The Sizewell C Project
2.5 Main Development SiteConventional Island (Unit 2)Plans For
Approval
Revision: 1.0
Applicable Regulation: Regulation 5(2)(o)
PINS Reference Number: EN010012
May 2020
Planning Act 2008Infrastructure Planning (Applications:
Prescribed Forms and Procedure) Regulations 2009
-
Drawing Number Revision Drawing Title Scale Sheet SizeUnit 2:
Turbine HallSZC-SZ0701-XX-000-DRW-100109 01 Roof Plan, East &
West Elevations 1:200 A0SZC-SZ0701-XX-000-DRW-100110 01 North &
South Elevations 1:200 A0Unit 2: Conventional Island Electrical
BuildingSZC-SZ0701-XX-000-DRW-100113 01 Roof Plan 1:100
A1SZC-SZ0701-XX-000-DRW-100114 01 West Evaluations 1:100
A1SZC-SZ0701-XX-000-DRW-100115 01 North & East Elevations 1:100
A1Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit
Transformer / Auxiliary TransformerSZC-SZ0701-XX-000-DRW-100116 01
Roof Plan 1:200 A1SZC-SZ0701-XX-000-DRW-100117 01 Elevations 1:200
A1
Main Development Site, Conventional Island Plans (Unit 2) – For
Approval
-
TRANSFORMERMAIN
TURBINE HALL
SKYBRIDGE SKYBRIDGE
TURBINE HALLBUILDINGELECTRICAL
ISLAND CONVENTIONAL
114500
64500
All Rights reserved. NNB GenCo Licence: 0100060408
Stationery Office © Crown copyright (2019).
Ordnance Survey on behalf of the controller of Her Majesty's
Reproduced from Ordnance Survey map with the permission of
NOTES:
is to be reproduced without prior permission of NNB Generation
Company (SZC) Limited.
Copyright 2020 NNB Generation Company (SZC) Limited. No part of
this drawing
DRAWING TITLE:
DOCUMENT:
DRAWING NO:
DATE: DRAWN: SCALE:
SCALE BAR:
COPYRIGHT:
c
NOT PROTECTIVELY MARKED
KEY:
DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED
CHECKED
REVISION:
PROJECT:
SIZEWELL C
SIZEWELL C Site Key Plan - NTS
4.11 Rainwater pipe and hopper
4.10 Wall vents and hatches
Retractable steel shutters4.9
Barbed tape4.8
Fencing4.7
Mesh expanded metal panels4.6
Glass brise-soleil4.5
Aluminium brise-soleil4.4
Steel louvres4.3
Aluminium louvres4.2
and casings
Aluminium trims, copings 4.1
4 External wall features
Opaque glazed spandrel panel3.4
Framed glazing3.3
Frameless glazing3.2
Glazed curtain wall3.1
3 Glazing / transluscent materials
Anodised Aluminium panels2.9
panels
Glassfibre reinforced concrete 2.8
Glass reinforced plastic 2.7
Fibre cement cladding2.6
Flat steel panels2.5
Profiled steel panels2.4
Aluminium fins2.3
Aluminium panels2.2
Aluminium standing seam2.1
2 Cladding
Render finish1.3
Pre-cast concrete1.2
In-situ concrete1.1
1 Concrete / render finishes
Wall
Vertical Enclosure
Steel guardrail6.5
Metal stairs and ladders6.4
Glazed balustrade6.3
Cavity venetian blinds6.2
External fabric blinds6.1
accessories
6 Window / metalwork
Access gates5.4
Glazed door5.3
Metal louvre door5.2
Metal door5.1
5 Doors
8.8 Steel Grid
8.7 Roof Plant
Timber decking8.6
