Top Banner
SEPTEMBER 2005 SEPTEMBER 2005 IO A 20 REG N L PLAN - 21 PI G NATIONAL CA TAL RE ION (Ap o d 28 ee ng of h N R-PB) pr ve in th M ti te C ed 9 uly 0 5 d ot ed 1 epte er, 5 Hl on th J 2 0 an N ifi on 7th S mb 200 d Ea ier P ans an rl l R.G. GUPTA POLICY/CITY PLANNER T is plan d cument is a copy of the h o T is plan d cument is a copy of the h o
160

This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

May 29, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

SEPTEMBER 2005SEPTEMBER 2005

IO A 20REG N L PLAN - 21

PI GNATIONAL CA TAL RE ION

(Ap o d 28 ee ng of h N R-PB)

pr ve in th M ti t e C

e d 9 uly 0 5 d ot ed 1 epte er, 5

H l on th J 2 0 an N ifi on 7th S mb 200

d Ea ier P ansan rl l

R.G. GUPTA POLICY/CITY PLANNER

T is plan d cument is a copy of the h o T is plan d cument is a copy of the h o

Page 2: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: Map taken from Google site

LOCATION OF NCR

2

Page 3: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

MAP OF UTTAR PRADESH

Part of UP State is in NCR

Source: Map taken from Google site

3

Page 4: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: Map taken from Google site

Part Rajasthan

of

State is in NCR

DISTRICTS OF RAJASTHAN

4

Page 5: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: Map taken from Google site

Part ofHaryanaState isin NCR

HARYANA DISTRICTS

5

Page 6: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: Delhi-1999 A Fact Sheet at page 3NCR-PB India Habitat Centre, Lodhi Road, New Delhi-110003

PHYSICAL GROWTH OF DELHI 1803-1953& SEVEN-SEVENTEEN DELHIS

6

Page 7: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source:Delhi-1999 A Fact Sheet at page 5

NCR-PB India Habitat Centre, Lodhi Road, New Delhi-110003

DELHI LANDUSE PLAN - 2001

7

Page 8: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document

NATIONAL CAPITAL REGIONLAND USE 1999

8

Page 9: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document

NATIONAL CAPITAL REGIONPROPOSED LAND USE 2021

9

Page 10: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : Delhi Master Plan 2021 at page 14

CENTRAL NATIONAL CAPITAL REGION

10

Page 11: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: Cover page of the NCR-PB document

{ks=kh; ;kstuk&2021jk"Vªh; jktèkkuh {ks=k

REGIONAL PLAN-2021NATIONAL CAPITAL REGION

{ks=kh; ;kstuk&2021jk"Vªh; jktèkkuh {ks=kREGIONAL PLAN-2021NATIONAL CAPITAL REGION

11

Page 12: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page vii

List of Tables

12

Page 13: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page vii

1. Major Changes in the Economic Policy

2. FDI Guidelines

3. Scope of Common Economic Zone

4. Potential Growth Areas in Hi-tech

5. Special Economic Zones

6. Wholesale Trade-Suggested Locations

7. Informal Sector Activities

8. Supreme Court Orders

9. General Packet Radio System

10. Blue Tooth Technology

11. A VVID Technology

12. National Housing and Habitat Policy 1998-Salient Features

13. Slum Population in four largest Metropolitan Cities of India, 2001

14. Slum Population in NCR (2001)

15. Slum and JJ Clusters in Delhi

16. National Slum Policy-Salient Features

17. UDPFI Guidelines

18. Educational Institutions in Delhi

19. Hospitals in Delhi

LIST OF BOXES

13

Page 14: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page vii

List of Maps

List of figures

14

Page 15: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

1 INTRODUCTION

Page 16: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Map No. 1.1 : National Capital Region–Regional Plan 2001: Constituent Areas

15

Page 17: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

2 THE REGION

Page 18: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Map 2.1 National Capital Region – Regional Plan 2021: Constituent Areas

Map 2.2 National Capital Region – Physiography and Slope

Map 2.3 National Capital Region – Lithology

Map 2.4 National Capital Region – Geomorphic Units

Map 2.5 National Capital Region – Ground Water Prospects

16

Page 19: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

3 AIMS OBJECTIVES AND POLICY ZONES

Page 20: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

3.1

Map:

National Capital Region–Regional–Policy Zones

17

Page 21: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

NATIONAL CAPITAL REGIONREGIONAL PLAN-2001. CONSSTITUENT AREAS

Source: NCR document at page

18

Page 22: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

NATIONAL CAPITAL REGIONREGIONAL PLAN 2021 : CONSTITUENT AREAS

Source: NCR document at page

19

Page 23: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page

NATIONAL CAPITAL REGIONPHYSIOGRAPHY AND SLOPE

20

Page 24: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

NATIONAL CAPITAL REGIONLITHOLOGY

21

Page 25: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page

NATIONAL CAPITAL REGIONGEOMORPUR-UNITS

22

Page 26: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

NATIONAL CAPITAL REGIONGROUND WATER PROSPECTS

Source : NCR document at page

23

Page 27: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page -19

NATIONAL CAPITAL REGIONPOLICY ZONES

24

Page 28: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

4 DEMOGRAPHIC PROFILES AND SETTLEMENT PATTERN

Page 29: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

4.1 Comparative Growth for NCT-Delhi and three Mega

4.2 Sub-region wise distribution of population in NCR

4.3 Urban-Rural components of population in NCR (1981-2001)

4.4 Sub-region wise population density in NCR (2001)

4.5 Growth of population of NCT-Delhi (1901-2001)

4.6 Trends of Urbanization in NCT-Delhi (in lakhs)

4.7 Growth of population and Migrants into Delhi (1961-1991)

4.8 Migrants classified by place of last residence

4.9 Growth of population in Haryana Sub-region (1961-2001)

4.10 Growth of population in Rajasthan Sub-region i.e. entire Alwar District (1961-2001)

4.11 Growth of population in Uttar Pradesh Sub-region (1961-2001)

4.12 Population projections of NCR and Sub-regions (in lakhs)

4.13 Urban Settlements in NCR (2001)

4.14 Analysis of the Assigned Population Regional Plan-2001 and Actual Population 2001 or NCT-Delhi, CNCR and Priority Towns

4.15 Proposed Hierarchy of Settlements

4.16 Proposed Metro Centres (2021)

4.17 Proposed Regional centres (2021)

4.18 Population projections for NCT-Delhi by different methods

4.19 Assigned Population of NCR and Sub-regions (in lakhs)

4.20 Population for Delhi, Metro and Regional Centres (2011 and 2021)

Map

4,1 National Capital Region–Existing Settlement Pattern 2001

4.2 National Capital Region–Proposed Settlement Pattern 2021

Table

25

Page 30: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 21

26

Page 31: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR documents at page 22

27

Page 32: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 22

Table 4.4 : Sub-region wise Population density in NCR (2001)

Sub-region/Year

Density (Person/sq km)

1981 2001

NCT-Delhi

Uttar Pradesh

Haryana

Rajasthan*

NCR

4,192

642

368

238

634

9,340

1,066

648

382

1,105

1 2 3

Note: * Corresponds to Rajasthan Sub-region comprising part of Alwardistrict in 1981 and the entire district in 2001Source : Census 1981 and 2001, Census of India

28

Page 33: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 23

29

Page 34: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

30

Page 35: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 24

Table 4.8 : Migrants classified by place of last residence

Place of last residence 1971-1981

(%)

1981-1991

(%)

1 2 3

Uttar Pradesh

Haryana

Bihar

Rajasthan

Punjab

West Bengal

Madhya Pradesh

Kerala

Tamil Nadu

Maharashtra

Himachal Pradesh

Others (include outside India)

Total

50.09

12.93

5.77

7.63

6.40

2.70

3.07

1.47

1.66

2.01

1.91

4.37

100.00

48.25

11.51

10.69

6.00

5.28

2.72

2.64

1.57

1.52

1.44

1.41

6.98

100.00

31

Page 36: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 24

Source: NCR document at page 25

32

Page 37: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

33

Page 38: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : Census 2001, Census of India

Table 4.8 : Urban Settlements in NCR (2001)

Urban Settle/Sub-region

Class-I100,000+

Class-II50,000-99,999

Class-III20,000-49,999

Class-IV10,000-19,999

Class-V5,000-9,999

Class-VIBelow 5,000 Total

Haryana

Rajasthan

Uttar Pradesh

NCT-Delhi

NCR

8

1

7

1

17

0

0

9

0

9

7

4

16

0

27

13

3

22

0

38

6

1

8

0

15

1

0

1

0

2

35

9

63

1

108

1 2 3 4 5 6 7 8

34

Page 39: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 27

NATIONAL CAPITAL REGIONEXISTING SETTLEMENT PATTERN 2001

35

Page 40: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 28

36

Page 41: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Table : Proposed Six-Tier Hierarchy of Settlements

1.

