1 The Wolseley Courthouse Civic Re-Use Project Prepared by the Wolseley Heritage Foundation. March 15 th , 2013
16

The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

Aug 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

1

The Wolseley Courthouse

Civic Re-Use

Project

Prepared by the Wolseley Heritage

Foundation.

March 15th, 2013

Page 2: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

2

Index

Page

1. Executive Summary..................................................................... 3

2. Introduction.................................................................................. 3

3. Proponent Information................................................................ 4

4. Project Benefits............................................................................. 5

5. Project Timeline…....................................................................... 6

6. Construction Schedule................................................................. 6

7. Conceptual Layout………………………………………………..8

8. Project Budget.............................................................................. 11

9. Financial Plan………………….................................................... 12

10. Conclusion...................................................................................... 12

11. Appendices

A. Statement of Significance of Courthouse (designation criteria).

B. Existing floor plan.

C. Proponent Structure and Associated Partners

Page 3: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

3

1. Executive Summary

The Wolseley Heritage Foundation, under endorsement from the Town of Wolseley, has

developed the following civic organization plan for the Wolseley Courthouse, The Wolseley

Museum, and the current Town of Wolseley municipal offices. The intention of the plan is to i)

solve several civic issues related to municipal buildings in Wolseley, ii) transfer the ownership of

the Wolseley Courthouse from the Province of Saskatchewan to The Municipality of Wolseley,

and iii) provide a use for the Wolseley Courthouse that will be sustainable and culturally

valuable to the community of Wolseley. It is proposed that The Town of Wolseley is the most

suitable owner of the building as they provide stability and would ensure correct maintenance,

security, and preservation of this historically important building. Further, this plan offers to solve

additional civic use problems by identifying opportunities to provide spaces for the Wolseley

Museum and the Wolseley Town Office.

2. Introduction

The Wolseley Heritage Foundation, in partnership with the Town of Wolseley, has undertaken

the Wolseley Courthouse Civic Reorganization Project as part of the effort to forward the

community’s vision of developing and promoting a healthy and prosperous community within

the context of cultural and historic preservation, with the express intent of having the

stakeholders play a leadership role in the social, economic, cultural and environmental

revitalization of the community. The revitalization of The Wolseley Courthouse is supported by

our community’s progressive vision and the implementation of this plan would add an important

cultural facility to the town and region of Wolseley.

This plan incorporates two key components. The first component is the revitalization of the

Wolseley Courthouse, which is best approached by breaking the project into two phases. The

first phase is the rehabilitation of the exterior of the building. The second phase is the

rehabilitation of the interior of the building such that it is ready for occupancy by the municipal

government office and council. The second component of the plan is the civic re-use associated

with moving the municipal government offices and the museum into the courthouse. Additional

use of the facility will also be explored with a focus on rented space for community organization

meetings and the inclusion of space for other community entities.

The civic re-use portion of this plan involves solving three community issues. Firstly, the

courthouse itself is an issue that needs resolution. The building has been unoccupied for many

years and constitutes an under-utilized resource within the community. Further, it is recognized

that the best way to conserve an important heritage building is to have a long-term suitable use

for the building. The primary use of the courthouse as the municipal offices and council

chambers answers this preferred situation, as the local government authority is the most stable

entity in the community. This would ensure proper maintenance and conservation of the building

and would allow diversification of the use of space to a maximum degree. It is suggested that this

Page 4: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

4

strategy allows for wide-spread community benefit and will result in the Wolseley Courthouse

becoming a central facility to the functioning of the community.

The second component of the civic re-use plan is related to the Town Office building that is

currently being used by the municipal government. This building has insufficient space to

operate as an administrative office. Foremost among the issues with the functionality of this

building is that there is no private office space. As is legislated in the Municipality Act, it is

important that the Town Administrator use discretion in many matters pertaining to government

function. Confidential conversation with elected officials and/or ratepayers is an important

component of the administrator’s responsibilities and is difficult to manage without an option for

private office use. Further, the local government office is also an important archive and record-

keeping facility. Currently, records are kept in the basement of the town office. This space is

limited in size and is not conducive to the quantity of materials needing to be retained or to the

functional organization of these records. Also, there exists the argument that the courthouse is a

much more prestigious building than the current town office. It is suggested that upgrading to the

courthouse would have a beneficial cultural impact that would be related to the pride of the

community in their local government facilities. Once the town office is moved to the courthouse,

the current town office building will be sold with all proceeds being allocated to the courthouse

civic re-use project.

