval - Chemical Dosing 01-Sep-15
01-Oct-15 08-Sep-15 08-Oct-15 0% 0% 129BUILDING MA BUILDING
MANAGEMENT SYSTEM25-Jul-15 02-Sep-15 01-Aug-15 09-Sep-15 0% 0% 205S
O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D2015
2016Date: 08-Aug-15 2/42 Start Date: 15-Oct-14 Completion Date:
13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.MS.AC.31 Material Submittal - Building
Management System 25-Jul-15 09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0%
56ENG.MS.AC.32 Material Approval - Building Management System
10-Aug-15 02-Sep-15 17-Aug-15 09-Sep-15 0% 0% 205CHILLERS
CHILLERS22-Jun-15 05-Aug-15 16-Jun-15 A 31-Aug-15 0% 0%
56ENG.MS.AC.22 Material Submittal - Chillers 22-Jun-15 07-Jul-15
16-Jun-15 A 22-Aug-15 100% 0% 56ENG.MS.AC.25 Material Approval -
Chillers 08-Jul-15 05-Aug-15 23-Jun-15 A 31-Aug-15 76.19% 0%
56SANITARY W SANITARY WARES FITTINGS & ACCESSORIES25-Jul-15
02-Sep-15 01-Aug-15 09-Sep-15 0% 0% 96ENG.MS.PL.13 Material
Submittal - Sanitary Wares Fittings & Accessories25-Jul-15
09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0% 96ENG.MS.PL.14 Material
Approval - Sanitary Wares Fittings & Accessories10-Aug-15
02-Sep-15 17-Aug-15 09-Sep-15 0% 0% 96GRP WATERGRP WATER TANK &
FITTINGS16-Sep-15 15-Oct-15 14-Jun-15 A 22-Aug-15 0% 0%
112ENG.MS.PL.18 Material Approval - GRP Watertank 16-Sep-15
15-Oct-15 14-Jun-15 A 22-Aug-15 0% 0% 112IPTV SYSTEM IPTV SYSTEM
& ACCESSORIES10-Jun-15 26-Jul-15 27-Jun-15 A 19-Aug-15 0% 0%
101ENG.MS.EE.30 Material Submittal - IPTV System & Accessories
10-Jun-15 27-Jun-15 27-Jun-15 A 06-Aug-15 100% 0% 101ENG.MS.EE.29
Material Approval - IPTV System & Accessories 27-Jun-15
26-Jul-15 04-Jul-15 A 19-Aug-15 100% 0% 101LOW VOLTAG LOW VOLTAGE
CABLE & ACCESSORIES25-May-15 22-Jul-15 07-May-15A19-Aug-15 0%
0% 72ENG.MS.EE.5 Material Submittal - Low Voltage Cable 25-May-15
09-Jun-15 07-May-15A06-Aug-15 100% 0% 17ENG.MS.EE.7 Material
Approval - Low Voltage Cable 23-Jun-15 22-Jul-15 28-Jun-15 A
19-Aug-15 100% 0% 72CBS & LUMIN CBS & LUMINAIRES &
ACCESSORIES27-Jun-15 02-Sep-15 07-May-15A09-Sep-15 0% 0%
53ENG.MS.EE.9 Material Submittal - CBS & Luminaires 27-Jun-15
12-Jul-15 07-May-15A16-Aug-15 100% 0% 17ENG.MS.EE.10 Material
Approval - CBS & Luminaires 10-Aug-15 02-Sep-15 17-Aug-15
09-Sep-15 0% 0% 53VA SYSTEM & VA SYSTEM &
ACCESSORIES04-Jul-15 02-Aug-15 27-Jun-15 A 05-Sep-15 0% 0%
58ENG.MS.EE.12 Material Submittal - VA System 13-Jul-15 02-Aug-15
27-Jun-15 A 23-Aug-15 85.71% 0% 17ENG.MS.EE.14 Material Approval -
VA System 04-Jul-15 01-Aug-15 04-Jul-15 A 05-Sep-15 95.24% 0%
58ACCESS CO ACCESS CONTROL SYSTEM & ACCESSORIES27-Jul-15
06-Sep-15 27-Jun-15 A 10-Sep-15 0% 0% 53ENG.MS.EE.15 Material
Submittal - Access Control System 27-Jul-15 12-Aug-15 27-Jun-15 A
30-Aug-15 24.29% 0% 17ENG.MS.EE.16 Material Approval - Access
Control System 12-Aug-15 06-Sep-15 04-Jul-15 A 10-Sep-15 0% 0% 53S
O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D2015
2016Date: 08-Aug-15 3/42 Start Date: 15-Oct-14 Completion Date:
13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatDATA & TELE DATA & TELEPHONE SYSTEM
& ACCESSORIES12-Aug-15 22-Sep-15 21-Jun-15 A 17-Sep-15 0% 0%
47ENG.MS.EE.17 Material Submittal - Data & Telephone System
12-Aug-15 29-Aug-15 21-Jun-15 A 05-Sep-15 0% 0% 17ENG.MS.EE.19
Material Approval - Data & Telephone System 29-Aug-15 22-Sep-15
28-Jun-15 A 17-Sep-15 0% 0% 47CCTV & SEC CCTV & SECURITY
SYSTEM & ACCESSORIES29-Aug-15 14-Oct-15 27-Jun-15 A 29-Sep-15
0% 0% 42ENG.MS.EE.18 Material Submittal - CCTV & Security
System 29-Aug-15 14-Sep-15 27-Jun-15 A 12-Sep-15 0% 0%
17ENG.MS.EE.21 Material Approval - CCTV & Security System
14-Sep-15 14-Oct-15 04-Jul-15 A 29-Sep-15 0% 0% 42LIGHT FITTIN
LIGHT FITTINGS & ACCESSORIES05-Sep-15 21-Oct-15 12-Sep-15
28-Oct-15 0% 0% 17ENG.MS.EE.20 Material Submittal - Light Fittings
05-Sep-15 21-Sep-15 12-Sep-15 04-Oct-15 0% 0% 17ENG.MS.EE.23
Material Approval - Light Fittings 21-Sep-15 21-Oct-15 04-Oct-15
28-Oct-15 0% 0% 17FIRE FIGHTIN FIRE FIGHTING VALVES &
FITTINGS08-Apr-15 18-May-15 01-Apr-15 A 15-Aug-15 0% 0%
101ENG.MS.FF.13 Material Submittal - Fire Fighting Valves &
Fittings 08-Apr-15 23-Apr-15 01-Apr-15 A 11-Aug-15 100% 0%
101ENG.MS.FF.14 Material Approval - Fire Fighting Valves &
Fittings 25-Apr-15 18-May-15 16-Jun-15 A 15-Aug-15 100% 0% 101FM
200 & ACC FM 200 & ACCESSORIES09-Jun-15 16-Jul-15 09-Jun-15
A 19-Aug-15 0% 0% 165ENG.MS.FF.15 Material Submittal - FM 200
09-Jun-15 24-Jun-15 09-Jun-15 A 06-Aug-15 100% 0% 104ENG.MS.FF.16
Material Approval - FM 200 22-Jun-15 16-Jul-15 16-Jun-15 A
19-Aug-15 100% 0% 165SPRINKLERSPRINKLER HEADS &
ACCESSORIES22-Jun-15 06-Aug-15 09-Jun-15 A 25-Aug-15 0% 0%
131ENG.MS.FF.2 Material Submittal - Sprinkler Head &
Accessories 22-Jun-15 08-Jul-15 09-Jun-15 A 13-Aug-15 100% 0%
104ENG.MS.FF.4 Material Approval - Sprinkler Head & Accessories
08-Jul-15 06-Aug-15 16-Jun-15 A 25-Aug-15 72.86% 0% 131FIRE BRIGAD
FIRE BRIGADE VALVE & FITTINGS08-Jul-15 23-Aug-15 09-Jun-15 A
01-Sep-15 0% 0% 126ENG.MS.FF.5 Material Submittal - Fire Brigade
Valve & Fittings 08-Jul-15 29-Jul-15 09-Jun-15 A 19-Aug-15 100%
0% 104ENG.MS.FF.6 Material Approval - Fire Brigade Valve &
Fittings 29-Jul-15 23-Aug-15 16-Jun-15 A 01-Sep-15 6.19% 0% 126FIRE
HOSE R FIRE HOSE REEL CABINET & ACCESSORIES29-Jul-15 08-Sep-15
09-Jun-15 A 07-Sep-15 0% 0% 104ENG.MS.FF.7 Material Submittal -
Fire Hose Reel Cabinet 29-Jul-15 15-Aug-15 09-Jun-15 A 26-Aug-15
9.29% 0% 104ENG.MS.FF.8 Material Approval - Fire Hose Reel Cabinet
15-Aug-15 08-Sep-15 16-Jun-15 A 07-Sep-15 0% 0% 104FIRE EXTING FIRE
EXTINGUISHER08-Sep-15 25-Oct-15 09-Jun-15 A 01-Oct-15 0% 0% 104S O
N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D2015
2016Date: 08-Aug-15 4/42 Start Date: 15-Oct-14 Completion Date:
13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.MS.FF.9 Material Submittal - Fire
Extinguisher 08-Sep-15 30-Sep-15 09-Jun-15 A 14-Sep-15 0% 0%
104ENG.MS.FF.10 Material Approval - Fire Extinguisher 30-Sep-15
25-Oct-15 16-Jun-15 A 01-Oct-15 0% 0% 104METHOD STAT METHOD
STATEMENT SUBMITTAL & APPROVAL21-May-15 06-Dec-15 02-Apr-15 A
10-Nov-15 0% 0% 146STRUCTURAL STRUCTURAL21-May-15 06-Jul-15
02-Apr-15 A 08-Aug-15 0% 0% 30STEEL STRU STEEL STRUCTURE &
METAL DECKING21-May-15 06-Jul-15 02-Apr-15 A 08-Aug-15 0% 0%
30ENG.MSS.ST.011 Method Statement Submittal - Steel Structure &
Metal Decking21-May-15 07-Jun-15 02-Apr-15 A 01-Aug-15 100% 0%
30ENG.MSS.ST.012 Method Statement Approval - Steel Structure &
Metal Decking13-Jun-15 06-Jul-15 30-Jun-15 A 08-Aug-15 100% 0%
30ARCHITECTU ARCHITECTURAL25-Jul-15 22-Oct-15 01-Aug-15 29-Oct-15
0% 0% 156WOOD VENE WOOD VENEERED MDF PANEL25-Jul-15 02-Sep-15
01-Aug-15 09-Sep-15 0% 0% 58ENG.MSS.AR.16 Method Statement
Submittal - Wood Veneered MDF Panel25-Jul-15 09-Aug-15 01-Aug-15
16-Aug-15 42.86% 0% 58ENG.MSS.AR.20 Method Statement Approval -
Wood Veneered MDF Panel10-Aug-15 02-Sep-15 17-Aug-15 09-Sep-15 0%
0% 58WOOD PARQ WOOD PARQUET FLOORING25-Jul-15 02-Sep-15 01-Aug-15
09-Sep-15 0% 0% 105ENG.MSS.AR.31 Method Statement Submittal - Wood
Parquet Flooring25-Jul-15 09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0%
105ENG.MSS.AR.33 Method Statement Approval - Wood Parquet
Flooring10-Aug-15 02-Sep-15 17-Aug-15 09-Sep-15 0% 0% 105INTERNAL
PA INTERNAL PAINT03-Sep-15 19-Oct-15 10-Sep-15 26-Oct-15 0% 0%
53ENG.MSS.AR.15 Method Statement Submittal - Internal Paint
03-Sep-15 19-Sep-15 10-Sep-15 01-Oct-15 0% 0% 53ENG.MSS.AR.19
Method Statement Approval - Internal Paint 20-Sep-15 19-Oct-15
03-Oct-15 26-Oct-15 0% 0% 53EPOXY PAINT EPOXY PAINT20-Sep-15
11-Oct-15 03-Oct-15 18-Oct-15 0% 0% 67ENG.MSS.AR.10 Method
Statement Submittal - Epoxy Paint 20-Sep-15 11-Oct-15 03-Oct-15
18-Oct-15 0% 0% 67PANTRY CAB PANTRY CABINET & BASE
CABINET25-Jul-15 02-Sep-15 01-Aug-15 09-Sep-15 0% 0%
128ENG.MSS.AR.36 Method Statement Submittal - Kitchen Cabinet
25-Jul-15 09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0% 128ENG.MSS.AR.37
Method Statement Approval - Kitchen Cabinet 10-Aug-15 02-Sep-15
17-Aug-15 09-Sep-15 0% 0% 128TOILET CUB TOILET CUBICLE25-Jul-15
02-Sep-15 01-Aug-15 09-Sep-15 0% 0% 131ENG.MSS.AR.32 Method
Statement Submittal - Toilet Cubicle 25-Jul-15 09-Aug-15 01-Aug-15
16-Aug-15 42.86% 0% 131ENG.MSS.AR.39 Method Statement Approval -
Toilet Cubicle 10-Aug-15 02-Sep-15 17-Aug-15 09-Sep-15 0% 0% 131S O
N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D2015
2016Date: 08-Aug-15 5/42 Start Date: 15-Oct-14 Completion Date:
13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatCARPET CARPET03-Sep-15 19-Oct-15 10-Sep-15
26-Oct-15 0% 0% 127ENG.MSS.AR.35 Method Statement Submittal -
Carpet 03-Sep-15 19-Sep-15 10-Sep-15 01-Oct-15 0% 0%
127ENG.MSS.AR.40 Method Statement Approval - Carpet 20-Sep-15
19-Oct-15 03-Oct-15 26-Oct-15 0% 0% 127VANITY TOPVANITY TOP
COUNTER25-Jul-15 02-Sep-15 01-Aug-15 09-Sep-15 0% 0%
148ENG.MSS.AR.41 Method Statement Submittal - Vanity Top 25-Jul-15
09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0% 148ENG.MSS.AR.42 Method
Statement Approval - Vanity Top 10-Aug-15 02-Sep-15 17-Aug-15
09-Sep-15 0% 0% 148WOODEN DO WOODEN DOORS INCLUDING SUBFRAMES &
ARC25-Jul-15 02-Sep-15 01-Aug-15 09-Sep-15 0% 0% 105ENG.MSS.AR.43
Method Statement Submittal - Wooden Doors 25-Jul-15 09-Aug-15
01-Aug-15 16-Aug-15 42.86% 0% 105ENG.MSS.AR.44 Method Statement
Approval - Wooden Doors 10-Aug-15 02-Sep-15 17-Aug-15 09-Sep-15 0%
