Top Banner
The Sizewell C Project 2.5 Main Development Site Conventional Island (Unit 2) Plans For Approval Revision: 1.0 Applicable Regulation: Regulation 5(2)(o) PINS Reference Number: EN010012 May 2020 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
9

The Sizewell C Project › wp... · 2020-06-25 · The Sizewell C Project 2.5 Main Development Site Conventional Island (Unit 2) Plans For Approval Revision: 1.0 Applicable Regulation:

Jul 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • The Sizewell C Project

    2.5 Main Development SiteConventional Island (Unit 2)Plans For Approval

    Revision: 1.0

    Applicable Regulation: Regulation 5(2)(o)

    PINS Reference Number: EN010012

    May 2020

    Planning Act 2008Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

  • Drawing Number Revision Drawing Title Scale Sheet SizeUnit 2: Turbine HallSZC-SZ0701-XX-000-DRW-100109 01 Roof Plan, East & West Elevations 1:200 A0SZC-SZ0701-XX-000-DRW-100110 01 North & South Elevations 1:200 A0Unit 2: Conventional Island Electrical BuildingSZC-SZ0701-XX-000-DRW-100113 01 Roof Plan 1:100 A1SZC-SZ0701-XX-000-DRW-100114 01 West Evaluations 1:100 A1SZC-SZ0701-XX-000-DRW-100115 01 North & East Elevations 1:100 A1Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary TransformerSZC-SZ0701-XX-000-DRW-100116 01 Roof Plan 1:200 A1SZC-SZ0701-XX-000-DRW-100117 01 Elevations 1:200 A1

    Main Development Site, Conventional Island Plans (Unit 2) – For Approval

  • TRANSFORMERMAIN

    TURBINE HALL

    SKYBRIDGE SKYBRIDGE

    TURBINE HALLBUILDINGELECTRICAL

    ISLAND CONVENTIONAL

    114500

    64500

    All Rights reserved. NNB GenCo Licence: 0100060408

    Stationery Office © Crown copyright (2019).

    Ordnance Survey on behalf of the controller of Her Majesty's

    Reproduced from Ordnance Survey map with the permission of

    NOTES:

    is to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

    Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawing

    DRAWING TITLE:

    DOCUMENT:

    DRAWING NO:

    DATE: DRAWN: SCALE:

    SCALE BAR:

    COPYRIGHT:

    c

    NOT PROTECTIVELY MARKED

    KEY:

    DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED CHECKED

    REVISION:

    PROJECT:

    SIZEWELL C

    SIZEWELL C Site Key Plan - NTS

    4.11 Rainwater pipe and hopper

    4.10 Wall vents and hatches

    Retractable steel shutters4.9

    Barbed tape4.8

    Fencing4.7

    Mesh expanded metal panels4.6

    Glass brise-soleil4.5

    Aluminium brise-soleil4.4

    Steel louvres4.3

    Aluminium louvres4.2

    and casings

    Aluminium trims, copings 4.1

    4 External wall features

    Opaque glazed spandrel panel3.4

    Framed glazing3.3

    Frameless glazing3.2

    Glazed curtain wall3.1

    3 Glazing / transluscent materials

    Anodised Aluminium panels2.9

    panels

    Glassfibre reinforced concrete 2.8

    Glass reinforced plastic 2.7

    Fibre cement cladding2.6

    Flat steel panels2.5

    Profiled steel panels2.4

    Aluminium fins2.3

    Aluminium panels2.2

    Aluminium standing seam2.1

    2 Cladding

    Render finish1.3

    Pre-cast concrete1.2

    In-situ concrete1.1

    1 Concrete / render finishes

    Wall

    Vertical Enclosure

    Steel guardrail6.5

    Metal stairs and ladders6.4

    Glazed balustrade6.3

    Cavity venetian blinds6.2

    External fabric blinds6.1

    accessories

    6 Window / metalwork

    Access gates5.4

    Glazed door5.3

    Metal louvre door5.2

    Metal door5.1

    5 Doors

    8.8 Steel Grid

    8.7 Roof Plant

    Timber decking8.6

    PVs and solar panels8.5

    Paving8.4

    and copings

    Metal cappings 8.3

    hatches

    Roof vents and 8.2

    Roof light8.1

    8 Roofing Accessories

    Concrete roof7.4

    Standing seam roof7.3

    Ballast7.2

    Sedum roof7.1

    7 Roofing

    Roof

    Horizontal Enclosure

    01 GA GA DCO SUBMISSION SZC CoFEB 20

    APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)

