The 5 th Interna+onal Indonesia Gas Infrastucture Conference and Exhibi+on (Indopipe 2014) YOGYAKARTA
The 5th Interna+onal Indonesia Gas Infrastucture Conference and Exhibi+on
(Indopipe 2014)
YOGYAKARTA
CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
PT PERTAMINA GAS
PT Pertamina Gas is an Indonesian gas company engaged in the upstream and downstream sectors (middle stream). The company responsible for commercial trading gas, gas transportation, gas processing and other business related to natural gas and itself derivatives. !PT Pertamina Gas is Establish by commodities increased need for domestic gas as an alternative energy to substitute oil fuel as well that would be give an additional value for business of PT Pertamina(Persero). !
The experience of PT Pertamina during 30th years in managing the gas business is expected to be a focus for the provision and professional in managing and developing business networks and resources of gas in the country.!
CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
THE BUSINESS SECTOR OF PT PERTAMINA GAS
GAS PROCESSING Concern to develope / build gas processing facili+es
• Make a rela+ons with company that concern with infrastructure of distribu+on.
• Build an IPP and make a rela+ons with another company especially PT PLN. • Build an LNG receiving system as a supported for consumer that should
be away from gas resources.
• GAS DISTRIBUTION • INDEPENDENT POWER PRODUCER • LNG RECEIVING TERMINAL
GAS TRADING
• Concern to do gas commercial/trading by producer and consumers
• Concern to do deriva+ves gas commercial/trading [Mix LPG & Condensates.
GAS TRANSPORTATION Concern to build pipeline network for gas transporta+on
CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
PT PERTAMINA GAS PROJECTS
NO PT PERTAMINA GAS PROJECTS
1 Gas Transmission Pipeline from Arun to Belawan Project
2 Gas Pipeline from Belawan to KIM and KEK Project
3 Gas Pipeline from Muara Karang to Muara Tawar Project
4 Gas Pipeline from Porong to Gra+ Project
Gas Transmission Pipeline from Arun to Belawan Project
CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
Government instruction by Ministry letter No. S-141/MBU/2012
Gas Transmission Pipeline from Arun to Belawan Project
Pipeline Length -‐ Arun – SLS A 70 km -‐ SLS A – P. Batu 202 km -‐ P. Batu – P. Brandan 6.5 km (ROW exis+ng) -‐ P. Brandan – Stabat 44.6 km (ROW exis+ng) -‐ Stabat – Belawan 28 km
Linepipe Specifica+on 24” OD, API 5L X52, 0,5 inch WT, 3LPE outer 2 mm
Flow Capacity 200 MMSCFD
Compression System Two Compressor Gas Sta+ons ( SKG Rantau Panjang, SKG Pangkalan Brandan)
First & Last Point Arun (Point B) – Belawan
Opera+ng Pressure 780 psig
Design Pressure 860 psig
Construc+on Period 18 Month
Gas Resource Arun Regasifica+on Unit
Status Open Access
Toll Fee Subject to BPH Migas approval
PROJECT DESCRIPTION Gas Transmission Pipeline from Arun to Belawan Project
SCHEDULE
PROJECT TIME SCHEDULE
Gas Transmission Pipeline from Arun to Belawan Project
PIPELINE ROUTE
HDD Wampu River
HDD Batang Sarangan River
HDD Babalan River
HDD Tamiang River
SKG P. Berandan
SKG R. Panjang
Metering St. Arun
Metering St. PLN Belawan
Gas Transmission Pipeline from Arun to Belawan Project
CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
PIPELINE ROUTE of Nangroe Aceh Darussalam Province
