THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN EWEC 22 April 2010 D E ESPA ÑA R ED ELÉC TRIC A
20

THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

Jan 16, 2016

Download

Documents

everly

THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN. EWEC 22 April 2010. Índex. The importance of wind energy in the Spanish generation mix The main challenges and the subsequent technical requirements. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND

ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC 22 April 2010

DE ESPAÑ AR ED ELÉC TRIC A

Page 2: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

2

Índex

The importance of wind energy in the Spanish generation mix

The main challenges and the subsequent technical requirements.

The case of LVRT codes and the verification procedure: solutions and

results.

The coordinated system operation

Conclusion

Page 3: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

3

Índex

The importance of wind energy in the Spanish generation mix

The main challenges and the subsequent technical requirements.

The case of LVRT codes and the verification procedure: solutions and

results.

The coordinated

Conclusion

Page 4: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

Significant and continuous growth of wind power in Spain

4

Page 5: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

5

Historical maximum Demand Coverage 8/11/2009

Page 6: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

6

Índex

The importance of wind energy in the Spanish generation mix

The main challenges and the subsequent technical requirements.

The case of LVRT codes and the verification procedure: solutions and

results.

The coordinated sytem operation

Conclusion

Page 7: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

But with some wind power trips (19/1/2007)

7

500 MW

400 MW

1000 MW

Page 8: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

Therefore the integration of wind energy raises many challenges

• Technical challenges: Reaction of wind farms to dip voltages: contribution to grid stability. Voltage control: Transient and Steady State Short-circuit power Inertia

• System Operation challenges: Wind production program: effects on the deviations and use of

ancillary services: Primary Regulation Coordinated operation of the systems

8

Page 9: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

9

Universities and Technological

centres

TECHNICALREQUIREMENTS

Laboratories, testing and certification

entities

The answer to those challenges requires the definition of technical requirements

Page 10: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

SINCE 2004 THE WIND SECTOR AND THE TSO HAVE CLOSELY COLLABORATED TO DEFINE THOSE REQUIREMENTS IN A REALISTIC AND PRACTICAL WAY

10

(WITH THE PORTUGUESE TSO INVOLVEMENT)2004

Page 11: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

11

Índex

The importance of wind energy in the Spanish generation mix

The main challenges and the subsequent technical requirements.

The case of LVRT codes and the verification procedure: solutions and

results.

The coordinated system operation

Conclusion

Page 12: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

12

An example; Technical Requirements for LVRT

Remain connected to the system in case of faults in the network (3/2/1 phase short circuits), allowing the protection system to clear the default (low voltage ride-through capability):

Voltage–time at the connection point to be supported (P.O.12.3) :

Power consumption (P,Q) limited

during fault and recovery.

Reactive power production during

fault

Lower restriction during 150 ms

after fault inception and fault

clearing

Lower restrictions for unbalanced

faults.

Voltage (pu)

1

0,2

0,5 1 Time (sec)

start of disturbance

0,80,95 pu

0 15

Clearance of the faultFault length

Generators must remain connected

0,62 ph faults

Page 13: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

13

Source: E2Q

LABORATORIO DEENSAYOS

FABRICANTE DEAEROGENERADORES

PRODUCTOR EOLICO

MITYC

PRODUCTOR EÓLICO

CERTIFICADOR ACREDITADO

LABORATORIO ACREDITADO DESIMULACIÓN AEROGENERADOR

LABORATORIO AVALADOSIMULACIÓN DE PARQUES

INICIO DEL PVVCPARQUE EÓLICO

IDENTIFICACION EL AEROGENERADOR A ENSAYARSELECCIÓN DE LOS LABORATORIOS Y CERTIFICADOR

REALIZA LOS ENSAYOS

MODELO RESP. RESULTADOS

PAGO

PARQUE ADECUADO

CERTIFICADO

SOLICITUD DE CERTIFICACIÓN

(*) AEROGENERADOR CUMPLE PO 12.3 Y PARQUE DENTRO DE PARQUE TIPO

PROC. PARTICULAR (*)

PROC. GENERAL

LABORATORIO DEENSAYOS

FABRICANTE DEAEROGENERADORES

PRODUCTOR EOLICO

MITYC

PRODUCTOR EÓLICO

CERTIFICADOR ACREDITADO

LABORATORIO ACREDITADO DESIMULACIÓN AEROGENERADOR

LABORATORIO AVALADOSIMULACIÓN DE PARQUES

INICIO DEL PVVCPARQUE EÓLICO

IDENTIFICACION EL AEROGENERADOR A ENSAYARSELECCIÓN DE LOS LABORATORIOS Y CERTIFICADOR

REALIZA LOS ENSAYOS

MODELO RESP. RESULTADOS

PAGO

PARQUE ADECUADO

CERTIFICADO

SOLICITUD DE CERTIFICACIÓN

(*) AEROGENERADOR CUMPLE PO 12.3 Y PARQUE DENTRO DE PARQUE TIPO

PROC. PARTICULAR (*)

PROC. GENERAL

SPECIFIC TESTING AND CERTIFICATION PROCEDURE

Page 14: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

14

Losses of Wind Power > 100 MW

Page 15: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

15

Índex

The importance of wind energy in the Spanish generation mix

The main challenges and the subsequent technical requirements.

The case of LVRT codes and the verification procedure: solutions and

results.

The coordinated system operation

Conclusion

Page 16: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

16 de

26

Renewable Energies in System Operation

Facilitate the maximum possible non-managed generation integration. Proposal to establish system operation measures which allow the

secure and stable operation of the whole electric system. Creation of the Control Centre for Renewable Energies (CECRE)

Control and supervision of special regime generation.Maximize RES production, but always keeping the electric

system in a secure state.

Page 17: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

17

An undesired situation: Wind Power Reduction after CECRE Order (24/2/2010)

Page 18: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

18

Índex

The importance of wind energy in the Spanish generation mix

The main challenges and the subsequent technical requirements.

The case of LVRT codes and the verification procedure: solutions and

results.

The coordinated system operation

Conclusions

Page 19: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

19

Conclusions

The collaboration between the Spanish wind sector and the TSO has proved to be most fruitful and fundamental towards guaranteeing the integration of wind energy in the power demand supply.

Both have learnt from the experience to overcome prejudices and to find practical and realistic solutions.

One of the consequences is that in Spain advanced technical solutions and many FACTS manufactures can be found.

The progressive growth of wind energy, reaching around 50% of the demand in some moments, will raise new challenges which will not be easy to resolve, but we are always working in a constructive way.

A GOOD REFERENCE FOR OTHER COUNTRIES: WORKING

TOGETHER IS THE BEST OPTION TO FIND EFFECTIVE SOLUTIONS

Page 20: THE SUCCESSFUL HISTORY OF THE COLLABORATION BETWEEN THE WIND ENERGY INDUSTRY AND THE TSO IN SPAIN

EWEC-2010

RED ELÉCTRICA DE ESPAÑA

20

WE ARE ALL IN THE SAME BOAT!!!