Top Banner
This is Turbofluid Projects Please enjoy the presentation...
35

This is Turbofluid Projects Please enjoy the presentation...

Mar 31, 2015

Download

Documents

Albert Dallas
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: This is Turbofluid Projects Please enjoy the presentation...

This is Turbofluid Projects

Please enjoy the presentation...

Page 2: This is Turbofluid Projects Please enjoy the presentation...

Established in 1997

• The current ownership structure been in place since 2002

• The existing company incorporates the collective knowledge of 3 companies that have been involved in pumps and related equipment since 1985

Page 3: This is Turbofluid Projects Please enjoy the presentation...

Our Head Office in Durban

• 1700m² of Workshop

• 560m² of Office

• 75 staff members

• 10 Company Vehicles

Page 4: This is Turbofluid Projects Please enjoy the presentation...

Our Branches

• We have a sales, workshop and repair centre in Secunda

• We have a sales office and workshop in Johannesburg

• We have sales offices in Port Elizabeth and George

Page 5: This is Turbofluid Projects Please enjoy the presentation...

Our Workshop

Page 6: This is Turbofluid Projects Please enjoy the presentation...

Receiving and Despatch

Page 7: This is Turbofluid Projects Please enjoy the presentation...

Quality Control

Page 8: This is Turbofluid Projects Please enjoy the presentation...

Machining

Page 9: This is Turbofluid Projects Please enjoy the presentation...

Fabrication and Finishing

Page 10: This is Turbofluid Projects Please enjoy the presentation...

Stripping and Repairs

Page 11: This is Turbofluid Projects Please enjoy the presentation...

As well as...

• 60 000ltr test tank• Performance testing up to 200kw• Balancing equipment• 10ton overhead cranage • 250ton bending machine• 3 lathes and 2 milling machine• Arc, MIG & TIG welding • 2 BSc Mechanical engineers• Over 20 qualified mechanical artisans

Page 12: This is Turbofluid Projects Please enjoy the presentation...

Our stock holding

• 316SS & CD4MCu Durco ANSI/ASME B73.1

• CI & 316SS Eagle DIN 24255

Page 13: This is Turbofluid Projects Please enjoy the presentation...

And... attention to detail

Page 14: This is Turbofluid Projects Please enjoy the presentation...

Our major brands include

• Eagle DIN spec 24255 Cast Iron and 316SS

• Eagle Horizontal Split case water pumps up to 3200m³/hr @ 200m head

Page 15: This is Turbofluid Projects Please enjoy the presentation...

Our Trade Marked pumps

• Eagle EJC Slurry Pumps – up to 1500m³/hr

• Eagle EHS Solids Handling Pumps –up to 900m³/hr

Page 16: This is Turbofluid Projects Please enjoy the presentation...

We are Flowserve distributors

• API 610 (8TH & 10TH ) Edition

• ANSI/ASME B73.1

• ISO 5199 & 13709

• Incorporating heritage brands such as:

• Byron Jackson• Worthington Simpson• Durco• Ingersoll Dresser• Pleuger• United Centrifugal• And over 30 others

Page 17: This is Turbofluid Projects Please enjoy the presentation...

Involving Turbofluid in:

• Desalination development in Africa

• Bio-fuels plants

• Co-generation projects

• Energy efficiency awareness

• International market trends and product enhancements

Page 18: This is Turbofluid Projects Please enjoy the presentation...

The Oil & Gas Industry

Page 19: This is Turbofluid Projects Please enjoy the presentation...

Chemical Process pumps

Page 20: This is Turbofluid Projects Please enjoy the presentation...

Turbofluid & Flowserve

• Turbofluid have recently been appointed as the only Southern African approved Flowserve repair facility

• This will introduce us to International Pump Industry Standards such as: ASTM; ESA; FSA; HI & ISO

• We have also completed our application for our ISO 9001 certification

Page 21: This is Turbofluid Projects Please enjoy the presentation...

We also represent...

• Broquet Molasses transfer pumps

• And last but not least...

Page 22: This is Turbofluid Projects Please enjoy the presentation...

HIVAC VACUUM PUMPS

Page 23: This is Turbofluid Projects Please enjoy the presentation...

About HIVAC

• Founded in 1966 in Johannesburg

• Moved to their current 3800m² premises in 1980

• They are currently operated and managed by the son of the founder

Page 24: This is Turbofluid Projects Please enjoy the presentation...

About HIVAC

• They have their own foundry on site

• In 2002 they introduced Single Stage Pumps with variable discharge valves up to 2800m³/hr

Page 25: This is Turbofluid Projects Please enjoy the presentation...

The HIVAC Facilities

• Foundry castings up to 750kg

• Machine shop Boring Mill 1200mm diameter

• Machining centres 1000x550x650

Page 26: This is Turbofluid Projects Please enjoy the presentation...

The HIVAC Range

• Single stage pumps from 18 to 3800m³/hr @ 200mbar

• Two stage pumps from 18 to 3800m³/hr @ 33mbar

• Single stage pumps from 18 to 22000m³/hr @ 33mbar

Page 27: This is Turbofluid Projects Please enjoy the presentation...

Additional information

• In 2006 the holding company of HIVAC purchased Flotech, which included the local manufacturing rights to Siemens designed vacuum pumps

• All rotors manufactured by HIVAC are balance to ISO G 6.3 standards

• Their in-house test facility can accommodate up to 260kws of power

Page 28: This is Turbofluid Projects Please enjoy the presentation...

Turbofluid & HIVAC

• We have been handling the marketing, distribution and repairs for HIVAC since 2002. First on a regional bases, then we expanded the business into Africa

Page 29: This is Turbofluid Projects Please enjoy the presentation...

Turbofluid & HIVAC

• We repair and modify the GDH4000 pumps for the Titanium mine in KZN to accommodate their dirty ring seal water

• They come like this...

Page 30: This is Turbofluid Projects Please enjoy the presentation...

And we fit VRN500 parts...

Page 31: This is Turbofluid Projects Please enjoy the presentation...

And the pumps leave like this...

Page 32: This is Turbofluid Projects Please enjoy the presentation...

And the result to the end user...

• We have doubled their MTBF

• They have reduced their stock holdings

• We have assisted them in improving their start up and shut down procedures by introducing instrumentation features

Page 33: This is Turbofluid Projects Please enjoy the presentation...

In conclusion...

• Turbofluid Projects are the best positioned and best equipped company to supply and service a Nigerian sugar mill

• Turbofluid collectively have already been involved in over 10 large sugar mill projects, both new and capacity upgrades in Africa and Vietnam

Page 34: This is Turbofluid Projects Please enjoy the presentation...

Thank you for your attention!

• Does anyone have questions?

Page 35: This is Turbofluid Projects Please enjoy the presentation...

THE END.