2.

3.

4.

5.

6.

Faridabad-Ballabgarh

Gurgaon-Mancsar

Ghaziabad-Loni

NOIDA

Sonepat-Kundli

Greater NOIDA

S.No. City/Complex

7. Meeru

Total

Proposed Population(in Lakhs)

2011 20213 4

16.00

4.50

19.00

6.00

3.50

7.00

15.00

25.00

16.50

30.19

12.00

10.00

12.00

22.00

71.00 127.69

Table : Proposed Six-Tier Hierarchy of Settlements

1. Metro Centre

2. Regional Centre

3. Sub-regional Centre

4. Service Centre

5. Central Village

6. Basic Village

S.No. Hierarchical Level

10 lakhs and above

3 to 10 lakhs

0.5 to 3 lakhs

10,000 to 50,000

5,000 to 10,000

Below 5,000

Population Range

37

Page 42: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 30

S.No. Regional Centre/ComplexProposed Population

(in Lakhs)

Proposed Regional Centres (2021)

1. Bahadurgarh 2.00 3.00

2. Panipat 5.00 7.00

3. Rohtak 4.20 6.00

4. Palwal 1.70 4.00

5. Rewari-Dharuhera-Bawal 2.00 4.00

6. Hapur-Pilkhua 3.00 4.50

7. Bulandshahr-Khurja 3.70 4.77

8. Baghpat-Baraut 1.60 3.00

9. Alwar 3.40 4.50

10. Greater Bhiwadi 1.00 3.00

11. Shahjahanpur-Neemrna-Behror 1.00 3.00

Total 28.60 46.77

38

Page 43: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : Census 2001, Census of India

Table 4.19 : Assigned Population of NCR and Sub-regions (in lakhs)

Regional Centre/ComplexProposed Population

(in Lakhs)

Population Projections for NCT-Delhi by Different Methods

Exponential Growth Rate 1,79,90,327

Water's II Formula 2.05,78,059

Ratio Method 1,67,24,398

2,34,86,698

3,24,96,135

2,24,39,532

Method 2011 2021

2 3

2001

2021

Year

NCT-Delhi Haryana Rajasthan Uttar Pradesh

NCR Total Population % to total

1 2 3 4

Population

5

371.00

641.38

138.50 37.33 86.87

225.00 35.08 163.50

% to total Population % to total % to totalPopulation

6 7 8 9 10

23.42 29.92 8.06 115.70 31.19

25.49 49.38 7.70 203.50 31.73

39

Page 44: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 33

NATIONAL CAPITAL REGIONPROPOSED SETTLEMENT PATTERN 2021

40

Page 45: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 34

Table 4.20 : Population for Delhi, Metro and Regional Centres (2011 and 2021)

41

Page 46: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

5 ECONOMIC ACTIVITY ANDFISCAL POLICY

Page 47: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

5.1 Major changes in the Economic Policy

5.2 FDI Guidelines

5.3 Scope of Common Economic Zone

5.4 Potential Growth areas in Hitech

5,5 Special Economic Zones

5,6 Wholesale Trade0Suggested Locations

5.7 Informal Sector Activities

5.8 Supreme Court Orders

Box

5.1 Distribution of Workforce in NCR (1971 and 1991)

5.2 Workforce Participation in NCR

5.3 Distribution of Workforce in NCT Delhi (1991-2021)

5.4 Distribution of Workforce in NCT Delhi (1971-1991)

5.5 Distribution of Workforce in Haryana Sub-region (1971-1991)

5.6 Distribution of workforce in Rajasthan Subregion (1971-1991)

5.7 Distribution of Workforce in Uttar Pradesh Subregion (1981-1991)

5.8 Workers Participation Ratio in Selected Towns of NCR (1981-1991)

5.9 Proposed Occupational Structure in Metro and Regional Centres within Central NCR (2021)

5.10 Proposed Occupational Structure in metro and Regional Centres outside CNCR (2021)

Tables

42

Page 48: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 36

MAJOR CHANGES IN THE ECONOMIC POLICY

1. Reduction of the number of industries or artivities reserved for the public sector.

2. Abolition of industrial licensing except for selected industries.

3. New policy on small-scale industry and permitting Foreign Equity Investment.

4. Automatic approval to foreign direct investment (FDI) in selected high priority industries.

5. Foreign equity proposals need not be accompained by foreign technology agreement.

6. Formation of a Foreign Investment Promotions Board (FIPB).

7. Simpler and easier procedure for foreign technology agreement.

8. Introduction of convertibility

9. suitable and Foreign Exchange Regulation Act removing restriction imposed earlier on companies.

10. Lowering of customs duties, central excise duties excise duties and removal of blanked ban on imports.

43

Page 49: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

FDI GUIDELINES

Government vide Press Note No. 4 (2001 series) permitted FDI up to 100% for development of integratedtownships including housing, commercial premises, hotels, resorts, city and regional level urban infrastructurefacilities suchas roads and bridges, mass rapid transit systems and manufacture of building materials. Development of land and providingallied infrastructure will form an integrated part of township’s development.

2. FDI in the development of integrated townships will be subject to the following Guide lines:

i. The Foreign Company intending to invest, shall be registeredas an Indian Company under Companies Act 1956 andwill henceforthbe allowed to take up land assembly and itsdevelopment as a part of Integrated Township Development.All such cases would be processed by FIPB on the recommendation of Ministry of Urban Development and PovertyAlleviation and other concerned Ministries/Departments. Ministry of Urban Development and Poverty Alleviation willdevelop an exclusive cell to deal with such cases.

ii. The core business of the Company seeking to make investment should be integrated township development with arecord of successful executionof such projectselsewhere.

iii. The minimum area to be developed by such a Company should be 100 acres for which norms and standards are to befollowed as per local bye-laws/rules. In the absence of such bye-laws/rules,a minimum of two thousands dwellingunits for about ten thousand populationwill need to be developed by the investor.

iv. The investing Foreign Companyshould achieve clear milestonesonce its proposal has been approved.

a) The minimum capitalizationnorm shall be US$ 10 million for a wholly owned subsidiary and US$ million forjoint ventures with Indian partner/s. The funds would have to be brought in upfront.

Salient Features

b) A minimum lock-in period of three years from completion of minimum capitalization shall apply beforerepatriation of original investment is permitted.

c) A minimum of 50% of the integrated project developmentmust be completed within a period of five yearsfrom the date of possessionof the first piece of land.

However, if the investor intends to exit earlier due to reasons beyond his control, it shall be decided byFIPB on a case-to-case basis.

v. Conditions regardingthe use of land for commercialpurposes, developmentcharges, externaldevelopment charges andother charges as laid down in Master Plan/Bye-laws, preparationof layout and building plan, development of internal andperipheral development, development of other infrastructure facilities including the trunk services etc., will be theresponsibility of the investoras per planning norms and standards on similar lines as those applicable to local investors. Inthe absence of such standards and norms, every State Government may decide their own conditions for which the UrbanDevelopment plan Formulationand Implementationguidelines circulatedby the Ministry of Urban Development andPoverty Alleviation may service as a guiding principle.

vi. Land with assembled area for peripheral services such as police stations,milk booths will be handed over free of cost to theGovernment/local authority/agencyas the case may be.

vi. The Developer will retain the lands for community services such as (i) schools, (ii) shopping complex, (iii) communitycentres, (iv) ration shop and (v) hospital/dispensary. These services will be developed by developer himself and shall bemade operational before the houses are occupied.

vi. The developer, after properly developing playgrounds, park, will make it available to the local authorities free of cost.

vi. The Developer willensure the norms and standards as applicable under local laws/rules.

vi. For companies investing in SpecialEconomic Zones, Foreign InvestmentPromotion Board accord exemption ofmay to anythe above mentioned conditions on a case-to-case basis. This will, however, be an interim measure till guidelines areevolved indue courses ina need based manner.