0% 105IRON MONG IRON MONGERY25-Jul-15 02-Sep-15 01-Aug-15 09-Sep-15
0% 0% 119ENG.MSS.AR.45 Method Statement Submittal - Ironmongery
25-Jul-15 09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0% 127ENG.MSS.AR.46
Method Statement Approval - Ironmongery 10-Aug-15 02-Sep-15
17-Aug-15 09-Sep-15 0% 0% 119STEEL DOOR STEEL DOORS INCLUDING
SUBFRAMES & ARCHIT25-Jul-15 17-Aug-15 01-Aug-15 24-Aug-15 0% 0%
112ENG.MSS.AR.47 Method Statement Submittal - Steel Doors 25-Jul-15
09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0% 112ENG.MSS.AR.48 Method
Statement Approval - Steel Doors 25-Jul-15 17-Aug-15 01-Aug-15
24-Aug-15 28.57% 0% 112INTERLOCKI INTERLOCKING TILES &
KERBS07-Sep-15 22-Oct-15 14-Sep-15 29-Oct-15 0% 0% 105ENG.MSS.AR.50
Method Statement Submittal - Interlocking Tiles &
Kerbs07-Sep-15 22-Sep-15 14-Sep-15 05-Oct-15 0% 0% 105ENG.MSS.AR.52
Method Statement Approval - Interlocking Tiles & Kerbs29-Sep-15
22-Oct-15 06-Oct-15 29-Oct-15 0% 0% 105GRC WORKS GRC WORKS07-Sep-15
22-Oct-15 14-Sep-15 29-Oct-15 0% 0% 91ENG.MSS.AR.49 Method
Statement Submittal - GRC Works 07-Sep-15 22-Sep-15 14-Sep-15
05-Oct-15 0% 0% 91ENG.MSS.AR.51 Method Statement Approval - GRC
Works 29-Sep-15 22-Oct-15 06-Oct-15 29-Oct-15 0% 0% 91SOFT LANDS
SOFT LANDSCAPE (PLANT, TREES, SHRUBS, GRAS07-Sep-15 22-Oct-15
14-Sep-15 29-Oct-15 0% 0% 156ENG.MSS.AR.53 Method Statement
Submittal - Soft Landscape (Plants, Trees, Shrubs, Grass, Ground
Cover, etc)07-Sep-15 22-Sep-15 14-Sep-15 05-Oct-15 0% 0%
156ENG.MSS.AR.55 Method Statement Approval - Soft Landscape
(Plants, Trees, Shrubs, Grass, Ground Cover, etc)29-Sep-15
22-Oct-15 06-Oct-15 29-Oct-15 0% 0% 156MEP WORKS MEP WORKS29-Aug-15
06-Dec-15 01-Jun-15 A 10-Nov-15 0% 0% 86S O N D J F M A M J Jul A S
O N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 6/42 Start
Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost %CompleteTotalFloatFIRE
FIGHTIN FIRE FIGHTING WORKS20-Sep-15 04-Nov-15 16-Jul-15 A
21-Oct-15 0% 0% 104ENG.MSS.MEP.3 Method Statement Submittal - Fire
Fighting Works 20-Sep-15 11-Oct-15 16-Jul-15 A 08-Oct-15 0% 0%
104ENG.MSS.MEP.4 Method Statement Approval - Fire Fighting Works
12-Oct-15 04-Nov-15 30-Jul-15 A 21-Oct-15 0% 0% 104HVAC WORK HVAC
WORKS29-Aug-15 14-Oct-15 16-Jul-15 A 29-Sep-15 0% 0%
123ENG.MSS.MEP.5 Method Statement Submittal - HVAC Works 29-Aug-15
14-Sep-15 16-Jul-15 A 10-Sep-15 0% 0% 123ENG.MSS.MEP.6 Method
Statement Approval - HVAC Works 14-Sep-15 14-Oct-15 30-Jul-15 A
29-Sep-15 0% 0% 123ELECTRICAL ELECTRICAL WORKS19-Nov-15 06-Dec-15
01-Jun-15 A 10-Nov-15 0% 0% 17ENG.MSS.MEP.9 Method Statement
Submittal - Electrical Works 19-Nov-15 06-Dec-15 01-Jun-15 A
10-Nov-15 0% 0% 17SHOP DRAWIN SHOP DRAWING SUBMITTAL &
APPROVAL11-Apr-15 02-Dec-15 26-Mar-15 A 26-Oct-15 0% 0%
175STRUCTURAL STRUCTURAL11-Apr-15 28-Jul-15 11-Apr-15 A 20-Aug-15
0% 0% 20STRUCTURA STRUCTURAL LAYOUT & DETAILS11-Apr-15
27-Jul-15 11-Apr-15 A 20-Aug-15 0% 0% 17WALL DETAILS WALL DETAILS
1-3 (BUILDING-2) 11-Apr-15 02-Jul-15 11-Apr-15 A 03-Aug-15 0% 0%
32ENG.SD.ST.28 Shop Drawing Submittal - Wall Details 1-3 11-Apr-15
26-Apr-15 11-Apr-15 A 01-Aug-15 100% 0% 17ENG.SD.ST.36 Shop Drawing
Approval - Wall Details 1-3 08-Jun-15 02-Jul-15 25-Jun-15 A
03-Aug-15 100% 0% 32WALL DETAILS WALL DETAILS 4-7 (BUILDING-2)
31-May-15 06-Jul-15 16-May-15A04-Aug-15 0% 0% 31ENG.SD.ST.38 Shop
Drawing Submittal - Wall Details 4-7 31-May-15 16-Jun-15
16-May-15A02-Aug-15 100% 0% 17ENG.SD.ST.46 Shop Drawing Approval -
Wall Details 4-7 11-Jun-15 06-Jul-15 25-Jun-15 A 04-Aug-15 100% 0%
31WALL DETAILS WALL DETAILS 8-12 (BUILDING-2) 08-Jun-15 14-Jul-15
16-May-15A12-Aug-15 0% 0% 24ENG.SD.ST.49 Shop Drawing Submittal -
Wall Details 8-12 08-Jun-15 24-Jun-15 16-May-15A10-Aug-15 100% 0%
17ENG.SD.ST.55 Shop Drawing Approval - Wall Details 8-12 20-Jun-15
14-Jul-15 25-Jun-15 A 12-Aug-15 100% 0% 24WALL DETAILS WALL DETAILS
13-15 (BUILDING-2) 16-Jun-15 27-Jul-15 16-May-15A20-Aug-15 0% 0%
17ENG.SD.ST.56 Shop Drawing Submittal - Wall Details 13-15
16-Jun-15 02-Jul-15 16-May-15A18-Aug-15 100% 0% 17ENG.SD.ST.58 Shop
Drawing Approval - Wall Details 13-15 28-Jun-15 27-Jul-15 25-Jun-15
A 20-Aug-15 100% 0% 17STEEL STRU STEEL STRUCTURE & METAL
DECKING29-Jun-15 28-Jul-15 08-Jun-15 A 02-Aug-15 0% 0%
37ENG.SD.ST.57 Shop Drawing Approval - Steel Structure 29-Jun-15
28-Jul-15 08-Jun-15 A 02-Aug-15 100% 0% 37S O N D J F M A M J Jul A
S O N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 7/42
Start Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatARCHITECTU ARCHITECTURAL11-Jul-15 19-Oct-15
19-May-15A26-Oct-15 0% 0% 130BLOCKWOR BLOCKWORK & OTHER
ARCHITECTURAL25-Jul-15 25-Aug-15 26-Jul-15 A 30-Aug-15 0% 0%
120BUILDING SEC BUILDING SECTION (BUILDING-1) 25-Jul-15 25-Aug-15
26-Jul-15 A 30-Aug-15 0% 0% 120ENG.SD.AR.34 Shop Drawing Submittal
- Building Section 25-Jul-15 09-Aug-15 26-Jul-15 A 13-Aug-15 42.86%
0% 120ENG.SD.AR.37 Shop Drawing Approval - Building Section
10-Aug-15 25-Aug-15 13-Aug-15 30-Aug-15 0% 0% 120WOOD VENE WOOD
VENEERED MDF PANEL03-Sep-15 19-Oct-15 10-Sep-15 26-Oct-15 0% 0%
58ENG.SD.AR.51 Shop Drawing Submittal - Wood Veneered MDF
Panel03-Sep-15 19-Sep-15 10-Sep-15 01-Oct-15 0% 0% 58ENG.SD.AR.55
Shop Drawing Approval - Wood Veneered MDF Panel20-Sep-15 19-Oct-15
03-Oct-15 26-Oct-15 0% 0% 5812.5MM THK. 12.5MM THK. WOOD VENEERED
MDF CEILING PANE25-Jul-15 02-Sep-15 01-Aug-15 09-Sep-15 0% 0%
120ENG.SD.AR.54 Shop Drawing Submittal - 12.5mm Wood Veneered MDF
Ceiling Panel25-Jul-15 09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0%
120ENG.SD.AR.57 Shop DrawingApproval - 12.5mm Wood Veneered MDF
Ceiling Panel10-Aug-15 02-Sep-15 17-Aug-15 09-Sep-15 0% 0%
120600x600 PER 600x600 PERFORATED METAL PAN CEILING11-Jul-15
25-Aug-15 19-May-15A19-Aug-15 0% 0% 125ENG.SD.AR.56 Shop Drawing
Submittal - 600x600 Per. Met. Pan Ceiling11-Jul-15 01-Aug-15
19-May-15A06-Aug-15 96.29% 0% 125ENG.SD.AR.61 Shop Drawing Approval
- 600x600 Per. Met. Pan Ceiling01-Aug-15 25-Aug-15
26-May-15A19-Aug-15 0% 0% 12512.5MM THK. 12.5MM THK. GYPSUM BOARD
CEILING11-Jul-15 25-Aug-15 19-May-15A19-Aug-15 0% 0%
184ENG.SD.AR.60 Shop Drawing Submittal - 12.5mm Thk. Gypsum Board
Ceiling11-Jul-15 01-Aug-15 19-May-15A06-Aug-15 96.29% 0%
184ENG.SD.AR.64 Shop Drawing Approval - 12.5mm Thk. Gypsum Board
Ceiling01-Aug-15 25-Aug-15 26-May-15A19-Aug-15 0% 0% 18412.5MM THK.
12.5MM THK. HUMIDITY RESISTANCE CEILING BOA09-Aug-15 19-Sep-15
19-May-15A19-Aug-15 0% 0% 145ENG.SD.AR.65 Shop Drawing Submittal -
12mm Thk. Humidity Res. Ceiling Board09-Aug-15 25-Aug-15
19-May-15A06-Aug-15 0% 0% 145ENG.SD.AR.66 Shop Drawing Approval -
12mm Thk. Humidity Res. Ceiling Board25-Aug-15 19-Sep-15
26-May-15A19-Aug-15 0% 0% 145WOOD PARQ WOOD PARQUET
FLOORING25-Jul-15 02-Sep-15 01-Aug-15 09-Sep-15 0% 0%
105ENG.SD.AR.67 Shop Drawing Submittal - Wood Parquet Flooring
25-Jul-15 09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0% 105ENG.SD.AR.70
Shop Drawing Approval - Wood Parquet Flooring 10-Aug-15 02-Sep-15
17-Aug-15 09-Sep-15 0% 0% 105WOODEN DO WOODEN DOORS INCLUDING
SUBFRAMES & ARC25-Jul-15 02-Sep-15 01-Aug-15 09-Sep-15 0% 0%
105ENG.SD.AR.79 Shop Drawing Submittal - Wooden Doors 25-Jul-15
09-Aug-15 01-Aug-15 16-Aug-15 42.86% 0% 105S O N D J F M A M J Jul
A S O N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 8/42
Start Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.SD.AR.81 Shop Drawing Approval - Wooden
Doors 10-Aug-15 02-Sep-15 17-Aug-15 09-Sep-15 0% 0% 105MEP WORKS
MEP WORKS09-May-15 02-Dec-15 26-Mar-15 A 26-Oct-15 0% 0%
175DRAINAGE S DRAINAGE SHOP DRAWINGS15-Jun-15 29-Aug-15 10-Jun-15 A
25-Aug-15 0% 0% 170ROOF FLOORROOF FLOOR LEVEL (BUILDING-1)
28-Jun-15 12-Aug-15 10-Jun-15 A 19-Aug-15 0% 0% 176ENG.SD.DR.15
Shop Drawing Submittal - Drainage 28-Jun-15 14-Jul-15 10-Jun-15 A
06-Aug-15 100% 0% 119ENG.SD.DR.18 Shop Drawing Approval - Drainage
14-Jul-15 12-Aug-15 17-Jun-15 A 19-Aug-15 49.52% 0% 176UPPER
ROOFUPPER ROOF FLOOR LEVEL (BUILDING-1) 14-Jul-15 29-Aug-15
10-Jun-15 A 25-Aug-15 0% 0% 170ENG.SD.DR.19 Shop Drawing Submittal
- Drainage 14-Jul-15 04-Aug-15 10-Jun-15 A 13-Aug-15 74.29% 0%
119ENG.SD.DR.21 Shop Drawing Approval - Drainage 04-Aug-15
29-Aug-15 17-Jun-15 A 25-Aug-15 0% 0% 170ROOF FLOORROOF FLOOR LEVEL
(BUILDING-2) 15-Jun-15 15-Jul-15 15-Jun-15 A 19-Aug-15 0% 0%
115ENG.SD.DR.8 Shop Drawing Submittal - Drainage 15-Jun-15
30-Jun-15 15-Jun-15 A 06-Aug-15 100% 0% 109ENG.SD.DR.11 Shop
Drawing Approval - Drainage 22-Jun-15 15-Jul-15 22-Jun-15 A
19-Aug-15 100% 0% 115UPPER ROOFUPPER ROOF FLOOR LEVEL (BUILDING-2)
22-Jun-15 05-Aug-15 15-Jun-15 A 25-Aug-15 0% 0% 109ENG.SD.DR.12
Shop Drawing Submittal - Drainage 22-Jun-15 07-Jul-15 15-Jun-15 A
13-Aug-15 100% 0% 109ENG.SD.DR.16 Shop Drawing Approval - Drainage
08-Jul-15 05-Aug-15 22-Jun-15 A 25-Aug-15 76.19% 0% 109WATER SUPP
WATER SUPPLY SHOP DRAWINGS09-May-15 03-Aug-15 09-May-15A25-Aug-15
0% 0% 137ROOF FLOORROOF FLOOR LEVEL (BUILDING-1) 06-Jun-15
15-Jul-15 29-Jun-15 A 19-Aug-15 0% 0% 143ENG.SD.WS.15 Shop Drawing
Submittal - Water Supply 06-Jun-15 21-Jun-15 29-Jun-15 A 06-Aug-15
100% 0% 143ENG.SD.WS.17 Shop Drawing Approval - Water Supply
22-Jun-15 15-Jul-15 05-Jul-15 A 19-Aug-15 100% 0% 143GROUND FLOO
GROUND FLOOR LEVEL (BUILDING-2) 09-May-15 13-Jul-15
09-May-15A19-Aug-15 0% 0% 90ENG.SD.WS.4 Shop Drawing Submittal -
Water Supply 09-May-15 24-May-15 09-May-15A06-Aug-15 100% 0%
