THE SEINE- SCHELDT PROJECT Design & Build Harelbeke ir. Ellen Maes, project engineer SMART Rivers 2011, 15th of September 2011
59

THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

Apr 13, 2018

Download

Documents

phamnguyet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

THE SEINE- SCHELDT PROJECT Design & Build Harelbeke

ir. Ellen Maes, project engineer SMART Rivers 2011, 15th of September 2011

Page 2: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

OVERVIEW

• Waterwegen en Zeekanaal NV

• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys

• Design & Build in Harelbeke

• Aims • Procedure

Page 3: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

OVERVIEW

• Waterwegen en Zeekanaal NV

• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys

• Design & Build in Harelbeke

• Aims • Procedure

Page 4: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

WATERWEGEN EN ZEEKANAAL NV

Flandres

Wallonia

Page 5: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

WATERWEGEN EN ZEEKANAAL NV

Page 6: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

WATERWEGEN EN ZEEKANAAL NV

Transport of goods over water

Water management & Safety against flooding

Multifunctionality of waterways

Page 7: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

OVERVIEW

• Waterwegen en Zeekanaal NV

• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys

• Design & Build in Harelbeke

• Aims • Procedure

Page 8: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

Seine bassin

Scheldt bassin

?

Page 9: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

EUROPEAN DECISIONS (1996- 2006)

Trans-European Network for Transport (TEN-T) • Realisation of missing links • 30 priority projects, including Seine-Scheldt

• France (VNF): new canal “Seine – Nord Europe” • Flandres (W&Z): navigability improvements

• ECMT class Vb (185m x 11.4m x 3.5m)

Page 10: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT France

Page 11: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock
Page 12: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

EUROPEAN FUNDING

• Multi-annual work program 2007-2013 • International cooperation Seine-Scheldt

• Intergovernmental Commission (IGC) • European Economic Interest Grouping (EEIG)

• 10% financial aid granted (= 460 mio EUR) • Canal Seine – Nord Europe (France) • Border Lys (France, Walloon and Flemish region) • Lys (45km) + canals (26km) in Ghent region (W&Z) • Scheldt + canal Condé-Pommeroeul (Wallonia)

Presenter
Presentation Notes
Flemish part: Ca. 420 mio EUR investment Ca. 42 mio EUR EU funding Total: Ca. 460 mio EUR EU funding
Page 13: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT Improving navigability

Design principles •1-way class Vb •2-way smaller vessels

Page 14: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT Water profile in the Lys river

• Water depth of 4.5m (now: Lys 3.5m)

• Maintaining the width at water level

=> Dredging necessary

Page 15: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT Improving navigability

Minimal lock dimensions 230m x 12.5m x 4.70m

Page 16: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT Bridges (8)

• Free height of 7.00m (over 35m width)

• Necessary for large parts or 3 layers of containers

Page 17: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT Embankments

• Mooring places (250-300m long) • 1-way traffic with communication through RIS/AIS • Waiting zone for large vessels to cross each other

• Ecological embankments • Quay walls

Page 18: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

OVERVIEW

• Waterwegen en Zeekanaal NV

• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys

• Design & Build in Harelbeke

• Aims • Procedure

Page 19: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT River restoration

Ecology Landscape Recreation

Page 20: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT Definition of River Restoration

“All measures to restore or reinforce the structure and processes which contribute to the dynamic balance in the river ecosystem”

•River ecosystem = river bed + meanders + embankments •Dynamic balance: a river is in constant evolution

• Erosion vs. sedimentation • Flooding vs. droughts

Page 21: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

HISTORY OF THE LYS

Extensive calibration

Page 22: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT River restoration (1)

• Reinforcing the dynamics in the ecosystem

Presenter
Presentation Notes
Parallel meanders become shallow zones where water vegetation can grow and fish can spawn Revalorisation of creeks and brooks Creation of wetlands in the winter bed of the river (+ allowing them to flood during winter times by lowering the dikes) Creation of ecological embankments (+ visualising them for the public by altering the road alongside) Connection and excavation of old meanders Creating green links with repect for the historical situation (not like trees along a canal)
Page 23: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT River restoration (2)