Source: NCR document at page 38

44

Page 50: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 39

45

Page 51: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 40

46

Page 52: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Table 5.4 : Distribution of Workforce in NCT-Delhi (1991-2021)

CATEGORIES PROPORTION OF WORKERS (%)

1991 2021

1 2 3

PRIMARY SECTOR

INDUSTRY

CONSTRUCTION

TRADE AND COMMERCE

TRANSPORT, STORAGE AND COMMUNICATIONS

OTHER SERVICES

PARTICIPATION RATE

Source : Census 1991, Census of India

2.85

24.68

7.80

23.91

8.30

32.52

31.51

0.75

21.00

7.25

30.00

8.00

33.00

38.00

47

Page 53: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

48

Page 54: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

49

Page 55: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 42

DISTRIBUTION OF WORKFORCE IN THE NCR (1991)

50

Page 56: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 43

51

Page 57: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

NCT-Delhi

Central NCR (DMA) Towns

Bahadurgarh

Faridabad

Ghaziabad

Gurgaon

NOIDA

Central NCR (DMA) Towns Total

Priority Towns

Alwar

Khurja

Meerut

Rohtak

Bulandshahr

Palwal

Panipat

Hapur

Rewari

Priority Towns Total

Source : Census 1981 and 1991, Census of India

29.0

29.7

33.8

29.0

28.0

28.2

26.7

25.4

28.3

19.6

26.2

27.4

30.4

26.2

29.9

26.6

1 2

31.8

28.1

30.4

28.0

28.7

29.5

27.6

25.9

26.9

27.3

25.2

27.1

30.4

25.3

26.3

27.1

3

32.7

Cities/Towns 1981 1991

Table 5.8 : Workers Participation Ratio in Selected Towns of NCR (1981-1991)

52

Page 58: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 44

Table 5.9 : Proposed Occupational Structure in Metro and Regional Centres within Central NCR (2021)

38.0 6.0 15.0 10.0 30.0

40.0 6.0 20.0 12.0 20.0

40.0 10.0 16.0 10.0 22.0

Proportion of Workers (%)

ParticipationRatioTown/Complex

PrimarySector

Industry Construction Trade andCommerce

Transport Storageand Communications

Services

1 2 3 4 5 6 7 8

Bahadurgarh 35 6.0 30.0 4.0 25.0 10.0 25.0

Faridabad- 35 2.0 45 .0 6.0 16.0 7.0 24.0

Ballabgarh

40.0 10.0 16.0 10.0 22.0

Ghaziabad-Loni 30 0.5

Noida 35 2.0

Sonepat-Kundli 35 2.0

Gurgaon-Manesar 35 2.0

53

Page 59: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 44

54

Page 60: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Rationalization of Tax StructureExtending Uniform Financial/Banking services throughout NCR-Sub RegionIntegrated Rail and Road Transport NetworkRemoving the restrictions of Inter-State movement of taxis and auto-rickshaws between the NCR StatesProviding Uniform Telecom Facilities throughout the NCRUniform Power SupplyDeveloping an Integrated Water Supply and Drainage System for NCRIntegrated Education PolicyIntegrated Health PolicyIntegrated approach for Pollution Control Integrated Law and Order MachineryProvision of adequate financial Resources in Sub-component Plans of participating States and concerned Central Ministries.

Source : NCR document at page 52

SCOPE OF COMMON ECONOMIC ZONE

55

Page 61: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

i. Computer hardware & software industry and industries doing system integration using computer hardware and software

ii. Packingiii. Industries integrating & manipulating the interfaces of the computers and telecom facilitiesiv. Industries catering to the information needs of uses by providing databases or access to databases spread

throughout the globe.v. Industries providing the facilities for sophisticated testing of different or all components of the information

technology.vi. Electronic goods.vii. Service & repair of TV and other electronic items.viii. Photo composing and Desk Top Publication.ix. TV and Video programme production.x. Textile designing and Fabric Testing etc.xi. Bio-technologyxii. Telecommunications and IT enabling servicesxiii. Gems and Jewellery

Source : NCR document at page 54

POTENTIAL GROWTH AREAS IN HI-TECH

56

Page 62: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Special Economic Zone (SEZ) is a specifically delineated duty free enclave and shall be deemed to be foreign territory for thepurposes of trade operationsand duties and tariffs.

Goods going into the SEZ area from Domestic Tariff Area (DTA) shall be treated as deemed exports and goods coming from the SEZarea into DTA shall be treated as if the goods are beingimported.

SEZ units may be set up for manufacture of goods and rendering of services, production, processing, assembling, trading, repair,remaking, reconditioning, reengineering including making of gold/silver/platinum jewellery and articles thereof or in connectiontherewith.

SEZ units may export goods and services including agro-products, partly processed jewellery, sub-assemblies and components. Itmay also export by-products, rejects an waste scrap out of the production process.

SEZ unit may import without payment of duty all types of goods, including capital goods, as defined in the Policy, whether new orsecond hand, required by it for its activities or in connection therewith, provided they are not prohibited items of imports in the ITC(HS). The units shall also be permitted to import goods required for the approved activity, including capital goods, free of cost or onloan from clients.

SEZ units may procure goods required by it without payment of duty, from boned warehouses in the DTA set up under the Policy.

SEZ units may import, without payment of duty, all types of goods for creating a central facility for software development can also beaccessed by units in the DTA for export of software.Gems & Jewellery and Jewelleryunits may also source gold/silver/platinumthrough the nominatedagencies.

SEZ units may also import/procure from DTA specified goods without payment of duty and subject to such conditions, as may benotified by the Government, for setting up of units in the Zone.

Source : NCR document at page 55

SPECIAL ECONOMIC ZONE

SALIENT FEATURES

57

Page 63: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Alwar : Engineering and metal work, leather work, murtikari, carpet weaving and pottery

Meerut : Handloom, sports goods and scissors and blades industryKhurja : Pottery and ceramicsPanipal : Handloom industryRewari : BrasswareMewat : Potteries

Source: NCR document at page 56

Source: NCR document at page 57

WHOLESALE TRADE-SUGGESTED LOCATIONS

Food grains Panipat, Hapur and Kundli (Sub Regional level)

Fruit and Vegetables Panipat (for apples and vegetables); Hapur (for potato and onion);

Kundli (mango and vegetables)

Textiles and Readymade Garments Meerut and Rohtak

Iron and Steel Ghaziabad, Faridabad/Gurgaon

Hardware and Building materials For hardware – Ghazibad; For building material – Alwar,

Dharuhera or Bhiwadi

INFORMAL SECTOR ACTIVITIES

58

Page 64: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

S. No. Order Dates Industries to be shifted / closed Down Closing Date 1. 08.07.96 168 Industries 30.11.962. 06.09.96 513 Industries 31.01.973. 10.10.96 43 Hotmix Plants 28.02.974. 26.11.96 246 Brick Kilns 30.06.975. 26.11.96 21 Arc/Induction Furnaces 31.03.976. 19.12.96 337 Industries 30.06.97

Directives

i) The allotment of plots, construction of factory buildings, etc. and issuance of any licenses / permissions etc. shall beexpedited and granted on priority basis.

ii) In order to facilitate shifting of industries from Delhi, all the four States constituting the NCR shall set up a Unified SingleAgency consisting of all the participatingstates to act as a Nodal Agency to sort out all the problems of such industries.

iii) The single window facility shall be set up by the four states.iv) The use of the land which would become availableon account of shifting / relocation of the industriesshall be permittedin

the following manner :

S.No. Extent Percentage to be surrendered and Percentage to be developed by the ownerdedicated to the DDA for development for his own benefit in accordance with the

greenbelts and other spaces use permitted under the Master Plan

1. Up to 2000 square meter 100% to be developed by the owner in (including the first 2000 square accordance with the zoning regulations ofmetres of the larger plot) the Master Plan.

2. 02. to 5 ha. 57 433. 5 ha. to 10 ha. 65 354. Over 10 ha. 68 32

SUPREME COURT ORDERS

59

Page 65: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

On the percentage of land as shown in Column 4 the owners at S. No. 2, 3 and 4 shall be entitled to one and half time of thepermissible FAR under the Master Plan.

v) The shifting industrieson their relocation in the new industrialestates shall be given incentivesin terms of the provisionsof the Master Plan and also the incentives which are normallyextended to new industries in new industrial estates.

