Top Banner
March 23 – 2015 VILLA LAZZARONI - ROME Lourens Vermaak Sales Manager Southern Africa Jinko Solar PTY LTD South Africa
37

THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Aug 19, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

THE PV GAME – ENEL ROUND TABLE March 23 – 2015 VILLA LAZZARONI - ROME

Lourens Vermaak

Sales Manager – Southern Africa

Jinko Solar PTY LTD

South Africa

Page 2: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Jinko Solar’s production Facility – Case Study on logistics

Source: DoE presentation: Round 4 preferred bidders

Page 3: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

South African Economy vs Logistics Industry

Government policies supports demand rather than Local Production. 20 years - Economy reliant on consumption expenditure. Demand-supply Imbalance. The business sector had to cope with:

Constant service tariffs rising Volatility in the financial markets Strikes / wage settlements. The abrupt cut in tariff protection following the 1994 election.

Highly transport intensive economic setup. Transport hungry country has a far higher landing cost. Less attractive environment in which to do business.

Page 4: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Logistics Industry – Infrastructure

470Billion Rand Industry that has: Total Railway network: 30 422km’s Track

20 101km’s Route Core Railway network: 12 801 km Proclaimed roads of approximately 535 000 km

366 872 km non-urban roads. +/-300 000 km gravel roads.

Eight commercial ports Durban/CPT/PE – Main Ports Airports Durban/CPT/Johannesburg

Page 5: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Total Logistics Cost

Fuel costs most significant and volatile cost driver – Total Cost. Crude oil prices coupled with Exchange Rate.

Page 6: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Fourth highest supply chain constraint.

Skills Shortage Breakdown

Page 7: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Industry status

Source: DoE presentation: Round 4 preferred bidders

Industry that has moved beyond survival mode to optimised mode where costs, inventories and lead times have been minimised.

Page 8: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Growth and Performance Influencers vs. Action Plan

Source: DoE presentation: Round 4 preferred bidders

Direct Impact on costing influenced by: Exchange Rate Inflation Rate Interest Rate

Macroeconomic influencers: Structure of the South African economy. Balance of payments Budget deficits

Performance influencers: Trends in South African supply chains Critical logistics enablers Transport efficiency Human Resource

Gov. & DTI’s action plan: National Development Plan, the Industrial Policy Action Plan and a number of

initiatives.

Page 9: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Jinko Solar production Facility

Page 10: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Global Company Overview

Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across the value chain Over 10 GW of modules deployed in the projects worldwide 23 sales offices, 13,000 employees worldwide Downstream business: 500 MW complete, to reach 800 MW by 2015 1,6 Bln in revenues, China Fortune 500 Company The 3rd largest crystalline module manufacturer globally

2nd in the Photon Module Test 4th in the PWC’s PV Sustainable Growth Index Tier 1 Global PV Company rated by Bloomberg Finance, 65 Banks

worldwide providing project financing for Jinko technology

Market Value

Silicone Module Cell Wafer Ingot EPC

Core Business

Company Overview

Industry Leader

Page 11: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Milestones

2013 2013

Jinko Solar Co., Ltd. established

Acquiring Sun Valley (cell & module manufacturer)

Operating the 1st fully automated PV module NPC production line in China

Successful IPO and listed in NYSE

German Office & USA Office Launched

Reaching 1 GW Capacity

Swiss & French & Italy Office launched Beijing Office launched

Sponsorship of Valencia C. F., San Francisco 49ers, Germany DFB stadium

2006 2007 2008 2009 2010 2011 2012

Reaching 3.2 GW Capacity

Chilean Office & 2nd Japan Office launched

Launching ingot manufacturing

Acquiring Sun Valley (cell & module manufacturer)

South Africa & Portugal Factory In operation

2014 2013

Page 12: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Bid Window 1 – Kathu Northern Cape

81MW PV Modules Module Type JKM-250P-60 324000 modules 12960 Pallets 589 Containers Inbound. Delivery window – February 2013 – October 2013 = 9months 66 Containers a month. From port to Site = 1078 km’s Total Km’s travelled = 1 270 000Km