90ENG.SD.WS.7 Shop Drawing Approval - Water Supply 18-Jun-15
13-Jul-15 17-Jun-15 A 19-Aug-15 100% 0% 90ROOF FLOORROOF FLOOR
LEVEL (BUILDING-2) 04-Jul-15 03-Aug-15 04-Jul-15 A 25-Aug-15 0% 0%
109ENG.SD.WS.8 Shop Drawing Submittal - Water Supply 04-Jul-15
23-Jul-15 04-Jul-15 A 13-Aug-15 100% 0% 109ENG.SD.WS.12 Shop
Drawing Approval - Water Supply 05-Jul-15 03-Aug-15 11-Jul-15 A
25-Aug-15 89.52% 0% 109S O N D J F M A M J Jul A S O N D J F M A M
J Jul A S O N D2015 2016Date: 08-Aug-15 9/42 Start Date: 15-Oct-14
Completion Date: 13-Oct-16Remaining Level of EffortProject Baseline
BarActual WorkEarly BarCritical ActivityBaseline BarCurrent Bar
LabelsEarly BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE
OF OFFICER'S BUILDING 12 AT BARZAN CAMP Layout Name: 3Month
Lookahead Programme (1.8.15) Date Revision Checked
Approved15-Oct-1... 1.8.15 Three Months Lookah... Richard
NabilActivity ID Activity Name Baseline StartBaseline FinishStart
Finish Schedule %CompleteCost %CompleteTotalFloatPOWER SHO POWER
SHOP DRAWINGS09-May-15 01-Oct-15 04-Jun-15 A 08-Oct-15 0% 0% 45ROOF
FLOORROOF FLOOR LEVEL (BUILDING-1) 08-Jul-15 22-Aug-15 18-Jul-15 A
19-Aug-15 0% 0% 84ENG.SD.PO.15 Shop Drawing Submittal - Electrical
Power 08-Jul-15 28-Jul-15 18-Jul-15 A 06-Aug-15 100% 0%
78ENG.SD.PO.18 Shop Drawing Approval - Electrical Power 29-Jul-15
22-Aug-15 25-Jul-15 A 19-Aug-15 9.52% 0% 84UPPER ROOFUPPER ROOF
FLOOR LEVEL (BUILDING-1) 29-Jul-15 07-Sep-15 18-Jul-15 A 25-Aug-15
0% 0% 78ENG.SD.PO.19 Shop Drawing Submittal - Electrical Power
29-Jul-15 13-Aug-15 18-Jul-15 A 13-Aug-15 14.29% 0% 78ENG.SD.PO.21
Shop Drawing Approval - Electrical Power 15-Aug-15 07-Sep-15
25-Jul-15 A 25-Aug-15 0% 0% 78GROUND FLOO GROUND FLOOR LEVEL
(BUILDING-2) 09-May-15 14-Jul-15 04-Jun-15 A 19-Aug-15 0% 0%
73ENG.SD.PO.4 Shop Drawing Submittal - Electrical Power 09-May-15
24-May-15 04-Jun-15 A 06-Aug-15 100% 0% 45ENG.SD.PO.7 Shop Drawing
Approval - Electrical Power 20-Jun-15 14-Jul-15 11-Jun-15 A
19-Aug-15 100% 0% 73ROOF FLOORROOF FLOOR LEVEL (BUILDING-2)
30-Jul-15 09-Sep-15 06-Aug-15 16-Sep-15 0% 0% 59ENG.SD.PO.8 Shop
Drawing Submittal - Electrical Power 30-Jul-15 16-Aug-15 06-Aug-15
23-Aug-15 2.86% 0% 45ENG.SD.PO.11 Shop Drawing Approval -
Electrical Power 16-Aug-15 09-Sep-15 23-Aug-15 16-Sep-15 0% 0%
59UPPER ROOFUPPER ROOF FLOOR LEVEL (BUILDING-2) 16-Aug-15 01-Oct-15
23-Aug-15 08-Oct-15 0% 0% 45ENG.SD.PO.12 Shop Drawing Submittal -
Electrical Power 16-Aug-15 01-Sep-15 23-Aug-15 08-Sep-15 0% 0%
45ENG.SD.PO.16 Shop Drawing Approval - Electrical Power 01-Sep-15
01-Oct-15 08-Sep-15 08-Oct-15 0% 0% 45LIGHTING SH LIGHTING SHOP
DRAWINGS09-May-15 04-Aug-15 08-Jun-15 A 25-Aug-15 0% 0% 120ROOF
FLOORROOF FLOOR LEVEL (BUILDING-1) 09-May-15 14-Jul-15 15-Jul-15 A
19-Aug-15 0% 0% 75ENG.SD.LI.15 Shop Drawing Submittal - Electrical
Lighting 09-May-15 24-May-15 15-Jul-15 A 06-Aug-15 100% 0%
69ENG.SD.LI.18 Shop Drawing Approval - Electrical Lighting
20-Jun-15 14-Jul-15 22-Jul-15 A 19-Aug-15 100% 0% 75UPPER ROOFUPPER
ROOF FLOOR LEVEL (BUILDING-1) 20-Jun-15 04-Aug-15 15-Jul-15 A
25-Aug-15 0% 0% 69ENG.SD.LI.19 Shop Drawing Submittal - Electrical
Lighting 20-Jun-15 06-Jul-15 15-Jul-15 A 13-Aug-15 100% 0%
69ENG.SD.LI.21 Shop Drawing Approval - Electrical Lighting
06-Jul-15 04-Aug-15 22-Jul-15 A 25-Aug-15 82.86% 0% 69ROOF
FLOORROOF FLOOR LEVEL (BUILDING-2) 09-May-15 14-Jul-15 08-Jun-15 A
19-Aug-15 0% 0% 115ENG.SD.LI.8 Shop Drawing Submittal - Electrical
Lighting 09-May-15 24-May-15 08-Jun-15 A 06-Aug-15 100% 0% 115S O N
D J F M A M J Jul A S O N D J F M A M J Jul A S O N D2015 2016Date:
08-Aug-15 10/42 Start Date: 15-Oct-14 Completion Date:
13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.SD.LI.11 Shop Drawing Approval - Electrical
Lighting 20-Jun-15 14-Jul-15 15-Jun-15 A 19-Aug-15 100% 0% 115UPPER
ROOFUPPER ROOF FLOOR LEVEL (BUILDING-2) 20-Jun-15 04-Aug-15
08-Jun-15 A 25-Aug-15 0% 0% 120ENG.SD.LI.12 Shop Drawing Submittal
- Electrical Lighting 20-Jun-15 06-Jul-15 08-Jun-15 A 13-Aug-15
100% 0% 120ENG.SD.LI.16 Shop Drawing Approval - Electrical Lighting
06-Jul-15 04-Aug-15 15-Jun-15 A 25-Aug-15 82.86% 0% 120CCTV &
SEC CCTV & SECURITY SYSTEM SHOP DRAWINGS06-Jun-15 18-Oct-15
07-Jul-15 A 25-Oct-15 0% 0% 176GROUND FLOO GROUND FLOOR LEVEL
(BUILDING-1) 06-Jun-15 15-Jul-15 07-Jul-15 A 19-Aug-15 0% 0%
75ENG.SD.CCTV.1 Shop Drawing Submittal - CCTV & Security System
06-Jun-15 21-Jun-15 07-Jul-15 A 06-Aug-15 100% 0% 35ENG.SD.CCTV.3
Shop Drawing Approval - CCTV & Security System 22-Jun-15
15-Jul-15 14-Jul-15 A 19-Aug-15 100% 0% 75FIRST FLOORFIRST FLOOR
LEVEL (BUILDING-1) 22-Jun-15 05-Aug-15 07-Jul-15 A 25-Aug-15 0% 0%
95ENG.SD.CCTV.2 Shop Drawing Submittal - CCTV & Security System
22-Jun-15 07-Jul-15 07-Jul-15 A 13-Aug-15 100% 0% 75ENG.SD.CCTV.5
Shop Drawing Approval - CCTV & Security System 08-Jul-15
05-Aug-15 14-Jul-15 A 25-Aug-15 76.19% 0% 95SECOND FLOO SECOND
FLOOR LEVEL (BUILDING-1) 06-Aug-15 16-Sep-15 13-Aug-15 29-Sep-15 0%
0% 84ENG.SD.CCTV.6 Shop Drawing Submittal - CCTV & Security
System 06-Aug-15 23-Aug-15 13-Aug-15 30-Aug-15 0% 0%
75ENG.SD.CCTV.9 Shop Drawing Approval - CCTV & Security System
23-Aug-15 16-Sep-15 30-Aug-15 29-Sep-15 0% 0% 84THIRD FLOOR THIRD
FLOOR LEVEL (BUILDING-1) 23-Aug-15 08-Oct-15 30-Aug-15 15-Oct-15 0%
0% 75ENG.SD.CCTV.10Shop Drawing Submittal - CCTV & Security
System 23-Aug-15 08-Sep-15 30-Aug-15 15-Sep-15 0% 0%
75ENG.SD.CCTV.13Shop Drawing Approval - CCTV & Security System
08-Sep-15 08-Oct-15 15-Sep-15 15-Oct-15 0% 0% 75UPPER ROOFUPPER
ROOF FLOOR LEVEL (BUILDING-1) 30-Sep-15 17-Oct-15 07-Oct-15
24-Oct-15 0% 0% 142ENG.SD.CCTV.19Shop Drawing Submittal - CCTV
& Security System 30-Sep-15 17-Oct-15 07-Oct-15 24-Oct-15 0% 0%
142ROOF FLOORROOF FLOOR LEVEL (BUILDING-1) 08-Sep-15 30-Sep-15
15-Sep-15 07-Oct-15 0% 0% 98ENG.SD.CCTV.15Shop Drawing Submittal -
CCTV & Security System 08-Sep-15 30-Sep-15 15-Sep-15 07-Oct-15
0% 0% 98GROUND FLOO GROUND FLOOR LEVEL (BUILDING-2) 30-Jul-15
09-Sep-15 06-Aug-15 16-Sep-15 0% 0% 69ENG.SD.CCTV.4 Shop Drawing
Submittal - CCTV & Security System 30-Jul-15 16-Aug-15
06-Aug-15 23-Aug-15 2.86% 0% 69ENG.SD.CCTV.7 Shop Drawing Approval
- CCTV & Security System 16-Aug-15 09-Sep-15 23-Aug-15
16-Sep-15 0% 0% 69ROOF FLOORROOF FLOOR LEVEL (BUILDING-2) 16-Aug-15
01-Oct-15 23-Aug-15 08-Oct-15 0% 0% 76S O N D J F M A M J Jul A S O
N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 11/42 Start
Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.SD.CCTV.8 Shop Drawing Submittal - CCTV
& Security System 16-Aug-15 01-Sep-15 23-Aug-15 08-Sep-15 0% 0%
76ENG.SD.CCTV.11Shop Drawing Approval - CCTV & Security System
01-Sep-15 01-Oct-15 08-Sep-15 08-Oct-15 0% 0% 76UPPER ROOFUPPER
ROOF FLOOR LEVEL (BUILDING-2) 01-Sep-15 18-Oct-15 08-Sep-15
25-Oct-15 0% 0% 176ENG.SD.CCTV.12Shop Drawing Submittal - CCTV
& Security System 01-Sep-15 17-Sep-15 08-Sep-15 30-Sep-15 0% 0%
162ENG.SD.CCTV.16Shop Drawing Approval - CCTV & Security System
17-Sep-15 18-Oct-15 30-Sep-15 25-Oct-15 0% 0% 176DRAWING DET
DRAWING DETAILS (BUILDING-2) 17-Sep-15 10-Oct-15 30-Sep-15
17-Oct-15 0% 0% 162ENG.SD.CCTV.14Shop Drawing Submittal - CCTV
& Security System 17-Sep-15 10-Oct-15 30-Sep-15 17-Oct-15 0% 0%
162TELEPHONE TELEPHONE, DATA & TV SYSTEM SHOP DRAWINGS22-Jun-15
02-Dec-15 07-Jul-15 A 21-Oct-15 0% 0% 107GROUND FLOO GROUND FLOOR
LEVEL (BUILDING-1) 22-Jun-15 05-Aug-15 07-Jul-15 A 13-Aug-15 0% 0%
71ENG.SD.TEL.1 Shop Drawing Submittal - Telephone, Data & TV
System22-Jun-15 07-Jul-15 07-Jul-15 A 08-Aug-15 100% 0%
35ENG.SD.TEL.3 Shop Drawing Approval - Telephone, Data & TV
System08-Jul-15 05-Aug-15 14-Jul-15 A 13-Aug-15 76.19% 0% 71FIRST
FLOORFIRST FLOOR LEVEL (BUILDING-1) 08-Jul-15 22-Aug-15 07-Jul-15 A
15-Aug-15 0% 0% 104ENG.SD.TEL.2 Shop Drawing Submittal - Telephone,
Data & TV System08-Jul-15 28-Jul-15 07-Jul-15 A 10-Aug-15 100%
0% 104ENG.SD.TEL.5 Shop Drawing Approval - Telephone, Data & TV
System29-Jul-15 22-Aug-15 14-Jul-15 A 15-Aug-15 9.52% 0% 104SECOND
FLOO SECOND FLOOR LEVEL (BUILDING-1) 12-Aug-15 22-Sep-15 20-Jul-15
A 29-Aug-15 0% 0% 105ENG.SD.TEL.6 Shop Drawing Submittal -
Telephone, Data & TV System12-Aug-15 29-Aug-15 20-Jul-15 A
16-Aug-15 0% 0% 105ENG.SD.TEL.9 Shop Drawing Approval - Telephone,
Data & TV System29-Aug-15 22-Sep-15 03-Aug-15 A 29-Aug-15 0% 0%
105THIRD FLOOR THIRD FLOOR LEVEL (BUILDING-1) 29-Aug-15 14-Oct-15
20-Jul-15 A 05-Sep-15 0% 0% 105ENG.SD.TEL.10 Shop Drawing Submittal
- Telephone, Data & TV System29-Aug-15 14-Sep-15 20-Jul-15 A
23-Aug-15 0% 0% 105ENG.SD.TEL.13 Shop Drawing Approval - Telephone,
Data & TV System14-Sep-15 14-Oct-15 03-Aug-15 A 05-Sep-15 0% 0%
105ROOF FLOORROOF FLOOR LEVEL (BUILDING-1) 14-Sep-15 31-Oct-15
20-Jul-15 A 10-Sep-15 0% 0% 137ENG.SD.TEL.15 Shop Drawing Submittal
- Telephone, Data & TV System14-Sep-15 06-Oct-15 20-Jul-15 A
30-Aug-15 0% 0% 107ENG.SD.TEL.18 Shop Drawing Approval - Telephone,
Data & TV System06-Oct-15 31-Oct-15 03-Aug-15 A 10-Sep-15 0% 0%
137UPPER ROOFUPPER ROOF FLOOR LEVEL (BUILDING-1) 06-Oct-15
16-Nov-15 20-Jul-15 A 17-Sep-15 0% 0% 131ENG.SD.TEL.19 Shop Drawing
Submittal - Telephone, Data & TV System06-Oct-15 22-Oct-15
20-Jul-15 A 05-Sep-15 0% 0% 107S O N D J F M A M J Jul A S O N D J
F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 12/42 Start Date:
15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.SD.TEL.21 Shop Drawing Approval - Telephone,
Data & TV System22-Oct-15 16-Nov-15 03-Aug-15 A 17-Sep-15 0% 0%