Besides this the Court also issued directives for the entitlement of the rights and benefits (payment of compensation,gratuity etc.) for the workmen employed inthese industries.

As regards non-conforming industries on 12.09.2000, the Court appointed the Ministry of Urban Development to act as aNodal Agency and directed the Ministry to create a Cell to see to the implementation of various orders passed by this courtas well as the implementation of the Master Plan. The Ministry of Urban Development and Poverty Alleviation, as perdirections of the Court, created a Cell on 19.09.2000. The Nodal Agency in the process had issued various directions fromtime to time.

In its judgment dated 07.05.2004, the Hon’ble Supreme Court issued following directions:

1. All the IndustrialUnits that have come up in Residential / non-confirmingareas inDelhi on or after 1st August 1990 shallclose down and stop operating as per following schedule:

a) Industrial Units pertaining to extensive industries (‘F’ category) within a period of four months.b) Industrial Units pertaining to light and service industries (category ‘B’ to ‘F’) within five months. (c) Impermissible household industries (category ‘A’) within six months.(d) 6,000 industrial units on waiting list for allotment of industrial plots within 18 months.

2. The Central Government to finalize the list of permissible household industries falling in category ‘A’ within a period of three months.

3. 6,000 industrial units on waiting list shall be allotted industrial plots within one year.

4. The Delhi Government may announcea policy within six weeks givingsuch incentives as it may deem fit andproper to those industrial units which came to be established after 1st August 1990 and may close down on their ownbefore the expiry of the time fixed in this order. The non-announcement of incentives by the Government shall not,however, delay the closure process.

5. The water and electricity connection of the industrial units found operating after due date of closure shall bedisconnectedforthwith and in any case not later than a month of the date fixed for closure in Direction No. 1 above. Ifthe industrial activity still continues, the premisesshall be sealed within a period of not later than another one month.

6. The Central Government to finalize within six months appropriate steps to be taken for making NCR a success forindustrial activity by removing the hurdles pointed out by the industry. The Governments of the adjoining StatesHaryana, Rajasthan and Uttar Pradesh to extend full cooperation.

7. The Municipal Corporation of Delhi shall consider within three months the aspect of withdrawal of exemptionnotification as suggested in the affidavit of its Town Planer filed on 28th October 2002.

8. The Honorable Court appointed a Monitoring Committeecomprising (i) Chief Secretary of Delhi, (ii) Commissionerof Police (Delhi) (iii) Commissioner (Municipal Corporation of Delhi) and (iv) Vice-Chairman (Delhi DevelopmentAuthority). This Committee would be responsible for stoppage of illegal industrial activity. It would, however, beopen to the aforesaid members of the Monitoring Committee to appoint responsible officers subordinate to them tooversee and ensure complianceof the directionscontained in the judgment.

9. The first Progress report by the Committee shall be filed by 31st August 2004 and thereafter it shall be filed at leastonce in a period of every two months.

Source: NCR document at page 59

60

Page 66: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

6 TRANSPORT

Page 67: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

6.1 National Capital Region: Existing Transport Network (Roads) 2002

6.2 National Capital Region: Existing Transport Network (Rail) 2002

6.3 National Capital Region: Proposed Transport Network (Roads) 2021

6.4 National Capital Region: Proposed Transport Network (Rail) 2021

VEHICLE DESTINATION AT OUTER CORDON OF NCT

Source : NCR document at page 63

Table 6.1 : Vehicle Destination at Outer Cordon of NCT-Delhi

Location NCT-Delhi Haryana Uttar Pradesh Others

1

% of vehicles

2

16

3

71

4

08

5

05

61

Page 68: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 62

NATIONAL CAPITAL REGIONNATIONAL CAPITAL REGIONEXISTING TRANSPORT NETWORK (ROADS) 2002EXISTING TRANSPORT NETWORK (ROADS) 2002

62

Page 69: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 64

NATIONAL CAPITAL REGIONEXISTING TRANSPORT NETWORK (ROADS) 2002

63

Page 70: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 68

NATIONAL CAPITAL REGIONPROPOSED TRANSPORT NETWORK (ROADS) 2021

64

Page 71: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 70

NATIONAL CAPITAL REGIONPROPOSED TRANSPORT NETWORK (ROADS) 2021

65

Page 72: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

TRANSPORTATION : ROAD, RAIL, & MRTS NETWORKTRANSPORTATION : ROAD, RAIL, & MRTS NETWORK

TRANSPORTATION : ROAD, RAIL & MRTS NETWORKSource : Delhi Master Plan (Page No. 147)

66

Page 73: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

FAST TRAINS TO CITY'S SUBURBSFAST TRAINS TO CITY'S SUBURBS

8 RAPID RAIL PROJECTS PLANNED TO CHECK8 RAPID RAIL PROJECTS PLANNED TO CHECK

PERMANENT MIGRATIONPERMANENT MIGRATION

67

Page 74: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

DELHI METRO (ROUTE MAP)DELHI METRO (ROUTE MAP)

Source : Delhi Master Plan (Page No. 142)Source : Delhi Master Plan (Page No. 142)

68

Page 75: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

7 ELECTRICITY

Page 76: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

7.1 Sub region wise Energy Received and Peak Load for NCR-

7.2 Sub-region wise Energy Requirement and Peak Load in NCR

7.3 Additional Generating Capacity Required (in MW)

7.4 List of Power Projects for benefits during 10h Plan in the Northern Region

7.5 List of Mega- Projects likely to give benefits during 10th Plan and beyond

7.6 Power Plants under the State Sector

7.7 Phase wise Fund Requirement for the Region (Rs. In Crores)

Map:

69

Page 77: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : Central electricity Authority

Table 7.1 : Sub-region wise Energy Received and Peak Load for NCR

Energy Received (Mkwh) Peak Load (MW)Sub-region/Region

1988-1999 1990-2000 2000-2001 1998-1999 1999-2000 2000-2001

1 2 3 4 5 6 7

NCT-Delhi 16,257 17,452 18,432 2,484 2,930 3,094

Haryana 6,153 6,609 6,983 1,154 1,154 1,143

Rajasthan 1,199 1,221 1,072 365 365 326

Uttar Pradesh 5,462 5,353 5,323 1,406 1,406 1,595

Total NCR 29,071 20,635 31,810 5,410 5,410 6,158

70

Page 78: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

71

Page 79: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

72

Page 80: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

73

Page 81: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

74

Page 82: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Table 7.6 : Power Plants under the State Sector

Sub-region wise Power Plant

1

Capacity (MW)

2

Remark

3

Haryana

TDL Thermal Power Plant

Thermal Power Plant, Palwal

Thermal Power Plant, Rohtak

Uttar Pradesh

Captive Power Plant, Tronica City

NCT-Delhi

Pragati Power Plant

Indraprastha Replacement Project

Bawana Phase I and II

Apollo Inter generation

2X250

2X250

2X250

11.45

300

300

600

300

Unit 7 and 8 (Targeted in 10th Plan)546 acres of land selected near village chandhut and cleared by CEA

Site identified

Site identified, Project approved in March 2002 by PSMG-1 NCRPB

225.78 MW commissioned up to June 2003

Source : Study Group Report on Utility service infrastructure including power, water, sewerage, solid waste, drainage, irrigation etc.

