The Race. FINISH. The Green team won by 1 mile!. FINISH. Currently the Red team management is having a new boat designed; and to demostrate fiscal and HR dexterity for stockholders they also outsourced the rowing to India. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Race
Page 2: The Race

Once upon a time there was a Red rowing team.

Page 3: The Race

This Red team agreed to hold an annual rowing race with a Green team. Each team would contain 8 men.

Page 4: The Race

Both teams worked really hard to get in the best shape. On the day of the fi rst race, both teams were ready to win.

Page 5: The Race

FINISHFINISH

The Green team won by 1 mile!

Page 6: The Race

The Red team was crushed in their defeat, but they were determined to win the race next year. So they established a panel of auditors to observe the situation and ascertain if there were any diff erences

between the teams.

Page 7: The Race

Af ter several weeks of detailed intelligence gathering, the auditors could fi nd only one diff erence; the Green team had 7 rowers and 1

captain...

Page 8: The Race
Page 9: The Race

… and the Red team had 7 captains and 1 rower!

Page 10: The Race
Page 11: The Race

Un-perplexed by the raw data, upper management showed unexpected wisdom: they hired a consulting company to analyze the data and suggest a

solution that would enable the Red team to win next year.

Page 12: The Race
Page 13: The Race

Af ter several months the consultants came to the conclusion that the ratio of captains to rowers was the problem in the Red team.

Based on this analysis a solution was proposed: the structure of the Red team has to be

changed!

Page 14: The Race

Like sharks getting the scent of reorganization blood, upper management wasted no time in restructuring the Red team into

4 Captains, led by 2 Managers, reporting to 1 Senior Director with a dotted line to the rower. Besides that, in a blaze of unrestricted inspiration, they suggested they might be inclined to improve the

rower’s working environment by a non-monetary reward and recognition scheme if there was improved perf ormance by the

rower.

Page 15: The Race
Page 16: The Race

FINISH

The next year, the Green team won by 2 miles.......

Page 17: The Race

The Red team upper management immediately fi red the rower based on his unsatisf actory perf ormance.

Page 18: The Race

A bonus was paid to the Captains, Directors, and Managers f or the strong leadership and motivation they showed during the preparation

phase and as an incentive f or them to find a better rower f or the next race.

Page 19: The Race

The consulting company prepared a new analysis of the restructuring activity, which showed that the strategy was good, the motivation was great, the restructuring

was executed correctly, but the tool used (which was not included in the original data) was sub-standard and had to

be improved.

Page 20: The Race

Currently the Red team management is having a new boat designed;

and to demostrate fiscal and HR dexterity for stockholders they also outsourced the rowing to India.