The third component of the civic re-use plan is the relocation of the Wolseley Museum to the

courthouse. The museum has been closed to the public for several years due to severe structural

problems with the building. Also, there has been an effort to consolidate the artifacts such that

they tell the Wolseley Story in a more precise manner than which they currently do. Therefore, it

is suggested that the museum can be housed in the basement of the courthouse and that particular

artifacts, with accompanying information relating the significance of the artifact to the Wolseley

Story, can be displayed in the lobby area of the courthouse. It is assumed that the bulk of the

artifacts would remain in storage in the basement but this area could also be set up as a museum

area. An important part of this re-use idea is that this strategy would result in many more people

visiting the courthouse and the museum. Wolseley’s famous Swinging Bridge terminates at the

courthouse property and it is a natural assumption to consider that people using the bridge would

extend their walk to include that of the Wolseley Courthouse and Museum. Further, the

administrative staff would be present Monday to Friday (from 8 am to 5 pm) to provide access

and security to visitors wishing to view the building and the museum. Additional to this portion

of the civic re-use plan is the potential to generate revenue via i) the housing of other community

organizations in the building (ie. Chamber of Commerce) and/or ii) through a community

meeting room that can be rented on a short-term basis. Once the museum is relocated to the

courthouse, the current museum buildings (building and Quonset) will be sold with all proceeds

being allocated to the courthouse civic re-use project.

3. Proponent Information

The Wolseley Heritage Foundation (WHF) is the lead proponent of the Wolseley Courthouse

Civic Re-use Plan. It is expected that, upon resolving to agree in principle to purchase the

courthouse, that The Town of Wolseley will become the lead proponent of the courthouse

Page 5: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

5

project. The WHF will then act in a support role to the Town, in particular in the area of fund-

raising, until the project is complete. Recently revitalized, the WHF hopes to build on previous

successes that include the rebuilding of the Wolseley Swinging Bridge and the restoration of the

Wolseley Town Hall/Opera Hall. The WHF’s mandate is to work to preserve and maintain the

historical infrastructure of Wolseley. As such, the WHF recognizes the cultural and historical

importance of the Wolseley Courthouse to the community. This civic re-use plan has been

endorsed by Wolseley municipal government, who also realizes the value of the Wolseley

courthouse to the community of Wolseley.

The Wolseley Heritage Foundation Board of Directors

Deanna Fjestad (Chair), Stewart Scott (Treasurer), Marilynn Malo (Vice-President), Stephen

Scriver (Secretary), Mayor Dennis Fjestad, George Fathers, Joel Kempfer, Kim Weber, Ross

Keith, James Garden, Jacquie-Jacobs Marshall.

The Mayor and Council of the Town of Wolseley

Mayor Dennis Fjestad. Councillors: Larry Hilderman, Troy Kyle, Dan Mckenna, Randy Quintyn,

Ron Lyke, and Gerald Hill.

Additional Partners/Direct Resources

Provincial Heritage Architect Patricia Glanville; Provincial Manager of Historic Places Bruce

Dawson; Canada Heritage Foundation Board of Directors Chairman Ross Keith; Executive

Director of Canada Heritage Foundation Natalie Bull.

4. Project Benefits

Cultural Benefits:

Local municipal ownership of an historically important provincially-designated

community asset.

Complementary to the provincially-designated Town Hall/Opera Hall.

Complementary to the objectives of the Saskatchewan Main Street Program.

Meeting space for community organizations.

Rental potential.

Cost-Effective Benefits:

Year-round interior construction.

Designed for high levels of use.

Community/Economic Benefits:

Re-activate use of a significant provincially-designated Saskatchewan heritage building.

Consolidation of municipal assets/services and correction of current situation.

Daily use by the community.

Prestigious municipal offices.

Consolidations of governmental and NGO community entities.

Promotional benefit of presence of Town Hall and Courthouse in Wolseley.

Page 6: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

6

5. Project Timeline and Task Schedule

It is suggested that this plan be implemented over a three-year period. This extended construction

schedule will allow for the sale of the museum as well as provide opportunity to maximize grant

application results. In this manner, it is hoped that the majority of required funds will be in place

before construction is initiated. As there are no carrying costs for the purchase of the courthouse,

it is further hoped that this schedule will allow for a seamless incorporation of the new uses for

the facility.

Year One (2013)

Agreement in principle by Town of Wolseley to purchase courthouse.

Town of Wolseley establishment of $300,000 construction line of credit account.

Negotiation with Sask Management for equivalent contribution.

Prepare and release tenders for completion of Phase One of construction (exterior).

Initiate and complete Phase One construction (exterior).

Dissolution of museum and downsizing of museum artifact collection.

Offer museum land and buildings for sale.

Apply museum land sale monies to line of credit account.

Grant application initiation.

Year 2 (2014)

Continue grant applications.

Prepare and release tenders for completion of Phase Two of construction (interior).

Initiate private donor program.

Review lottery program.

Year 3 (2015)

Continued funding programs.

Initiate and complete Phase Two construction (interior).