131DRAWING DET DRAWING DETAILS (BUILDING-1) 22-Oct-15 02-Dec-15
05-Sep-15 21-Oct-15 0% 0% 107ENG.SD.TEL.20 Shop Drawing Submittal -
Telephone, Data & TV System22-Oct-15 08-Nov-15 05-Sep-15
21-Sep-15 0% 0% 107ENG.SD.TEL.22 Shop Drawing Approval - Telephone,
Data & TV System08-Nov-15 02-Dec-15 21-Sep-15 21-Oct-15 0% 0%
107GROUND FLOO GROUND FLOOR LEVEL (BUILDING-2) 06-Aug-15 16-Sep-15
20-Jul-15 A 27-Aug-15 0% 0% 87ENG.SD.TEL.4 Shop Drawing Submittal -
Telephone, Data & TV System06-Aug-15 23-Aug-15 20-Jul-15 A
15-Aug-15 0% 0% 87ENG.SD.TEL.7 Shop Drawing Approval - Telephone,
Data & TV System23-Aug-15 16-Sep-15 03-Aug-15 A 27-Aug-15 0% 0%
87ROOF FLOORROOF FLOOR LEVEL (BUILDING-2) 23-Aug-15 08-Oct-15
20-Jul-15 A 02-Sep-15 0% 0% 102ENG.SD.TEL.8 Shop Drawing Submittal
- Telephone, Data & TV System23-Aug-15 08-Sep-15 20-Jul-15 A
22-Aug-15 0% 0% 96ENG.SD.TEL.11 Shop Drawing Approval - Telephone,
Data & TV System08-Sep-15 08-Oct-15 03-Aug-15 A 02-Sep-15 0% 0%
102UPPER ROOFUPPER ROOF FLOOR LEVEL (BUILDING-2) 08-Sep-15
25-Oct-15 20-Jul-15 A 09-Sep-15 0% 0% 96ENG.SD.TEL.12 Shop Drawing
Submittal - Telephone, Data & TV System08-Sep-15 30-Sep-15
20-Jul-15 A 27-Aug-15 0% 0% 96ENG.SD.TEL.16 Shop Drawing Approval -
Telephone, Data & TV System30-Sep-15 25-Oct-15 03-Aug-15 A
09-Sep-15 0% 0% 96DRAWING DET DRAWING DETAILS (BUILDING-2)
30-Sep-15 10-Nov-15 27-Aug-15 13-Oct-15 0% 0% 114ENG.SD.TEL.14 Shop
Drawing Submittal - Telephone, Data & TV System30-Sep-15
17-Oct-15 27-Aug-15 13-Sep-15 0% 0% 114ENG.SD.TEL.17 Shop Drawing
Approval - Telephone, Data & TV System17-Oct-15 10-Nov-15
13-Sep-15 13-Oct-15 0% 0% 114FIRE ALARM FIRE ALARM SHOP
DRAWINGS06-Aug-15 31-Oct-15 09-Aug-15 26-Oct-15 0% 0% 55THIRD FLOOR
THIRD FLOOR LEVEL (BUILDING-1) 12-Aug-15 22-Sep-15 09-Aug-15
17-Sep-15 0% 0% 83ENG.SD.FA.10 Shop Drawing Submittal - Fire Alarm
System 12-Aug-15 29-Aug-15 09-Aug-15 24-Aug-15 0% 0% 55ENG.SD.FA.13
Shop Drawing Approval - Fire Alarm System 29-Aug-15 22-Sep-15
25-Aug-15 17-Sep-15 0% 0% 83ROOF FLOORROOF FLOOR LEVEL (BUILDING-1)
29-Aug-15 14-Oct-15 25-Aug-15 10-Oct-15 0% 0% 69ENG.SD.FA.15 Shop
Drawing Submittal - Fire Alarm System 29-Aug-15 14-Sep-15 25-Aug-15
09-Sep-15 0% 0% 55ENG.SD.FA.18 Shop Drawing Approval - Fire Alarm
System 14-Sep-15 14-Oct-15 10-Sep-15 10-Oct-15 0% 0% 69UPPER
ROOFUPPER ROOF FLOOR LEVEL (BUILDING-1) 14-Sep-15 31-Oct-15
10-Sep-15 26-Oct-15 0% 0% 55ENG.SD.FA.19 Shop Drawing Submittal -
Fire Alarm System 14-Sep-15 06-Oct-15 10-Sep-15 01-Oct-15 0% 0% 55S
O N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D2015
2016Date: 08-Aug-15 13/42 Start Date: 15-Oct-14 Completion Date:
13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.SD.FA.21 Shop Drawing Approval - Fire Alarm
System 06-Oct-15 31-Oct-15 03-Oct-15 26-Oct-15 0% 0% 55GROUND FLOO
GROUND FLOOR LEVEL (BUILDING-2) 06-Aug-15 16-Sep-15 09-Aug-15
17-Sep-15 0% 0% 68ENG.SD.FA.4 Shop Drawing Submittal - Fire Alarm
System 06-Aug-15 23-Aug-15 09-Aug-15 24-Aug-15 0% 0% 41ENG.SD.FA.7
Shop Drawing Approval - Fire Alarm System 23-Aug-15 16-Sep-15
25-Aug-15 17-Sep-15 0% 0% 68ROOF FLOORROOF FLOOR LEVEL (BUILDING-2)
23-Aug-15 08-Oct-15 25-Aug-15 10-Oct-15 0% 0% 69ENG.SD.FA.8 Shop
Drawing Submittal - Fire Alarm System 23-Aug-15 08-Sep-15 25-Aug-15
09-Sep-15 0% 0% 41ENG.SD.FA.11 Shop Drawing Approval - Fire Alarm
System 08-Sep-15 08-Oct-15 10-Sep-15 10-Oct-15 0% 0% 69UPPER
ROOFUPPER ROOF FLOOR LEVEL (BUILDING-2) 08-Sep-15 25-Oct-15
10-Sep-15 26-Oct-15 0% 0% 55ENG.SD.FA.12 Shop Drawing Submittal -
Fire Alarm System 08-Sep-15 30-Sep-15 10-Sep-15 01-Oct-15 0% 0%
41ENG.SD.FA.16 Shop Drawing Approval - Fire Alarm System 30-Sep-15
25-Oct-15 03-Oct-15 26-Oct-15 0% 0% 55DRAWING DET DRAWING DETAILS
(BUILDING-2) 30-Sep-15 17-Oct-15 03-Oct-15 18-Oct-15 0% 0%
41ENG.SD.FA.14 Shop Drawing Submittal - Fire Alarm System 30-Sep-15
17-Oct-15 03-Oct-15 18-Oct-15 0% 0% 41FIRE FIGHTIN FIRE FIGHTING
SHOP DRAWINGS28-May-15 07-Nov-15 26-Mar-15 A 07-Oct-15 0% 0%
71FIRST FLOORFIRST FLOOR LEVEL (BUILDING-1) 03-Jun-15 28-Jun-15
26-Mar-15 A 12-Aug-15 0% 0% 103ENG.SD.FF.5 Shop Drawing Approval -
Fire Fighting 03-Jun-15 28-Jun-15 26-Mar-15 A 12-Aug-15 100% 0%
103SECOND FLOO SECOND FLOOR LEVEL (BUILDING-1) 10-Jun-15 25-Jul-15
27-Apr-15 A 27-Aug-15 0% 0% 91ENG.SD.FF.6 Shop Drawing Submittal -
Fire Fighting 10-Jun-15 25-Jun-15 27-Apr-15 A 15-Aug-15 100% 0%
79ENG.SD.FF.9 Shop Drawing Approval - Fire Fighting 27-Jun-15
25-Jul-15 28-Apr-15 A 27-Aug-15 100% 0% 91THIRD FLOOR THIRD FLOOR
LEVEL (BUILDING-1) 27-Jun-15 18-Aug-15 27-Apr-15 A 08-Sep-15 0% 0%
91ENG.SD.FF.10 Shop Drawing Submittal - Fire Fighting 27-Jun-15
12-Jul-15 27-Apr-15 A 22-Aug-15 100% 0% 79ENG.SD.FF.16 Shop Drawing
Approval - Fire Fighting 26-Jul-15 18-Aug-15 28-Apr-15 A 08-Sep-15
23.81% 0% 91ROOF FLOORROOF FLOOR LEVEL (BUILDING-1) 26-Jul-15
05-Sep-15 09-Jun-15 A 09-Sep-15 0% 0% 90ENG.SD.FF.14 Shop Drawing
Submittal - Fire Fighting 26-Jul-15 11-Aug-15 09-Jun-15 A 27-Aug-15
34.29% 0% 79ENG.SD.FF.18 Shop Drawing Approval - Fire Fighting
11-Aug-15 05-Sep-15 16-Jun-15 A 09-Sep-15 0% 0% 90UPPER ROOFUPPER
ROOF FLOOR LEVEL (BUILDING-1) 11-Aug-15 21-Sep-15 09-Jun-15 A
15-Sep-15 0% 0% 84S O N D J F M A M J Jul A S O N D J F M A M J Jul
A S O N D2015 2016Date: 08-Aug-15 14/42 Start Date: 15-Oct-14
Completion Date: 13-Oct-16Remaining Level of EffortProject Baseline
BarActual WorkEarly BarCritical ActivityBaseline BarCurrent Bar
LabelsEarly BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE
OF OFFICER'S BUILDING 12 AT BARZAN CAMP Layout Name: 3Month
Lookahead Programme (1.8.15) Date Revision Checked
Approved15-Oct-1... 1.8.15 Three Months Lookah... Richard
NabilActivity ID Activity Name Baseline StartBaseline FinishStart
Finish Schedule %CompleteCost %CompleteTotalFloatENG.SD.FF.19 Shop
Drawing Submittal - Fire Fighting 11-Aug-15 27-Aug-15 09-Jun-15 A
03-Sep-15 0% 0% 79ENG.SD.FF.21 Shop Drawing Approval - Fire
Fighting 27-Aug-15 21-Sep-15 16-Jun-15 A 15-Sep-15 0% 0% 84DRAWING
DET DRAWING DETAILS (BUILDING-1) 21-Sep-15 07-Nov-15 23-Jul-15 A
07-Oct-15 0% 0% 71ENG.SD.FF.20 Shop Drawing Submittal - Fire
Fighting 21-Sep-15 13-Oct-15 23-Jul-15 A 09-Sep-15 0% 0%
79ENG.SD.FF.22 Shop Drawing Approval - Fire Fighting 13-Oct-15
07-Nov-15 30-Jul-15 A 07-Oct-15 0% 0% 71GROUND FLOO GROUND FLOOR
LEVEL (BUILDING-2) 28-May-15 22-Jun-15 06-Apr-15 A 11-Aug-15 0% 0%
115ENG.SD.FF.7 Shop Drawing Approval - Fire Fighting 28-May-15
22-Jun-15 06-Apr-15 A 11-Aug-15 100% 0% 115ROOF FLOORROOF FLOOR
LEVEL (BUILDING-2) 08-Jul-15 22-Aug-15 09-Jun-15 A 27-Aug-15 0% 0%
101ENG.SD.FF.8 Shop Drawing Submittal - Fire Fighting 08-Jul-15
28-Jul-15 09-Jun-15 A 15-Aug-15 100% 0% 71ENG.SD.FF.11 Shop Drawing
Approval - Fire Fighting 29-Jul-15 22-Aug-15 16-Jun-15 A 27-Aug-15
9.52% 0% 101UPPER ROOFUPPER ROOF FLOOR LEVEL (BUILDING-2) 29-Jul-15
07-Sep-15 09-Jun-15 A 02-Sep-15 0% 0% 95ENG.SD.FF.12 Shop Drawing
Submittal - Fire Fighting 29-Jul-15 13-Aug-15 09-Jun-15 A 22-Aug-15
14.29% 0% 71ENG.SD.FF.15 Shop Drawing Approval - Fire Fighting
15-Aug-15 07-Sep-15 16-Jun-15 A 02-Sep-15 0% 0% 95DRAWING DET
DRAWING DETAILS (BUILDING-2) 19-Aug-15 05-Oct-15 22-Aug-15
07-Oct-15 0% 0% 71ENG.SD.FF.13 Shop Drawing Submittal - Fire
Fighting 19-Aug-15 05-Sep-15 22-Aug-15 07-Sep-15 0% 0%
71ENG.SD.FF.17 Shop Drawing Approval - Fire Fighting 05-Sep-15
05-Oct-15 07-Sep-15 07-Oct-15 0% 0% 71HVAC SHOPHVAC SHOP
DRAWINGS08-Jul-15 29-Sep-15 16-Jun-15 A 30-Sep-15 0% 0% 35ROOF
FLOORROOF FLOOR LEVEL (BUILDING-1) 08-Jul-15 22-Aug-15 27-Jun-15 A
27-Aug-15 0% 0% 60ENG.SD.AC.15 Shop Drawing Submittal - HVAC Shop
Drawing 08-Jul-15 28-Jul-15 27-Jun-15 A 15-Aug-15 100% 0%
48ENG.SD.AC.18 Shop Drawing Approval - HVAC Shop Drawing 29-Jul-15
22-Aug-15 04-Jul-15 A 27-Aug-15 9.52% 0% 60UPPER ROOFUPPER ROOF
FLOOR LEVEL (BUILDING-1) 29-Jul-15 07-Sep-15 27-Jun-15 A 02-Sep-15
0% 0% 54ENG.SD.AC.19 Shop Drawing Submittal - HVAC Shop Drawing
29-Jul-15 13-Aug-15 27-Jun-15 A 22-Aug-15 14.29% 0% 48ENG.SD.AC.21
Shop Drawing Approval - HVAC Shop Drawing 15-Aug-15 07-Sep-15
04-Jul-15 A 02-Sep-15 0% 0% 54DRAWING DET DRAWING DETAILS
(BUILDING-1) 15-Aug-15 29-Sep-15 16-Jun-15 A 09-Sep-15 0% 0%
48ENG.SD.AC.20 Shop Drawing Submittal - HVAC Shop Drawing 15-Aug-15
30-Aug-15 16-Jun-15 A 27-Aug-15 0% 0% 48S O N D J F M A M J Jul A S
O N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 15/42 Start
Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatENG.SD.AC.22 Shop Drawing Approval - HVAC Shop
Drawing 31-Aug-15 29-Sep-15 23-Jun-15 A 09-Sep-15 0% 0% 48ROOF
FLOORROOF FLOOR LEVEL (BUILDING-2) 08-Jul-15 22-Aug-15 22-Jun-15 A
27-Aug-15 0% 0% 60ENG.SD.AC.8 Shop Drawing Submittal - HVAC Shop
Drawing 08-Jul-15 28-Jul-15 22-Jun-15 A 15-Aug-15 100% 0%
35ENG.SD.AC.11 Shop Drawing Approval - HVAC Shop Drawing 29-Jul-15
22-Aug-15 29-Jun-15 A 27-Aug-15 9.52% 0% 60UPPER ROOFUPPER ROOF
FLOOR LEVEL (BUILDING-2) 12-Aug-15 22-Sep-15 15-Aug-15 30-Sep-15 0%
0% 35ENG.SD.AC.12 Shop Drawing Submittal - HVAC Shop Drawing
12-Aug-15 29-Aug-15 15-Aug-15 31-Aug-15 0% 0% 35ENG.SD.AC.16 Shop
Drawing Approval - HVAC Shop Drawing 29-Aug-15 22-Sep-15 31-Aug-15
30-Sep-15 0% 0% 35DRAWING DET DRAWING DETAILS (BUILDING-2)
15-Aug-15 29-Sep-15 22-Jun-15 A 30-Sep-15 0% 0% 35ENG.SD.AC.14 Shop
Drawing Submittal - HVAC Shop Drawing 15-Aug-15 30-Aug-15 22-Jun-15
A 07-Sep-15 0% 0% 40ENG.SD.AC.17 Shop Drawing Approval - HVAC Shop
