The tools of Managed Aquifer Recharge (MAR) Golder Associates (NZ) Limited Bob Bower - Principal Hydrologist Wairarapa Workshop – 16 February 2017
46

The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

May 16, 2018

Download

Documents

lamliem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

The tools

of

Managed

Aquifer

Recharge

(MAR)

Golder Associates (NZ) Limited

Bob Bower - Principal Hydrologist

Wairarapa Workshop – 16 February

2017

Page 2: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Overview

MAR – concepts and principles

Practical NZ example(s)

Questions and discussion

Page 3: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

Systems Approach

Integrated Water

Management Systems

• A ‘healthy aquifer’ is good for everyone

• Catchment-scale and conjunctive management solutions

• Integration of surface and groundwater resources

• MAR trial sites – education and technical information gathering

• Build diverse partnerships from start

Page 4: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

What is MAR?

Generally a set of physical tools to

proactively manage the

replenishment of groundwater

supplies

Page 5: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Managed Aquifer Recharge

The physical tools

Page 6: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Infiltration

Basins

A tool of MAR

Page 7: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

March 28, 2017 7

CAP Recharge Program, Arizona

Page 8: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

The Tools

of MAR

Think of it as a toolbox

Page 9: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Means to an end…

Really its about catchment-scale, conjunctive, sustainable groundwater management.

Tools of MAR Groundwater Replenishment System

Page 10: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

Ground Water Replenishment Systems

Page 11: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

How does MAR

work?

Page 12: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

BALANCING GROUNDWATER STORAGE

MAR to offset mass balance changes

RIVER &

STREAMS SPRINGS &

BASEFLOW

RAINFALL

EVAPORATION

NATURAL GROUNDWATER STORAGE

RECHARGE DISCHARGE

DECLINING STORAGE & SPRING FLOWS

IRRIGATION &

RACES

MANAGED STORAGE INCREASING STORAGE & BASEFLOWS

MAR

NATURAL YIELD

SUSTAINABLE YIELD

ADDITIONAL

MAR

ADDITIONAL

ALLOCATION

ADDITIONAL YIELD

ABSTRACTION

GROUNDWATER

OUTFLOW

OVER

ALLOCATION

Page 13: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Ground Water

Replenishment Systems

TWO MAR PILOT PROJECT CURRENTLY UNDERWAY IN NZ

Hinds MAR Modelling & Pilot(s)

Gisborne MAR Pilot

Page 14: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Hinds

Catchment

Between Rangitata to

Ashburton Rivers

MAYFIELD HINDS

MAYFIELD HINDS

VALETTA

VALETTA

HINDS RIVER

Page 15: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Pilot Project

Partners

All the contributors

Page 16: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Changing dynamic groundwater storage

DEPTH OF BORE LEVELS (K37/0300 – GWE-4)

1973 – 2016

1973 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2012 2014 2016

-22.8m

Time

Depth to G

roundw

ater (m

)

0

-5

-10

-15

-20

-25

DROUGHT

SEASONS

WETTER SEASONS

DROUGHT SEASONS

IRRIG

ATIO

N &

ST

OC

KW

ATER E

FFIC

IEN

CIE

S +

G

RO

UN

DW

ATER U

SA

GE

Page 17: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

QUALITY TRENDS

Rise of Nitrate Levels

12

10

8

6

4

2

0

Average A

nnual N

itrate-N

itrogen C

oncentration (m

g/L)

1990 1995 2000 2005 2010 2015

Drinking water max

accepted value (MAV)

Guideline – 80% protection

of aquatic biodiversity

Guideline – 90% protection

of aquatic biodiversity

Half MAV average

concentration target

SHALLOW GROUNDWATER

SURFACE WATER DRAINS

DEEP GROUNDWATER

Page 18: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Hinds

Mitigations

Community solutions

QUANTITY

Cap new groundwater allocations

Review existing permits for actual usage (metering rule)

Allow surface users to transfer to groundwater

QUALITY

Reduce nitrogen losses at farm level up to 36% by 2035

Restriction of new ‘intensification’ of land use until target

is reached (< 6.9 mg/L)

Initiate MAR pilot for proof of concept testing

Initiate MAR pilot for proof of concept testing

Page 19: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Why did we

pick this site?

