Chinese Reconciliation Project Foundation 5 th Annual Dinner March 4, 2016 Presenter: Lihuang Wung, City of Tacoma Chinese Reconciliation Park Status Report 2016
18

THE TACOMA CHINESE RECONCILIATION PARK

Jan 30, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: THE TACOMA CHINESE RECONCILIATION PARK

1

Chinese Reconciliation Project Foundation5th Annual Dinner

March 4, 2016Presenter: Lihuang Wung, City of Tacoma

Chinese Reconciliation ParkStatus Report

2016

Page 2: THE TACOMA CHINESE RECONCILIATION PARK

2

Chinese Reconciliation Park –Chronology

1991 (AUG) Request for Reconciliation1992 (SEP) Citizens Advisory Committee1993 (NOV) Res. #32415 Acknowledging Wrongdoing1995 (JUN) Groundbreaking (site preparation)1996 (OCT) Park Site Transferred2001 (OCT) Master Site Plan2005 (AUG) Groundbreaking (construction)2007 – 2009 Phase I Construction2009 – 2011 Phase II Construction 2014 (JUL) Master Site Plan Updated2015 (SEP) Fuzhou Ting Repaired2015 – 2016 Phase III Construction

Page 3: THE TACOMA CHINESE RECONCILIATION PARK

3

Multicultural Pavilion, Pond and Bay-viewing Terrace Area

Entrance Gate & Sojourners’ Room Area

Classroom Area

EducationReflection Reconciliation

Reconciliation Pavilion Area

Expulsion

Tacoma Chinese Reconciliation ParkMaster Site Plan (Updated 2014)

Page 4: THE TACOMA CHINESE RECONCILIATION PARK

4

Fuzhou Ting: A Magnificent Landscape of Tacoma福州亭:四季风情,自成一景

Page 5: THE TACOMA CHINESE RECONCILIATION PARK

5

Fuzhou TingWeathered and Damaged

Page 6: THE TACOMA CHINESE RECONCILIATION PARK

6

Fuzhou Ting Repair –Planning and Management

• Fuzhou provided labor and materials • Tacoma provided:

– Assessment of Fuzhou Ting Conditions– Importer of Shipment– Site Preparation and Construction Management– Accommodations (Housing, Food, Transportation,

Interpretation, Shopping, and Cultural Experience) – News Media Coverage

• Special Thanks to:– Chinese Reconciliation Project Foundation– Tacoma-Fuzhou Sister City Committee– City of Tacoma (esp. Sister Cities Program)

Page 7: THE TACOMA CHINESE RECONCILIATION PARK

7

Fuzhou Ting Repair (Aug-Sep 2015)

Page 8: THE TACOMA CHINESE RECONCILIATION PARK

8

Fuzhou Ting Repair (Aug-Sep 2015)

Page 9: THE TACOMA CHINESE RECONCILIATION PARK

9

Fuzhou Ting – Happy Again

Page 11: THE TACOMA CHINESE RECONCILIATION PARK

11

Phase III Improvement ProjectTimeline2014 – 2016

FundingHistorical Society Grant $400,000

Scope• Parking Lot• Fencing• Landscaping• Lighting• Bamboo Removal• Signage

Page 12: THE TACOMA CHINESE RECONCILIATION PARK

12

Phase III Improvement –Parking Lot & Bamboo Fencing

Page 13: THE TACOMA CHINESE RECONCILIATION PARK

13

Next Steps• Reaffirm the Vision• Prioritize Improvements• Expand Partnerships• Acquire Resources

Page 14: THE TACOMA CHINESE RECONCILIATION PARK

14

Planned Item:

Multicultural Pavilion

Page 15: THE TACOMA CHINESE RECONCILIATION PARK

15

Multicultural Pavilion –Schematic Design Study • Expected Outcomes:

– Schematic Building Design– Landscaping Plan– Cost Estimates

• Scope of Work:– Programming– Site Analysis– Schematic Design– Cost Estimating– Stakeholder Involvement– Seeking Funding

• Managers:– City, CRPF and Consultants

• Timeline:– Assume a schedule of 4 months

• Cost:– $150,000 to $200,000 (depending on the scope)

Page 16: THE TACOMA CHINESE RECONCILIATION PARK

16

Planned Item:

Reconciliation Hall

Page 17: THE TACOMA CHINESE RECONCILIATION PARK

17

Planned Item:

Entrance Gate and Garden Walls

Page 18: THE TACOMA CHINESE RECONCILIATION PARK

18