    2

    2

    3

    3

    0 5 10 15m4 268m

    1:200

    SCALE IN METRES

    2

    1

    3

    2

    2.9

    2.8

    2.9

    FEB 2020 EDH 1:200 @ A0

    SZC-SZ0701-XX-000-DRW-100109

    SAFEGUARD BUILDING

    SCALE

    1 ROOF PLAN1:200

    SCALE 1:200

    2 EAST ELEVATION

    SCALE 1:200

    3 WEST ELEVATION

    100109

    100110

    100109

    100110

    2.9

    SKYBRIDGE

    01

    ROOF PLAN, EAST & WEST ELEVATIONS

    UNIT 2: TURBINE HALL

    MAIN DEVELOPMENT SITE

    TRANSFORMER

    UNIT

    SWITCH GEAR

    GAS INSULATED

    TRANSFORMER

    MAIN

    TOWER

    ACCESS

    ELECTRICAL BUILDING

    CONVENTIONAL ISLAND

    1.1

    8.3 1.11.1 8.3

    FFL +47.00

    +54.50AOD

    7.3

    8.2

    8.2

    BUILDING

    SAFEGUARD

    - 00.20FFL

    +07.30AOD

    +47.00FFL

    +54.50AOD

    +00.00FFL

    +07.50AOD

    +47.00FFL

    +54.50AOD

    ACCESS TOWER

    6450064500

    SIZEWELL C Elevation Key Plan - NTS

    FFL +44.30

    +51.80AOD

    Sizewell C Design and Access Statement Chapter 7 for details.

    and machinery which may protrude above the stated roof height, see

    4. An additional 5m may be required to account for roof plant

    3. All dimensions are indicated to a tolerance of 0.5m.

    locates the finished floor level of all buildings at +7.50m AOD.

    2. Platform level is defined as +7.30m AOD, an additional step of +0.20m

    AOD - Above Ordnance Datum

    FFL - Finished Floor Level

    1. Definitions:

    POWER TRANSMISSION PLATFORM

  • POWER TRANSMISSION PLATFORM

    114500

    NUCLEAR ISLANDTURBINE HALL

    114500

    SKYBRIDGE

    TURBINE HALLNUCLEAR ISLAND

    All Rights reserved. NNB GenCo Licence: 0100060408

    Stationery Office © Crown copyright (2019).

    Ordnance Survey on behalf of the controller of Her Majesty's

    Reproduced from Ordnance Survey map with the permission of

    NOTES:

    is to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

    Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawing

    DRAWING TITLE:

    DOCUMENT:

    DRAWING NO:

    DATE: DRAWN: SCALE:

    SCALE BAR:

    COPYRIGHT:

    c

    NOT PROTECTIVELY MARKED

    KEY:

    DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED CHECKED

    REVISION:

    PROJECT:

    SIZEWELL C

    SIZEWELL C Site Key Plan - NTS

    4.11 Rainwater pipe and hopper

    4.10 Wall vents and hatches

    Retractable steel shutters4.9

    Barbed tape4.8

    Fencing4.7

    Mesh expanded metal panels4.6

    Glass brise-soleil4.5

    Aluminium brise-soleil4.4

    Steel louvres4.3

    Aluminium louvres4.2

    and casings

    Aluminium trims, copings 4.1

    4 External wall features

    Opaque glazed spandrel panel3.4

    Framed glazing3.3

    Frameless glazing3.2

    Glazed curtain wall3.1

    3 Glazing / transluscent materials

    Anodised Aluminium panels2.9

    panels

    Glassfibre reinforced concrete 2.8

    Glass reinforced plastic 2.7

    Fibre cement cladding2.6

    Flat steel panels2.5

    Profiled steel panels2.4

    Aluminium fins2.3

    Aluminium panels2.2

    Aluminium standing seam2.1

    2 Cladding

    Render finish1.3

    Pre-cast concrete1.2

    In-situ concrete1.1

    1 Concrete / render finishes

    Wall

    Vertical Enclosure

    Steel guardrail6.5

    Metal stairs and ladders6.4

    Glazed balustrade6.3

    Cavity venetian blinds6.2

    External fabric blinds6.1

    accessories

    6 Window / metalwork

    Access gates5.4

    Glazed door5.3

    Metal louvre door5.2

    Metal door5.1

    5 Doors

    8.8 Steel Grid

    8.7 Roof Plant

    Timber decking8.6

    PVs and solar panels8.5

    Paving8.4

    and copings

    Metal cappings 8.3

    hatches

    Roof vents and 8.2

    Roof light8.1

    8 Roofing Accessories

    Concrete roof7.4

    Standing seam roof7.3

    Ballast7.2

    Sedum roof7.1

    7 Roofing

    Roof

    Horizontal Enclosure

    01 GA GA DCO SUBMISSION SZC CoFEB 20

    APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)

    1

    0 5 10 15m4 268m

    1:200

    SCALE IN METRES

    1

    22

    SZC-SZ0701-XX-000-DRW-100110

    FEB 2020 EDH 1:200 @ A0

    01

    NORTH & SOUTH ELEVATIONS

    UNIT 2: TURBINE HALL

    MAIN DEVELOPMENT SITE

    2.9

    2.8

    5.1

    5.1

    BUILDING

    SAFEGUARD

    SKYBRIDGE

    5.1

    SCALE 1:200

    1 SOUTH ELEVATION

    +00.00FFL

    +07.50AOD

    +47.00FFL

    +54.50AOD

    SCALE 1:200

    2 NORTH ELEVATION

    2.8

    2.9

    5.1

    +47.00FFL

    +54.50AOD

    +00.00FFL

    +07.50AOD

    5.1

    ELECTRICAL BUILDING

    CONVENTIONAL ISLAND

    SIZEWELL C Elevation Key Plan - NTS

    3. All dimensions are indicated to a tolerance of 0.5m.

    locates the finished floor level of all buildings at +7.50m AOD.

    2. Platform level is defined as +7.30m AOD, an additional step of +0.20m

    AOD - Above Ordnance Datum

    FFL - Finished Floor Level

    1. Definitions:

    2.8

    4.3

    2.8

    4.3

  • All Rights reserved. NNB GenCo Licence: 0100060408

    Majesty's Stationery Office © Crown copyright (2019).

    of Ordnance Survey on behalf of the controller of Her

    Reproduced from Ordnance Survey map with the permission

    NOTES:

    is to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

    Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawing

    DRAWING TITLE:

    DOCUMENT:

    DRAWING NO:

    DATE: DRAWN: SCALE:

    SCALE BAR:

    COPYRIGHT:

    c

    NOT PROTECTIVELY MARKED

    KEY:

    DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED CHECKED

    REVISION:

    PROJECT:

    SIZEWELL C

    4.11 Rainwater pipe and hopper

    4.10 Wall vents and hatches

    Retractable steel shutters4.9

    Barbed tape4.8

    Fencing4.7

    panels

    Mesh expanded metal 4.6

    Glass brise-soleil4.5

    Aluminium brise-soleil4.4

    Steel louvres4.3

    Aluminium louvres4.2

    and casings

    Aluminium trims, copings 4.1

    4 External wall features

    panel

    Opaque glazed spandrel 3.4

    Framed glazing3.3

    Frameless glazing3.2

    Glazed curtain wall3.1

    materials

    3 Glazing / transluscent

    panels

    Anodised Aluminium 2.9

    concrete panels

    Glassfibre reinforced 2.8

    Glass reinforced plastic2.7

    Fibre cement cladding2.6

    Flat steel panels2.5

    Profiled steel panels2.4

    Aluminium fins2.3

    Aluminium panels2.2

    Aluminium standing seam2.1

    2 Cladding

    Render finish1.3

    Pre-cast concrete1.2

    In-situ concrete1.1

    1 Concrete / render finishes

    Wall

    Vertical Enclosure

    Steel guardrail6.5

    ladders

    Metal stairs and 6.4

    Glazed balustrade6.3

    Cavity venetian blinds6.2

    External fabric blinds6.1

    accessories

    6 Window / metalwork

    Access gates5.4

    Glazed door5.3

    Metal louvre door5.2

    Metal door5.1

    5 Doors

    8.8 Steel Grid

    8.7 Roof Plant

    Timber decking8.6

    PVs and solar panels8.5

    Paving8.4

    and copings

    Metal cappings 8.3

    hatches

    Roof vents and 8.2

    Roof light8.1

    8 Roofing Accessories

    Concrete roof7.4

    Standing seam roof7.3

    Ballast7.2

    Sedum roof7.1

    7 Roofing

    Roof

    Horizontal Enclosure

    01 GAGA

    SIZEWELL C Site Key Plan - NTS

    DCO SUBMISSION SZC Co

    NOTES:

    FEB 20

    APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)

    33800

    38800

    TURBINE HALL

    1:100 @ A1EDH

    SCALE 1:100

    ROOF PLAN1

    1

    21

    0 2 4 6m2 1345m

    1:100

    SCALE IN METRES

    SZC-SZ0701-XX-000-DRW-100113

    FEB 2020

    100115

    100115

    100114

    01

    FFL +15.40

    +22.90AOD

    FFL +22.10

    +29.60AOD

    ELECTRICAL BUILDING

    CONVENTIONAL ISLAND

    FFL +16.25

    +23.75AOD

    FFL +23.05

    +30.55AOD

    ROOF PLAN

    ELECTRICAL BLDG

    UNIT 2: CONVENTIONAL ISLAND

    MAIN DEVELOPMENT SITE

    C Design and Access Statement for details.

    machinery which may protrude above stated roof height, see Sizewell

    4. An additional 5m may be required to account for roof plant and

    3. All dimensions are indicated to a tolerance of 0.5m.

    +0.20m locates the finished floor level of all buildings at +7.50m AOD.

    2. Platform level is defined as +7.30m AOD, an additional step of

    AOD - Above Ordnance Datum

    FFL - Finished Floor Level 1. Definitions:

  • All Rights reserved. NNB GenCo Licence: 0100060408

    Majesty's Stationery Office © Crown copyright (2019).

    of Ordnance Survey on behalf of the controller of Her

    Reproduced from Ordnance Survey map with the permission

    NOTES:

    is to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

    Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawing

    DRAWING TITLE:

    DOCUMENT:

    DRAWING NO:

    DATE: DRAWN: SCALE:

    SCALE BAR:

    COPYRIGHT:

    c

    NOT PROTECTIVELY MARKED

    KEY:

    DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED CHECKED

    REVISION:

    PROJECT:

    SIZEWELL C

    4.11 Rainwater pipe and hopper

    4.10 Wall vents and hatches

    Retractable steel shutters4.9

    Barbed tape4.8

    Fencing4.7

    panels

    Mesh expanded metal 4.6

    Glass brise-soleil4.5

    Aluminium brise-soleil4.4

    Steel louvres4.3

    Aluminium louvres4.2

    and casings

    Aluminium trims, copings 4.1

    4 External wall features

    panel

    Opaque glazed spandrel 3.4

    Framed glazing3.3

    Frameless glazing3.2

    Glazed curtain wall3.1

    materials

    3 Glazing / transluscent

    panels

    Anodised Aluminium 2.9

    concrete panels

    Glassfibre reinforced 2.8

    Glass reinforced plastic2.7

    Fibre cement cladding2.6

    Flat steel panels2.5

    Profiled steel panels2.4

    Aluminium fins2.3

    Aluminium panels2.2

    Aluminium standing seam2.1

    2 Cladding

    Render finish1.3

    Pre-cast concrete1.2

    In-situ concrete1.1

    1 Concrete / render finishes

    Wall

    Vertical Enclosure

    Steel guardrail6.5

    ladders

    Metal stairs and 6.4

    Glazed balustrade6.3

    Cavity venetian blinds6.2

    External fabric blinds6.1

    accessories

    6 Window / metalwork

    Access gates5.4

    Glazed door5.3

    Metal louvre door5.2

    Metal door5.1

    5 Doors

    8.8 Steel Grid

    8.7 Roof Plant

    Timber decking8.6

    PVs and solar panels8.5

    Paving8.4

    and copings

    Metal cappings 8.3

    hatches

    Roof vents and 8.2

    Roof light8.1

    8 Roofing Accessories

    Concrete roof7.4

    Standing seam roof7.3

    Ballast7.2

    Sedum roof7.1

    7 Roofing

    Roof

    Horizontal Enclosure

    01 GAGA

    SIZEWELL C Site Key Plan - NTS

    DCO SUBMISSION SZC Co

    NOTES:

    FEB 20

    APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)

    38800

    TURBINE HALL

    CONVENTIONAL ISLAND ELECTRICAL BUILDING

    1:100 @ A1EDH

    SCALE 1:100

    WEST ELEVATION1

    1.1

    1.1

    6.4

    1

    1

    0 2 4 6m2 1345m

    1:100

    SCALE IN METRES

    SZC-SZ0701-XX-000-DRW-100114

    FEB 2020

    SIZEWELL C Elevation Key Plan - NTS

    01

    +23.05FFL

    +30.55AOD

    +16.25FFL

    +23.75AOD

    +0.00FFL

    +7.50AOD- 0.20FFL

    +7.30AOD

    WEST ELEVATION

    ELECTRICAL BLDG

    UNIT 2: CONVENTIONAL ISLAND

    MAIN DEVELOPMENT SITE

    and lighting) are not shown and may be added subsequently.

    including solar panels) and minor architectural features (including gutters

    (including ladders and handrails), mechanical plant, utilities infrastructure

    (including aerials and satellites), access structures and safety measures

    4. External projections including telecommunications infrastructure

    3. All dimensions are indicated to a tolerance of 0.5m.

    locates the finished floor level of all buildings at +7.50m AOD.

    2. Platform level is defined as +7.30m AOD, an additional step of +0.20m

    AOD - Above Ordnance Datum

    FFL - Finished Floor Level 1. Definitions:

  • All Rights reserved. NNB GenCo Licence: 0100060408

    Majesty's Stationery Office © Crown copyright (2019).

    of Ordnance Survey on behalf of the controller of Her

    Reproduced from Ordnance Survey map with the permission

    NOTES:

    is to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

    Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawing

    DRAWING TITLE:

    DOCUMENT:

    DRAWING NO:

    DATE: DRAWN: SCALE:

    SCALE BAR:

    COPYRIGHT:

    c

    NOT PROTECTIVELY MARKED

    KEY:

    DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED CHECKED

    REVISION:

    PROJECT:

    SIZEWELL C

    4.11 Rainwater pipe and hopper

    4.10 Wall vents and hatches

    Retractable steel shutters4.9

    Barbed tape4.8

    Fencing4.7

    panels

    Mesh expanded metal 4.6

    Glass brise-soleil4.5

    Aluminium brise-soleil4.4

    Steel louvres4.3

    Aluminium louvres4.2

    and casings

    Aluminium trims, copings 4.1

    4 External wall features

    panel

    Opaque glazed spandrel 3.4

    Framed glazing3.3

    Frameless glazing3.2

    Glazed curtain wall3.1

    materials

    3 Glazing / transluscent

    panels

    Anodised Aluminium 2.9

    concrete panels

    Glassfibre reinforced 2.8

    Glass reinforced plastic2.7

    Fibre cement cladding2.6

    Flat steel panels2.5

    Profiled steel panels2.4

    Aluminium fins2.3

    Aluminium panels2.2

    Aluminium standing seam2.1

    2 Cladding

    Render finish1.3

    Pre-cast concrete1.2

    In-situ concrete1.1

    1 Concrete / render finishes

    Wall

    Vertical Enclosure

    Steel guardrail6.5

    ladders

    Metal stairs and 6.4

    Glazed balustrade6.3

    Cavity venetian blinds6.2

    External fabric blinds6.1

    accessories

    6 Window / metalwork

    Access gates5.4

    Glazed door5.3

    Metal louvre door5.2

    Metal door5.1

    5 Doors

    8.8 Steel Grid

    8.7 Roof Plant

    Timber decking8.6

    PVs and solar panels8.5

    Paving8.4

    and copings

    Metal cappings 8.3

    hatches

    Roof vents and 8.2

    Roof light8.1

    8 Roofing Accessories

    Concrete roof7.4

    Standing seam roof7.3

    Ballast7.2

    Sedum roof7.1

    7 Roofing

    Roof

    Horizontal Enclosure

    01 GAGA

    SIZEWELL C Site Key Plan - NTS

    DCO SUBMISSION SZC Co

    NOTES:

    FEB 20

    APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)

    TURBINE HALL

    38800

    33450

    CONVENTIONAL ISLAND ELECTRICAL BUILDING

    CONVENTIONAL ISLAND ELECTRICAL BUILDING 1:100 @ A1EDH

    1.1

    1.1

    1.1

    1.1

    5.1

    5.1

    0 2 4 6m2 1345m

    1:100

    SCALE IN METRES

    11

    2

    2

    SZC-SZ0701-XX-000-DRW-100115

    FEB 2020

    SCALE 1:100

    NORTH ELEVATION1

    SCALE 1:100

    EAST ELEVATION2

    +23.05FFL

    +30.55AOD

    SIZEWELL C Elevation Key Plan - NTS

    01

    +0.00FFL

    +7.50AOD

    +23.05FFL

    +30.55AOD

    +0.00FFL

    +7.50AOD

    +0.00FFL

    +7.50AOD

    NORTH & EAST ELEVATIONS

    ELECTRICAL BLDG

    UNIT 2: CONVENTIONAL ISLAND

    MAIN DEVELOPMENT SITE

    +16.25FFL

    +23.75AOD

    +16.25FFL

    +23.75AOD

    and lighting) are not shown and may be added subsequently.

    (including solar panels) and minor architectural features (including gutters

    (including ladders and handrails), mechanical plant, utilities infrastructure

    (including aerials and satellites), access structures and safety measures

    4. External projections including telecommunications infrastructure

    3. All dimensions are indicated to a tolerance of 0.5m.

    locates the finished floor level of all buildings at +7.50m AOD.

    2. Platform level is defined as +7.30m AOD, an additional step of +0.20m

    AOD - Above Ordnance Datum

    FFL - Finished Floor Level 1. Definitions:

  • All Rights reserved. NNB GenCo Licence: 0100060408

    Majesty's Stationery Office © Crown copyright (2019).

    of Ordnance Survey on behalf of the controller of Her

    Reproduced from Ordnance Survey map with the permission

    NOTES:

    is to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

    Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawing

    DRAWING TITLE:

    DOCUMENT:

    DRAWING NO:

    DATE: DRAWN: SCALE:

    SCALE BAR:

    COPYRIGHT:

    c

    NOT PROTECTIVELY MARKED

    KEY:

    DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED CHECKED

    REVISION:

    PROJECT:

    SIZEWELL C

    4.11 Rainwater pipe and hopper

    4.10 Wall vents and hatches

    Retractable steel shutters4.9

    Barbed tape4.8

    Fencing4.7

    panels

    Mesh expanded metal 4.6

    Glass brise-soleil4.5

    Aluminium brise-soleil4.4

    Steel louvres4.3

    Aluminium louvres4.2

    and casings

    Aluminium trims, copings 4.1

    4 External wall features

    panel

    Opaque glazed spandrel 3.4

    Framed glazing3.3

    Frameless glazing3.2

    Glazed curtain wall3.1

    materials

    3 Glazing / transluscent

    panels

    Anodised Aluminium 2.9

    concrete panels

    Glassfibre reinforced 2.8

    Glass reinforced plastic2.7

    Fibre cement cladding2.6

    Flat steel panels2.5

    Profiled steel panels2.4

    Aluminium fins2.3

    Aluminium panels2.2

    Aluminium standing seam2.1

    2 Cladding

    Render finish1.3

    Pre-cast concrete1.2

    In-situ concrete1.1

    1 Concrete / render finishes

    Wall

    Vertical Enclosure

    Steel guardrail6.5

    ladders

    Metal stairs and 6.4

    Glazed balustrade6.3

    Cavity venetian blinds6.2

    External fabric blinds6.1

    accessories

    6 Window / metalwork

    Access gates5.4

    Glazed door5.3

    Metal louvre door5.2

    Metal door5.1

    5 Doors

    8.8 Steel Grid

    8.7 Roof Plant

    Timber decking8.6

    PVs and solar panels8.5

    Paving8.4

    and copings

    Metal cappings 8.3

    hatches

    Roof vents and 8.2

    Roof light8.1

    8 Roofing Accessories

    Concrete roof7.4

    Standing seam roof7.3

    Ballast7.2

    Sedum roof7.1

    7 Roofing

    Roof

    Horizontal Enclosure

    01 GAGA

    SIZEWELL C Site Key Plan - NTS

    DCO SUBMISSION SZC Co

    NOTES:

    FEB 20

    APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)

    TURBINE HALL

    MAIN TRANSFORMER

    SWITCH GEARGAS INSULATED

    UNIT TRANSFORMERTRANSFORMER AUXILIARY

    VOID

    VOID

    VOID

    36500

    ELECTRICAL BUILDING

    CONVENTIONAL ISLAND

    73200

    POWER TRANSMISSION PLATFORM

    1:200 @ A1EDH

    SCALE 1:200

    ROOF PLAN1

    1

    332

    7.3

    7.4

    7.4

    7.4

    7.4

    7.4

    7.4

    7.3

    7.47.4

    0 5 10 15m4 268m

    1:200

    SCALE IN METRES

    SZC-SZ0701-XX-000-DRW-100116

    FEB 2020

    FFL +15.20

    +22.70AOD

    100117 100117

    100117

    01

    FFL +12.00

    +19.50AOD

    FFL +12.00

    +19.50AOD

    FFL +12.00

    +19.50AOD

    FFL +44.20

    +51.70AOD

    FFL +16.15

    +23.65AOD

    FFL +12.50

    +20.00AOD

    ROOF PLAN

    / AUXILIARY TRANSFORMER

    MAIN TRANSFORMER / UNIT TRANSFORMER

    UNIT 2: GAS INSULATED SWITCH GEAR /

    MAIN DEVELOPMENT SITE

    .C Design and Access Statement for details.

    machinery which may protrude above stated roof height, see Sizewell

    4. An additional 5m may be required to account for roof plant and

    3. All dimensions are indicated to a tolerance of 0.5m.

    +0.20m locates the finished floor level of all buildings at +7.50m AOD.

    2. Platform level is defined as +7.30m AOD, an additional step of

    AOD - Above Ordnance Datum

    FFL - Finished Floor Level 1. Definitions:

  • All Rights reserved. NNB GenCo Licence: 0100060408

    Majesty's Stationery Office © Crown copyright (2019).

    of Ordnance Survey on behalf of the controller of Her

    Reproduced from Ordnance Survey map with the permission

    NOTES:

    is to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

    Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawing

    DRAWING TITLE:

    DOCUMENT:

    DRAWING NO:

    DATE: DRAWN: SCALE:

    SCALE BAR:

    COPYRIGHT:

    c

    NOT PROTECTIVELY MARKED

    KEY:

    DATE REVISION DRAWN REASONS FOR REVISION / COMMENTS APPROVED CHECKED

    REVISION:

    PROJECT:

    SIZEWELL C

    4.11 Rainwater pipe and hopper

    4.10 Wall vents and hatches

    Retractable steel shutters4.9

    Barbed tape4.8

    Fencing4.7

    panels

    Mesh expanded metal 4.6

    Glass brise-soleil4.5

    Aluminium brise-soleil4.4

    Steel louvres4.3

    Aluminium louvres4.2

    and casings

    Aluminium trims, copings 4.1

    4 External wall features

    panel

    Opaque glazed spandrel 3.4

    Framed glazing3.3

    Frameless glazing3.2

    Glazed curtain wall3.1

    materials

    3 Glazing / transluscent

    panels

    Anodised Aluminium 2.9

    concrete panels

    Glassfibre reinforced 2.8

    Glass reinforced plastic2.7

    Fibre cement cladding2.6

    Flat steel panels2.5

    Profiled steel panels2.4

    Aluminium fins2.3

    Aluminium panels2.2

    Aluminium standing seam2.1

    2 Cladding

    Render finish1.3

    Pre-cast concrete1.2

    In-situ concrete1.1

    1 Concrete / render finishes

    Wall

    Vertical Enclosure

    Steel guardrail6.5

    ladders

    Metal stairs and 6.4

    Glazed balustrade6.3

    Cavity venetian blinds6.2

    External fabric blinds6.1

    accessories

    6 Window / metalwork

    Access gates5.4

    Glazed door5.3

    Metal louvre door5.2

    Metal door5.1

    5 Doors

    8.8 Steel Grid

    8.7 Roof Plant

    Timber decking8.6

    PVs and solar panels8.5

    Paving8.4

    and copings

    Metal cappings 8.3

    hatches

    Roof vents and 8.2

    Roof light8.1

    8 Roofing Accessories

    Concrete roof7.4

    Standing seam roof7.3

    Ballast7.2

    Sedum roof7.1

    7 Roofing

    Roof

    Horizontal Enclosure

    01 GAGA

    SIZEWELL C Site Key Plan - NTS

    DCO SUBMISSION SZC Co

    NOTES:

    FEB 20

    APPLICATION DRAWING - FOR APPROVALREGULATION 5(2)(o)

    36550

    MAIN TRANSFORMER

    36550

    AUXILIARY TRANSFORMERUNIT TRANSFORMER UNIT TRANSFORMER

    1:200 @ A1EDH

    SCALE 1:200

    NORTH ELEVATION1

    +0.00FFL

    +7.50AOD

    1.1

    SCALE 1:200

    EAST ELEVATION2SCALE 1:200

    WEST ELEVATION3

    1.1

    1.1

    1.1

    4.74.7

    2

    11

    3

    23

    0 5 10 15m4 268m

    1:200

    SCALE IN METRES

    SZC-SZ0701-XX-000-DRW-100117

    FEB 2020

    1.1

    1.1

    1.1

    1.1

    1.11.1

    1.1

    5.1 5.1 5.4

    5.4 5.44.7

    +16.15FFL

    +23.65AOD

    +12.00FFL

    +19.50AOD

    MAIN TRANSFORMER UNIT TRANSFORMERGAS INSULATED SWITCH GEAR AUXILIARY TRANSFORMER

    SIZEWELL C Elevation Key Plan - NTS

    01

    +44.20FFL

    +51.70AOD

    +16.15FFL

    +23.65AOD

    -0.20FFL

    +7.30AOD

    +0.00FFL

    +7.50AOD

    +44.20FFL

    +51.70AOD

    +44.20FFL

    +51.70AOD

    +16.15FFL

    +23.65AOD

    +0.00FFL

    +7.50AOD

    ELEVATIONS

    / AUXILIARY TRANSFORMER

    MAIN TRANSFORMER / UNIT TRANSFORMER

    UNIT 2: GAS INSULATED SWITCH GEAR /

    MAIN DEVELOPMENT SITE

    and lighting) are not shown and may be added subsequently.

    (including solar panels) and minor architectural features (including gutters

    (including ladders and handrails), mechanical plant, utilities infrastructure

    (including aerials and satellites), access structures and safety measures

    4. External projections including telecommunications infrastructure

    3. All dimensions are indicated to a tolerance of 0.5m.

    locates the finished floor level of all buildings at +7.50m AOD.

    2. Platform level is defined as +7.30m AOD, an additional step of +0.20m

    AOD - Above Ordnance Datum

    FFL - Finished Floor Level 1. Definitions:

    POWER TRANSMISSION PLATFORM

    FINAL_SZC-SZ0701-XX-000-DRW-100109_HMFINAL_SZC-SZ0701-XX-000-DRW-100110_HMFINAL_SZC-SZ0701-XX-000-DRW-100113_HFFINAL_SZC-SZ0701-XX-000-DRW-100114_HFFINAL_SZC-SZ0701-XX-000-DRW-100115_HFFINAL_SZC-SZ0701-XX-000-DRW-100116_HTPFINAL_SZC-SZ0701-XX-000-DRW-100117_HTP