PVs and solar panels8.5
Paving8.4
and copings
Metal cappings 8.3
hatches
Roof vents and 8.2
Roof light8.1
8 Roofing Accessories
Concrete roof7.4
Standing seam roof7.3
Ballast7.2
Sedum roof7.1
7 Roofing
Roof
Horizontal Enclosure
01 GA GA DCO SUBMISSION SZC CoFEB 20
APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)
2
2
3
3
0 5 10 15m4 268m
1:200
SCALE IN METRES
2
1
3
2
2.9
2.8
2.9
FEB 2020 EDH 1:200 @ A0
SZC-SZ0701-XX-000-DRW-100109
SAFEGUARD BUILDING
SCALE
1 ROOF PLAN1:200
SCALE 1:200
2 EAST ELEVATION
SCALE 1:200
3 WEST ELEVATION
100109
100110
100109
100110
2.9
SKYBRIDGE
01
ROOF PLAN, EAST & WEST ELEVATIONS
UNIT 2: TURBINE HALL
MAIN DEVELOPMENT SITE
TRANSFORMER
UNIT
SWITCH GEAR
GAS INSULATED
TRANSFORMER
MAIN
TOWER
ACCESS
ELECTRICAL BUILDING
CONVENTIONAL ISLAND
1.1
8.3 1.11.1 8.3
FFL +47.00
+54.50AOD
7.3
8.2
8.2
BUILDING
SAFEGUARD
- 00.20FFL
+07.30AOD
+47.00FFL
+54.50AOD
+00.00FFL
+07.50AOD
+47.00FFL
+54.50AOD
ACCESS TOWER
6450064500
SIZEWELL C Elevation Key Plan - NTS
FFL +44.30
+51.80AOD
Sizewell C Design and Access Statement Chapter 7 for
details.
and machinery which may protrude above the stated roof height,
see
4. An additional 5m may be required to account for roof
plant
3. All dimensions are indicated to a tolerance of 0.5m.
locates the finished floor level of all buildings at +7.50m
AOD.
2. Platform level is defined as +7.30m AOD, an additional step
of +0.20m
AOD - Above Ordnance Datum
FFL - Finished Floor Level
1. Definitions:
POWER TRANSMISSION PLATFORM
-
POWER TRANSMISSION PLATFORM
114500
NUCLEAR ISLANDTURBINE HALL
114500
SKYBRIDGE
TURBINE HALLNUCLEAR ISLAND
All Rights reserved. NNB GenCo Licence: 0100060408
Stationery Office © Crown copyright (2019).
Ordnance Survey on behalf of the controller of Her Majesty's
Reproduced from Ordnance Survey map with the permission of
NOTES:
is to be reproduced without prior permission of NNB Generation
Company (SZC) Limited.
Copyright 2020 NNB Generation Company (SZC) Limited. No part of
this drawing
DRAWING TITLE:
DOCUMENT:
DRAWING NO:
DATE: DRAWN: SCALE:
SCALE BAR:
COPYRIGHT:
c
NOT PROTECTIVELY MARKED
KEY:
DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED
CHECKED
REVISION:
PROJECT:
SIZEWELL C
SIZEWELL C Site Key Plan - NTS
4.11 Rainwater pipe and hopper
4.10 Wall vents and hatches
Retractable steel shutters4.9
Barbed tape4.8
Fencing4.7
Mesh expanded metal panels4.6
Glass brise-soleil4.5
Aluminium brise-soleil4.4
Steel louvres4.3
Aluminium louvres4.2
and casings
Aluminium trims, copings 4.1
4 External wall features
Opaque glazed spandrel panel3.4
Framed glazing3.3
Frameless glazing3.2
Glazed curtain wall3.1
3 Glazing / transluscent materials
Anodised Aluminium panels2.9
panels
Glassfibre reinforced concrete 2.8
Glass reinforced plastic 2.7
Fibre cement cladding2.6
Flat steel panels2.5