• Fish migratory routes around locks

Page 24: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT River restoration (3)

• Recreational routes with respect for heritage • Landscaping

Page 25: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

OVERVIEW

• Waterwegen en Zeekanaal NV

• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys

• Design & Build in Harelbeke

• Aims • Procedure

Page 26: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT Harelbeke

Page 27: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT IN HARELBEKE (1/3)

• Deepening of the Lys • New lock • New weir • Restoration of migratory

routes for fish • Heightening of

Kuurnebrug upstream (*) • New Hoge Brug

downstream • New waiting and mooring

places • Construction of

(ecological) embankments

(*) not part of D&B

Hoge brug

Kuurnebrug

Page 28: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT IN HARELBEKE (2/3)

• Dredging + protection against erosion

• Straightening of waterway downstream Hoge Brug

• New urban quay • New industrial quay Geldof

• Realisation of intake at Banmolens

• Renovation of hydraulic turbine Banmolens (*)

• Continuous service road on left bank (+ bridge over intake)

• Road works on right bank

(*) not part of D&B

Site Geldof

Banmolens Banmolens

Page 29: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SEINE- SCHELDT IN HARELBEKE (3/3)

• Spatial planning (without realisation): • Passage of the Lys at the

new lock & weir • Insertion of Marina

(Kuurne) • Impact assessment on

new urban quarter on left bank

• Overall spatial valorisation of the surroundings (o.o. Bloemmolens)

Bloemmolens

Urban development

Page 30: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

HARELBEKE: MAIN PROJECT ZONE

Page 31: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

EXISTING INFRASTRUCTURE (1/3)

• Banmolens • Industrial heritage • Reconversion project

• Lofts • Hydraulic turbine • Intake needed!

• Spatial cohesion • Fish migration?

Page 32: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

EXISTING INFRASTRUCTURE (2/3)

• Bloemmolens • Industrial site until

summer ‘09 • Acquisition by W&Z

to safeguard space for future lock and weir

• Possibility to transform into lofts?

Page 33: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

EXISTING INFRASTRUCTURE (3/3)

• Lock and weir

Page 34: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

NAVIGATIONAL DEMANDS

• Traffic prognosis versus lock capacity (1/2) Traffic prognosis Seine-Scheldt (million tonnes)

0

2

4

6

8

10

12

14

16

1997

1999

2001

2003

2005

2007

2009

2011

2013

2015

2017

2019

2021

2023

2025

traffic in the pastgrowth industrial production +1.37%container and waste traffic + new quay wallsproject induced trafficchange of route

Page 35: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

NAVIGATIONAL DEMANDS

• Traffic prognosis versus lock capacity (2/2)

Page 36: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

NAVIGATIONAL DEMANDS

• Lock geometry based on class Vb

Page 37: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

NAVIGATIONAL DEMANDS

• Mooring structures • Bollards in lock walls • Floating construction

• Continuity of

navigation during construction

Page 38: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

WATER MANAGEMENT

• Normal water management: • Upstream

10.18m TAW • Downstream

8.00m TAW • Hydrological data

T (year)

Q (m³/s)

H_up (m TAW)

H_dwn (m TAW)

1 145 10.05 8.94

2 165 10.05 9.12

5 174 10.05 9.28

10 180 10.05 9.40

25 190 10.08 9.56

50 199 10.28 9.69

100 208 10.46 9.84

500 240 10.86 10.20

MHW

Presenter
Presentation Notes
Opwaarts normaal peil NP = 10,18 mTAW maatgevend hoog water peil MHW = 10,86 mTAW maatgevend laag water peil MLW = 10,07 mTAW Afwaarts normaal peil NP = 8,00 mTAW maatgevend hoog water peil MHW = 10,20 mTAW maatgevend laag water peil MLW = 7,88 mTAW
Page 39: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

CONCEPTUAL PLANS

• Variant A

Page 40: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

CONCEPTUAL PLANS

• Variant C

Page 41: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

CONCEPTUAL PLANS

Variant A Variant C

Acquisitions needed Minimal to none Bloemmolens

By-pass weir Not necessary (temporarely) necess.