Page 13: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Bid Window 1 – Linde, South Africa

40MW PV Modules Module Type JKM-290P-72 137950 modules 5518 Pallets 251 Containers Inbound. Delivery window – February 2013 – October 2013 = 9months 27 Containers a month. From port to Site = 780 km’s Total Km’s travelled = 391 560 Km

Page 14: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Bid Window 2 – Dreunberg, South Africa

75MW PV Modules Module Type JKM-295P-72 254250 modules 10170 Pallets 463 Containers Inbound. Delivery window – September 2013 – June 2014 = 9months 51 Containers a month. From port to Site = 920 km’s Total Km’s travelled = 851 920 Km

Page 15: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Bid Window 2 – Sishen, South Africa

95MW PV Modules Module Type JKM-295P-72 308475 modules 12339 Pallets 561 Containers Inbound. Delivery window – September 2013 – June 2014 = 9months 62 Containers a month. From port to Site = 1100 km’s Total Km’s travelled = 1 234 200 Km

Page 16: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Global Footprint

Headquartered in San Francisco (USA)

Ontario office (Canada)

Munich office (Germany)

Swiss Office European Warehouses

Bologna office (Italy)

Queensland Office (Australia)

Singapore office (APAC HQ)

India office

Thailand office

Tokyo & Osaka office (Japan)

Santiago office (Chile)

Sao Paolo office (Brazil)

South Africa factory

Portugal Factory

Beijing office (China)

Guangzhou office

Page 17: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Jinko Solar PTY LTD – South Africa

South Africa factory

Page 18: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Milestones

2013 2013 2012 2013 2014

• Jinko Solar PTY LTD Registered.

• First Production Equipment arrived Q4 2012

Final Production equipment arrived Q4 2013

Factory setup started Jan 2014 First Module produced April 2014

Page 19: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Company Profile

The only Tier 1 Solar Module Manufacturer in South Africa.

Capacity:

120MW Solar Module production Plant

245 local Employees.

Level 4 BBBEE contributor.

Listed on IDC’s preferred list of suppliers.

Local content offer of up 33%

Page 20: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Integrated Supply-Chain

Jinko Solar PTY LTD has a fully integrated supply-chain. End-to-End user integration.

PMC creates Job and

issues Job Card Customer

order received.

Procurement

Raw Material

Warehouse

FQC ProductionI

IPQC

FQC

Finished Goods/ Dispatch

End User

Page 21: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply-Chain: Raw Material Warehouse

Current Operation.

Fully Functional Rebate/Customs controlled Warehouse.

IQC done on all incoming products.

Average turn around time of 20min per container when receiving goods.

Minimum stock level of 3MW.

Total Capacity of 10MW per product line.

Full traceability throughout the complete product line.

100% FIFO compliant

ISO and TUV Certified

Page 22: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply-Chain: Raw Material Warehouse

Process Flow

Inbound/ Customs

Clearance

Receipt of Stock/IQC

Stock labelled/ stored – FiFo/BOE

Records updated

Inbound process flow

BOM Receipt

Picking Handover to production

Records updated

Outbound process flow

Page 23: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply-Chain - Factors to consider:

Rebate Application: Challenge:

Application Delays.

Possible issues: Duty payments or bonded Facility charges.

Solution: Allow Approximately 120 days for application process

Staff skills: Challenge:

Complex warehousing. Higher skilled staff required.

Possible Issue: Penalties and possible revoke of licence.

Solution: Training available through external parties. Inhouse-training program.

Page 24: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply-Chain: Production Facility

Current Operation

Three shift system, operating 24/7 - Daily production of +/- 0.325MW

4 x stringers with a total of 8 line output.

Line output of 600 cells per hour.

EL testing done at pre and post lamination.

Total of six Laminators laminating on average 83 modules per hour.

Fully automated framing table ensuring an output of a 100 modules per hour.