Profiled steel panels2.4
Aluminium fins2.3
Aluminium panels2.2
Aluminium standing seam2.1
2 Cladding
Render finish1.3
Pre-cast concrete1.2
In-situ concrete1.1
1 Concrete / render finishes
Wall
Vertical Enclosure
Steel guardrail6.5
Metal stairs and ladders6.4
Glazed balustrade6.3
Cavity venetian blinds6.2
External fabric blinds6.1
accessories
6 Window / metalwork
Access gates5.4
Glazed door5.3
Metal louvre door5.2
Metal door5.1
5 Doors
8.8 Steel Grid
8.7 Roof Plant
Timber decking8.6
PVs and solar panels8.5
Paving8.4
and copings
Metal cappings 8.3
hatches
Roof vents and 8.2
Roof light8.1
8 Roofing Accessories
Concrete roof7.4
Standing seam roof7.3
Ballast7.2
Sedum roof7.1
7 Roofing
Roof
Horizontal Enclosure
01 GA GA DCO SUBMISSION SZC CoFEB 20
APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)
1
0 5 10 15m4 268m
1:200
SCALE IN METRES
1
22
SZC-SZ0701-XX-000-DRW-100110
FEB 2020 EDH 1:200 @ A0
01
NORTH & SOUTH ELEVATIONS
UNIT 2: TURBINE HALL
MAIN DEVELOPMENT SITE
2.9
2.8
5.1
5.1
BUILDING
SAFEGUARD
SKYBRIDGE
5.1
SCALE 1:200
1 SOUTH ELEVATION
+00.00FFL
+07.50AOD
+47.00FFL
+54.50AOD
SCALE 1:200
2 NORTH ELEVATION
2.8
2.9
5.1
+47.00FFL
+54.50AOD
+00.00FFL
+07.50AOD
5.1
ELECTRICAL BUILDING
CONVENTIONAL ISLAND
SIZEWELL C Elevation Key Plan - NTS
3. All dimensions are indicated to a tolerance of 0.5m.
locates the finished floor level of all buildings at +7.50m
AOD.
2. Platform level is defined as +7.30m AOD, an additional step
of +0.20m
AOD - Above Ordnance Datum
FFL - Finished Floor Level
1. Definitions:
2.8
4.3
2.8
4.3
-
All Rights reserved. NNB GenCo Licence: 0100060408
Majesty's Stationery Office © Crown copyright (2019).
of Ordnance Survey on behalf of the controller of Her
Reproduced from Ordnance Survey map with the permission
NOTES:
is to be reproduced without prior permission of NNB Generation
Company (SZC) Limited.
Copyright 2020 NNB Generation Company (SZC) Limited. No part of
this drawing
DRAWING TITLE:
DOCUMENT:
DRAWING NO:
DATE: DRAWN: SCALE:
SCALE BAR:
COPYRIGHT:
c
NOT PROTECTIVELY MARKED
KEY:
DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED
CHECKED
REVISION:
PROJECT:
SIZEWELL C
4.11 Rainwater pipe and hopper
4.10 Wall vents and hatches
Retractable steel shutters4.9
Barbed tape4.8
Fencing4.7
panels
Mesh expanded metal 4.6
Glass brise-soleil4.5
Aluminium brise-soleil4.4
Steel louvres4.3
Aluminium louvres4.2
and casings
Aluminium trims, copings 4.1
4 External wall features
panel
Opaque glazed spandrel 3.4
Framed glazing3.3
Frameless glazing3.2
Glazed curtain wall3.1
materials
3 Glazing / transluscent
panels
Anodised Aluminium 2.9
concrete panels
Glassfibre reinforced 2.8
Glass reinforced plastic2.7
Fibre cement cladding2.6
Flat steel panels2.5
Profiled steel panels2.4
Aluminium fins2.3
Aluminium panels2.2
Aluminium standing seam2.1