MAR testing location

background

MAYFIELD HINDS

MAYFIELD HINDS

VALETTA

VALETTA

HINDS RIVER

MAR Site final location

Higher nitrate plume

Most impacted

baseflows

Page 20: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

MAR Pilot

Project

2016 – 2021

5 YEAR CONSENT

Rangitata River ADC Existing Consent (500 L/s)

Hinds MAR Working Group

MPI, Ecan, Community & In-kind

Nitrogen tracking, rural drinking water,

aquifer mapping & modelling

PROJECT RESEARCH

Phase 1 (Year 1) and Phase 2

SOURCE WATER

MANAGEMENT

FUNDING

Page 21: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

SITE FUNCTIONALITY

MAR Site – Intake off Valetta Irrigation

VALETTA POND #3 INTAKE

VALETTA POND #3 OUTLFOW

(BEHIND TRUCK)

GATE CONTROL HOUSE

MANUAL CONTROL &

COMMS EQUIPEMENT

ESG ON WOODEN BOARD

Note – board is facing Gate House

MAR FLUME #1

Page 22: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

MAR OPERATIONS

Infiltration Basin with Forebay, and Monitoring

TIM

AR

U T

RA

CK

MAR SITE BORE

BYPASS GATE

FOREBAY

MAIN INFILTRATION BASIN MAIN BASIN LEVEL

MAR SITE BOUNDARY

Page 23: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Site

Operations

Results

At the MAR Site General operations – progressing

well Current recharge rates – 100 to 105 L/s

Total recharge (to date) – 1.9 million m³

(2% of allocation limit)

>220 days operations (started 10 June

2016)

Page 24: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

HINDS MAR PILOT PROJECT MONITORING NETWORK

Mountains to the sea – monitoring surface and groundwater, dependent

ecology

GWE-01

GWE-02

& GWE-11

GWE-03

& GWE-12

GWD-04

GWE-05

GWD-01

GWD-02

GWD-03

GWE-15

GWE-04

GWE-17

GWE-13

GWE-16

GWD-05

Existing monitoring sites

New monitoring sites (Golder 2016)

Surface water

Ecology monitoring sites

ECAN water quality wells

MAR SITE

Page 25: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Water Quantity Results

Start 10 June 2016 – 150+ days of operations

Page 26: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

CROSS SECTION FROM MAR SITE TO FRASTERS ROAD

What is going on down below

INFILTRATION BASIN

SILTY GRAVEL

CLEAN GRAVEL

SILT

SILTY GRAVEL

REGIONAL

GROUNDWATER

SYSTEM

270 m

1,000 m

2,200 m

30 m

Page 27: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

CROSS SECTION FROM MAR SITE TO FRASTERS ROAD

What is going on down below

INFILTRATION BASIN

SILTY GRAVEL

CLEAN GRAVEL

SILT

SILTY GRAVEL

REGIONAL

GROUNDWATER

SYSTEM

270 m

1,000 m

2,200 m

30 m

1,100m³ 2,300m³ 3,500m³ 4,600m³

Da

y

0.25 0.55 0.75 1

Page 28: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

CROSS SECTION FROM MAR SITE TO FRASTERS ROAD

What is going on down below

INFILTRATION BASIN

SILTY GRAVEL

CLEAN GRAVEL

SILT

SILTY GRAVEL

REGIONAL

GROUNDWATER

SYSTEM

270 m

1,000 m

2,200 m

30 m

9,400m³ 30,700m³

Da

y 5 14 870,000m³ 100 120

1,000,000m³

Page 29: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Movement of clean water plume

Slower than pressure response of groundwater

SILTY GRAVEL

CLEAN GRAVEL

SILT

SILTY GRAVEL

REGIONAL

GROUNDWATER

SYSTEM

270 m

1,000 m

2,200 m

30 m

2.8 mg/L 2.8 mg/L 2.5 mg/L 12.7 mg/L

Page 30: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

GROUNDWATER LEVELS MEASURED FROM SURFACE

5

10

15

20

25

30

27/4/

16

17/5/

16

6/6/1

6

16/7/

16

5/8/1

6

4/10/

16

26/6/

16

25/8/

16

14/9/

16

Groundw

ater level as m

easured from

the surface (m

)

10

8

6

4

2

0

Nitrate N

C

oncentration (m

gN

/L)

