Top Banner
1 THE TRES AMIGAS SUPERSTATION ENERGY GAME CHANGERS “THE DELIVERERS” FEBRUARY 28, 2011 UNITING THE NATION’S ELECTRIC POWER GRID
14

THE TRES AMIGAS SUPERSTATION

Feb 10, 2016

Download

Documents

Zeke

UNITING THE NATION’S ELECTRIC POWER GRID. THE TRES AMIGAS SUPERSTATION . ENERGY GAME CHANGERS “THE DELIVERERS” FEBRUARY 28, 2011. Hierarchical View of the Issues facing the European Transmission System Operators (TSOs). - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: THE TRES AMIGAS SUPERSTATION

THE TRES AMIGAS SUPERSTATION

ENERGY GAME CHANGERS

“THE DELIVERERS”FEBRUARY 28, 2011

UNITING THE NATION’S ELECTRIC POWER GRID

Page 2: THE TRES AMIGAS SUPERSTATION

2

Hierarchical View of the Issues facing the European Transmission System Operators (TSOs)

Source: ENTSO-E: The pathway towards common European network operation

Page 3: THE TRES AMIGAS SUPERSTATION

3

China: Current HVDC National Grid Plan

Page 4: THE TRES AMIGAS SUPERSTATION

4

Europe: Extended Grid Plan

• From Iceland (Northwest) to Israel (Southeast)= 3,200 mi

• Concept of grid is 25,000 miles of line

Solar PowerWind PowerGeothermalHydroBiomass

The new high-voltage network would range from the Sahara to the polar cap. The concept calls for main lines that are 40,000 kilometers long. And parts of it already exist.

Connections already in place or plannedVision of ABB and DLR

Page 5: THE TRES AMIGAS SUPERSTATION

5

Page 6: THE TRES AMIGAS SUPERSTATION

6

The Location

Tres Amigas Is Ideally Situated in Eastern New Mexico Near the Borders of CO, OK and TX Serving as a Three-Way Interconnection of

WECC, Eastern and ERCOT

Page 7: THE TRES AMIGAS SUPERSTATION

7

The Location: Regional Renewable Resource Potential

Significant Regional Wind & Solar Capacity Factors in Excess of 35%

Source: NREL

Page 8: THE TRES AMIGAS SUPERSTATION

8

From the 2010 Transmission Summit in Sweetwater

8

w/ HVDC Proposals

Page 9: THE TRES AMIGAS SUPERSTATION

9

Texas Economic Impact: Ripple Effect

Induced ImpactsConstruction Phase

6,800 new jobs$714M to local economies

Operational Phase:630 new long-term jobs

$62.0M/year to local economies

Indirect ImpactsConstruction Phase:

5,700 new jobs$645M to local economies

Operational Phase:300 new long-term lobs

$30.9M/year to local economies

Direct Impacts from 4.7 GWLandowner Revenue:

Over $12.9M/yearConstruction Phase:

10,900 new jobs$2.0B to local economies

Operational Phase (20yrs):1,150 new long-term jobs

$103M/year to local economies

Source: CDEAC report

Illustrates Ripple Effect if 4.7 GW of Wind Is Developed

by 2015

Page 10: THE TRES AMIGAS SUPERSTATION

10

New Mexico Economic Impact: Ripple Effect

Induced ImpactsConstruction Phase

8,600 new jobs$905M to local economies

Operational Phase:800 new long-term jobs

$78.6M/year to local economies

Indirect ImpactsConstruction Phase:

7,200 new jobs$818M to local economies

Operational Phase:380 new long-term lobs

$39.2M/year to local economies

Direct Impacts from 6.0 GWLandowner Revenue:

Over $16.3M/yearConstruction Phase:

13,800 new jobs$2.6B to local economies

Operational Phase (20yrs):1,460 new long-term jobs

$130M/year to local economies

Source: CDEAC report

Illustrates Ripple Effect if 6.0 GW of Wind Is Developed

by 2015

Page 11: THE TRES AMIGAS SUPERSTATION

11

Page 12: THE TRES AMIGAS SUPERSTATION

12

Page 13: THE TRES AMIGAS SUPERSTATION

13

Strategic Partners & Vendors

AMSCPOWER ENGINEERSZ GLOBALALT ENERGYBURNS & MCDONNELLCH2MHILLALSTOM GRIDPOWER ENGINEERSXTREME POWERWILSON & COSTEPTOE JOHNSONGIBSON DUNNPARAMETRIXHILLIARD ENERGYVIRIDITY ENERGY

Page 14: THE TRES AMIGAS SUPERSTATION

14

Tres Amigas SuperStation….

Uniting the Electric Grid