2 Cladding
Render finish1.3
Pre-cast concrete1.2
In-situ concrete1.1
1 Concrete / render finishes
Wall
Vertical Enclosure
Steel guardrail6.5
ladders
Metal stairs and 6.4
Glazed balustrade6.3
Cavity venetian blinds6.2
External fabric blinds6.1
accessories
6 Window / metalwork
Access gates5.4
Glazed door5.3
Metal louvre door5.2
Metal door5.1
5 Doors
8.8 Steel Grid
8.7 Roof Plant
Timber decking8.6
PVs and solar panels8.5
Paving8.4
and copings
Metal cappings 8.3
hatches
Roof vents and 8.2
Roof light8.1
8 Roofing Accessories
Concrete roof7.4
Standing seam roof7.3
Ballast7.2
Sedum roof7.1
7 Roofing
Roof
Horizontal Enclosure
01 GAGA
SIZEWELL C Site Key Plan - NTS
DCO SUBMISSION SZC Co
NOTES:
FEB 20
APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)
33800
38800
TURBINE HALL
1:100 @ A1EDH
SCALE 1:100
ROOF PLAN1
1
21
0 2 4 6m2 1345m
1:100
SCALE IN METRES
SZC-SZ0701-XX-000-DRW-100113
FEB 2020
100115
100115
100114
01
FFL +15.40
+22.90AOD
FFL +22.10
+29.60AOD
ELECTRICAL BUILDING
CONVENTIONAL ISLAND
FFL +16.25
+23.75AOD
FFL +23.05
+30.55AOD
ROOF PLAN
ELECTRICAL BLDG
UNIT 2: CONVENTIONAL ISLAND
MAIN DEVELOPMENT SITE
C Design and Access Statement for details.
machinery which may protrude above stated roof height, see
Sizewell
4. An additional 5m may be required to account for roof plant
and
3. All dimensions are indicated to a tolerance of 0.5m.
+0.20m locates the finished floor level of all buildings at
+7.50m AOD.
2. Platform level is defined as +7.30m AOD, an additional step
of
AOD - Above Ordnance Datum
FFL - Finished Floor Level 1. Definitions:
-
All Rights reserved. NNB GenCo Licence: 0100060408
Majesty's Stationery Office © Crown copyright (2019).
of Ordnance Survey on behalf of the controller of Her
Reproduced from Ordnance Survey map with the permission
NOTES:
is to be reproduced without prior permission of NNB Generation
Company (SZC) Limited.
Copyright 2020 NNB Generation Company (SZC) Limited. No part of
this drawing
DRAWING TITLE:
DOCUMENT:
DRAWING NO:
DATE: DRAWN: SCALE:
SCALE BAR:
COPYRIGHT:
c
NOT PROTECTIVELY MARKED
KEY:
DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED
CHECKED
REVISION:
PROJECT:
SIZEWELL C
4.11 Rainwater pipe and hopper
4.10 Wall vents and hatches
Retractable steel shutters4.9
Barbed tape4.8
Fencing4.7
panels
Mesh expanded metal 4.6
Glass brise-soleil4.5
Aluminium brise-soleil4.4
Steel louvres4.3
Aluminium louvres4.2
and casings
Aluminium trims, copings 4.1
4 External wall features
panel
Opaque glazed spandrel 3.4
Framed glazing3.3
Frameless glazing3.2
Glazed curtain wall3.1
materials
3 Glazing / transluscent
panels
Anodised Aluminium 2.9
concrete panels
Glassfibre reinforced 2.8
Glass reinforced plastic2.7
Fibre cement cladding2.6
Flat steel panels2.5
Profiled steel panels2.4
Aluminium fins2.3
Aluminium panels2.2
