Top Banner

Click here to load reader

of 15

This Briefing is: UNCLASSIFIED 83rd NETWORK OPERATIONS SQUADRON 83 NOS Perspective: AFNETOPS and the AFNET Migration Lt Col Eric P. DeLange Commander.

Dec 14, 2015

Download

Documents

Paula Mawson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Slide 1

This Briefing is: UNCLASSIFIED 83rd NETWORK OPERATIONS SQUADRON 83 NOS Perspective: AFNETOPS and the AFNET Migration Lt Col Eric P. DeLange Commander Slide 2 UNCLASSIFIED Standards = Success AFSPC AF Network Integration Center (Scott AFB) 690 NSG (Lackland AFB) 83 NOS (Langley AFB) 561 NOS (Peterson AFB) 690 NSS (Lackland AFB) 690 ISS (Lackland AFB) 299 NOSS (KS ANG) 310 CF (CO AFR) 622 CF (VA AFR) Base Network Control Ctrs (NCCs) ---- AFNETOPS C2 Process 67 NWG (Lackland AFB) 91 NWS (Lackland AFB) 315 NWS (Fort Meade) 26 NOG (Lackland AFB) 26 NOS (Gunter Annex) 33 NWS (Lackland AFB) 26 OSS (Lackland AFB) 352 NWS (Hickam AFB) 426 NWS (Vogelweh GE) 68 NWS (Brooks CB, TX) 24 AF 624 OC 67 Net Warfare Wing Net Ops & Monitoring, CND/A (Lackland AFB) 688 Info Ops Wing Info Ops & Net Engineering (Lackland AFB) 689 Combat Comm Wing Combat Comm & Comm Maint/System Tech Eval (Robins AFB) Chain of Command & AFNETOPS Organization Slide 3 UNCLASSIFIED Standards = Success 67th Network Warfare Wing USAFs Cyberspace Force Combat Wing, Global Presence Mission: Operate, Manage, & Defend Global AF Networks Train and Ready Airmen to Execute Computer Network Exploitation and Attack Perform Electronic Systems Security Assessments Conducts the Full Range of Network Warfare Network Operations (Establish) Net Defense (Control) Full Spectrum (Use) Defend Operate Attack Operations Of and On the Network 67 NWW 26 NOG Net Defense 690 NSG Net Ops 67 NWG Full Spectrum Slide 4 UNCLASSIFIED Standards = Success Mission Command, Control, Operate, Sustain, and Defend assigned Air Force networks to assure global cyber supremacy and enforce Air Force network standards and to develop Airman as cyber warriors. Slide 5 UNCLASSIFIED Standards = Success The AFNET Platform Delivering Air Force Wide Enterprise Career Email Address Single Sign-On Reduced Cost and System Complexity AF-Wide Collaboration Standardization and Consolidation Standardized and Secure! Slide 6 UNCLASSIFIED Standards = Success UNCLASSIFIED Services in the AFNET Management Tools Network Account Management Security Policy Enforcement/Management Application Monitoring Network Monitoring Security/Authentication Directory (AD) Anti-Virus Security Patching (SCCM) CAC Certification Capabilities E-mail Mobile Devices ESD AF Enterprise Forest C2 and Functional Systems Functional Services SharePoint MS Office Communication Server List Servers Fax Servers Project Management Servers FTP Servers Enterprisewide VPN Storage Slide 7 UNCLASSIFIED Standards = Success What the AFNET Migration is NOT! AFNet is not a full tech refresh of base equipment AFNet does not reprogram PMO systems AFNet does not provide C&A of base enclaves AFNet Enterprise Service Desk (ESD) was not not established to handle all communication issues (LMR, IPTV, etc) AFNet does not provide Continuity of Operations (COOP) AFNet does not restructure AF boundaries; Completely separate but related effort AFNet does not remove Single Points of Failure (SPOF) AFNet does not fix existing network issues AFNet does not physically move base level functional systems to the APC 7 Slide 8 Components of Migration Initial Coordination Programmatic Coordination Begins 210 days prior to migration / Duration ~15 days Infrastructure Preparation Circuit Upgrades, Facility Improvements, AQ processes Begins ~180 days prior to migration / Duration up to 150 days (or more) Source Environment Preparation Prepare the legacy environments for migration (Administrative & Technical) Begins ~90 days prior to migration / Duration ~60 days Target Environment Preparation Prepare AFNET to support migration of site Begins ~60 days prior to migration / Duration ~60 days Migration Move Legacy Active Directory resources to AFNet Duration varies from 15 days - up to 150 days (or more) Post Migration Environment Clean up, Legacy Func App Transition & Shutdown Begins ~180 prior to migration / Duration up to 150 days (or more) Legacy Shutdown Legacy shutdown actions occur concurrently during migration/post migration actions Slide 9 UNCLASSIFIED Standards = Success Key stakeholders and what each contributes to the migration of an organization Coordinate Base Support Coordinate Migration Schedule Facilitate Strategic Communication Core Migration Team O&M for the AFNet Operational Issue Resolution Executes Checklist Coord Local Support/Info Dissemination Provides Dedicated CST Support Funding for Hardware and Allied Support Contracting Support Project Management Operations Legacy Shutdown MAJCOM 24 AF/67 NWW ( Includes 690 NSG, 83 NOS, 561 NOS) AFNIC Base AFSPC Migration Organizational Roles/Responsibilities This is a TEAM Sport! Slide 10 UNCLASSIFIED Standards = Success Entrance Criteria Complete all pre-migration checklists Key servers in-place, configured, and operational Proper, documented certification and accreditation Support orgs prepared to accept responsibility