Sale of current Town offices. Deposit proceeds to line of credit account.

6. Construction Schedule

1. Acquire Ownership/Set up Line of Credit/Investigate Insurance

2. Select architect:

A. Conduct site visit.

B. Consult with Town on building usage. Review all systems, room layouts,

access egress.

C. Items of concern include roof condition, plumbing systems,

heating/cooling/ventilation/humidification systems, air quality and filtration

systems, control systems, insulation/vapour barriers, electrical services,

interior and exterior lighting, safety services, equipment and technology

Page 7: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

7

services, vacuum capability, handicapped accessibility, fire code compliance,

security, window/door design and colour, additional regulatory issues.

D. Architect to prepare construction drawings, confirm budget, prepare tender

drawings and specifications.

3. Select Project Manager

A. Prepare construction schedule.

B. Secure construction fund.

C. Issue tender drawings.

D. Confirm contracts with town.

E. Prepare on-site construction office.

F. Install construction services/heat, power/washrooms/fire protection/safety.

G. Confirm regulatory compliance.

H. Complete on-site demolition.

4. Supervise museum artifact relocation to courthouse basement or other site as selected by

Town of Wolseley.

5. Phase One Construction (exterior rehabilitation)

A. Windows and doors.

B. Handicapped access.

C. Roof repair.

D. Exterior painting/detail work.

E. Irrigation services.

F. Tree trimming or removal as needed.

G. Signage and Exterior lighting.

6. Phase Two (interior renovation)

A. Complete all interior rough-in specifications.

B. Stairs to basement.

C. Mechanical room/washrooms in basement.

D. All electrical considerations.

E. Install handicapped elevator.

F. Insulation/vapour barrier.

G. Fire caulking.

7. Interior Finish

A. Repairs to plaster/drywall/taping etc.

B. Painting of all surfaces.

C. Woodwork trim.

D. Flooring.

E. Electrical/lighting/trims.

F. Mechanical trims.

Page 8: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

8

G. Fire system commissioning.

H. Safety/technology commissioning.

I. Full building commissioning.

J. Final inspections and sign-offs.

K. Deficiency analysis.

L. Town walk-through/approval.

M. Deliver of excess furniture.

N. Install phones/internet/satellite etc.

O. Coordinate Town move to courthouse.

7. Conceptual Layout

This section contains a suggested floor plan re-use for the interior spaces of the courthouse. This

layout is intended to assist the understanding of building use, and people-flow patterns, and

incorporates as many of the existing floor to ceiling walls and existing rooms as possible (see

Appendix B: Existing Floor Plan). The walls which constitute the main lobby and the Council

Chamber could be partition walls made of finished wood and need be only 10-12’ in height.

These walls would be cost effective and allow for free circulation of heating and cooling, as well

as general fire protection, and would require no additional mechanical changes to the standard

coverage. By re-using as many of the existing walls, rooms, and doorways demolition costs are

greatly reduced and historic content is maximized. The full-height walls in the offices already

provide a reasonable degree of privacy and each has a window. The main business office and

lobby could have finished wood floors while the office areas should be carpeted for reasons of

cost and noise abatement. The public washrooms in the basement are located close to mechanical

services and would serve the Town clients as well as the organizations renting the public meeting

room in the basement. After-hour use would be achieved by entering the building by the

basement side entrance and building security would be maintained by locking the double doors at

the end of the hallway. The mechanical room is located near the outside wall to take advantage

of the existing electrical and fire services installed in that area. The two windows in the

mechanical room could be removed and replaced with access panels to allow for furnace air

intake and exhaust, air conditioning piping to condensers located outside, bathroom exhaust and

combustion air for the furnaces. This side of their building is the least seen area and presents the

moist cost effective location for these components. These drawings are intended to assist in

visualizing the multiple uses of this structure and in no way limit re-design opportunities prior to

construction. A major problem at this time is the handicap elevator. Architectural help would be

required to come to a suitable design for the entrance to the elevator from street level. The level

of interior finish is a major expense area and would require additional consultation, although

most of the costs associated with this item are contained within the supplied budget.