Drawing 31-Aug-15 29-Sep-15 29-Jun-15 A 30-Sep-15 0% 0%
35PROCUREMENT PROCUREMENT06-Jun-15 07-Nov-15 28-May-15A29-Oct-15 0%
0% 238SUBCONTRAC SUBCONTRACTOR/SUPPLIER PREQUALIFICATION25-Jul-15
21-Aug-15 01-Aug-15 28-Aug-15 0% 0% 111ARCHITECTU
ARCHITECTURAL25-Jul-15 21-Aug-15 01-Aug-15 28-Aug-15 0% 0%
111MIRRORS MIRRORS25-Jul-15 21-Aug-15 01-Aug-15 28-Aug-15 0% 0%
111PRO.SS.AR.21 Subcontractor Submission - Mirrror 25-Jul-15
07-Aug-15 01-Aug-15 14-Aug-15 50% 0% 111PRO.SS.AR.22 Subcontractor
Approval - Mirrror 08-Aug-15 21-Aug-15 15-Aug-15 28-Aug-15 0% 0%
111MANUFACTUR MANUFACTURE/PURCHASE/DELIVERY06-Jun-15 07-Nov-15
28-May-15A29-Oct-15 0% 0% 238LONG LEAD I LONG LEAD ITEMS07-Jul-15
22-Oct-15 28-May-15A29-Oct-15 0% 0% 151STRUCTURAL
STRUCTURAL07-Jul-15 30-Sep-15 28-May-15A07-Oct-15 0% 0% 35STEEL
STRUC STEEL STRUCTURE & METAL DECKING 07-Jul-15 30-Sep-15
28-May-15A07-Oct-15 0% 0% 35PRO.PD.ST.20 Manufacture & Delivery
Period - Steel Structure & Metal Decking07-Jul-15 19-Sep-15
28-May-15A07-Oct-15 33.33% 0% 35PRO.PD.ST.32 Materials Available on
Site - Steel Structure& Metal Decking30-Sep-15 07-Oct-15 0% 0%
35ARCHITECTU ARCHITECTURAL25-Jul-15 22-Oct-15 01-Aug-15 29-Oct-15
0% 0% 151WOOD PARQU WOOD PARQUET FLOORING 10-Aug-15 18-Oct-15
17-Aug-15 25-Oct-15 0% 0% 128PRO.PD.AR.012 Manufacture &
Delivery Period - Wood Parquet Flooring10-Aug-15 18-Oct-15
17-Aug-15 25-Oct-15 0% 0% 128S O N D J F M A M J Jul A S O N D J F
M A M J Jul A S O N D2015 201607-Oct-15, , 07-Oct-15Date: 08-Aug-15
16/42 Start Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining
Level of EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatPRO.PD.AR.026 Materials Available on Site - Wood
Parquet Flooring18-Oct-15 25-Oct-15 0% 0% 128WALL & FLOO WALL
& FLOOR CERAMIC TILES 25-Jul-15 22-Sep-15 01-Aug-15 29-Sep-15
0% 0% 125PRO.PD.AR.02 Materials Order & Delivery Period -
Ceramic Tiles 25-Jul-15 22-Sep-15 01-Aug-15 29-Sep-15 11.67% 0%
125PRO.PD.AR.010 Materials Available on Site - Ceramic Tiles
22-Sep-15 29-Sep-15 0% 0% 125MARBLE TILES MARBLE TILES 25-Jul-15
22-Oct-15 01-Aug-15 29-Oct-15 0% 0% 112PRO.PD.AR.03 Materials Order
& Delivery Period - Marble Tiles 25-Jul-15 22-Oct-15 01-Aug-15
29-Oct-15 7.78% 0% 112PRO.PD.AR.015 Materials Available on Site -
Marble Tiles 22-Oct-15 29-Oct-15 0% 0% 112MOSAIC TILES MOSAIC TILES
25-Jul-15 22-Oct-15 01-Aug-15 29-Oct-15 0% 0% 140PRO.PD.AR.04
Materials Order & Delivery Period - Mosaic Tiles 25-Jul-15
22-Oct-15 01-Aug-15 29-Oct-15 7.78% 0% 140PRO.PD.AR.017 Materials
Available on Site - Mosaic Tiles 22-Oct-15 29-Oct-15 0% 0%
140PANTRY CABIN PANTRY CABINET & BASE CABINET 10-Aug-15
18-Oct-15 17-Aug-15 25-Oct-15 0% 0% 155PRO.PD.AR.013 Manufacture
& Delivery Period - Kitchen Cabinet 10-Aug-15 18-Oct-15
17-Aug-15 25-Oct-15 0% 0% 155PRO.PD.AR.029 Materials Available on
Site - Kitchen Cabinet 18-Oct-15 25-Oct-15 0% 0% 155SHORT LEAD
SHORT LEAD ITEMS06-Jun-15 07-Nov-15 06-Jun-15 A 29-Oct-15 0% 0%
238STRUCTURAL STRUCTURAL06-Jun-15 22-Oct-15 06-Jun-15 A 29-Oct-15
0% 0% 122WATER PROO WATER PROOFING WORKS 25-Jul-15 22-Oct-15
01-Aug-15 29-Oct-15 0% 0% 122WET AREA WAT WET AREA WATERPROOFING
25-Jul-15 22-Oct-15 01-Aug-15 29-Oct-15 0% 0% 79PRO.PD.ST.15
Manufacture & Delivery Period - Waterproofing to Wet
Areas25-Jul-15 22-Oct-15 01-Aug-15 29-Oct-15 7.78% 0%
79PRO.PD.ST.28 Materials on Site Storage - Waterproofing to Wet
Areas22-Oct-15 29-Oct-15 0% 0% 79ROOF WATERPR ROOF WATERPROOFING
25-Jul-15 22-Oct-15 01-Aug-15 29-Oct-15 0% 0% 122PRO.PD.ST.29
Manufacture & Delivery Period - Waterproofing to Roof25-Jul-15
22-Oct-15 01-Aug-15 29-Oct-15 7.78% 0% 122PRO.PD.ST.34 Materials on
Site Storage - Waterproofing to Roof 22-Oct-15 29-Oct-15 0% 0%
122REINFORCING REINFORCING STEEL 06-Jun-15 07-Sep-15 06-Jun-15 A
14-Sep-15 0% 0% 110THIRD FLOOR ( THIRD FLOOR (BUILDING-1) 06-Jun-15
15-Aug-15 06-Jun-15 A 22-Aug-15 0% 0% 38PRO.PD.ST.24 Manufacture
& Delivery Period - Third Floor Slab &Verticals06-Jun-15
05-Jul-15 06-Jun-15 A 15-Aug-15 100% 0% 38S O N D J F M A M J Jul A
S O N D J F M A M J Jul A S O N D2015 201625-Oct-15, ,
25-Oct-1529-Sep-15, , 29-Sep-1529-Oct-15, , 29-Oct-1529-Oct-15, ,
29-Oct-1525-Oct-15, , 25-Oct-1529-Oct-15, , 29-Oct-1529-Oct-15, ,
29-Oct-15Date: 08-Aug-15 17/42 Start Date: 15-Oct-14 Completion
Date: 13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatPRO.PD.ST.26 Materials on Site Storage - Third
Floor Slab & Verticals09-Aug-15 15-Aug-15 16-Aug-15 22-Aug-15
0% 0% 38ROOF FLOOR ( ROOF FLOOR (BUILDING-1) 25-Jul-15 30-Aug-15
01-Aug-15 06-Sep-15 0% 0% 58PRO.PD.ST.27 Manufacture & Delivery
Period - Roof Floor Slab & Verticals25-Jul-15 23-Aug-15
01-Aug-15 30-Aug-15 23.33% 0% 58PRO.PD.ST.30 Materials on Site
Storage - Roof Floor Slab & Verticals24-Aug-15 30-Aug-15
31-Aug-15 06-Sep-15 0% 0% 58UPPER ROOF F UPPER ROOF FLOOR
(BUILDING-1) 25-Jul-15 30-Aug-15 01-Aug-15 06-Sep-15 0% 0%
104PRO.PD.ST.31 Manufacture & Delivery Period - Upper Roof
Floor Slab & Verticals25-Jul-15 23-Aug-15 01-Aug-15 30-Aug-15
23.33% 0% 104PRO.PD.ST.33 Materials on Site Storage - Upper Roof
Floor Slab & Verticals24-Aug-15 30-Aug-15 31-Aug-15 06-Sep-15
0% 0% 104ROOF FLOOR ( ROOF FLOOR (BUILDING-2) 25-Jul-15 07-Sep-15
01-Aug-15 14-Sep-15 0% 0% 23PRO.PD.ST.17 Manufacture & Delivery
Period - Roof Floor Slab & Verticals25-Jul-15 23-Aug-15
01-Aug-15 30-Aug-15 23.33% 0% 23PRO.PD.ST.21 Materials on Site
Storage - Roof Floor Slab & Verticals24-Aug-15 07-Sep-15
31-Aug-15 14-Sep-15 0% 0% 23UPPER ROOF F UPPER ROOF FLOOR
(BUILDING-2) 25-Jul-15 07-Sep-15 01-Aug-15 14-Sep-15 0% 0%
110PRO.PD.ST.22 Manufacture & Delivery Period - Upper Roof
Floor Slab & Verticals25-Jul-15 07-Sep-15 01-Aug-15 14-Sep-15
15.56% 0% 110PRO.PD.ST.25 Materials on Site Storage - Upper Roof
Floor Slab & Verticals07-Sep-15 14-Sep-15 0% 0% 110ARCHITECTU
ARCHITECTURAL12-Aug-15 19-Oct-15 19-Aug-15 26-Oct-15 0% 0%
197INTERNAL PAI INTERNAL PAINT 20-Sep-15 19-Oct-15 27-Sep-15
26-Oct-15 0% 0% 62PRO.PD.AR.1 Material Order & Delivery Period
- Internal Paint 20-Sep-15 19-Oct-15 27-Sep-15 26-Oct-15 0% 0%
62PRO.PD.AR.5 Materials Available on Site - Internal Paint
19-Oct-15 26-Oct-15 0% 0% 6212.5MM THK. G 12.5MM THK. GYPSUM BOARD
CEILING 12-Aug-15 26-Sep-15 19-Aug-15 03-Oct-15 0% 0%
221PRO.PD.AR.15 Materials Order & Delivery Period - 12.5mm Thk.
Gypsum Board Ceiling12-Aug-15 26-Sep-15 19-Aug-15 03-Oct-15 0% 0%
221PRO.PD.AR.37 Materials Available on Site - 12.5mm Thk. Gypsum
Board Ceiling26-Sep-15 03-Oct-15 0% 0% 221MEP WORKS MEP
WORKS25-Jul-15 07-Nov-15 01-Aug-15 24-Oct-15 0% 0% 243ELECTRICAL M
ELECTRICAL MATERIALS 25-Jul-15 02-Oct-15 01-Aug-15 03-Oct-15 0% 0%
159POWER & LIGHT POWER & LIGHTING CABLE 25-Jul-15 07-Sep-15
01-Aug-15 14-Sep-15 0% 0% 130PRO.PD.EE.3 Manufacture & Delivery
Period - Power Cable 25-Jul-15 07-Sep-15 01-Aug-15 14-Sep-15 15.56%
0% 130PRO.PD.EE.6 Materials on Site - Power Cable 07-Sep-15
14-Sep-15 0% 0% 130S O N D J F M A M J Jul A S O N D J F M A M J
Jul A S O N D2015 201614-Sep-15, , 14-Sep-1526-Oct-15, ,
26-Oct-1503-Oct-15, , 03-Oct-1514-Sep-15, , 14-Sep-15Date:
08-Aug-15 18/42 Start Date: 15-Oct-14 Completion Date:
13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatLOW VOLTAGELOW VOLTAGE CABLE 18-Aug-15 02-Oct-15
19-Aug-15 03-Oct-15 0% 0% 159PRO.PD.EE.8 Manufacture & Delivery
Period - Low Voltage Cable18-Aug-15 02-Oct-15 19-Aug-15 03-Oct-15
0% 0% 159PRO.PD.EE.17 Materials on Site Storage - Low Voltage Cable
02-Oct-15 03-Oct-15 0% 0% 159MBD's, SMBD's, MBD's, SMBD's, MCC
& DB's 18-Aug-15 02-Oct-15 19-Aug-15 03-Oct-15 0% 0%
100PRO.PD.EE.2 Manufacture & Delivery Period - MDB, SMDB &
DB 18-Aug-15 02-Oct-15 19-Aug-15 03-Oct-15 0% 0% 100PRO.PD.EE.5
Materials on Site - MDB, SMDB & DB 02-Oct-15 03-Oct-15 0% 0%
100FIRE FIGHTING FIRE FIGHTING MATERIALS 08-Oct-15 07-Nov-15
07-Sep-15 07-Oct-15 0% 0% 160SPRINKLER PIP SPRINKLER PIPES &
FITTINGS 08-Oct-15 07-Nov-15 07-Sep-15 07-Oct-15 0% 0%
160PRO.PD.FF.1 Materials Order & Delivery Period - Sprinkler
Pipes& Fittings08-Oct-15 07-Nov-15 07-Sep-15 07-Oct-15 0% 0%
160PRO.PD.FF.6 Materials on Site Storage - Sprinkler Pipes &
Fittings07-Nov-15 07-Oct-15 0% 0% 160PLUMBING MA PLUMBING MATERIALS
18-Aug-15 17-Oct-15 25-Aug-15 24-Oct-15 0% 0% 243GRP WATER TA GRP
WATER TANK 03-Sep-15 17-Oct-15 10-Sep-15 24-Oct-15 0% 0%
243PRO.PD.PL.11 Materials Order & Delivery Period - GRP
Watertank 03-Sep-15 17-Oct-15 10-Sep-15 24-Oct-15 0% 0%
243PRO.PD.PL.18 Materials on Site Storage - GRP Watertank 17-Oct-15
24-Oct-15 0% 0% 243FLOOR DRAIN & FLOOR DRAIN & COVER
18-Aug-15 02-Oct-15 25-Aug-15 09-Oct-15 0% 0% 179PRO.PD.PL.8
Materials Order & Delivery Period - Floor Drain &
Cover18-Aug-15 02-Oct-15 25-Aug-15 09-Oct-15 0% 0% 179PRO.PD.PL.13
Materials on Site Storage - Floor Drain & Cover 02-Oct-15
09-Oct-15 0% 0% 179FLOOR TRAP & FLOOR TRAP & FITTINGS
18-Aug-15 02-Oct-15 25-Aug-15 09-Oct-15 0% 0% 179PRO.PD.PL.7
Materials Order & Delivery Period - Floor Trap &
Fittings18-Aug-15 02-Oct-15 25-Aug-15 09-Oct-15 0% 0%
133PRO.PD.PL.12 Materials on Site Storage - Floor Trap &
Fittings 02-Oct-15 09-Oct-15 0% 0% 179HVAC MATERI HVAC MATERIALS
07-Sep-15 22-Oct-15 09-Sep-15 24-Oct-15 0% 0% 144CHILLED WATER
CHILLED WATER PIPE INSULATION 07-Sep-15 22-Oct-15 09-Sep-15
24-Oct-15 0% 0% 144PRO.PD.AC.12 Materials Order & Delivery
Period - Insulation Chilled Water Pipes07-Sep-15 22-Oct-15
09-Sep-15 24-Oct-15 0% 0% 144PRO.PD.AC.23 Materials Available on