DEPTH TO WATER

LINCOLN AGRITECH

SENSOR NO3-N

FIELD MONITORING LAB

RESULTS NO3-N

Page 31: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Project

Summary

Where we’re at

Year 1 operations – 9 June 2017

Final reports – August 2017

Year 2 operations would start on 10 June 2017

Phase 2:

Governance Group 1st March 2017

Develop business case for Groundwater

Replenishment Scheme for Mid-Canterbury

Peter Lowe, Chairman - Hinds MAR Pilot

Working Group -

Page 32: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Managing Groundwater at Catchment Level

Groundwater Replenishment Scheme – “A systems approach”

Page 33: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

Hinds Catchment: Groundwater Replenishment Programme

GRS Focus Areas

Upper Plains – large infiltration basins (water banking)

Mid-Plains: ‘on-farm’ galleries or smaller basins (nitrogen mitigation and water banking)

Coastal springs: basins/galleries (targeted baseflows and offset pumping)

Page 34: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS Plains

Canterbury

Ground Water Replenishment

Scheme Modelling

MIKE SHE (DHI) Model Patrick Durney (2014, 2015)

Page 35: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS Plains Canterbury

Ground Water Replenishment

Scheme Modelling

4th Year

MIKE SHE (DHI) Model Patrick Durney (2014, 2015)

Page 36: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

MIKE SHE (DHI) Model Patrick Durney (2014, 2015)

HINDS Plains Canterbury

Ground Water Replenishment

Scheme Modelling

10th Year

Page 37: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

Golder Associates | New Zealand

Ground Water

Storage & Restored Baseflows

Golder Associates | New Zealand

Groundwater storage and restored baseflows

Year 1 Year 15 Year 30

Change in storage (Million m3) Spring-fed streams baseflows (m3/s)

1Million m3 = 1 gigalitres 1 m3/s = 1,000 L/s

Page 38: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

POVERTY BAY MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Ground Water

Replenishment Systems

TWO MAR PILOT PROJECT CURRENTLY UNDERWAY IN NZ

Hinds MAR Modelling & Pilot(s)

Gisborne MAR Pilot

Page 39: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

POVERTY BAY MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

The Gisborne

MAR Pilot Area

Groundwater Basin

Page 40: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

POVERTY BAY MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

HYDROGEOLOGY POVERTY BAY

NORTH

SOUTH

SOUTH

PACIFIC

OCEAN

Te Hapara Sand Shallow Fluvial

Gravels Waipaoa Gravels

LEGEND

Makauri Gravels

Matokitoki Gravels

Page 41: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

POVERTY BAY MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

GISBORNE MAR TOOL - INJECTION

Page 42: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

POVERTY BAY MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

GROUNDWATER TRENDS

Declining median, increasing pumping effects, seasonal peaks & drought response

Page 43: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

POVERTY BAY MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

TIMELINE - 30 YEAR DISCUSSION – NOW ACTION

1992

Barber (GDC 1992)

Data 1982 to 1992

- Steady continual drop

- Recharge less than abstraction

2012

White (GNS, 2012)

Data 1982 to 2012

Statistically significant decreasing trend

-0.02 to -0.1 m/year

2012

Review of GNS report by Aqualinc

2012

FWAG

How to manage

increasing demand and

declining groundwater

levels?

Page 44: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

POVERTY BAY MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

MAR INJECTION PROCESS

110,000m³

SENTINAL BORE

75-85 m

10 L/S

Page 45: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

POVERTY BAY MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Poverty Bay

MAR Pilot

Project

2013 - 2016

5 YEAR CONSENT

Waipaoa River via Infiltration Gallery

Gisborne District Council – for pilot, growers group

forming a potential ‘scheme’

MPI, Community & In-kind

Drilling this summer, injection May 2017,

final report October 2017

TIMELINE

Injection of a total volume of 110,000 m3

SOURCE WATER

MANAGEMENT

FUNDING

Page 46: The tools of Managed Aquifer - GW€¦ · The tools of Managed Aquifer Recharge (MAR) Golder Associates ... GROUNDWATER SYSTEM 270 m30 m ... Review of GNS report by Aqualinc 2012

HINDS MAR PILOT PROJECT | GOLDER ASSOCIATES NEW ZEALAND

Thank you