Top Banner
Renewable Energy and Mini Grids in East Africa The Technical Challenges and Opportunities for Developers, Investors and Off-Takers
20

The Technical Challenges and Opportunities for Developers ...

Feb 02, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Technical Challenges and Opportunities for Developers ...

Renewable Energy and Mini Grids in East Africa

The Technical Challenges and Opportunities for

Developers, Investors and Off-Takers

Page 2: The Technical Challenges and Opportunities for Developers ...

2

Page 3: The Technical Challenges and Opportunities for Developers ...

3

Page 4: The Technical Challenges and Opportunities for Developers ...

4

Page 5: The Technical Challenges and Opportunities for Developers ...

5

Mini-Grids

— Mini Grid = Micro Grid

— Electricity distribution systems containing loads and distributed energy

resources, (such as distributed generators, storage devices, or controllable loads)

that can be operated in a controlled, coordinated way either while connected

to the main power network or while islanded. (CIGRE)

— Typically includes a mix of

dispatchable and non-dispatchable

power sources.

— Health & Safety of new electricity

users of utmost importance.

Page 6: The Technical Challenges and Opportunities for Developers ...

6

Mini-Grids

Page 7: The Technical Challenges and Opportunities for Developers ...

7

Global Market Trends

— Value of the market - $12 billion in 2016 and is estimated to reach $23

billion in 2021 (GlobalData)

— Mini Grids with renewables generation sources are becoming a go-to

option for project developers.

— US Mini Grid market:

— 39% of the global market share during 2016

— Forecasting 52% by 2021

Page 8: The Technical Challenges and Opportunities for Developers ...

8

Why Mini-Grids and Renewables in Sub-Saharan Africa?

— Rural energy access remains a

major challenge

— 1.5 billion people without access to

electricity

— 80% in rural areas

— Large proportion across the African

continent

— Centralised electricity generation

— Inequity in access is prevalent

even where supply has been

achieved

IEA, 2012

Page 9: The Technical Challenges and Opportunities for Developers ...

9

The Benefits of Mini-Grids

— Power connectivity to remote populations at lower cost

— Fast deployment

— Tailor design of Mini-Grid to local requirements

— Enhanced reliability of supply and resilience

— Integration of local / renewable generation sources

— Better environmental performance

— Trading / market access

—Grid-tied: market participation, aggregation of

resources, Mini Grid as a virtual power plant

— Islanded: community energy / markets

— Power quality

Page 10: The Technical Challenges and Opportunities for Developers ...

10

Technical Challenges

Page 11: The Technical Challenges and Opportunities for Developers ...

11

Energy Storage and Mini-Grids

— Energy storage acts as a balancing mechanism

— Whole range of benefits including:

— Energy management and reserves

— Avoids / defers reinforcement

— Improves power quality and reliability

— Improves system control

— Range of energy storage technologies:

— Batteries

— Pumped storage

— Hydrogen energy storage

— Thermal (molten salt)

— Compressed Air Energy Storage (CAES)

— High power flywheels

— High power supercapacitors

Photo courtesy of Anesco

Spector, 2016

Page 12: The Technical Challenges and Opportunities for Developers ...

12

Commercial Challenges

— Upfront capital investment. Main cost components:

— Generating plant

— Energy storage

— Switchgear protection and transformers

— Communication and control system

— Site engineering and construction cost

— Cost of Mini-Grid technology is reducing

— Cost of renewable generation and energy

storage technologies is reducing

— Increasing reliability leading to reduced

OPEX

— New payment innovations – pay-as-you-go

and mobile money

Page 13: The Technical Challenges and Opportunities for Developers ...

13

Regulatory Challenges

—Rural electrification agendas now feature extensively across Sub-

Saharan Africa

—Streamline regulations - unclear which regulations apply

—Electricity distribution concessions

—Cost reflective tariffs

—Plan for future growth

ACORE, 2015

Page 14: The Technical Challenges and Opportunities for Developers ...

14

Sizing and Designing a Mini-Grid

Page 15: The Technical Challenges and Opportunities for Developers ...

15

Load Study

— Objective – 20 year power projected daily and annual hourly load

profile data

— Input for the preliminary design of a solar PV, battery, and diesel Mini

Grid for the island

— Annual power and energy forecast, daily load profile

— Number of customers per customer class

— Sales per customer class

— Analysis of the impact of Distributed Generation additions and Energy

Efficiency programmes

— Challenges for forecasting load using standard

regression analysis

Page 16: The Technical Challenges and Opportunities for Developers ...

16

Individual Approach to Load Forecast

Detailed site survey

Establishing work programme and development of tools

Page 17: The Technical Challenges and Opportunities for Developers ...

17

Present and Future Conditions

- Identifying main driver for load increase:

1. Development on the island

2. Population growth

3. Main load types

4. New electrical appliances in the houses (upgrade)

5. Occupancy rates

Present:

Future:

Scenario 1 Scenario 2 Scenario 3

Page 18: The Technical Challenges and Opportunities for Developers ...

18

New Infrastructure Development

— STREET LIGHTS - Island length

1.7 km, One pole at 8m, LED

15W each.

— DESALINATION PLANT- 100

litres / day / person, the required

plant should be run by 15 kW to

20 kW motor

— WATER PRESSURE PUMP-

Based on the length of the island

the required size of the pump is

between 5kW and 10kW

— MARKET/SHOP constant load

level when the shop is open (9h-

21h) and when closed

Page 19: The Technical Challenges and Opportunities for Developers ...

19

Load Forecast Results

Annual growth 11.7% to 14.7%

2.4% 1.3%

Very high annual growthi within first 1 to 5 years

Yearly forecast for 20 years – for understanding the size for electrical installations/system

Detailed daily diagrams – for dimensioning the Mini Grid (the size of solar, wind, storage, diesel)

Typical working day: Typical weekend: Yearly Peak:

Page 20: The Technical Challenges and Opportunities for Developers ...

20

National Department of Tourism, South Africa

— National Department of Tourism of South Africa – renewable energy Mini Grid projects at state-

owned tourism attractions:

— Robben Island, Western Cape Province

(667 kWp)

— Hantam National Botanical Garden,

Western Cape Province (HNBG) (2.5

kWp)

— Karoo Desert National Botanical Garden,

Northern Cape Province (KNBG) (52.9

kWp)

— Free State National Botanical Garden,

Free State Province (FNBG) (52.9 kWp)