Site - Insulation Chilled Water Pipes22-Oct-15 24-Oct-15 0% 0%
144VOLUME CONTR VOLUME CONTROL DAMPER (VCD) 07-Sep-15 22-Oct-15
09-Sep-15 24-Oct-15 0% 0% 115S O N D J F M A M J Jul A S O N D J F
M A M J Jul A S O N D2015 201603-Oct-15, , 03-Oct-1503-Oct-15, ,
03-Oct-1507-Oct-15, , 07-Oct-1524-Oct-15, , 24-Oct-1509-Oct-15, ,
09-Oct-1509-Oct-15, , 09-Oct-1524-Oct-15, , 24-Oct-15Date:
08-Aug-15 19/42 Start Date: 15-Oct-14 Completion Date:
13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatPRO.PD.AC.2 Materials Order & Delivery
Period - Volume ControlDamper07-Sep-15 22-Oct-15 09-Sep-15
24-Oct-15 0% 0% 115PRO.PD.AC.17 Materials Available on Site -
Volume Control Damper22-Oct-15 24-Oct-15 0% 0% 115SOUND ATTENU
SOUND ATTENUATORS 07-Sep-15 22-Oct-15 09-Sep-15 24-Oct-15 0% 0%
115PRO.PD.AC.7 Materials Order & Delivery Period - Sound
Attenuators07-Sep-15 22-Oct-15 09-Sep-15 24-Oct-15 0% 0%
115PRO.PD.AC.18 Materials Available on Site - Sound Attenuators
22-Oct-15 24-Oct-15 0% 0% 115SUPPLY, RETUR SUPPLY, RETURN &
EXHAUST DUCT 07-Sep-15 22-Oct-15 09-Sep-15 24-Oct-15 0% 0%
99PRO.PD.AC.5 Materials Order & Delivery Period - Supply &
Return Duct07-Sep-15 22-Oct-15 09-Sep-15 24-Oct-15 0% 0%
99PRO.PD.AC.15 Materials Available on Site - Supply & Return
Duct 22-Oct-15 24-Oct-15 0% 0% 99CONSTRUCTIO CONSTRUCTION15-Oct-14
13-Oct-16 15-Oct-14 A 13-Oct-16 19.13% 21.39% 0PRELIMINARIE
PRELIMINARIES15-Oct-14 13-Oct-16 15-Oct-14 A 13-Oct-16 39.73% 39.9%
0C1-OFFICERSC1-OFFICERS BUILDING-114-Jul-15 06-Nov-15 14-Jul-15 A
30-Oct-15 3.67% 6.8% 156SUBSTRUCTU SUBSTRUCTURE WORK25-Jul-15
28-Jul-15 01-Aug-15 04-Aug-15 100% 0% 30CIVIL WORKS CIVIL
WORKS25-Jul-15 28-Jul-15 01-Aug-15 04-Aug-15 100% 0% 30AREA-1 (EART
AREA-1 (EARTHWORKS & CONCRETE WORKS) 25-Jul-15 28-Jul-15
01-Aug-15 04-Aug-15 100% 0% 30AREA-2 (EART AREA-2 (EARTHWORKS &
CONCRETE WORKS) 25-Jul-15 28-Jul-15 01-Aug-15 04-Aug-15 100% 0%
30AREA-3 (EART AREA-3 (EARTHWORKS & CONCRETE WORKS) 25-Jul-15
28-Jul-15 01-Aug-15 04-Aug-15 100% 0% 30SUPERSTRUC SUPERSTRUCTURE
WORKS14-Jul-15 06-Nov-15 14-Jul-15 A 30-Oct-15 3.94% 7.54% 34GROUND
FL GROUND FLOOR LEVEL17-Aug-15 10-Sep-15 16-Jul-15 A 25-Aug-15 0%
75.52% 39STAIRCASE STAIRCASE 17-Aug-15 10-Sep-15 16-Jul-15 A
25-Aug-15 0% 75.52% 39STAIRCASE-01 STAIRCASE-01 17-Aug-15 23-Aug-15
26-Jul-15 A 14-Aug-15 0% 70.75% 34B1CSGA1.SC.1 Steel Reinforcement
for Staircase-1 17-Aug-15 21-Aug-15 26-Jul-15 A 12-Aug-15 0% 80%
34B1CSGA1.SC.2 Shuttering for Staircase-1 18-Aug-15 22-Aug-15
27-Jul-15 A 13-Aug-15 0% 72% 34B1CSGA1.SC.3 Pouring of Concrete for
Staircase-1 22-Aug-15 23-Aug-15 30-Jul-15 A 14-Aug-15 0% 60%
34STAIRCASE-02 STAIRCASE-02 01-Sep-15 10-Sep-15 16-Jul-15 A
25-Aug-15 0% 83.35% 39B1CSGA2.SC.1 Steel Reinforcement for
Staircase-2 06-Sep-15 10-Sep-15 16-Jul-15 A 24-Aug-15 0% 97% 39S O
N D J F M A M J Jul A S O N D J F M A M J Jul A S O N D2015
201624-Oct-15, , 24-Oct-1524-Oct-15, , 24-Oct-1524-Oct-15, ,
24-Oct-15Date: 08-Aug-15 20/42 Start Date: 15-Oct-14 Completion
Date: 13-Oct-16Remaining Level of EffortProject Baseline BarActual
WorkEarly BarCritical ActivityBaseline BarCurrent Bar LabelsEarly
BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S
BUILDING 12 AT BARZAN CAMP Layout Name: 3Month Lookahead Programme
(1.8.15) Date Revision Checked Approved15-Oct-1... 1.8.15 Three
Months Lookah... Richard NabilActivity ID Activity Name Baseline
StartBaseline FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatB1CSGA2.SC.3 Pouring of Concrete for Staircase-2
01-Sep-15 02-Sep-15 22-Jul-15 A 25-Aug-15 0% 70% 39FIRST FLOO FIRST
FLOOR LEVEL14-Jul-15 21-Oct-15 14-Jul-15 A 21-Oct-15 13.08% 26.52%
12BEAMS & SLA BEAMS & SLABS 14-Jul-15 17-Sep-15 14-Jul-15 A
10-Sep-15 14.99% 35.08% 15AREA-3 - BEAM AREA-3 - BEAMS & SLAB
14-Jul-15 20-Aug-15 14-Jul-15 A 20-Aug-15 61.9% 79.55%
16B1CS1A3.BS.2 MEP Works Related to Structure 14-Jul-15 28-Jul-15
14-Jul-15 A 01-Aug-15 100% 95% 0B1CS1A3.BS.3 Steel Reinforcement
for Beams & Suspended Slab 22-Jul-15 01-Aug-15 22-Jul-15 A
03-Aug-15 92.5% 95% 0B1CS1A3.BS.4 Inspection of Engineer Prior to
Pour Beams & Slab 29-Jul-15 30-Jul-15 23-Jul-15 A 03-Aug-15
100% 0% 0B1CS1A3.BS.5 Pouring of Concrete for Beams & Suspended
Slab 02-Aug-15 03-Aug-15 01-Aug-15 A 03-Aug-15 0% 50% 0B1CS1A3.BS.6
Curing & Removal of Shuttering for Beams & Suspended
Slab03-Aug-15 20-Aug-15 03-Aug-15 20-Aug-15 0% 0% 16AREA-4 - BEAM
AREA-4 - BEAMS & SLAB 14-Jul-15 27-Aug-15 14-Jul-15 A 25-Aug-15
38.59% 50.95% 13B1CS1A4.BS.1 Shuttering for Beams & Suspended
Slab 14-Jul-15 27-Jul-15 14-Jul-15 A 01-Aug-15 100% 90%
6B1CS1A4.BS.2 MEP Works Related to Structure 27-Jul-15 03-Aug-15
21-Jul-15 A 04-Aug-15 56.67% 60% 6B1CS1A4.BS.3 Steel Reinforcement
for Beams & Suspended Slab 29-Jul-15 05-Aug-15 25-Jul-15 A
06-Aug-15 23.33% 60% 6B1CS1A4.BS.4 Inspection of Engineer Prior to
Pour Beams & Slab 08-Aug-15 09-Aug-15 26-Jul-15 A 06-Aug-15 0%
0% 6B1CS1A4.BS.5 Pouring of Concrete for Beams & Suspended Slab
09-Aug-15 10-Aug-15 06-Aug-15 08-Aug-15 0% 0% 6B1CS1A4.BS.6 Curing
& Removal of Shuttering for Beams & Suspended Slab10-Aug-15
27-Aug-15 08-Aug-15 25-Aug-15 0% 0% 13AREA-5 - BEAM AREA-5 - BEAMS
& SLAB 30-Jul-15 03-Sep-15 30-Jul-15 A 30-Aug-15 0.14% 15.98%
17B1CS1A5.BS.1 Shuttering for Beams & Suspended Slab 30-Jul-15
09-Aug-15 30-Jul-15 A 04-Aug-15 0.63% 70% 6B1CS1A5.BS.2 MEP Works
Related to Structure 09-Aug-15 15-Aug-15 04-Aug-15 10-Aug-15 0% 0%
6B1CS1A5.BS.3 Steel Reinforcement for Beams & Suspended Slab
10-Aug-15 16-Aug-15 05-Aug-15 11-Aug-15 0% 0% 6B1CS1A5.BS.4
Inspection of Engineer Prior to Pour Beams & Slab 15-Aug-15
16-Aug-15 10-Aug-15 11-Aug-15 0% 0% 6B1CS1A5.BS.5 Pouring of
Concrete for Beams & Suspended Slab 16-Aug-15 17-Aug-15
11-Aug-15 12-Aug-15 0% 0% 6B1CS1A5.BS.6 Curing & Removal of
Shuttering for Beams & Suspended Slab17-Aug-15 03-Sep-15
12-Aug-15 30-Aug-15 0% 0% 17AREA-6 - BEAM AREA-6 - BEAMS & SLAB
05-Aug-15 03-Sep-15 14-Jul-15 A 30-Aug-15 0% 67.3% 17B1CS1A6.BS.1
Shuttering for Beams & Suspended Slab 05-Aug-15 15-Aug-15
14-Jul-15 A 04-Aug-15 0% 95% 14S O N D J F M A M J Jul A S O N D J
F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 21/42 Start Date:
15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatB1CS1A6.BS.2 MEP Works Related to Structure
10-Aug-15 16-Aug-15 21-Jul-15 A 05-Aug-15 0% 90% 19B1CS1A6.BS.3
Steel Reinforcement for Beams & Suspended Slab 11-Aug-15
17-Aug-15 22-Jul-15 A 06-Aug-15 0% 90% 19B1CS1A6.BS.4 Inspection of
Engineer Prior to Pour Beams & Slab 13-Aug-15 15-Aug-15
25-Jul-15 A 06-Aug-15 0% 0% 19B1CS1A6.BS.5 Pouring of Concrete for
Beams & Suspended Slab 15-Aug-15 16-Aug-15 06-Aug-15 08-Aug-15
0% 0% 19B1CS1A6.BS.6 Curing & Removal of Shuttering for Beams
& Suspended Slab17-Aug-15 03-Sep-15 12-Aug-15 30-Aug-15 0% 0%
17AREA-7 - BEAM AREA-7 - BEAMS & SLAB 13-Aug-15 09-Sep-15
23-Jul-15 A 02-Sep-15 0% 6.85% 14B1CS1A7.BS.1 Shuttering for Beams
& Suspended Slab 15-Aug-15 24-Aug-15 23-Jul-15 A 11-Aug-15 0%
30% 14B1CS1A7.BS.2 MEP Works Related to Structure 13-Aug-15
19-Aug-15 06-Aug-15 12-Aug-15 0% 0% 14B1CS1A7.BS.3 Steel
Reinforcement for Beams & Suspended Slab 16-Aug-15 22-Aug-15
09-Aug-15 15-Aug-15 0% 0% 14B1CS1A7.BS.4 Inspection of Engineer
Prior to Pour Beams & Slab 20-Aug-15 22-Aug-15 13-Aug-15
15-Aug-15 0% 0% 14B1CS1A7.BS.5 Pouring of Concrete for Beams &
Suspended Slab 22-Aug-15 23-Aug-15 15-Aug-15 16-Aug-15 0% 0%
14B1CS1A7.BS.6 Curing & Removal of Shuttering for Beams &
Suspended Slab23-Aug-15 09-Sep-15 16-Aug-15 02-Sep-15 0% 0%
14AREA-8 - BEAM AREA-8 - BEAMS & SLAB 18-Aug-15 17-Sep-15
11-Aug-15 10-Sep-15 0% 0% 15B1CS1A8.BS.1 Shuttering for Beams &
Suspended Slab 18-Aug-15 27-Aug-15 11-Aug-15 20-Aug-15 0% 0%
15B1CS1A8.BS.2 MEP Works Related to Structure 23-Aug-15 29-Aug-15
16-Aug-15 22-Aug-15 0% 0% 15B1CS1A8.BS.3 Steel Reinforcement for
Beams & Suspended Slab 24-Aug-15 30-Aug-15 17-Aug-15 23-Aug-15
0% 0% 15B1CS1A8.BS.4 Inspection of Engineer Prior to Pour Beams
& Slab 29-Aug-15 30-Aug-15 22-Aug-15 23-Aug-15 0% 0%
15B1CS1A8.BS.5 Pouring of Concrete for Beams & Suspended Slab
30-Aug-15 31-Aug-15 23-Aug-15 24-Aug-15 0% 0% 15B1CS1A8.BS.6 Curing
& Removal of Shuttering for Beams & Suspended Slab31-Aug-15
17-Sep-15 24-Aug-15 10-Sep-15 0% 0% 15COLUMNS, WA COLUMNS, WALLS
& COREWALLS 15-Jul-15 06-Oct-15 14-Jul-15 A 06-Oct-15 9.49%
8.19% 7AREA-2 - COLU AREA-2 - COLUMNS 15-Jul-15 27-Jul-15 14-Jul-15
A 01-Aug-15 100% 86.36% 4B1CS1A2.CO.2 Shuttering for Columns
15-Jul-15 26-Jul-15 14-Jul-15 A 01-Aug-15 100% 90% 4B1CS1A2.CO.3
Pouring of Concrete for Columns 26-Jul-15 27-Jul-15 16-Jul-15 A
01-Aug-15 100% 80% 4AREA-3 - COLU AREA-3 - COLUMNS & WALLS
03-Aug-15 11-Aug-15 03-Aug-15 11-Aug-15 0% 0% 2B1CS1A3.CO.1 Steel
Reinforcement for Columns & Walls 03-Aug-15 09-Aug-15 03-Aug-15
09-Aug-15 0% 0% 0S O N D J F M A M J Jul A S O N D J F M A M J Jul
A S O N D2015 2016Date: 08-Aug-15 22/42 Start Date: 15-Oct-14
Completion Date: 13-Oct-16Remaining Level of EffortProject Baseline
BarActual WorkEarly BarCritical ActivityBaseline BarCurrent Bar
LabelsEarly BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE
OF OFFICER'S BUILDING 12 AT BARZAN CAMP Layout Name: 3Month
Lookahead Programme (1.8.15) Date Revision Checked
Approved15-Oct-1... 1.8.15 Three Months Lookah... Richard
NabilActivity ID Activity Name Baseline StartBaseline FinishStart
Finish Schedule %CompleteCost %CompleteTotalFloatB1CS1A3.CO.2