78

Page 83: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 80

Plan PeriodAdditional capacityrequired in MW

Cost of power generation@ Rs. 4 crores/MW)

Cost of transmission/distribution@ Rs. 2.5 cro Total Cost

1 2 3 4 5

2002-2007 4,513 18,052.00 11,282.50 29,335.00

Table 7.7 : Phase wise Fund Requirement for the Region (Rs. in Crores)

2007-2012 2,549 10,196.00 6,372.50 16,569.00

2012-2017 7,780 31,120.00 19,450.00 50,570.00

2017-2021 8,503 34,012.00 21,257.00 55269.00

Total 23,345 93,380.00 58,362.00 151,742.00

79

Page 84: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

8 WATER

Page 85: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

TABLES

8.1

8.2

8.3

8.4

Sub-region wise Drinking Water Demand

Potential Water Rechargeable Areas (in sq.kms)

Sub-region wise Investment Requirement for Drinking Water demand (Rs. In Crores)

Plan wise Fund Requirement for Drinking Water Demand (Rs. In Crores)

MAPS

8.1

8.2

National Capital Region: Ground Water Rechargeable Areas

National Capital Region: Status of Ground Water Availability

80

Page 86: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Table 8.1 : Sub-region Wise Drinking Water Demand

SUB-REGION DRINKING WATER REQUIREMENT (MLD)

2001 2021

2 3

1,046 2,412

266 664

1,433 3,086

3,584 5,822

6,329 11,984

6.329 MCM/day 11.984 MCM/day

2310.07 MCM/annum 4374.27 MCM/annum

1

Haryana

Rajasthan

Uttar Pradesh

NCT-Delhi

Total

Source : NCR document at page 84

81

Page 87: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 85

Table 8.2 : Potential Water rechargeable Areas (in sq kms)

NCT-Delhi

Haryana

Rajasthan

Uttar Pradesh

Total

Note : The area figures are approximate

SUB-REGIONFLOOD PLAIN ANDRIVER BED

OX-BOW LAKE

2

25

68.88

17.75

227.35

338.98

1 3

Nill

4.25

Nill

Nill

4.35

4

2.5

5.13

Nill

84.74

92.37

5

Nill

4.25

Nill

Nill

149.45

6

5.5

62.65

9.14

32.26

109.55

7

33

162.61

154.64

344.35

6946

PALEO-CHANNEL

VALLEYFILL POND TOTAL

82

Page 88: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Table 8.3 : Sub-region wise Investment Requirement for Drinking Water Demand (Rs. in crores)

Sub-regionDistribution Network(@ Rs. 0.60 crores per mld)

Production of Water(@ Rs. 0.50 crores per mld) Total

1 2 3 4

Haryana

Rajasthan

Uttar Pradesh

NCT-Delhi

Total

1,447.21

398.24

1,851.99

3,493.13

7,190.57

1,206.01

331.87

1,543.33

2,910.94

5,992.15

2,653.22

730.11

3,395.32

6,404.06

13,182.72

Source: NCR document page 90

Table 8.4 : Plan wise Fund Requirement for Drinking Water

Plan PeriodPercentage

(%)Amount

(Rs. in Crores)

1 2 3

2002-2007

2007-2012

20.0 2,637

3,955

2012-2017

2017-2021

30.0

30.0

20.0

3,955

2,637

83

Page 89: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document page 86

NATIONAL CAPITAL REGIONNATIONAL CAPITAL REGIONGROUND WATER RECHARGABLE AREASGROUND WATER RECHARGABLE AREAS

84

Page 90: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 88

NATIONAL CAPITAL REGIONNATIONAL CAPITAL REGIONSTATUS OF GROUND WATER VAHLABILITYSTATUS OF GROUND WATER VAHLABILITY

85

Page 91: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

9 SEWERAGE, SOLID WASTE MANAGEMENT,DRAINAGE & IRRIGATION

Page 92: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

9.1.1

Tables:

Sewage Generation in Urban Areas of NCR

9.1.2

9.1.3

9.1.1

9.1.2

9.1.2

Sub-region wise Investment requirement in Sewage (Rs. In Crores)

Plan wise Investment requirement for Sewage

Solid Waste Generation in NCR

Sub-region wise Investment required in Urban Areas for SWM

Plan wise Investment required for SWM

86

Page 93: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 94

SUB-REGIONSEWAGE GENERATION (MLD)

2001 2021

1 2 3

NCT-Delhi

Haryana

Rajasthan

Uttar Pradesh

Total

2,493

394

53

576

3,516

4,050

1,123

282

1,480

6,935

Note : This does not include the UAF 2001.

Table 9.1.1 : Sewage Generation in Urban Areas of NCR

87

Page 94: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 96

Table 9.1.3 : Plan wise Investment requirement for Sewage

Plan PeriodPercentage Amount

(Rs. in Crores

1 2 3

(%)

2002-2007

2007-2012

2012-2017

2017-2021

15.0

35.0

30.0

20.0

1,248.29

2,912.68

2,496.58

1,664.39

Table 9.1.2 : Sub-region wise Investment requirement for Sewage (Rs. in Crores)

Sub-region

1

Haryana

Rajasthan

Uttar Pradesh

NCT-Delhi

Total

2

561.49

140.80

740.18

2,025.00

3,467.47

Sewerage System(@ Rs. 0.50 crores per mld)

Sewage Treatment Plant(@ Rs. 0.70 crores per mld) Total

3

786.08

197.13

1,036.25

2,835.00

4,854.46

4

1,347.57

337.93

1,776.43

4,860.00

8,321.93

88

Page 95: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

TABLE 9.2.1 : SOLID WASTE GENERATION IN NCR

Source : NCR document at page 97

SUB-REGION GARBAGE GENERATION (IN MT/DAY)

2021

9,488 15,413

2 31

NCT-Delhi

2001

1,540 4,569Haryana

201 1,116Rajasthan

2,270 6,138Uttar Pradesh

Total 13,499 27,236

89

Page 96: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

TABLE 9.2.2 : SUB-REGION WISE INVESTMENT REQUIRED IN URBAN AREAS FOR SWM

Source : NCR document at page 97

1

Haryana

Rajasthan

Uttar Pradesh

NCT-Delhi

Total

228,46

55.80

306.92

770.63

1,361.81

2

SUB-REGIONREQUIREMENT @ RS. 0.05 CRORES PER MT

(RS. IN CRORES)

Source : NCR document at page 101

1

2002-2007

2007-2012

2012-2017

2017-2021

PLAN PERIODPERCENTAGE

40.0

2

25.0

20.0

15.0

(%)

AMOUNT

(RS. IN CRORES)

3

544.73

340.45

272.36

204.27

90

Page 97: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

10 TELECOMMUNICATION

Page 98: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

10.1

Tables:

Expenditure during 9th Plan in NCR

10.1

Boxes:

General Packet Radio System

10.2 Blue Tooth Technology

10.3 AVVID Technology

91

Page 99: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 109

Table 10.1 : Expenditure during 9th Plan in NCR

1 2

SUB-REGIONEXPENDITURE

(RS. IN CRORES)

NCT-DELHI

HARYANA

RAJASTHAN

UTTAR PRADESH

TOTAL NCR

2,294.85

473.07

100.92

432.86

3,301.70

92

Page 100: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

GENERAL PACKET RADIO SYSTEM

General Packet Radio System (GPRS) is a new service that provides actual packet radio access for mobile Global Systemfor Mobile Communications(GSM) and time-division multiple access (TDMA) users. The main benefit of GPRS is that itreserves radio resources only when there is data to be sent and it reduces reliance on traditional circuit-switched networkelements. The increasedfunctionalityof GPRS will decrease the incrementalcost to provide data services, that will, in turn,increase the penetration of data services among consumer and business users. GPRS is important step towards third-generation (3G) networks. GPRS will allow network operators to implement IP-based core architecture for dataapplications, which will continue to be used and expanded upon 3G services for integrated voice and data applications.

BLUE TOOTH TECHNOLOGY

Telecom technology compatible with Blue Tooth is a Radio Frequency (RF) specification for short-range, point tomultipoint voice and data transfer. Blue tooth will enable users to connect to a wide range of computing andtelecommunications devices without the need for proprietary cables that often fall short in terms of ease-of-use. Thetechnology represents an opportunity for the industry to deliver wireless solutions that are ubiquitous across a broad rangeof devices. Blue tooth technology was designed to be small and inexpensive. Blue tooth technology has no line-of-sightrequirements making it a potential replacement for infra-red ports. Blue tooth can operate through walls or from withinyour briefcase. Printers, PDA’s desktop computers, fax machines, keyboards, joysticks and many other digital devices canbe part of the Blue tooth system. Blue tooth radio technology provides a universal bridge to existing data networks, aperipheral interface, and a mechanism to form small private and ad-hoc groupings of connected devices away from fixednetwork infrastructures.