WILAYAH KECAMATAN PANJANG (km)
LUAS (Ha) AREA/PEMILIK
ACEH UTARA
35,0 49,0 PT Arun/DJKN
38,0 53,2 Exxon Mobil
ACEH TIMUR
Indra Makmu 18,0 25,2 PT.Medco
Pantee Bidari
Pantee Bidari 29,8 41,7 Ex.Asamera
Ranto Peureulak 6,2 8,7 Masyarakat
Ranto Peureulak 4,4 6,1 PTPN-I
Peureulak 3,2 4,5 Masyarakat
Peureulak Timur 6,1 8,6 PT.Wahyu Rizki
Peureulak Timur 7,7 10,7 PT.Minamas
Sungai Raya 4,6 6,5 PT.Patria Kamau
Bireun Bayeun 3,1 4,3 PT.Damar Siput
Bireun Bayeun 11,1 15,5 PTPN-I
Bireun Bayeun 1,8 5,9 PT.ARCO
Bireun Bayeun 0,3 14,5 Masyarakat
LANGSA Langsa Baro 4,2 2,5 PT.Timbang Langsa
Langsa Baro 10,4 0,4 PTPN-I
ACEH TAMIANG
Manyak Payeud 0,9 1,3 PT.ARCO
Karang Baru 6,0 8,3 Masyarakat
Karang Baru 1,5 2,1 PTPN-I
Karang Baru 6,5 9,1 Masyarakat
Karang Baru 2,1 2,9 PTPN-I
Karang Baru 34,2 47,9 PEP Rantau
TOTAL 235,0 329,0
Gas Transmission Pipeline from Arun to Belawan Project
CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement
PIPELINE ROUTE of Sumatera Utara Province Gas Transmission Pipeline from Arun to Belawan Project
EPC PACKAGE
Package V. SCADA q METERING STATION q SCADA q GMS & PMS
GA
S PI
PELI
NE
TRA
NSM
ISSI
ON
FR
OM
AR
UN
– B
ELAW
AN
Package I. EPC Gas Compressor Station
q SKG Rantau Panjang q SKG P. Berandan
CONSTRUCTION STATUS q Cut & Fill : Completed q Building, Warehouse Water
pond : on-progres Package II. EPC Pipeline
q Pipa Size : 24” OD x 0.5” WT x 334 KM
q Design Life : 20 THN
CONSTRUCTION STATUS q Welding Completion : 316 KM q River & Road Crossing
Completion : 104
Package III. LINEPIPE PURCHASING q 3LPE Pipe : 23.084 jts q CWC Pipe : 1.500 jts
Package IV. EPC Compressor Unit q 3 Unit GTC + Acces+ Piping on skid-
SKG R. Panjang q 2 Unit GTC + Acces + Piping on skid-
SKG P. Brandan
STATUS GTC q FAT GTC : April 2014 q GTC On Site : July 2014
CONSTRUCTION STATUS q FO Installation : 228 KM q Metering Fabrication : In-Progress
DELIVERY STATUS q Completed : 24.584 jts
Package III. LINEPIPE PURCHASING (Add)
q 3LPE Pipe : 5.000 jts
DELIVERY STATUS q Completed : 5.000 jts
Gas Transmission Pipeline from Arun to Belawan Project
HDD Wampu River
HDD Batang Sarangan River
HDD Babalan River
HDD Tamiang River
SKG P. Berandan
SKG R. Panjang Metering St. Arun
Metering St. PLN Belawan
PPIPELINE PROGRESS PER 3.06.14
Welding : 316 KM (Target 334 KM)
Backfill : 301 KM (Target 334 KM)
Road Cross : 79 (Target 96)
River Cross (HDD) : 3 (Target 4)
River Cross (Non HDD) : 6 (Target 12)
PIPELINE PROGRESS
ROW weldiing backfill
Gas Transmission Pipeline from Arun to Belawan Project
PROGRESS S-CURVE (OVERALL)
Per June 3rd 2014
Plan Progress per June 3rd , 2014, : 83,2460% Actual Progress per June 3rd , 2014, : 83,0424% Deviation per June 3rd t , 2014, : -0,2035% (behind)
Gas Transmission Pipeline from Arun to Belawan Project
LONG LEAD ITEM MATERIALS
Long Lead Items PO (purchase Order)
FAT (Factory acceptance Test)
MoS (Material on ite)
SAT (Site Acceptance Test)
Shutdown & Blowdown Valve
18 Dec 2013 16 June 2014 16 July 2014 31 July 2014
LBCV Package 25 Oct 2013 5 May 2014 27 June 2014 11 July 2014
Pig Launcher/Receiver 25 Nov 2013 2 June 2014 27 June 2014 4 July 2014
Turbine Compressor 1 Aug 2013 31 March – 21 April 2014
4 June 2014 27 July 2014
Metering Skid 23 Oct 2013 25 April 2014 20 July 2014 10 Aug2014
Gas Transmission Pipeline from Arun to Belawan Project
THANK YOU