Shuttering for Columns & Walls 04-Aug-15 10-Aug-15 04-Aug-15
10-Aug-15 0% 0% 2B1CS1A3.CO.3 Pouring of Concrete for Columns &
Walls 10-Aug-15 11-Aug-15 10-Aug-15 11-Aug-15 0% 0% 2AREA-4 - COLU
AREA-4 - COLUMNS & WALLS 09-Aug-15 18-Aug-15 09-Aug-15
18-Aug-15 0% 0% 7B1CS1A4.CO.1 Steel Reinforcement for Columns &
Walls 09-Aug-15 13-Aug-15 09-Aug-15 13-Aug-15 0% 0% 0B1CS1A4.CO.2
Shuttering for Columns & Walls 11-Aug-15 17-Aug-15 11-Aug-15
17-Aug-15 0% 0% 7B1CS1A4.CO.3 Pouring of Concrete for Columns &
Walls 17-Aug-15 18-Aug-15 17-Aug-15 18-Aug-15 0% 0% 7AREA-5 - COLU
AREA-5 - COLUMNS & CORE WALL 13-Aug-15 23-Aug-15 13-Aug-15
23-Aug-15 0% 0% 0B1CS1A5.CO.1 Steel Reinforcement for Columns &
Core Wall 13-Aug-15 18-Aug-15 13-Aug-15 18-Aug-15 0% 0%
0B1CS1A5.CO.2 Shuttering for Columns & Core Wall 16-Aug-15
22-Aug-15 16-Aug-15 22-Aug-15 0% 0% 0B1CS1A5.CO.3 Pouring of
Concrete for Columns & Core Wall 22-Aug-15 23-Aug-15 22-Aug-15
23-Aug-15 0% 0% 0AREA-6 - COLU AREA-6 - COLUMNS & WALLS
18-Aug-15 26-Aug-15 18-Aug-15 26-Aug-15 0% 0% 4B1CS1A6.CO.1 Steel
Reinforcement for Columns & Walls 18-Aug-15 24-Aug-15 18-Aug-15
24-Aug-15 0% 0% 0B1CS1A6.CO.2 Shuttering for Columns & Walls
19-Aug-15 25-Aug-15 19-Aug-15 25-Aug-15 0% 0% 4B1CS1A6.CO.3 Pouring
of Concrete for Columns & Walls 25-Aug-15 26-Aug-15 25-Aug-15
26-Aug-15 0% 0% 4AREA-7 - COLU AREA-7 - COLUMNS & WALLS
24-Aug-15 01-Sep-15 24-Aug-15 01-Sep-15 0% 0% 10B1CS1A7.CO.1 Steel
Reinforcement for Columns & Walls 24-Aug-15 30-Aug-15 24-Aug-15
30-Aug-15 0% 0% 0B1CS1A7.CO.2 Shuttering for Columns & Walls
25-Aug-15 31-Aug-15 25-Aug-15 31-Aug-15 0% 0% 10B1CS1A7.CO.3
Pouring of Concrete for Columns & Walls 31-Aug-15 01-Sep-15
31-Aug-15 01-Sep-15 0% 0% 10AREA-8 - COLU AREA-8 - COLUMNS &
WALLS 30-Aug-15 07-Sep-15 30-Aug-15 07-Sep-15 0% 0% 2B1CS1A8.CO.1
Steel Reinforcement for Columns & Walls 30-Aug-15 05-Sep-15
30-Aug-15 05-Sep-15 0% 0% 0B1CS1A8.CO.2 Shuttering for Columns
& Walls 31-Aug-15 06-Sep-15 31-Aug-15 06-Sep-15 0% 0%
2B1CS1A8.CO.3 Pouring of Concrete for Columns & Walls 06-Sep-15
07-Sep-15 06-Sep-15 07-Sep-15 0% 0% 2AREA-9 - COLU AREA-9 - COLUMNS
& WALLS 05-Sep-15 13-Sep-15 05-Sep-15 13-Sep-15 0% 0%
10B1CS1A9.CO.1 Steel Reinforcement for Columns & Walls
05-Sep-15 10-Sep-15 05-Sep-15 10-Sep-15 0% 0% 0B1CS1A9.CO.2
Shuttering for Columns & Walls 06-Sep-15 12-Sep-15 06-Sep-15
12-Sep-15 0% 0% 10S O N D J F M A M J Jul A S O N D J F M A M J Jul
A S O N D2015 2016Date: 08-Aug-15 23/42 Start Date: 15-Oct-14
Completion Date: 13-Oct-16Remaining Level of EffortProject Baseline
BarActual WorkEarly BarCritical ActivityBaseline BarCurrent Bar
LabelsEarly BarProject Name: CONSTRUCTION, COMPLETION MAINTENANCE
OF OFFICER'S BUILDING 12 AT BARZAN CAMP Layout Name: 3Month
Lookahead Programme (1.8.15) Date Revision Checked
Approved15-Oct-1... 1.8.15 Three Months Lookah... Richard
NabilActivity ID Activity Name Baseline StartBaseline FinishStart
Finish Schedule %CompleteCost %CompleteTotalFloatB1CS1A9.CO.3
Pouring of Concrete for Columns & Walls 12-Sep-15 13-Sep-15
12-Sep-15 13-Sep-15 0% 0% 10AREA-10 - COLU AREA-10 - COLUMNS &
CORE WALL 10-Sep-15 19-Sep-15 10-Sep-15 19-Sep-15 0% 0%
0B1CS1A10.CO.1Steel Reinforcement for Columns & Core Wall
10-Sep-15 16-Sep-15 10-Sep-15 16-Sep-15 0% 0%
0B1CS1A10.CO.2Shuttering for Columns & Core Wall 12-Sep-15
17-Sep-15 12-Sep-15 17-Sep-15 0% 0% 0B1CS1A10.CO.3Pouring of
Concrete for Columns & Core Wall 17-Sep-15 19-Sep-15 17-Sep-15
19-Sep-15 0% 0% 0AREA-11 - COLU AREA-11 - COLUMNS & WALLS
16-Sep-15 30-Sep-15 16-Sep-15 30-Sep-15 0% 0% 2B1CS1A11.CO.1Steel
Reinforcement for Columns & Walls 16-Sep-15 22-Sep-15 16-Sep-15
22-Sep-15 0% 0% 2B1CS1A11.CO.2Shuttering for Columns & Walls
17-Sep-15 29-Sep-15 17-Sep-15 29-Sep-15 0% 0% 2B1CS1A11.CO.3Pouring
of Concrete for Columns & Walls 29-Sep-15 30-Sep-15 29-Sep-15
30-Sep-15 0% 0% 2AREA-12 - COLU AREA-12 - COLUMNS & WALLS
22-Sep-15 06-Oct-15 22-Sep-15 06-Oct-15 0% 0% 7B1CS1A12.CO.1Steel
Reinforcement for Columns & Walls 22-Sep-15 04-Oct-15 22-Sep-15
04-Oct-15 0% 0% 7B1CS1A12.CO.2Shuttering for Columns & Walls
29-Sep-15 05-Oct-15 29-Sep-15 05-Oct-15 0% 0% 7B1CS1A12.CO.3Pouring
of Concrete for Columns & Walls 05-Oct-15 06-Oct-15 05-Oct-15
06-Oct-15 0% 0% 7STAIRCASE STAIRCASE 16-Aug-15 21-Oct-15 18-Aug-15
21-Oct-15 0% 0% 12STAIRCASE-01 STAIRCASE-01 13-Sep-15 19-Sep-15
14-Sep-15 19-Sep-15 0% 0% 35B1CS1A1.ST.1 Steel Reinforcement for
Staircase-1 13-Sep-15 17-Sep-15 14-Sep-15 17-Sep-15 0% 0%
35B1CS1A1.ST.2 Shuttering for Staircase-1 14-Sep-15 18-Sep-15
15-Sep-15 18-Sep-15 0% 0% 35B1CS1A1.ST.3 Pouring of Concrete for
Staircase-1 18-Sep-15 19-Sep-15 19-Sep-15 19-Sep-15 0% 0%
35STAIRCASE-02 STAIRCASE-02 15-Oct-15 21-Oct-15 16-Oct-15 21-Oct-15
0% 0% 12B1CS1A2.ST.1 Steel Reinforcement for Staircase-2 15-Oct-15
19-Oct-15 16-Oct-15 19-Oct-15 0% 0% 12B1CS1A2.ST.2 Shuttering for
Staircase-2 16-Oct-15 20-Oct-15 17-Oct-15 20-Oct-15 0% 0%
12B1CS1A2.ST.3 Pouring of Concrete for Staircase-2 20-Oct-15
21-Oct-15 21-Oct-15 21-Oct-15 0% 0% 12STAIRCASE-03 STAIRCASE-03
16-Aug-15 22-Aug-15 18-Aug-15 23-Aug-15 0% 0% 43B1CS1A3.ST.1 Steel
Reinforcement for Staircase-3 16-Aug-15 20-Aug-15 18-Aug-15
21-Aug-15 0% 0% 43B1CS1A3.ST.2 Shuttering for Staircase-3 17-Aug-15
21-Aug-15 19-Aug-15 22-Aug-15 0% 0% 43S O N D J F M A M J Jul A S O
N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 24/42 Start
Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatB1CS1A3.ST.3 Pouring of Concrete for Staircase-3
21-Aug-15 22-Aug-15 23-Aug-15 23-Aug-15 0% 0% 43SECOND FLO SECOND
FLOOR LEVEL27-Jul-15 26-Oct-15 03-Aug-15 27-Oct-15 1% 0% 19BEAMS
& SLA BEAMS & SLABS 27-Jul-15 24-Oct-15 03-Aug-15 24-Oct-15
1.35% 0% 0AREA-1 - BEAM AREA-1 - BEAMS & SLAB 27-Jul-15
25-Aug-15 03-Aug-15 31-Aug-15 10.77% 0% 25B1CS2A1.BS.1 Shuttering
for Beams & Suspended Slab 27-Jul-15 04-Aug-15 03-Aug-15
10-Aug-15 45.71% 0% 0B1CS2A1.BS.2 MEP Works Related to Structure
30-Jul-15 05-Aug-15 06-Aug-15 11-Aug-15 4% 0% 0B1CS2A1.BS.3 Steel
Reinforcement for Beams & Suspended Slab 01-Aug-15 06-Aug-15
08-Aug-15 12-Aug-15 0% 0% 0B1CS2A1.BS.4 Inspection of Engineer
Prior to Pour Beams & Slab 05-Aug-15 06-Aug-15 12-Aug-15
12-Aug-15 0% 0% 0B1CS2A1.BS.5 Pouring of Concrete for Beams &
Suspended Slab 06-Aug-15 08-Aug-15 13-Aug-15 13-Aug-15 0% 0%
0B1CS2A1.BS.6 Curing & Removal of Shuttering for Beams &
Suspended Slab08-Aug-15 25-Aug-15 15-Aug-15 31-Aug-15 0% 0%
25AREA-2 - BEAM AREA-2 - BEAMS & SLAB 04-Aug-15 02-Sep-15
06-Aug-15 03-Sep-15 0% 0% 22B1CS2A2.BS.1 Shuttering for Beams &
Suspended Slab 04-Aug-15 12-Aug-15 06-Aug-15 13-Aug-15 0% 0%
0B1CS2A2.BS.2 MEP Works Related to Structure 08-Aug-15 13-Aug-15
10-Aug-15 15-Aug-15 0% 0% 4B1CS2A2.BS.3 Steel Reinforcement for
Beams & Suspended Slab 09-Aug-15 15-Aug-15 11-Aug-15 16-Aug-15
0% 0% 4B1CS2A2.BS.4 Inspection of Engineer Prior to Pour Beams
& Slab 13-Aug-15 15-Aug-15 16-Aug-15 16-Aug-15 0% 0%
4B1CS2A2.BS.5 Pouring of Concrete for Beams & Suspended Slab
15-Aug-15 16-Aug-15 17-Aug-15 17-Aug-15 0% 0% 4B1CS2A2.BS.6 Curing
& Removal of Shuttering for Beams & Suspended Slab16-Aug-15
02-Sep-15 18-Aug-15 03-Sep-15 0% 0% 22AREA-3 - BEAM AREA-3 - BEAMS
& SLAB 12-Aug-15 12-Sep-15 15-Aug-15 13-Sep-15 0% 0%
22B1CS2A3.BS.1 Shuttering for Beams & Suspended Slab 12-Aug-15
22-Aug-15 15-Aug-15 23-Aug-15 0% 0% 0B1CS2A3.BS.2 MEP Works Related
to Structure 17-Aug-15 23-Aug-15 19-Aug-15 24-Aug-15 0% 0%
1B1CS2A3.BS.3 Steel Reinforcement for Beams & Suspended Slab
18-Aug-15 24-Aug-15 20-Aug-15 25-Aug-15 0% 0% 1B1CS2A3.BS.4
Inspection of Engineer Prior to Pour Beams & Slab 23-Aug-15
24-Aug-15 25-Aug-15 25-Aug-15 0% 0% 1B1CS2A3.BS.5 Pouring of
Concrete for Beams & Suspended Slab 24-Aug-15 25-Aug-15
26-Aug-15 26-Aug-15 0% 0% 1B1CS2A3.BS.6 Curing & Removal of
Shuttering for Beams & Suspended Slab25-Aug-15 12-Sep-15
27-Aug-15 13-Sep-15 0% 0% 22AREA-4 - BEAM AREA-4 - BEAMS & SLAB
23-Aug-15 21-Sep-15 24-Aug-15 21-Sep-15 0% 0% 15S O N D J F M A M J
Jul A S O N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15
25/42 Start Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining
Level of EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatB1CS2A4.BS.1 Shuttering for Beams &
Suspended Slab 23-Aug-15 31-Aug-15 24-Aug-15 31-Aug-15 0% 0%
0B1CS2A4.BS.2 MEP Works Related to Structure 26-Aug-15 01-Sep-15
27-Aug-15 01-Sep-15 0% 0% 4B1CS2A4.BS.3 Steel Reinforcement for
Beams & Suspended Slab 27-Aug-15 02-Sep-15 29-Aug-15 02-Sep-15
0% 0% 4B1CS2A4.BS.4 Inspection of Engineer Prior to Pour Beams
& Slab 01-Sep-15 02-Sep-15 02-Sep-15 02-Sep-15 0% 0%
4B1CS2A4.BS.5 Pouring of Concrete for Beams & Suspended Slab
02-Sep-15 03-Sep-15 03-Sep-15 03-Sep-15 0% 0% 4B1CS2A4.BS.6 Curing
& Removal of Shuttering for Beams & Suspended Slab03-Sep-15
21-Sep-15 05-Sep-15 21-Sep-15 0% 0% 15AREA-5 - BEAM AREA-5 - BEAMS
& SLAB 31-Aug-15 06-Oct-15 01-Sep-15 06-Oct-15 0% 0%
15B1CS2A5.BS.1 Shuttering for Beams & Suspended Slab 31-Aug-15
09-Sep-15 01-Sep-15 09-Sep-15 0% 0% 0B1CS2A5.BS.2 MEP Works Related
to Structure 05-Sep-15 10-Sep-15 06-Sep-15 10-Sep-15 0% 0%
1B1CS2A5.BS.3 Steel Reinforcement for Beams & Suspended Slab
06-Sep-15 12-Sep-15 07-Sep-15 12-Sep-15 0% 0% 1B1CS2A5.BS.4
Inspection of Engineer Prior to Pour Beams & Slab 10-Sep-15
12-Sep-15 12-Sep-15 12-Sep-15 0% 0% 1B1CS2A5.BS.5 Pouring of
Concrete for Beams & Suspended Slab 12-Sep-15 13-Sep-15