Aluminium standing seam2.1
2 Cladding
Render finish1.3
Pre-cast concrete1.2
In-situ concrete1.1
1 Concrete / render finishes
Wall
Vertical Enclosure
Steel guardrail6.5
ladders
Metal stairs and 6.4
Glazed balustrade6.3
Cavity venetian blinds6.2
External fabric blinds6.1
accessories
6 Window / metalwork
Access gates5.4
Glazed door5.3
Metal louvre door5.2
Metal door5.1
5 Doors
8.8 Steel Grid
8.7 Roof Plant
Timber decking8.6
PVs and solar panels8.5
Paving8.4
and copings
Metal cappings 8.3
hatches
Roof vents and 8.2
Roof light8.1
8 Roofing Accessories
Concrete roof7.4
Standing seam roof7.3
Ballast7.2
Sedum roof7.1
7 Roofing
Roof
Horizontal Enclosure
01 GAGA
SIZEWELL C Site Key Plan - NTS
DCO SUBMISSION SZC Co
NOTES:
FEB 20
APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)
38800
TURBINE HALL
CONVENTIONAL ISLAND ELECTRICAL BUILDING
1:100 @ A1EDH
SCALE 1:100
WEST ELEVATION1
1.1
1.1
6.4
1
1
0 2 4 6m2 1345m
1:100
SCALE IN METRES
SZC-SZ0701-XX-000-DRW-100114
FEB 2020
SIZEWELL C Elevation Key Plan - NTS
01
+23.05FFL
+30.55AOD
+16.25FFL
+23.75AOD
+0.00FFL
+7.50AOD- 0.20FFL
+7.30AOD
WEST ELEVATION
ELECTRICAL BLDG
UNIT 2: CONVENTIONAL ISLAND
MAIN DEVELOPMENT SITE
and lighting) are not shown and may be added subsequently.
including solar panels) and minor architectural features
(including gutters
(including ladders and handrails), mechanical plant, utilities
infrastructure
(including aerials and satellites), access structures and safety
measures
4. External projections including telecommunications
infrastructure
3. All dimensions are indicated to a tolerance of 0.5m.
locates the finished floor level of all buildings at +7.50m
AOD.
2. Platform level is defined as +7.30m AOD, an additional step
of +0.20m
AOD - Above Ordnance Datum
FFL - Finished Floor Level 1. Definitions:
-
All Rights reserved. NNB GenCo Licence: 0100060408
Majesty's Stationery Office © Crown copyright (2019).
of Ordnance Survey on behalf of the controller of Her
Reproduced from Ordnance Survey map with the permission
NOTES:
is to be reproduced without prior permission of NNB Generation
Company (SZC) Limited.
Copyright 2020 NNB Generation Company (SZC) Limited. No part of
this drawing
DRAWING TITLE:
DOCUMENT:
DRAWING NO:
DATE: DRAWN: SCALE:
SCALE BAR:
COPYRIGHT:
c
NOT PROTECTIVELY MARKED
KEY:
DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED
CHECKED
REVISION:
PROJECT:
SIZEWELL C
4.11 Rainwater pipe and hopper
4.10 Wall vents and hatches
Retractable steel shutters4.9
Barbed tape4.8
Fencing4.7
panels
Mesh expanded metal 4.6
Glass brise-soleil4.5
Aluminium brise-soleil4.4
Steel louvres4.3
Aluminium louvres4.2
and casings
Aluminium trims, copings 4.1
4 External wall features
panel
Opaque glazed spandrel 3.4
Framed glazing3.3
Frameless glazing3.2
Glazed curtain wall3.1
materials