Source : NCR document at page 110

93

Page 101: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

AVVID TECHNOLOGY

Telecom facility compatible to AVVID Technology (Architecture for Voice, Video and IntegratedData) defines a framework for building and evolving customer networks supporting internetbusiness solutions. As more and different applications begin sharing the data network, the needsfor management, reliability, and control grow. Unlike traditional hierarchical networkarchitectures, such as SNA, the emerging network model is widely distributed so that serversanywhere in the network provide information and processing services to users regardless oflocation. Adequately serving the needs of Internet business solutions in this environmentrequires aconsistent set of network services end-to-end through the network, providing prioritization, highavailability, and performance. Since a level physical foundation provides the reference point andsupport for a complex physical building, these consistent services provide a foundation for rapiddeployment and easy administrationof internet business solutions.

Source: NCR document at page 110

94

Page 102: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

11 SHELTER

Page 103: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

11.1

Boxes:

National Housing and Habitat Policy 1998-Salient Features

11.2

11.3

11.4

11.5

Slum Population in four largest Metropolitan Cities of India, 2001

Slum Population in NCR (2001)

Slum and JJ Clusters in Delhi

National Slum Policy-Salient Features

95

Page 104: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Salient Features

Objectives• Creation of surpluses in housing stock eitheron rental or ownership basis• Providing quality and cost effectiveshelter options, especially to vulnerable groups and the poor• Removing legal, financial and administrativebarriers for facilitatingaccess to land, finance and technology.• Forging strong partnership between private, public and cooperative sectors to enhance the capacity of the construction

industry to participate in every sphere of housing and habitat* Using technology for modernizing the housing sector to increase efficiency, productivity, energy efficiency and quality ** Empowering Panchayati Raj institutionsand village cooperatives to mobilizecredit for adding to the housing stock.

Role of all the Stake Holders

Central GovernmentThe Central Government’s role in implementing the Policy is to take steps to bring in legal reforms including formulation ofeffective foreclosure laws. Further, it has to devise macroeconomic policies to enable flow of resources to the housing andinfrastructure sector, develop a debt market for housing and infrastructurefully integrated with the financial markets in country.For this purpose the Governmenthas to set up a National Shelter Fund to meet the requirementof low cost funds for the housingneeds of the poor. It is also required to promote research and development and transfer of technologyfor constructionof housesand evolve parametersfor optimal use of available resourcesto promote developmentand growth in a sustained manner.The housing policy recognizes the necessity of providing fiscal concessions for housing, infrastructure, innovative and energysaving construction materials and methods and also setting up a regulatory mechanism to ensure that the concessions arecorrectly targeted and utilized.

The CentralGovernment is also required to develop and enforce appropriate ecological standards to protect the environment andprovide a better quality of life in human settlements. It should also promote the creationof a secondary mortgage market.

State GovernmentThe State Governments are required to liberalise the legal and regulatory regime to give a boost to housing and supportinginfrastructure, promote private sector and cooperative in undertaking housing construction for all segments in urban andrural areas. They are also required to undertake appropriate reforms for easy access to land and promote decentralizedproduction and availabilityof building material.

The State Governments have to facilitate training of construction workers by converging other development programmesthrough Building Centres and other agencies. Besides they are to empower the local bodies to discharge theirresponsibilities in regulatory and developmentfunctions.

Local AuthorityThe role of local authorities is to identify specific housing shortages and prepare District Housing Action Plans for ruralareas, devise programmes to meet housing shortages and augment supply of land for housing, particularly for vulnerablegroups and plan expansion of both urban and rural infrastructure services. They are also required to enforce effectivelyregulatory measures for planned development.

Public/Private Housing Finance CompaniesThe policy anticipates that the public/private housing finance companies will redefine their role and move away from thetraditional approach to housing finance and develop and expand their reach to meet the needs of people. Besides this theymay have to devise schemes to lend at affordable rates to those who are in dire need of housing finance support, mobilizeresources from provident funds, insurance funds, mutual funds etc. for house building activities and develop innovativeinstruments to mobilize domestic savings.

NATIONAL HOUSING AND HABITAT POLICY 1998

96

Page 105: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Housing Board/Corporations/DevelopmentAuthoritiesand Other Public AgenciesThe policy envisages that Housing Boards and other agencies involved in housing development will revamp their method ofworking and redefine their role for facilitating land assembly and development of infrastructure,moving away from directconstruction activity For achieving their objectives they will have to forge partnerships with the private sector and.cooperatives for housing construction in an efficient manner and devise flexible schemes to meet the user’s requirement

Housing Board/Corporations/DevelopmentAuthorities andOther Public AgenciesThe policy envisages that Housing Boards and other agencies involved in housing development will revamp their method ofworking and redefine their role for facilitating land assembly and development of infrastructure, moving away from directconstruction activity. For achieving their objectives they will have to forge partnerships with the private sector andcooperatives for housing constructioninan efficient manner and devise flexible schemes to meet the user’s requirement.

Corporate, Private and Cooperative SectorsThe policy accords a very high importance to corporate, private and cooperative sectors in housing delivery. They areexpected to take the lead role in land assembly, construction of houses and development of amenities. In the endeavourthey should forge partnership with State Governments and local authorities for construction of houses and collaborate withthe State Governments to work out schemes for slum reconstruction on cross subsidization basis.

Research and Technology Transfer OrganizationThese institutions are required to direct research efforts to locally available raw materials and reduce the use of scarcenatural resources and replace them with renewable resources. They may also have to standardize new technology for easyadoption by various public and private construction agencies and also promote energy efficiency in building materials andconstruction methods. This will also entail promoting use of renewable energy sources for the housing sector particularly,solar, bio-mass and waste based energy.

It is also necessary for them to promote disaster mitigation techniques for new constructions as well as strengthening ofexisting houses to prevent continuing less of housing stock and human lives form natural hazards like earthquakes, cyclonesand floods.

One of their important role is to disseminate information about new technologies and provide training to constructionworkers inthe use of new technologies.

Source: NCR document at page 114

97

Page 106: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

SLUM POPULATION

(in Four Largest Metropolitan Cities of India, 2001)

Name of City Total Population Slum Population % of Population in SlumsGreater Mumbai 1,19,14,398 58,23,510 48.88Delhi Municipal 98,17,439 18,54,685 18.89Corporation (Urban)Kolkata 45,80,544 14,90,811 32.55Bangalore 42,92,223 3,45,200 8.04

Note : Data pertains to Municipal Corporation Source: NCR document at page 115

98

Page 107: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

SLUM POPULATION IN NCR (2001)

Sub-region/Cities Population %age of Slum Sex Literacy Total Slum Population ratio Rate

NCT-Delhi (MC-Urban) 98,17,439 18,54,685 18.89 825 48.17Haryana (Urban) 61,14,139 14,21,839 23.25 824 73.911. Panipat 2,68,823 1,02,813 38.25 798 72.142. Sonepat 2,25,151 75,454 33.51 853 78.473. Rohtak 2,94,537 90,645 30.78 871 78.044. Bahadurgarh 1,26,746 39,478 30.90 820 79.125. Rewari 1,00,946 51,754 51.27 862 81.426. Gurgaon 2,01,759 33,570 16.64 815 82.687. Faridabad (MC) 10,54,981 4,91,131 46.55 796 74.268. Palwal 1,00,528 15,589 15.50 859 60.67Rajasthan (Urban) 1,32,05,444 12,06,123 9.13 900 66.191. Alwar 2,60,245 15,923 6.11 883 58.36Uttar Pradesh (Urban) 3,45,12,629 43,99,005 12.75 859 54.681. Meerut 10,74,229 4,71,316 43.87 867 52.062. Ghaziabad 9,68,521 2,58,834 26.72 863 61.423. Hapur 2,11,987 90,964 42.91 876 49.554. Bulandshahr 1,76,256 50,292 28.53 837 55.965. Modinagar 1,12,918 33,103 29.31 816 63.546. NOIDA 2,93,908 26,824 9.12 812 60.24

Source: Census 2001, Census of India

99

Page 108: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

SLUM AND JJ CLUSTERS IN DELHI

S.NO. Item Position as on 31.03.19991. Number of JJ Clusters 1,0802. Number of Basti Vikas Kendras 1923. Number of Shishu Vatikas 1994. Number of Jan Suvidha Complexes

i. Pucca 292ii. Prefab 131iii. Mobile Toilet Vans 101Total 524

5. W.C. seats of JSCsi. Pucca 11,290ii. Prefab 3,496iii. Mobile Toilet Vans 1,414Total 16,200

6. Number of Plots developed for relocation of JJ Squatters 13,0007. Number of plots allotted to JJ Squatters 11,0978. Number of Night Shelters 199. Number of Katras 30910. Number of plots developed under In-situ-upgradation of 5,022

JJ clusters

Source: Socio Economic Profile of Delhi 2001-2002, Planning Department, GNCT of DelhI Source: NCR documents at page 116

100

Page 109: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

ObjectivesTo integrate slum settlements and the communities residing within them into the urban area as a whole bycreating awareness amongst the public and in Government of the underlying principles that guide the processof slum development and improvement and the options that are available for bringing about the integration.To strengthen the legal and policy framework to facilitate the process of slum development and improvementon a sustainable basis.To establish a framework for involving all stakeholders for the efficient and smooth implementation of policyobjectives.

