National Poverty Policy Week 2013 Presented by: Gissima Nyamo-Hanga Rural Energy Agency P.O. BOX 7990 Dar es Salaam Email: [email protected] Website: www.rea.go.tz THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION
22

THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

Feb 06, 2016

Download

Documents

janet

THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION. National Poverty Policy Week 2013 Presented by: Gissima Nyamo-Hanga Rural Energy Agency P.O. BOX 7990 Dar es Salaam Email: [email protected] Website: www.rea.go.tz 25 th November, 2013. Contents. Introduction - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

National Poverty Policy Week 2013Presented by:

Gissima Nyamo-Hanga

Rural Energy Agency

P.O. BOX 7990

Dar es SalaamEmail: [email protected] Website: www.rea.go.tz 25th November, 2013.

THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

Page 2: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

1. Introduction

2. Initiatives in the Energy Sector

3. Legal and Regulatory Frameworks

4. Access Rate: Energy

5. Power Generation

6. Power Transmission

7. Power Distribution

8. Rural Energya) Rural Electrification through Grid Extension b) Rural Electrification through Off-Grid Initiatives

9. The Future

10. Rural Electrification’s Contribution to Poverty Reduction 04/22/232

Contents

Page 3: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

1. IntroductionRural Energy Agency:

• Government Institution, Autonomous: • Rural Energy Act No. 8 of 2005

• Rural Energy Board (REB);• Rural Energy Fund (REF);

• Oversee matters related to:• Rural Energy in Mainland Tanzania through:

• Promotion and Facilitation;• Training and Capacity Building;• Technical Assistance• Provision of Grants:

• Matching, Performance and Green Generation Grants;• Long Term Financing and a Credit Line arrangement.3

Page 4: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

2. Initiatives in the Energy SectorInitiatives :

• Power System Master Plan (PSMP);• Big Results Now (BRN);• Power Africa;• Rural Energy Master Plan;• Scaling-up of Renewable Energy Programme (SREP);• Second Compact of the Millennium Challenge

Corporation;• Annual Joint Energy Sector Reviews (JESR);• National Energy Policy Review;• Formulation of the Natural Gas Policy;• Investment Prospectus (REA).

4

Page 5: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

• Some of guiding legal instruments:• National Energy Policy of 2003;• Energy and Water Utilities Regulatory Authority No. 11 of 2001 (Cap. 414);

• Environmental Management Act No. 20 of 2004 (Cap. 191);

• Rural Energy Act No. 8 of 2005;• Petroleum Act No. 4 of 2008;• Electricity Act No. 10 of 2008 (Cap. 131);

04/22/235

3. Legal and Regulatory Frameworks

Page 6: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

4. Access Rate: Energy• Access Rate:

• 2008: 10%• 2013: 21%• 2015: 30%• 2025: 75%

•Installed capacity: 1501.24 MW;

•Maximum Demand: 851 MW; •Customer base: 1,102,475• Per Capita Power Consumption: 100 kWh

6

Page 7: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

5. Power Generation• Generation:

• Hydro: 561.84MW (39%)• Thermal: 939.4MW (61%)

• Natural Gas (501MW); HFO/Diesel - 375.4MW

• Installed capacity: 1501.24 MW;

•Maximum Demand: 851 MW; Customer base: 1,102,475

• Access Rate:• 2008: 10%• 2013: 21%• 2015: 30%• 2025: 75%7

Page 8: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

5.1. Grid Installed CapacitiesSTATION NO. OF UNITS INSTALLED CAPACITY MW

KIDATU 4 204.0KIHANSI 3 180.0MTERA 2 80.0

N/P FALLS 2 68.0

HALE 2 21.0

NYUMBA YA MUNGU 2 8.0

UWEMBA 3 0.8

TOTAL HYDRO   561.8IMPORT FROM SONGAS UGT1_UGT 6 189.0

UGP1 12 102.0

TGP 5 45.0

*SYMB UB GP 2 60.0UGP2 UGT1_UGT 3 105.0

TOTAL GAS PLANTS   501.0

IMPORT FROM IPTL 10 103.00

DIESELS (TANESCO) 3 7.40

AGR (UB) 63 50.00

AGR (TG) 63 50.00

**SYMB UB JET A 3 60.00

SYMB (ARU) 64 50.00

MWANZA 1 60

SYMB (DOM) 73 55.00

TOTAL OTHER FOSSIL (HFO/G.O/DIESEL)   435.40

SYSTEM TOTAL   1,501.24

8

Page 9: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

YEAR Project Addition

Type MW

2014 Singida Geo Wind Wind 50

2014 Kinyerezi I Gas 150

2015 Kinyerezi III & IV Gas 900

2015 Kilwa Energy Phase I Gas 210

2016 Kinyerezi II Gas 240

9

5.2. Short Term Generation Plans

Page 10: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

6. Power Transmission

• Current Transmission System:• Comprised of 4,869.96 km of:

• 220kV - 2,861.36km• 132kV – 1528 km• 66kV - 546 km

• Planned Transmission System:• Comprised of 4,869.96 km of:

• 132 kV – 366 km• 220kV – 993 km• 300kV – 1000 km (DC)• 400kV - 2249 km

10

Page 11: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

6.1. Transmission Expansion Plan

11

Page 12: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

7. Power Distribution

• Distribution System is Comprised of 53,655 km of power lines:• 33kV : 14,141km • 1kV : 6,392 km• 400/230kV : 34,157km• Connecting over 1,102,475 customers

• This component benefit from rural electrification interventions of the Rural Energy Agency (REA):• Rural Electrification Projects• Off-Grid Renewable Energy Projects

12

Page 13: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

8. Rural Energy• Mainland Tanzania: Mandated to REA;

• Governed by the Rural Energy Act No. 8 of 2005;

• Consists of:• Grid extension based rural electrification;• Off-Grid based energy services and solutions

13

Page 14: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

8.1. Grid Extension Based Rural Electrification

• Grid Extension (Pilot Phase): (completed)

• 39 Sub-projects: Major ones are:• District Headquarters: Kilolo, Bahi, Uyui, Kilindi and

Mkinga, Kasulu, Kibondo, Nkasi, Ngorongoro and Rorya;• Active Commercial Centers: Matema Beach, Mto wa Mbu,

Oswald Mang’ombe, Ngage A & B.

14

Page 15: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

8.1. Grid Extension Based Rural Electrification

• Grid Densification: (Underline Transformers)

• 81 Villages• 90,000 initial connections

•Turnkey Projects• Phase I: 16 Regions: 22,000 initial connections (completion

stage)• Phase II: 25 Regions: 250,000 initial connections (starting

stage) • 13 New District Headquarters• Buhigwe, Busega, Chemba, Itilima, Kakonko, Kalambo,

Kyerwa, Mkalama, Mlele, Momba, Namtumbo, Nyasa, and Uvinza

15

Page 16: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

8.1. Grid Extension Based Rural Electrification

• Low Cost Design Project: • Kilombero: 14 villages: 2,048 initial connections• Mbozi: 9 villages: 578 initial connections.

•Backbone Transmission Investment Project (BTIP)

• 647 km, 400 KV Line;• 51 Villages

• Makambako Songea Project • 320 km, 132 KV Line;• 81 Villages• Provide T-Offs Lines to Mbinga, Namtumbo and Ludewa.16

Page 17: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

8.2. Off-Grid Based Energy Services and Solutions

• Small Hydropower based solutions:• 450 MW potential available;• 100 MW identified for studies;• 30 MW currently under study;• Mwenga (4 MW), Mawengi (300 KW) are operating;• Mapembasi (10 MW), Andoya (1 MW), Yovi (0.95 MW), Tulila (6.5 MW),

Kiwira II (6.5 MW) are prospective candidates.

• Solar PV:• Prospective Farms: 5 MW (Kigoma);• SSMP1, SSMP2, LRTC2010, LRTC2012;• Demo Systems in Schools and Health Facilities: REA Capacity Building and

Training Programmes.

17

Page 18: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

8.2. Off-Grid Based Energy Services and Solutions

• Biomass:• Gasification: Manyata Village Kongwa Dodoma• Biogas: In schools (Kibaha, Kwimba, Ngudu, Kahama and Kibondo); Prisons

(Namajani –Songea);• Charcoal and Wood fuel Briquettes: Training for Youth and Women Groups in

Kilosa, Mkuranga, Bagamoyo, Mtwara, and Lindi. Private Sector Based Capacity Building, Market Promotion: ARTI Tanzania, BEDOKO, Kiwia and Lausten, ENVOTEC, M&R Appro. Technologies.

• Wind Energy:• Training and Capacity Building to rural entrepreneurs;• Demo installations in Schools and Health Facilities (Wama Nakayama

Secondary School);• Site Assessments for large scale systems: Tendered

18

Page 19: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

9. The Future

• The future of the energy sector in Tanzania will be influenced by a number of factors; perhaps the major ones being:

• Shift in generation mix: Natural Gas and Renewables;• Increased private investment;• Growth in demand due industrial, agricultural,

population and urbanization growth;• More regulated power industry;• Regional integrations: East Africa, SADC, Nile Basin

Initiative, etc.;• New Governance models and structures.

19

Page 20: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

10. How is Rural Electrification Contributing to Poverty Reduction?

04/22/2320

Milling & Hulling, Welding & Carpentry, Electrifying Households, Water Pumping, Communication, Education & Skills Development, ….

Page 21: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

10. How is Rural Electrification Contributing to Poverty Reduction?

• Social Services: (Outcome: Health, Informed and Skilled Workforce)

• Education (Secondary & Primary Schools, Colleges)• Health Facilities (Dispensaries & Health Centres)• Water Pumping, Electrified Households• Communication (Information, Internet Based Information,

Financial Transactions: M-&Tigo PESA, Airtel-Money)

• Productive Use: (Outcome: Improved Livelihoods)

• Welding & Carpentry Workshops;• Agro-processing (Milling & Hulling, Freezing & Drying, Packing);• Business: Restaurants, Hotels & Lodges, I-Cafes, Stationary, Printing,

etc.•Indirect Outcomes: Reduced rural urban migration, retention of extension workers

• Impact: Poverty Reduction and Overall Economic Growth21

Page 22: THE ROLE OF RURAL ELECTRIFICATION IN POVERTY REDUCTION

THANK YOUFOR LISTENING

04/22/2322