3 Glazing / transluscent
panels
Anodised Aluminium 2.9
concrete panels
Glassfibre reinforced 2.8
Glass reinforced plastic2.7
Fibre cement cladding2.6
Flat steel panels2.5
Profiled steel panels2.4
Aluminium fins2.3
Aluminium panels2.2
Aluminium standing seam2.1
2 Cladding
Render finish1.3
Pre-cast concrete1.2
In-situ concrete1.1
1 Concrete / render finishes
Wall
Vertical Enclosure
Steel guardrail6.5
ladders
Metal stairs and 6.4
Glazed balustrade6.3
Cavity venetian blinds6.2
External fabric blinds6.1
accessories
6 Window / metalwork
Access gates5.4
Glazed door5.3
Metal louvre door5.2
Metal door5.1
5 Doors
8.8 Steel Grid
8.7 Roof Plant
Timber decking8.6
PVs and solar panels8.5
Paving8.4
and copings
Metal cappings 8.3
hatches
Roof vents and 8.2
Roof light8.1
8 Roofing Accessories
Concrete roof7.4
Standing seam roof7.3
Ballast7.2
Sedum roof7.1
7 Roofing
Roof
Horizontal Enclosure
01 GAGA
SIZEWELL C Site Key Plan - NTS
DCO SUBMISSION SZC Co
NOTES:
FEB 20
APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)
TURBINE HALL
38800
33450
CONVENTIONAL ISLAND ELECTRICAL BUILDING
CONVENTIONAL ISLAND ELECTRICAL BUILDING 1:100 @ A1EDH
1.1
1.1
1.1
1.1
5.1
5.1
0 2 4 6m2 1345m
1:100
SCALE IN METRES
11
2
2
SZC-SZ0701-XX-000-DRW-100115
FEB 2020
SCALE 1:100
NORTH ELEVATION1
SCALE 1:100
EAST ELEVATION2
+23.05FFL
+30.55AOD
SIZEWELL C Elevation Key Plan - NTS
01
+0.00FFL
+7.50AOD
+23.05FFL
+30.55AOD
+0.00FFL
+7.50AOD
+0.00FFL
+7.50AOD
NORTH & EAST ELEVATIONS
ELECTRICAL BLDG
UNIT 2: CONVENTIONAL ISLAND
MAIN DEVELOPMENT SITE
+16.25FFL
+23.75AOD
+16.25FFL
+23.75AOD
and lighting) are not shown and may be added subsequently.
(including solar panels) and minor architectural features
(including gutters
(including ladders and handrails), mechanical plant, utilities
infrastructure
(including aerials and satellites), access structures and safety
measures
4. External projections including telecommunications
infrastructure
3. All dimensions are indicated to a tolerance of 0.5m.
locates the finished floor level of all buildings at +7.50m
AOD.
2. Platform level is defined as +7.30m AOD, an additional step
of +0.20m
AOD - Above Ordnance Datum
FFL - Finished Floor Level 1. Definitions:
-
All Rights reserved. NNB GenCo Licence: 0100060408
Majesty's Stationery Office © Crown copyright (2019).
of Ordnance Survey on behalf of the controller of Her
Reproduced from Ordnance Survey map with the permission
NOTES:
is to be reproduced without prior permission of NNB Generation
Company (SZC) Limited.
Copyright 2020 NNB Generation Company (SZC) Limited. No part of
this drawing
DRAWING TITLE:
DOCUMENT:
DRAWING NO:
DATE: DRAWN: SCALE:
SCALE BAR:
COPYRIGHT:
c
NOT PROTECTIVELY MARKED
KEY:
DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED
CHECKED
REVISION:
PROJECT:
SIZEWELL C
4.11 Rainwater pipe and hopper