13-Sep-15 13-Sep-15 0% 0% 1B1CS2A5.BS.6 Curing & Removal of
Shuttering for Beams & Suspended Slab13-Sep-15 06-Oct-15
14-Sep-15 06-Oct-15 0% 0% 15AREA-6 - BEAM AREA-6 - BEAMS & SLAB
09-Sep-15 15-Oct-15 10-Sep-15 15-Oct-15 0% 0% 7B1CS2A6.BS.1
Shuttering for Beams & Suspended Slab 09-Sep-15 19-Sep-15
10-Sep-15 19-Sep-15 0% 0% 0B1CS2A6.BS.2 MEP Works Related to
Structure 14-Sep-15 20-Sep-15 15-Sep-15 20-Sep-15 0% 0%
3B1CS2A6.BS.3 Steel Reinforcement for Beams & Suspended Slab
15-Sep-15 21-Sep-15 16-Sep-15 21-Sep-15 0% 0% 3B1CS2A6.BS.4
Inspection of Engineer Prior to Pour Beams & Slab 20-Sep-15
21-Sep-15 21-Sep-15 21-Sep-15 0% 0% 3B1CS2A6.BS.5 Pouring of
Concrete for Beams & Suspended Slab 21-Sep-15 22-Sep-15
22-Sep-15 22-Sep-15 0% 0% 3B1CS2A6.BS.6 Curing & Removal of
Shuttering for Beams & Suspended Slab22-Sep-15 15-Oct-15
29-Sep-15 15-Oct-15 0% 0% 7AREA-7 - BEAM AREA-7 - BEAMS & SLAB
19-Sep-15 24-Oct-15 20-Sep-15 24-Oct-15 0% 0% 0B1CS2A7.BS.1
Shuttering for Beams & Suspended Slab 19-Sep-15 03-Oct-15
20-Sep-15 03-Oct-15 0% 0% 0B1CS2A7.BS.2 MEP Works Related to
Structure 22-Sep-15 04-Oct-15 29-Sep-15 04-Oct-15 0% 0%
0B1CS2A7.BS.3 Steel Reinforcement for Beams & Suspended Slab
29-Sep-15 05-Oct-15 30-Sep-15 05-Oct-15 0% 0% 0B1CS2A7.BS.4
Inspection of Engineer Prior to Pour Beams & Slab 04-Oct-15
05-Oct-15 05-Oct-15 05-Oct-15 0% 0% 0S O N D J F M A M J Jul A S O
N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15 26/42 Start
Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatB1CS2A7.BS.5 Pouring of Concrete for Beams &
Suspended Slab 05-Oct-15 06-Oct-15 06-Oct-15 06-Oct-15 0% 0%
0B1CS2A7.BS.6 Curing & Removal of Shuttering for Beams &
Suspended Slab06-Oct-15 24-Oct-15 07-Oct-15 24-Oct-15 0% 0% 0AREA-8
- BEAM AREA-8 - BEAMS & SLAB 03-Oct-15 15-Oct-15 04-Oct-15
15-Oct-15 0% 0% 0B1CS2A8.BS.1 Shuttering for Beams & Suspended
Slab 03-Oct-15 12-Oct-15 04-Oct-15 12-Oct-15 0% 0% 0B1CS2A8.BS.2
MEP Works Related to Structure 07-Oct-15 13-Oct-15 08-Oct-15
13-Oct-15 0% 0% 0B1CS2A8.BS.3 Steel Reinforcement for Beams &
Suspended Slab 08-Oct-15 14-Oct-15 10-Oct-15 14-Oct-15 0% 0%
0B1CS2A8.BS.4 Inspection of Engineer Prior to Pour Beams & Slab
13-Oct-15 14-Oct-15 14-Oct-15 14-Oct-15 0% 0% 0B1CS2A8.BS.5 Pouring
of Concrete for Beams & Suspended Slab 14-Oct-15 15-Oct-15
15-Oct-15 15-Oct-15 0% 0% 0COLUMNS, WA COLUMNS, WALLS &
COREWALLS 10-Aug-15 26-Oct-15 17-Aug-15 27-Oct-15 0% 0% 2AREA-1 -
COLU AREA-1 - COLUMNS 10-Aug-15 18-Aug-15 17-Aug-15 24-Aug-15 0% 0%
11B1CS2A1.CO.1 Steel Reinforcement for Columns 10-Aug-15 16-Aug-15
17-Aug-15 22-Aug-15 0% 0% 0B1CS2A1.CO.2 Shuttering for Columns
11-Aug-15 17-Aug-15 18-Aug-15 23-Aug-15 0% 0% 11B1CS2A1.CO.3
Pouring of Concrete for Columns 17-Aug-15 18-Aug-15 24-Aug-15
24-Aug-15 0% 0% 11AREA-2 - COLU AREA-2 - COLUMNS 16-Aug-15
24-Aug-15 23-Aug-15 30-Aug-15 0% 0% 12B1CS2A2.CO.1 Steel
Reinforcement for Columns 16-Aug-15 22-Aug-15 23-Aug-15 27-Aug-15
0% 0% 0B1CS2A2.CO.2 Shuttering for Columns 17-Aug-15 23-Aug-15
24-Aug-15 29-Aug-15 0% 0% 12B1CS2A2.CO.3 Pouring of Concrete for
Columns 23-Aug-15 24-Aug-15 30-Aug-15 30-Aug-15 0% 0% 12AREA-3 -
COLU AREA-3 - COLUMNS & WALLS 25-Aug-15 02-Sep-15 29-Aug-15
05-Sep-15 0% 0% 13B1CS2A3.CO.1 Steel Reinforcement for Columns
& Walls 25-Aug-15 31-Aug-15 29-Aug-15 02-Sep-15 0% 0%
0B1CS2A3.CO.2 Shuttering for Columns & Walls 26-Aug-15
01-Sep-15 30-Aug-15 03-Sep-15 0% 0% 13B1CS2A3.CO.3 Pouring of
Concrete for Columns & Walls 01-Sep-15 02-Sep-15 05-Sep-15
05-Sep-15 0% 0% 13AREA-4 - COLU AREA-4 - COLUMNS & WALLS
31-Aug-15 08-Sep-15 03-Sep-15 10-Sep-15 0% 0% 24B1CS2A4.CO.1 Steel
Reinforcement for Columns & Walls 31-Aug-15 06-Sep-15 03-Sep-15
08-Sep-15 0% 0% 0B1CS2A4.CO.2 Shuttering for Columns & Walls
01-Sep-15 07-Sep-15 05-Sep-15 09-Sep-15 0% 0% 24B1CS2A4.CO.3
Pouring of Concrete for Columns & Walls 07-Sep-15 08-Sep-15
10-Sep-15 10-Sep-15 0% 0% 24S O N D J F M A M J Jul A S O N D J F M
A M J Jul A S O N D2015 2016Date: 08-Aug-15 27/42 Start Date:
15-Oct-14 Completion Date: 13-Oct-16Remaining Level of
EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost %CompleteTotalFloatAREA-5
- COLU AREA-5 - COLUMNS & CORE WALL 06-Sep-15 14-Sep-15
09-Sep-15 16-Sep-15 0% 0% 5B1CS2A5.CO.1 Steel Reinforcement for
Columns & Core Wall 06-Sep-15 12-Sep-15 09-Sep-15 14-Sep-15 0%
0% 0B1CS2A5.CO.2 Shuttering for Columns & Core Wall 07-Sep-15
13-Sep-15 10-Sep-15 15-Sep-15 0% 0% 5B1CS2A5.CO.3 Pouring of
Concrete for Columns & Core Wall 13-Sep-15 14-Sep-15 16-Sep-15
16-Sep-15 0% 0% 5AREA-6 - COLU AREA-6 - COLUMNS & WALLS
13-Sep-15 21-Sep-15 15-Sep-15 22-Sep-15 0% 0% 6B1CS2A6.CO.1 Steel
Reinforcement for Columns & Walls 13-Sep-15 19-Sep-15 15-Sep-15
20-Sep-15 0% 0% 0B1CS2A6.CO.2 Shuttering for Columns & Walls
14-Sep-15 20-Sep-15 16-Sep-15 21-Sep-15 0% 0% 6B1CS2A6.CO.3 Pouring
of Concrete for Columns & Walls 20-Sep-15 21-Sep-15 22-Sep-15
22-Sep-15 0% 0% 6AREA-7 - COLU AREA-7 - COLUMNS & WALLS
19-Sep-15 03-Oct-15 21-Sep-15 04-Oct-15 0% 0% 22B1CS2A7.CO.1 Steel
Reinforcement for Columns & Walls 19-Sep-15 30-Sep-15 21-Sep-15
01-Oct-15 0% 0% 0B1CS2A7.CO.2 Shuttering for Columns & Walls
20-Sep-15 01-Oct-15 22-Sep-15 03-Oct-15 0% 0% 22B1CS2A7.CO.3
Pouring of Concrete for Columns & Walls 01-Oct-15 03-Oct-15
04-Oct-15 04-Oct-15 0% 0% 22AREA-8 - COLU AREA-8 - COLUMNS &
WALLS 30-Sep-15 08-Oct-15 03-Oct-15 10-Oct-15 0% 0% 3B1CS2A8.CO.1
Steel Reinforcement for Columns & Walls 30-Sep-15 06-Oct-15
03-Oct-15 07-Oct-15 0% 0% 0B1CS2A8.CO.2 Shuttering for Columns
& Walls 01-Oct-15 07-Oct-15 04-Oct-15 08-Oct-15 0% 0%
3B1CS2A8.CO.3 Pouring of Concrete for Columns & Walls 07-Oct-15
08-Oct-15 10-Oct-15 10-Oct-15 0% 0% 3AREA-9 - COLU AREA-9 - COLUMNS
& WALLS 06-Oct-15 14-Oct-15 08-Oct-15 15-Oct-15 0% 0%
12B1CS2A9.CO.1 Steel Reinforcement for Columns & Walls
06-Oct-15 12-Oct-15 08-Oct-15 13-Oct-15 0% 0% 0B1CS2A9.CO.2
Shuttering for Columns & Walls 07-Oct-15 13-Oct-15 10-Oct-15
14-Oct-15 0% 0% 12B1CS2A9.CO.3 Pouring of Concrete for Columns
& Walls 13-Oct-15 14-Oct-15 15-Oct-15 15-Oct-15 0% 0% 12AREA-10
- COLU AREA-10 - COLUMNS & CORE WALL 12-Oct-15 20-Oct-15
14-Oct-15 21-Oct-15 0% 0% 0B1CS2A10.CO.1Steel Reinforcement for
Columns & Core Wall 12-Oct-15 18-Oct-15 14-Oct-15 19-Oct-15 0%
0% 0B1CS2A10.CO.2Shuttering for Columns & Core Wall 13-Oct-15
19-Oct-15 15-Oct-15 20-Oct-15 0% 0% 0B1CS2A10.CO.3Pouring of
Concrete for Columns & Core Wall 19-Oct-15 20-Oct-15 21-Oct-15
21-Oct-15 0% 0% 0AREA-11 - COLU AREA-11 - COLUMNS & WALLS
18-Oct-15 26-Oct-15 20-Oct-15 27-Oct-15 0% 0% 2S O N D J F M A M J
Jul A S O N D J F M A M J Jul A S O N D2015 2016Date: 08-Aug-15
28/42 Start Date: 15-Oct-14 Completion Date: 13-Oct-16Remaining
Level of EffortProject Baseline BarActual WorkEarly BarCritical
ActivityBaseline BarCurrent Bar LabelsEarly BarProject Name:
CONSTRUCTION, COMPLETION MAINTENANCE OF OFFICER'S BUILDING 12 AT
BARZAN CAMP Layout Name: 3Month Lookahead Programme (1.8.15) Date
Revision Checked Approved15-Oct-1... 1.8.15 Three Months Lookah...
Richard NabilActivity ID Activity Name Baseline StartBaseline
FinishStart Finish Schedule %CompleteCost
%CompleteTotalFloatB1CS2A11.CO.1Steel Reinforcement for Columns
& Walls 18-Oct-15 24-Oct-15 20-Oct-15 25-Oct-15 0% 0%
2B1CS2A11.CO.2Shuttering for Columns & Walls 19-Oct-15
25-Oct-15 21-Oct-15 26-Oct-15 0% 0% 2B1CS2A11.CO.3Pouring of
Concrete for Columns & Walls 25-Oct-15 26-Oct-15 27-Oct-15
27-Oct-15 0% 0% 2STAIRCASE STAIRCASE 13-Sep-15 12-Oct-15 11-Sep-15
11-Oct-15 0% 0% 35STAIRCASE-01 STAIRCASE-01 06-Oct-15 12-Oct-15
06-Oct-15 11-Oct-15 0% 0% 35B1CS1A1.ST.6 Steel Reinforcement for
Staircase-1 06-Oct-15 10-Oct-15 06-Oct-15 09-Oct-15 0% 0%
35B1CS1A1.ST.5 Shuttering for Staircase-1 07-Oct-15 11-Oct-15
07-Oct-15 10-Oct-15 0% 0% 35B1CS1A1.ST.4 Pouring of Concrete for
Staircase-1 11-Oct-15 12-Oct-15 11-Oct-15 11-Oct-15 0% 0%
35STAIRCASE-03 STAIRCASE-03 13-Sep-15 19-Sep-15 11-Sep-15 16-Sep-15
0% 0% 50B1CS1A3.ST.6 Steel Reinforcement for Staircase-3 13-Sep-15
17-Sep-15 11-Sep-15 14-Sep-15 0% 0% 50B1CS1A3.ST.5 Shuttering for
Staircase-3 14-Sep-15 18-Sep-15 12-Sep-15 15-Sep-15 0% 0%
50B1CS1A3.ST.4 Pouring of Concrete for Staircase-3 18-Sep-15
19-Sep-15 16-Sep-15 16-Sep-15 0% 0% 50THIRD FLOO THIRD FLOOR
LEVEL27-Aug-15 04-Nov-15 25-Aug-15 30-Oct-15 0% 0% 34BEAMS &
SLA BEAMS & SLABS 27-Aug-15 29-Oct-15 25-Aug-15 30-Oct-15 0% 0%
16AREA-1 - BEAM AREA-1 - BEAMS & SLAB 27-Aug-15 21-Sep-15
25-Aug-15 18-Sep-15 0% 0% 39B1CS3A1.BS.1 Shuttering for Beams &
Suspended Slab 27-Aug-15 03-Sep-15 25-Aug-15 31-Aug-15 0% 0%
13B1CS3A1.BS.2 MEP Works Related to Structure 30-Aug-15 04-Sep-15
28-Aug-15 01-Sep-15 0% 0% 32B1CS3A1.BS.3 Steel Reinforcement for
Beams & Suspended Slab 31-Aug-15 05-Sep-15 29-Aug-15 02-Sep-15
0% 0% 32B1CS3A1.BS.4 Inspection of Engineer Prior to Pour Beams
& Slab 04-Sep-15 05-Sep-15 02-Sep-15 02-Sep-15 0% 0%
32B1CS3A1.BS.5 Pouring of Concrete for Beams & Suspended Slab
05-Sep-15 06-Sep-15 03-Sep-15 03-Sep-15 0% 0% 32B1CS3A1.BS.6 Curing
& Removal of Shuttering for Beams & Suspended Slab06-Sep-15
21-Sep-15 04-Sep-15 18-Sep-15 0% 0% 39AREA-2 - BEAM AREA-2 - BEAMS
& SLAB 03-Sep-15 28-Sep-15 01-Sep-15 25-Sep-15 0% 0%
41B1CS3A2.BS.1 Shuttering for Beams & Suspended Slab 03-Sep-15
10-Sep-15 01-Sep-15 07-Sep-15 0% 0% 13B1CS3A2.BS.2 MEP Works
Related to Structure 06-Sep-15 11-Sep-15 04-Sep-15 08-Sep-15 0% 0%
30B1CS3A2.BS.3 Steel Reinforcement for Beams & Suspende