Salient FeaturesThe policy primarily endorses and promotes an upgrading and improvement approach to deal with slums andinformal settlements as opposed to resettlement. It proposes that all existing planning instruments such asmaster plans, land use plans etc. should be modified to ensure that slums and informal settlements can beproperly integrated into the winder urban area.

The policy states that all physical upgrading and improvement in informal settlements should adopt acommunity-based approach with the active involvement of members of the community at every stage ofdesign, implementation, and maintenance of services and assets. It sets forth specific norms and guidingprinciples for physical infrastructure developments and the desirability of collection of user charges.

NATIONAL SLUM POLICYSalient Features

The policy also emphasizes improving access to social services-health, education, child labour and childrights and public distribution system-as their effective delivery would also reduce social inequities andpromote integration of people residing in slums into the social and economic networks of the city as a whole.

The policy recognizes the importance of economic empowerment of the slum dweller and lays guidelines forprovision of financial services for the poor and economic support/enterprise development designed to addressthe livelihood needs of the urban poor.

The policy proposes a sustainable financing mechanism for slum improvement through a Slum DevelopmentFund at the State level, while recognizing the role of private sector funding and institutional finance.

The policy proposes a Consolidated Service Tax on properties located in slums. It gives measures forstrengthening municipal governance and management in the context of slum areas. It also proposesestablishment of a system of monitoring and evaluation at different levels of government in order to find outthe extent to which the programmes under the policy are being implemented and whether the policyobjectives are being achieved.

The policy is committed to a shelter up-gradation approach that will enable, support and extend individualand community initiatives for housing provision.

Incorporating some of the important features outlined in the policy, the Central Government has announcedthe ‘Valmiki Ambedkar Malin Basti Awas Yojna (VAMBAY)’ for construction of dwelling units, upgradationof slum tenements and provision of basic amenities like water supply and sanitation in slums.Source: National Slum Policy (Draft), Ministry of Urban Development and Poverty Alleviation, October2001.

Source: NCR document at page 118

101

Page 110: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

12 SOCIAL INFRASTRUCTURE

Page 111: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

12.1

Boxes:

UDPFI Guidelines

12.2 Educational Institutions in Delhi

12.3 Hospitals in Delhi

102

Page 112: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 120

UDPFI GUIDELINES

I. EDUCATIONAL FACILITIES NORMS AND STANDARDSA. Pre-Primary to Secondary Educationa. Pre-Primary, Nursery School One for 2,500 population b. Primary School (Class I to V) One for 5,000 populationc. Senior Secondary School (VI to XII) One for 7,500 populationd. Integrated school with hostel facility (Class I to XII) One for 90,000 one lakh populatione. Integrated school without hostel facility (Class I to XII) One for 90,000 one lakh populationf. School for handicapped One for 45,000 populationB. Higher Education - Generala. College One for 1.25 lakhs populationb. Technical Education Technical Education Centre (A): One such centre provided for every 10

lakhs population to include one industrial training institute and one polytechnic.Technical Centre (B): One provided for 10 lakhs population to include one industrial training institute, one technical centre and one coaching center

II. HEALTH CARE FACILITIES a. General hospital One Hospital for 2.5 lakhs population with provision for 500 bedsb. Intermediate hospital (Category A) One Hospital for one lakh population with provision for 100 bedsc. Intermediate hospital (Category B) One Hospital for one lakh population with provision for 80 beds

(initially may be for 50 with 20 maternity beds)d. Polyclinic with some observation beds One for one lakh populatione. Nursing home, Child welfare and One for 0.45 to one lakh population

maternity centeR

III. SOCIO -CULTURAL FACILITIES

a. Community room One for 5,000 populationb. Community hall and library One for 15,000 populationc. Recreational club One for one lakh population d. Music, dance and drama centre One for one lakh populatione. Meditation and spiritual centre One for one lakh population

f. Socio-cultural centre One for 10 lakhs population

IV. DISTRIBUTION SERVICES a. Milk Distribution One milk booth for 5,000 populationb. LPG Godown One gas Godown for 40-50,000 population

V. POLICEa. Police Station One for 90,000 populationb. Police Post One for 0.4 to 0.5 lakh population (not served by a police

station)

c. District Office and Battalion One for 10 lakhs populationd. Police Line One for 20 lakhs populatione. District Jail One for 20 lakhs populationf. Civil Defence and Home Guards One for 10 lakhs population

VI. FIREa. Fire Station / Sub-fire station One within 1 to 3 km for 2 lakhs population

103

Page 113: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

EDUCATIONAL INSTITUTIONS IN DELHI

Number of Schools 4,618a) Primary Schools (including Nursery) 2,406b) Middle Schools 666c) Secondary Schools 405d) Senior Secondary Schools 1,141Higher EducationUniversities 5Institutions deemed as Universities 6Colleges 103a) Funded by Delhi Government 12b) Funded by Delhi Government and UGC 16c) Others 75

Technical EducationColleges for Technical Education (Engineering) 5Polytechnics 9Industrial Training Institutes (ITIs) 15Basic Training Centre 6

Source : Socio Economic Profile of Delhi, 2001-2002, Planning Department, Govt. of NCT of Delhi.

104

Page 114: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

HOSPITALS IN DELHIHospitals Nos. Beds

i) Allopathic 79 20,396ii) Ayurvedic 6 401iii) Unani 1 70iv) Homoeopathic 2 200Total 88 21,067Dispensaries / Health Centresi) Allopathic 516 -ii) Ayurvedic 149 -iii) Unani 22 -iv) Homoeopathic 108Total 795 -Primary Health Centres 8 79Sub Centres attached to PHC’s 42 -Maternity Homes/Maternity & Child Centres / Sub-centres 202 285Poly Clinics 32 -Special Clinics (TB/STD/Leprosy) 17 186Private Nursing Homes / Clinics 420 11,000 Bed population ratio (per thousand) 2.34Family Welfare Centres 121

Source: Socio Economic Profile of Delhi, 2001-2002, Planning Department, Govt. of NCT of Delhi

105

Page 115: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

13 HERITAGE AND TOURISM

Page 116: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

13.1 Number of Protected Monuments in various States of NCR13.2 Number of Monuments and Conservation areas listed by INTACH

Tables:

106

Page 117: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Table 13.2 : Number of Monuments and Conservation areas listed by INTACH

Source : NCR document at page 126

Sub Regions Haryana Uttar Pradesh Rajasthan Delhi Total

2 3 4 5 61

Monuments 334 NA 85 1,208 1,627

Conservation Areas 0 NA 0 26 26

Protection/State Haryana Rajasthan Uttar Pradesh NCT-Delhi Total

2 4 3 5 61

Centrally Protected 63 03 26 166 258

State Protected 01 17 02 NA 20

Table 13.1 : Number of Protected Monuments in various States of NCR

Source : Study Group Report on Environment including tourism, heritage, pollution, disaster management etc.