4.10 Wall vents and hatches
Retractable steel shutters4.9
Barbed tape4.8
Fencing4.7
panels
Mesh expanded metal 4.6
Glass brise-soleil4.5
Aluminium brise-soleil4.4
Steel louvres4.3
Aluminium louvres4.2
and casings
Aluminium trims, copings 4.1
4 External wall features
panel
Opaque glazed spandrel 3.4
Framed glazing3.3
Frameless glazing3.2
Glazed curtain wall3.1
materials
3 Glazing / transluscent
panels
Anodised Aluminium 2.9
concrete panels
Glassfibre reinforced 2.8
Glass reinforced plastic2.7
Fibre cement cladding2.6
Flat steel panels2.5
Profiled steel panels2.4
Aluminium fins2.3
Aluminium panels2.2
Aluminium standing seam2.1
2 Cladding
Render finish1.3
Pre-cast concrete1.2
In-situ concrete1.1
1 Concrete / render finishes
Wall
Vertical Enclosure
Steel guardrail6.5
ladders
Metal stairs and 6.4
Glazed balustrade6.3
Cavity venetian blinds6.2
External fabric blinds6.1
accessories
6 Window / metalwork
Access gates5.4
Glazed door5.3
Metal louvre door5.2
Metal door5.1
5 Doors
8.8 Steel Grid
8.7 Roof Plant
Timber decking8.6
PVs and solar panels8.5
Paving8.4
and copings
Metal cappings 8.3
hatches
Roof vents and 8.2
Roof light8.1
8 Roofing Accessories
Concrete roof7.4
Standing seam roof7.3
Ballast7.2
Sedum roof7.1
7 Roofing
Roof
Horizontal Enclosure
01 GAGA
SIZEWELL C Site Key Plan - NTS
DCO SUBMISSION SZC Co
NOTES:
FEB 20
APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)
TURBINE HALL
MAIN TRANSFORMER
SWITCH GEARGAS INSULATED
UNIT TRANSFORMERTRANSFORMER AUXILIARY
VOID
VOID
VOID
36500
ELECTRICAL BUILDING
CONVENTIONAL ISLAND
73200
POWER TRANSMISSION PLATFORM
1:200 @ A1EDH
SCALE 1:200
ROOF PLAN1
1
332
7.3
7.4
7.4
7.4
7.4
7.4
7.4
7.3
7.47.4
0 5 10 15m4 268m
1:200
SCALE IN METRES
SZC-SZ0701-XX-000-DRW-100116
FEB 2020
FFL +15.20
+22.70AOD
100117 100117
100117
01
FFL +12.00
+19.50AOD
FFL +12.00
+19.50AOD
FFL +12.00
+19.50AOD
FFL +44.20
+51.70AOD
FFL +16.15
+23.65AOD
FFL +12.50
+20.00AOD
ROOF PLAN
/ AUXILIARY TRANSFORMER
MAIN TRANSFORMER / UNIT TRANSFORMER
UNIT 2: GAS INSULATED SWITCH GEAR /
MAIN DEVELOPMENT SITE
.C Design and Access Statement for details.
machinery which may protrude above stated roof height, see
Sizewell
4. An additional 5m may be required to account for roof plant
and
3. All dimensions are indicated to a tolerance of 0.5m.
+0.20m locates the finished floor level of all buildings at
+7.50m AOD.
2. Platform level is defined as +7.30m AOD, an additional step
of
AOD - Above Ordnance Datum
FFL - Finished Floor Level 1. Definitions:
-
All Rights reserved. NNB GenCo Licence: 0100060408
Majesty's Stationery Office © Crown copyright (2019).
of Ordnance Survey on behalf of the controller of Her
Reproduced from Ordnance Survey map with the permission
NOTES:
is to be reproduced without prior permission of NNB Generation
Company (SZC) Limited.