Techn. feasability To be investigated OK

Continuity navigation During construction OK

Navigability Optimal axis line Broken axis line

Bloemmolens Lofts in the future? Demolition needed

Variant A: best solution, but achievable? Variant C is achievable, but not as good…

Page 42: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

FISH MIGRATORY ROUTE

• By-pass new lock and weir • Restoration of river dynamics on meander • Integration of Banmolens / Bloemmolens?

Page 43: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

BRIDGES

Heightening Kuurnebrug (*) Rebuilding Hoge Brug

(*) not part of D&B

Page 44: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

KUURNEBRUG Palmbout: Opportunity to

improve road situation

Page 45: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

HOGE BRUG

Page 46: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SPATIAL VISION (1/3)

Page 47: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SPATIAL VISION (2/3) Masterplan Palmbout

Page 48: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

SPATIAL VISION (3/3)

Masterplan Palmbout

Page 49: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

PROJECT ZONE DOWNSTREAM

• Straightening the curve • Urban quay widening • Industrial quay Geldof

Page 50: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

STRAIGHTENING THE CURVE

Min. 35m Max. 42.75m

Ca. 8m

Page 51: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

INDUSTRIAL QUAY GELDOF

• Continuity of Geldofs activities • Straightening the curve implies building

a new quay wall downstream • Acquisition planned nearby

Page 52: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

EXPLOITATION & MAINTENANCE REQUIREMENTS

• Life Cycle Management “keep the Whole Life Cycle Cost to a minimum”

• Avoid calamities • Renewable energy sources • Accessibility of the (construction) site

Page 53: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

CONCLUSION OF PRELIMINARY STUDY

• The construction of a new lock and weir at Harelbeke is one of the main challenges for the international Seine-Scheldt project

• There are many conflicting goals that need to be reconciled

• An integrated project, by means of a Design & Build procedure is launched, based on two variants

Page 54: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

OVERVIEW

• Waterwegen en Zeekanaal NV

• Seine-Scheldt an inland navigation project on a European scale… … with respect for the natural river Lys

• Design & Build in Harelbeke

• Aims • Procedure

Page 55: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

DESIGN & BUILD PROCEDURE

Phase 1: 7 candidates • 31/05/2011 – 25/10/2011 • Conceptual plans to be provided

Phase 2: 3 candidates • 20/01/2012 – 19/06/2012 • Detailled design to be provided

Phase 3: 3 candidates • 01/10/2012 – 30/10/2012 • Price to be offered for approved tender from phase 2

Page 56: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

D&B AND DURABILITY (1/2)

• Lack of M(aintenance) in procedure • How to obtain durability?

• Reduce maintenance costs • Reduce exploitation costs • Use sustainable forms of energy • Minimize downtime of the structure • Maximize comfort for navigation • Avoid calamities • Take the necessary safety measures • …

Page 57: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

D&B AND DURABILITY (2/2)

Criteria for ranking tenders Points

Total cost 40

Technical quality 20

Nautic and hydraulic quality 15

Life span, exploitation and maintenance cost 10

Spatial quality 5

Nuisance control 5

Planning 5

TOTAL 100

Page 58: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

CONCLUSION

• Complexity of the project • Close deadline (2016)

D&B procedure

• Lack of maintenance part in procedure Attention to durability Life Cycle Management

Page 59: THE SEINE- SCHELDT PROJECT - Cloud Object Storage · • Renovation of hydraulic turbine Banmolens (*) • Continuous service road on left bank (+ bridge ... • Bollards in lock

Any questions?

More information: www.seineschelde.be