The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR
24

The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Jan 18, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

The Road(map) AheadTREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS

ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR

Page 2: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Roadmap Principles

•Dispatchable Location

•Open, Transparent Testing

•Better Lat/Long, Standard Confidence

•Enforceable Metrics and Fallbacks

Page 3: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

What Isn’t Changing

•Latitude / Longitude / Uncertainty

•ALI Formats

•MSAG / LVF Validation of Addresses

•Best estimate available from network

3

Page 4: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Dispatchable Location

+38.806 -077.058 U=50 C=90%

↓1700 Diagonal Rd Ste 500

Alexandria VA 22314

Page 5: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Dispatchable Location Defined

“A location…that consists of the street address of the calling party, plus… suite, apartment or similar information … .”

WPH2

1700 DIAGONAL ROAD

SUITE 500

ALEXANDRIA VA

5

Page 6: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

6

Beacon Addresses

MSAG(Valid/Invalid)

National Emergency

Address Database

Validated Addresses Only

evolvedServingMobile

LocationCenter (eSMLC)

Beacon Entry Time

MAC/UUID(From Phone)

AutomaticLocation

Identification(ALI)

PSAP Call Taking Display

Call Time

Page 7: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Corroboration

7

Page 8: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Timeline

8

11/17/2014 11/17/20171/15 4/15 7/15 10/15 1/16 4/16 7/16 10/16 1/17 4/17 7/17 10/17

8/15Dispatchable Location Demo

5/16 - 11/16New WHP Products Support DL2/15

Working Groups Established

11/17National Emergency Address Database Online

11/15 - 5/16Standards Work Completed

(Range)

Page 9: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

DL Tech

9

WiFi MAC Address

04:0A:1A:66:BF:F1

Bluetooth LE UUID123e4567-e89b-12d3-a456-

426655440000

Page 10: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

DL Roll Out

←Post-Standards Deployment of new VoLTE Handsets

• Network-wide support at standards + 24 months

• Delivery to ALI providers at standards + 48 months

10

18-24 mo, 25%

24-30 mo25%

30-36 mo50%

Sales

Page 11: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Lat/Lon Tech

11

Page 12: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

A-GNSS

12

Page 13: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

O-TDOA

13

Page 14: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Improving L/Lo Tech

•Carriers will deploy O-TDOA ,A-GNSS, and hybrid network-wide.

•New VoLTE phones will support both.

•Carriers crowd-sourced WiFi & Bluetooth X/Y in ~36 months.

14

24 mo, 50%

36 mo25%

48 mo25%

Sales

Page 15: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

15

reported position

uconfidence=63%

true position

Uncertainty “u” is proportional to the confidence factor “c”.

o The smaller the confidence percentage, the shorter the uncertainty distance.

o The larger the confidence percentage, the longer the uncertainty distance.

uconfidence=95%

Position determining

system is 95% confident that true

position falls within this circle

Position determining

system is 63% confident that true

position falls within this circle

Standard Confidence

Page 16: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Test Bed

•Permanent test-bed for DL & X/Y/Z

•Objective, Transparent, Open, & Public-Safety Inclusive

•Representative of all morphologies(Dense Urban, Urban, Suburban, Rural)

16

Page 17: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Test Bed

•Quantify the “art of the possible.”

•Characterize the performance of technologies.

•Provide “compliant fractions” to assess live-call data.

17

Page 18: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Test Bed

•Two Locations:◦San Francisco◦Atlanta

•Provides a mix of construction types, structure density, and topology.

18

Page 19: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Performance Metrics

6 “Monitored Markets”19

Page 20: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Performance Measurement

• Aggregated monthly, reported quarterly.

• Fraction of fixes by technology.

• PSAPs can get positioning source data!

• 9-1-1 Authorities must work with carriers to resolve performance issues before seeking FCC enforcement actions.

20

Page 21: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Performance Requirements

DL or ≤ 50m Technology for:◦40% of all wireless 9-1-1 calls within 2 years

◦50% “ “ “ “ “ “ “ 3 years

◦70% “ “ “ “ “ “ “ 5 years

◦80% “ “ “ “ “ “ “ 6 years21

Page 22: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Vertical Information

22

Page 23: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Vertical Location Information

•Within 6 years, carriers must, for each of the top 25 Cellular Market Areas (by population) deploy either:◦ 1 DL reference point for every 4 residents; or

◦ Z-Axis technology covering at least 80% of the population.

23

Page 24: The Road(map) Ahead TREY FORGETY – NENA DIRECTOR OF GOVERNMENT AFFAIRS ROGER HIXSON – NENA TECHNICAL ISSUES DIRECTOR.

Formal Evaluation

•NENA and APCO continuously evaluate carrier performance and adherence to timelines.

•Reasonable variations (e.g., standards development cycles) are expected, but will be monitored.

•At 36 months, a major assessment will determine whether the development and deployment of Dispatchable Location technology is “on track.”

•If not, carriers must supplement DL with Lat/Lon and Altitude technologies.

24