Copyright 2020 NNB Generation Company (SZC) Limited. No part of
this drawing
DRAWING TITLE:
DOCUMENT:
DRAWING NO:
DATE: DRAWN: SCALE:
SCALE BAR:
COPYRIGHT:
c
NOT PROTECTIVELY MARKED
KEY:
DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED
CHECKED
REVISION:
PROJECT:
SIZEWELL C
4.11 Rainwater pipe and hopper
4.10 Wall vents and hatches
Retractable steel shutters4.9
Barbed tape4.8
Fencing4.7
panels
Mesh expanded metal 4.6
Glass brise-soleil4.5
Aluminium brise-soleil4.4
Steel louvres4.3
Aluminium louvres4.2
and casings
Aluminium trims, copings 4.1
4 External wall features
panel
Opaque glazed spandrel 3.4
Framed glazing3.3
Frameless glazing3.2
Glazed curtain wall3.1
materials
3 Glazing / transluscent
panels
Anodised Aluminium 2.9
concrete panels
Glassfibre reinforced 2.8
Glass reinforced plastic2.7
Fibre cement cladding2.6
Flat steel panels2.5
Profiled steel panels2.4
Aluminium fins2.3
Aluminium panels2.2
Aluminium standing seam2.1
2 Cladding
Render finish1.3
Pre-cast concrete1.2
In-situ concrete1.1
1 Concrete / render finishes
Wall
Vertical Enclosure
Steel guardrail6.5
ladders
Metal stairs and 6.4
Glazed balustrade6.3
Cavity venetian blinds6.2
External fabric blinds6.1
accessories
6 Window / metalwork
Access gates5.4
Glazed door5.3
Metal louvre door5.2
Metal door5.1
5 Doors
8.8 Steel Grid
8.7 Roof Plant
Timber decking8.6
PVs and solar panels8.5
Paving8.4
and copings
Metal cappings 8.3
hatches
Roof vents and 8.2
Roof light8.1
8 Roofing Accessories
Concrete roof7.4
Standing seam roof7.3
Ballast7.2
Sedum roof7.1
7 Roofing
Roof
Horizontal Enclosure
01 GAGA
SIZEWELL C Site Key Plan - NTS
DCO SUBMISSION SZC Co
NOTES:
FEB 20
APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)
36550
MAIN TRANSFORMER
36550
AUXILIARY TRANSFORMERUNIT TRANSFORMER UNIT TRANSFORMER
1:200 @ A1EDH
SCALE 1:200
NORTH ELEVATION1
+0.00FFL
+7.50AOD
1.1
SCALE 1:200
EAST ELEVATION2SCALE 1:200
WEST ELEVATION3
1.1
1.1
1.1
4.74.7
2
11
3
23
0 5 10 15m4 268m
1:200
SCALE IN METRES
SZC-SZ0701-XX-000-DRW-100117
FEB 2020
1.1
1.1
1.1
1.1
1.11.1
1.1
5.1 5.1 5.4
5.4 5.44.7
+16.15FFL
+23.65AOD
+12.00FFL
+19.50AOD
MAIN TRANSFORMER UNIT TRANSFORMERGAS INSULATED SWITCH GEAR
AUXILIARY TRANSFORMER
SIZEWELL C Elevation Key Plan - NTS
01
+44.20FFL
+51.70AOD
+16.15FFL
+23.65AOD
-0.20FFL
+7.30AOD
+0.00FFL
+7.50AOD
+44.20FFL
+51.70AOD
+44.20FFL
+51.70AOD
+16.15FFL
+23.65AOD
+0.00FFL
+7.50AOD
ELEVATIONS
/ AUXILIARY TRANSFORMER
MAIN TRANSFORMER / UNIT TRANSFORMER
UNIT 2: GAS INSULATED SWITCH GEAR /
MAIN DEVELOPMENT SITE
and lighting) are not shown and may be added subsequently.
(including solar panels) and minor architectural features
(including gutters
(including ladders and handrails), mechanical plant, utilities
infrastructure
(including aerials and satellites), access structures and safety
measures
4. External projections including telecommunications
infrastructure
3. All dimensions are indicated to a tolerance of 0.5m.
locates the finished floor level of all buildings at +7.50m
AOD.
2. Platform level is defined as +7.30m AOD, an additional step
of +0.20m
AOD - Above Ordnance Datum
FFL - Finished Floor Level 1. Definitions:
POWER TRANSMISSION PLATFORM
FINAL_SZC-SZ0701-XX-000-DRW-100109_HMFINAL_SZC-SZ0701-XX-000-DRW-100110_HMFINAL_SZC-SZ0701-XX-000-DRW-100113_HFFINAL_SZC-SZ0701-XX-000-DRW-100114_HFFINAL_SZC-SZ0701-XX-000-DRW-100115_HFFINAL_SZC-SZ0701-XX-000-DRW-100116_HTPFINAL_SZC-SZ0701-XX-000-DRW-100117_HTP