Things are happening Things are happening …..…..
WEEK ONEWEEK ONE
Language Unit - The way it Language Unit - The way it was…..was…..
Unisex toilets
Meeting Room & Therapy
Room
Inner corridor and entrance
corridor
Entrance doors and corridor kitchenette
Unisex Toilet AreaUnisex Toilet Area
Old PTA Cupboard Old PTA Cupboard now knocked now knocked through into old through into old toilet area – to be toilet area – to be made into meeting made into meeting roomroom
After one week………
Window knocked Window knocked through from old through from old PTA cupboard into PTA cupboard into corridor next to old corridor next to old therapy roomstherapy rooms
Old meeting room, Old meeting room, now to be turned now to be turned into Inclusion Office into Inclusion Office
Meeting room and Meeting room and new corridor being new corridor being constructed in old constructed in old KS2 classroom areaKS2 classroom area
KS1 Classroom – now has KS1 Classroom – now has windows into corridorwindows into corridor
View into KS1 View into KS1 classroom from classroom from corridorcorridor
OUTSIDE AREASOUTSIDE AREAS
Enclosed outside area for Chickens
New Sensory Garden / Quiet area
EYFS Inside AreaEYFS Inside Area
Unisex toilets being taken out, to be
refitted with new cubicles
Nursery classroom with new opening
into small learning room
Inner corridor being opened
up
WEEK TWOWEEK TWO
KS2 classroom with new corridor KS2 classroom with new corridor and meeting room constructed.and meeting room constructed.
Old PTA Cupboard Old PTA Cupboard now knocked now knocked through into old through into old toilet area, toilet area, partitioned off and partitioned off and made into meeting made into meeting room.room.
Language Unit
New Inclusion New Inclusion Office area, with Office area, with old kitchen, office old kitchen, office and toilet stripped and toilet stripped out. These to be out. These to be made into small made into small teaching room, teaching room, meeting room and meeting room and kitchenettekitchenette
All other areas of the Language Unit All other areas of the Language Unit refurbishment are progressing well. However, it refurbishment are progressing well. However, it was not possible to take photos this week as we was not possible to take photos this week as we did not want to disturb the workmen in these did not want to disturb the workmen in these rooms.rooms.
EYFS Inside AreaEYFS Inside Area
Looking from Nursery towards Looking from Nursery towards the Office, and visa versathe Office, and visa versa
Inner corridor Inner corridor being opened being opened upup
Reception 1 classroom Reception 1 classroom being re-decorated. Old being re-decorated. Old carpet and parquet carpet and parquet flooring has been flooring has been removed.removed.
Old Reception 1 Old Reception 1 classroom being classroom being restructured back to restructured back to its original form to its original form to match current match current Reception 1 and 2. Reception 1 and 2. This room will This room will become the new become the new D&T roomD&T room
Nursery area, with Nursery area, with opening from small opening from small learning room into learning room into main class; new main class; new radiators in whole radiators in whole area and kitchen area and kitchen stripped out.stripped out.
EYFS Outside AreaEYFS Outside Area
New guttering, New guttering, fascias and fascias and soffits being soffits being installed.installed.
Old canopy has Old canopy has been removed, been removed, awaiting awaiting installation of installation of new one. new one.
ALLOTMENT AREAALLOTMENT AREA
SENSORY GARDEN / QUIET SENSORY GARDEN / QUIET AREAAREA
Trellis, raised Trellis, raised plant beds and plant beds and entry bridges entry bridges installed. installed.
Hole dug in Hole dug in preparation for preparation for water featurewater feature
WEEK THREEWEEK THREE
Language Unit
Unisex toilet area. Walls being covered with hygienic cladding.
Sink being installed in KS1 classroom. Walls have first coat of paint.
Work being carried out in KS2 classroom
Old office area being plaster boarded.
Old adult toilet area being refurbished into kitchenette.
Outside are of old PTA cupboard. Now to have window installed into new meeting room.
EYFS Area
Practical Room with sinks installed and
walls painted.
New units being fitted into kitchen area.
Old Reception 2 classroom, now with newly painted white
walls and ceiling, with two walls being depicted in blue.
Outside Areas
EYFS playground with rubber surface removed. Holes being dug for canopy structure.
Sensory Garden / Quiet Area
Water feature, pergolas and blackboards
now installed.
WEEK FOURWEEK FOUR
Language Unit
Adult toilet and Unisex toilets with utilities being installed.
KS1 classroom. Decorated, sink installed and vinyl flooring laid.
Inclusion Room. Decorated and IT data being installed.
Entrance Lobby. Plastered awaiting decoration.
Inner Corridor being decorated.
EYFS Area
Nursery Classroom. Entrance to small learning room plastered. Remainder of room
decorated.
Nursery Entrance Lobby and inner corridor being decorated.
Practical Room. Windows between room and corridor installed.
Rec 1 Classroom. Flooring being laid, prior to screeding.
EYFS Playground Area
Canopy structure posts being installed.
Sensory Garden / Quiet Area
Almost complete.
Water feature, bridges, pergolas,
planting and pathway all finished.
Plaque still to be done.
Seating to be installed during
October half term.
WEEK FIVEWEEK FIVE
Language Unit
• Old Therapy room being decorated
• New classroom doors being fitted
• Unisex toilets being installed
• Kitchenette area being decorated and electrics installed
• Office Area with IT, electrics and phone cables being installed.
• KS2 classroom flooring being laid
EYFS Area
Above: New kitchen being installed
Below: Store room being decorated
Above: Learning room being decorated
Below: Unisex toilets being installed.
EYFS Playground
• New Canopy installed full length of EYFS Area
• New soft play area being marked out.
• New sand and water play area being constructed