107

Page 118: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

15 DISASTER MANAGEMENT

Page 119: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

15.1 Earthquake with Intensity more than 5 on Richter Scale

15.2 Areas affected under Earthquake of Magnitude 6.5 (in sq.kms.)

Tables:

15.1 National Capital Region: Seismo-tectonic Features

Map:

108

Page 120: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 134

Earthquake

Table 15.2 : Areas Affected under earthquake of Magnitude 6.5 (in sq kms)

Magnitude I = VIII I = VII Total under VII & VIII

1 2 3 4 5

Koyna, 1967

Uttarkashi, 1991

Killari, 1993

6.5

6.6

6.3

130

700

420

430

1300

930

560

2000

1350

Source: NCR document at page 134

Date Time of Origin (GMT)

1 2

1720, 15th July

1803, 1st September

1809

-

-

-

Table 15.1 : Earthquake with Intensity more than 5 on Richter scale

1842, 16th January

1842, 5th March

1956, 10th October

1960, 27th August

1966, 15th August

-

-

15:31:36

15:58:592

02:15:28

0Latitude ( N)

28.40

27.00

30.00

27.00

30.00

3

28.20

28.20

28.67

0Latitude ( E)

4

77.10

77.00

79.00

78.00

78.00

77.70

77.40

78.93

Focal Depth (Km)

5

109.0

5.0

Magnitude

66

6.5

6.8

6.0

5.5

5.5

6.7

6.0

5.6

109

Page 121: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 135

NATIONAL CAPITAL REGION SEISMO-TECTONIC FEATURES

110

Page 122: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

17 REGIONAL LAND USE

Page 123: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

17.1 National Capital Region: Land Use 1999

17.2 National Capital Region: Proposed Land Use 2021

Maps:

17.1 Existing Land Use in NCR (1999)

Table:

17.2 Sub-region wise Land use in NCR based on 1999 Satellite Imagery Data (inhect.)

17.3 Land Use in NCR for the year 1986 and 1999 (in hectares)

17.4 Conversion of agricultural land into non-agricultural uses

17.5 Conversion from Non-Built up area into Built-up areas

17.6 Conversion of Wastelands

17.7 Conversion of Forests cover

17.8 Comparative Analysis of Land Use 1999 and Proposed Land Use 2001 of NCR

17.9 Density Norms proposed in Regional Plan-2001

17.10 Density Norms suggested in Regional Plan-2021

17.11 Green Buffers along Transport Networks

111

Page 124: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Table 17.1 : Existing Land Use in NCR (1999)

Category Area (hectares) % to total

1 2 3

Built-up

Agriculture

Forest

Wastelands

Water bodies

Others

Total NCR

263,500

24,04,964

1,21,435

2,00,535

24,217

9,549

30,24,200

8.71

79.52

4.02

6.63

0.80

0.32

100.00

Source : Study Report on Urban Sprawl and Land Use/Land Cover Mapping for NCR-NRSA, 1999.

112

Page 125: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 145

113

Page 126: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 145

o`Qf"k Hkwfe mi;ksx] fufeZr vkSj ou ds ekeys esa izeq[k cnyko ns[ks x, gSa] tSlk fp=k 7-1 esa laosQfrd fd;k x;k gSA

fp=k 17-1 : o"kZ 1986 vkSj 1999 osQ fy, jk"Vªh; jktèkkuh {ks=k esa Hkwfe&mi;ksx forj.k

114

Page 127: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 147

115

Page 128: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

116

Table 17.5 : Conversion from Non-Built-up area into Built-up areas

Built-up area converted from Area (in Hectares) Percentage

1 2 3

Agriculture

Wastelands

Forest

Other uses

Total

1,54,000

10,100

600

100

1,64,800

93.45

06.13

00.36

00.06

100.00

Table 17.6 : Conversion of Wastelands

Source: NCR document at page 147

Page 129: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 148

117

Page 130: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 151

Source : NCR document at page 152

118

Page 131: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Table 17.11 : Green Buffers along Transport Networks

Source: NCR document at page 153

TRANSPORT NETWORKDISTANCE FROM THE EITHER SIDE

OF ROW (IN METRES)

1 2Expressways/Bypass

National Highway

State Highway

Railways line

100

60

30

30

119

Page 132: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

18 COUNTER MAGNET TOWNS

Page 133: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source: NCR document at page 160

NATIONAL CAPITAL REGION COUNTER-MAGNET TOWNS

120

Page 134: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

19 IMPLEMENTATION STRATEGIES,MANAGEMENT STRUCTURE ANDRESOURCE MOBILIZATION

Page 135: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Source : NCR document at page 168

121

Page 136: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

122

Page 137: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

123

Page 138: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

124

Page 139: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

GHAZIABAD MASTERPLAN-2021REVISED DRAFT

PROPOSED LANDUSE

125

Page 140: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

126

Page 141: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

127

Page 142: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

128

Page 143: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

GURH GANGA

Page 144: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

R.G.GuptaB.Sc.; B.Arch (G.Md); MCAMasters degree in Urban planning from SPA DelhiP.G.Dip (R.D.P.) NetherlandsF.I.E.; F.I.T.P.; F.I.I.A; F.Amda .Member - IRC, IBC, IIPA, IRT, ISRS, CIT (India)

GARHMUKTESHWAR -BRIJGHAT-DEVELOPMENT

129

Page 145: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

LOCATION OF GARH MUKTESHWARLOCATION OF GARH MUKTESHWAR

GARH

130

Page 146: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

NH-24 BRIDGE ON RIVER GANGANH-24 BRIDGE ON RIVER GANGA

131

Page 147: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

132

Page 148: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

133

Page 149: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

eqDrs'oj efUnj o uDdk oqaQvk

134

Page 150: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

135

Page 151: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

1 Formulation of Strategy of Development.

2 Detailed comprehensive plans.

3 Land Policy.

4 Financial Policy.

5 Involvement of private sector & join vent.

6 Vision, Goals, Aims & Objectives.

7 Decision to be taken at the top level.

8 Importance of street furniture.

SEQUENCE OF ACTION

136

Page 152: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

1 Create organizations like Swami Narayan, ISKON etc..

a Core unit of Faith, Devotion, Meditation by

2 Sec. 4 of LA act on the entire area.

3 Involve all the land owners in the process.

4 Prepare detailed physical plans.

5 Give full publicity.

6 Demarcate public & Semi public sites.

7 Prepare land acquisition plans .

8 Take seed capital of Rs. 50 cr. From the Govt.

STRATEGY OF DEVELOPMENT

137

Page 153: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

Physical Infrastructure Power, Tele-communication etc.

: Water, Sewerage, Drainage,

TYPE OF INFRASTRUCTURETYPE OF INFRASTRUCTURE

1

Social Infrastructure Security : Education, Health, ,Safety, Shelter, Justice, Recreational etc.2

Economic Infrastructure : Work Centres to increase GDP and per capita income.3

Ecological Infrastructure : To stop water, air, noise and soil pollution.4

Emergency Infrastructure : Earthquake, Cyclone, Flood, Drought etc. 5

138

Page 154: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

VISIONVISION

Infrastructures.

Public & semi public facilities, with proper Police Security.

Fair Ground Center.

Pilgrimage Center.

Health Resort.

Tourist Center.

Picnic Place.

A city for 100,000 population.

Linkages via roads, rails and airways.

TO DEVELOP GARH MUKTESHWAR A NEW CITY IN TERMS OF THE FOLLOWINGS:

139

Page 155: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

IN 20 YEARS, GARH MUKTESHWAR SHOULD COME NOT ONLY ON THE MAP OF U.P. INDIA BUT IN SOME PARTS IN THE WORLD.

In 5 years to develop Core units of:

Religious Center

Picnic Center

Health Resort

Tourists Center.

GOALS

AIMS & OBJECTIVES

140

Page 156: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

PREDICTED LAND USEFor permanent population

Residential 35%

Industrial 02%

Commercial 03%

Public & semi public 13%

Recreational 30%

Circulation 15%

Utility & Services 02%

Total 100%

141

Page 157: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

FOR FAIR GROUND POPULATION

Residential

Commercial

Public & semi public

Recreational

Circulation

Utility & Services

Total

12%

10%

02%

100%

65%

07%

04%

PREDICTED LAND USE

142

Page 158: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

KARMA

RAJ (GOVERNANCE)

GYAN

BHAKTI

INTEGRATED YOGA

143

Page 159: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

144

Page 160: This plan document is a copy of the IONAL PLAN -2021 ... › ncr › NCR.pdf · NATIONAL CAPITAL REGION (A p o d 2 8 ee ng o f h N R -P B) pr ve in th M ti t e C e d 9 ul y 0 5 d

1. Ghaziabad & Loni

2.JahangirabadSikandrabad, Bulandshahr, Khurja,

3. Hapur/Pilukhwa/Garmukteshwar

4. Faridabad/Ballabhgarh

5. Palwal

6. Gurgaon+Sona

7. Manesar8. Bahadurgarh9. Rohtak

10. Sonepat & surrounding areas

11. Panipat12. Baghpat13. Meerut

145