IV Flash done: 1000W/m² - 25 degree Celsius - AM=1.5

Page 25: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply-Chain: Production Process Flow

Pre-lamination

Lamination Post

Lamination Final QC

EL Test Pre/Post lamination

Outbound Finished Goods

Page 26: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply Chain: Quality Control

EMS- Electronic Management System

16 in-line quality control points in module workshop {IQC/IPQC(Pre/post Lam)/FQC/OQC/OBI}.

Precise data-recording & supervision for all the manufacturing QC points

Product Traceability Control Tracking card with unique barcodes tracing from module back to ingot Long term data accessibility

Page 27: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Production Facility - Factors to consider:

Staff Transport: Challenge:

Geographical position VS Skills availability.

Possible issues: High staff Transport transport cost.

Solution: Allow enough time for an in-depth recruitment process.

Page 28: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply Chain: Finished Goods warehouse

Current operation.

Fully Functional Finished Goods Warehouse.

Storage Capacity of 30Mwatt.

Loading Capacity of 12 x 40’’ containers per day.

Loading Capacity of 15 Super-Link Trucks per day.

ISO + TUV certified.

Ability to deliver first modules within 48 hours after receipt of release.

100% FIFO compliant.

Page 29: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply Chain: Finished Goods Warehouse

Process Flow

Receipt from Production + quality Check

Loading Container

Truck

Stored

Finalise Documents

Update Records

Update Records

OBI – Quality

Page 30: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Support Structure – Local Projects

Source: DoE presentation: Round 4 preferred bidders

Road Map – Renewable Program.

Page 31: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Product line

Packaging: • 25 unit per Pallet • 28 pallets per container • 40 pallets per Inter-link truck • 505Kg Per Pallet

Packaging: • 25 unit per Pallet • 22 pallets per container • 36 pallets per Inter-link truck • 708Kg Per Pallet

JKM295-310P-72 JKM245-265P-60

Page 32: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Project Supply Costing

Transport

Mode

Project Size

Module Type Transport Method

Total Transport cost

Project Savings in ZAR

12m CPT (R19000.00) 75MW JKM-295P-72

CPT Harbour direct to Site R 8 797 000 R 0

18mCPT (R21000.00) 75MW JKM-295P-72 CPT break-bulk to Site R 8 383 800 R 413 200

18mCPT (R21000.00) 75MW JKM-295P-72

Ex-works South African factory R 5 943 000 R 2 854 000

Transport to site: 75MW = 10170 Pallets

Containerized x 463 loads

Beak bulk x 283 loads

Page 33: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Supply Chain - Factors to consider:

Volume based Inventory: Challenge:

60 Cell pallets dimensions – 1.70mx1.1mx1.1m 72 Cells pallet dimensions – 2.0mx1.1mx1.1m

Possible issues: Storage, staff and transport costs.

Solution: Catered storage space/External storage.

Page 34: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Summary

Page 35: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

Summary:

Past economical setup – limited the success rate of the logistics Industry.

Globally competitiveness S.A. Industries. Government and DTI – Initiative – Increase production output. Change the underlying structure of the economy. Local Production allows supply chain integrations - Unlocking

transport efficiency. End-to-end visibility enables real time decision making. Local Production supports – Critical enablers. Skills development though exposure to international standards. Drives down total logistics cost - Build an economy – Better exchange

rate - Lower the demand – Increase sustainability.

Page 36: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

References:

CSIR – “State of logistics” – Survey for south Africa University of Stellenbosch – Department of logistics Jinko Solar PTY LTD – Management www.energy.org.za

Page 37: THE PV GAME ENEL ROUND TABLE - ESI-Africa.com · Global Company Overview Established in 2006, Listed in NYSE: May.2010 (NYSE: JKS) Vertically integrated with 2.5-3 GW capacity across

www.jinkosolar.com

Lourens Vermaak

Sales Manager – Southern Africa

[email protected]

Mobile: +2783 259 7613

Office: +27 21 534 3467