Page 9: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

9

Suggested Floor Plan Layout of Main Floor

Page 10: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

10

Suggested Floor Plan Layout of Basement

Page 11: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

11

8. Project Budget

Exterior Expenses Expense Description Expense Amount

Windows and doors (installed) $ 140,000

Painting and detailing $ 10,000

Landscape/irrigation/sidewalk $ 38,000

Total Exterior Expenses

$ 188,000

Interior Expenses

Architectural drawings and tenders $ 60,000

Demolition/insulation/vapour Barrier $ 60,000

Mechanical systems/heating/cooling/controls $ 120,000

Electrical/lighting $ 80,000

Handicapped access/elevator $ 70,000

Interior framing/sub-floor $ 30,000

Stairs to Basement $ 10,000

Security/safety/technology wiring $ 20,000

Painting/ trim refurbishment $ 50,000

Flooring $ 50,000

Public washrooms in main floor and basement $ 80,000

Total Interior Expenses

$ 630,000

Total Expenses $ 818,000

Page 12: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

12

9. Financing Plan

Town of Wolseley commitment to this project is recommended at $300,000. Proceeds from the

sales of municipal properties related to this proposal are expected to generate $135,000. This

amount will be dedicated to the courthouse re-use project and is included in the municipal

contribution of $300,000. Additionally, it is hoped that the Ministry of Central Services will

match this amount conditional upon no further monies being required of, or solicited from, the

Ministry of Central Services for Wolseley Courthouse in the future. The remainder of monies

($218,000) will be generated by The Wolseley Heritage Foundation through grant applications

and other fund-raising activities, in partnership with The Town of Wolseley, The Ministry of

Parks, Culture and Sports, The Heritage Canada Foundation, and private donors. It is expected

that these fund-raising activities will occur prior to the commencement of construction. Any

overages achieved through the fund raising process will be applied to The Town of Wolseley

contribution.

10. Conclusion

As is detailed in this proposal, The Wolseley Heritage Foundation’s plan to restore the

courthouse to a condition of use as suggested in this document would be a significant and

beneficial enhancement to the community of Wolseley that includes cultural and economic

connotations. This project was identified by way of the extensive community consultation led by

the Heritage Canada Foundation, and subsequently documented in their Main Street Wolseley

Implementation Plan (available on request), in March 2012. As such, it can be stated with

confidence that the community of Wolseley is firmly in support of this project. For further

information regarding this plan, or any other item related to the Wolseley Heritage Foundation’s

Civic Re-Use Project, please contact Ed Attridge at the Main Street Wolseley Office at (306)

698- 2769.

Page 13: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

13

Appendix A: Wolseley Court House Statement of Significance. Approved January 12, 2005.

PHP 581

Description of Historic Place

The Wolseley Court House is a Provincial Heritage Property located on a landscaped block of

land at the corner of Ouimet and Richmond Street within the Town of Wolseley. It is a one-

storey brick building with a fieldstone foundation built between 1893 and 1895.

Heritage Value

The heritage value of the Wolseley Court House lies in its status as the oldest surviving court

house in Saskatchewan. Built between 1893 and 1895, the building is the only remaining court

house from the Territorial period of Saskatchewan history. The choice of Wolseley for the new

Judicial District reflects the importance of the town during the early settlement period. The

building ceased operation as a court house in 1909, but continued to serve as a public building in

the community for many years.

The heritage value of the property also lies in its architecture. The building was designed under

the direction of Thomas Fuller, Chief Dominion Architect and constructed by local notables R.

A. Magee and E.A. Banbury. Built of brick and fieldstone the building exhibits a Georgian

influence in its simple symmetrical layout, hip roof and the arrangement of its windows. In the

early 1980’s, the porch, cupola and sheet metal roof were restored to reflect its original function

as a court house.

Situated on a well landscaped plot of land, the Wolseley Court House is also valued for its

grounds. The landscaping reflects the property’s prestigious nature as it is set back from the

roadway and overlooks the town lake. The prestige of the property is further enhanced through

its connection with the town’s commercial district via a pedestrian swing bridge.

Sources

Province of Saskatchewan, Notice of Intention to Designate as Provincial Heritage Property

under the Heritage Property Act, August 18, 1982.

Province of Saskatchewan, Order to Designate as Provincial Heritage Property under the

Heritage Property Act, November 24, 1982.

Character-defining elements

The heritage value of the Wolseley Court resides in the following character-defining elements:

-those exterior elements that speak to the building’s use as a court house such as the brick façade,

the flag pole, the sheet metal roof, the wooden porch and cupola;

-those original elements of the interior that reflect the building’s use as a courthouse such as the

basement jail cells and wooden moldings;

-those elements that reflect the prestigious nature of the property, such as the surrounding

landscape and its position on the lake at the entrance of the swing bridge.

Page 14: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

14

Page 15: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

15

Page 16: The Wolseley Courthouse Civic Re-Use Projectwolseley.ca/wp-content/uploads/Userfile/civicreuseproject.pdf · civic re-use project. The third component of the civic re-use plan is

16

Appendix C: Proponent Structure and Associated Partners

Wolseley Heritage Foundation Courthouse Committee

Town of Wolseley Main Street Wolseley Isabelle Taylor

Myrna Tubman

Stephen Scriver

Project Manager Allen Gurtler

Heritage Canada Foundation Ministry of Parks, Culture, and Sports

Provincial Heritage Architect

Funding Partners Manager of Historic Places