Page 1: The successful delivery of the largest rigid pavement ...

Woolgoolga to Ballina Pacific Highway upgrade

The successful delivery of the largest rigidpavement program undertaken by TfNSW (nee RMS)

ASCP Forum | 14th July 2020

Page 2: The successful delivery of the largest rigid pavement ...

Woolgoolga to Ballina Pacific Highway upgrade

Woolgoolga to BallinaMichael Heathwood

Pavements Lead | Pacific Complete

2

Page 3: The successful delivery of the largest rigid pavement ...

Woolgoolga to Ballina Pacific Highway upgrade

3

Woolgoolga to Ballina

• The Project• The Delivery Partner• Strategies for Success• Quality of Product

Page 4: The successful delivery of the largest rigid pavement ...

Woolgoolga to Ballina Pacific Highway upgrade

The Project

4

Page 5: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Woolgoolga to Ballina

Page 6: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Final link

Our legacy

Delivery partner model

Page 7: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Woolgoolga to Ballina

155km dual carriagewayhighway

170 bridges Nine interchanges

Bypasses 5 towns 14.2 million cubic metres ofearthwork

About 3,500 peakemployment

Page 8: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Scope

• 78% of the mainline is rigid pavement (PCP)

• Standard RMS embankment with 150mm LCS and 250mm PCP

Portion of work LMC + PCP (m3)

A – Glenugie to Maclean 310,000

C – Maclean to Richmond River 360,000

D – Richmond River to Ballina Bypass 80,000

Page 9: The successful delivery of the largest rigid pavement ...

Woolgoolga to Ballina Pacific Highway upgrade

The Delivery Partner

Page 10: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Pacific Complete

Our goal: “driven to save lives”

As Australia’s first delivery partner,we are working with stakeholders atan unprecedented scale and pace tosuccessfully deliver the final link in thePacific Highway upgrade. This is ourlegacy.

… Pacific Complete Programme Leadership Team

Page 11: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Pacific Complete

• Pacific Complete - Who is it? What is it? Why?

Packaging &Procurement

Cost Plan

ProjectManagement

DeliverySchedule

Page 12: The successful delivery of the largest rigid pavement ...

Woolgoolga to Ballina Pacific Highway upgrade

Strategies for success

- Materials Supply Agreements

- Laboratory establishment- Concrete Mix consistency

Page 13: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Strategies employed for Success

Materials Supply Agreements – Quarries

Laboratory establishment

Concrete Mix consistency

Page 14: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Materials Supply Agreements - Quarries

Executed through supply deeds

Dedicated resources

Made and stockpiled ahead ofschedule

DA approvals for movementsadequate to meet demand

Quality of materials

Contractor to manage

Page 15: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Laboratory establishment

Portion Wide Laboratory Establishment

All contractors in that Portion usedthat specific laboratory for testing

List of tests and cost per testprocured separately

Challenges

Different approach to “PrimaryTesting”

Clear definitions required aroundtesting involved in each specification

Page 16: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Concrete mix consistency

Pacific Complete conducted 22 trial mixesduring the course of the project

Focus on minimizing the drying shrinkage

Workability, coarseness, gradingcharacteristics Slip-formability?

Box testing and Kelly Ball testing wasadditionally done

Results of the trials confirmed theaggregates selected during the MSAprocurement would be suitable for use

Subject to mix designs being conducted bythe Contractors to suit the individualequipment

Page 17: The successful delivery of the largest rigid pavement ...

Woolgoolga to Ballina Pacific Highway upgrade

Quality of Product- Production Numbers- Ride- Bridge deck pavement

Page 18: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Program completion

• The construction program is 85%complete

95% earthworks complete

92% Concrete pavements complete

• There is in the order of:

60,000 WAE drawings

650,000 documents to betransmitted

274 Property Adjustment plans

• Asset transfer workshops planned 48

Page 19: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Production Numbers – Concrete pavement

Page 20: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Ride

The ride testing data is showing that across the program the contractorsare all achieving outcomes of between 20-35 NAASRA bump countsand only small areas of base concrete being diamond ground foradverse ride or poor surface texture finish following ‘imminent’ rain …

W2B has excellent riding quality

Page 21: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Bridge deck pavements

Innovation through design phase

• Apply R93 to bridge decks …

• Needed to develop ‘specific’ bridge drawings

• 9 twin bridges diamond ground with Conventional Diamond Grinding

• Excellent results, especially for ride.

Page 22: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Bridge deck pavements

Apply R93 to bridge decks … but …must develop ‘specific’ bridge drawings

Page 23: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Bridge deck pavements

Apply R93 to bridge decks … but …must develop ‘specific’ bridge drawings

Page 24: The successful delivery of the largest rigid pavement ...

Woolgoolga to BallinaPacific Highway upgrade

Bridge deck pavements

Page 25: The successful delivery of the largest rigid pavement ...

Woolgoolga to Ballina Pacific Highway upgrade

Thanks – Q’s & maybe A’s?