Top Banner
The Nuclear Power Development in China WEI Suo Senior Vice President State Nuclear Power Technology Corporation 2014.08
28

The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Apr 27, 2018

Download

Documents

vuongthu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

The Nuclear Power Development in ChinaWEI Suo

Senior Vice PresidentState Nuclear Power Technology Corporation

2014.08

Page 2: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

CONTENTS

1. Overview of Nuclear Power Development in China

2. Progress in the AP1000 Project

3. Progress in China’s follow-up AP1000 projects

4. Progress in China’s CAP1400 Project

5. Overview of SNPTC

1

Page 3: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Decided to develop nuclear

power

The end of last century

Overview of Nuclear Power Development in China

1970

1984

First self-developed and designed PWR unit started to be

constructed

Built a batch of NNP units based on the

technology introduced from France, Canada

and Russia

Via the design, construction and safely operation of the above NNP units, formed the route of nuclear power development based on PWR technology.

2

Page 4: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

78.40%

17.08%2.22% 2.30%

火电

水电

核电

其它

By July 2014, there are 20 NNP units in operation with total installed capability of 18 GW.

The nuclear power generation of the second quarter of 2014 is 29.386 GWH, approximately 2.22% of the total power generation.

In 20th August, one more unit was successfully first connected to grid. So far, there are 27 units under construction with total installed

capability of 29 GW.

Overview of Nuclear Power Development in China

Coal

Hydro

Nuclear

Others

3

Page 5: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

• The total installed capability will reach 58 GWBy 2020

• The total under construction capability will reach 30 GWBy 2020

Plan of nuclear power development

Overview of Nuclear Power Development in China

Currently, a number of sites have completed thetechnical preparation.

Prepared to start construction recently, to fulfillthe need of nuclear power development.

4

Page 6: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

The idea of Nuclear Power Development:To develop nuclear power efficiently on the basis of assured safety

A batch of AP1000 and CAP1400 NNP

units will be constructed

SFR, HTGR and

advanced nuclear

fule cycle technology

research

Joined the ITER project

Nuclear industrial system of thermal neutron reactors, fast neutron reactors and advanced nuclear fule cycle technology will be established gradually.

Overview of Nuclear Power Development in China

5

Page 7: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

CONTENTS

1. Overview of Nuclear Power Development in China

2. Progress in the AP1000 Project

3. Progress in China’s follow-up AP1000 projects

4. Progress in China’s CAP1400 Project

5. Overview of SNPTC

6

Page 8: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

To promote the nuclear power development in a safe and

efficient way, in 2006, China decided to introduce AP1000 from

the US to build two AP1000 units in Sanmen, Zhejiang and

Haiyang, Shandong respectively.

The Progress in the AP1000 Project

Geographical locations of Sanmen and Haiyang AP1000 Project

7

Page 9: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

2014.08

2008.04

Construction drawing is more than 99% completed.

Most of the key components of the NI have been installed completely.

The improved 2-inch lower thrust bearing plate test was completed last week. Westinghouse and EMD’s preliminary conclusion is that the test result is consistent to the expectation.

SM1

Sanmen Unit 1

The Progress in the AP1000 Project

8

Page 10: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

74 out of 226 turnover packages in NI have been turned over for testing.

The main control room has been put into service.

Main control room available

Dome Completed Key components set

Electrical system and I&C system test

Sanmen Unit 1

The Progress in the AP1000 Project

9

Page 11: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Planned to be connected to grid approximately at the end of 2015 respectively.

Sanmen Unit 1 Haiyang Unit 1

Planned to be connected to grid at the end of 2016.

Sanmen Unit 2 Haiyang Unit 2

Sanmen1-NI Haiyang1-NI

2014.08 2014.08

The Progress in the AP1000 Project

Sanmen2-NI Haiyang2-NI

10

Page 12: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

CONTENTS

1. Overview of Nuclear Power Development in China

2. Progress in the AP1000 Project

3. Progress in China’s follow-up AP1000 projects

4. Progress in China’s CAP1400 Project

5. Overview of SNPTC

11

Page 13: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Via the construction of the AP1000 supporting project

China has basically established the 3rd generation nuclear power industrial system.

Built up the complete equipment supplied chain.

Completed the standard design of localized AP1000.

Prepared for mass construction of the localized AP1000.

Progress in China’s follow-up AP1000 projects

12

Page 14: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

XudapuPhase 1

(2 Units)HaiyangPhase 2

(2 Units)

SanmenPhase 2

(2 Units)

LufengPhase 1

(2 Units)

Totally 8 units have been approved by the government, and will start construction recently.

Progress in China’s follow-up AP1000 projects

13

Page 15: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Taohuajiang in Hunan, Pengze in Jiangxi, Xianning in Hubei plan to build 6 units, and have completed the technical preparation of the site

HubeiXianning

JiangxiPengze

HunanTaohuajiang

Progress in China’s follow-up AP1000 projects

14

Page 16: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

CONTENTS

1. Overview of Nuclear Power Development in China

2. Progress in the AP1000 Project

3. Progress in China’s follow-up AP1000 projects

4. Progress in China’s CAP1400 Project

5. Overview of SNPTC

15

Page 17: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

The large-scaled advanced pressurized water reactor nuclear power plant

CAP1400 is one of the sixteen major programs listed in

China's plan for scientific and technological development.

The main goal is to develop large advanced PWR nuclear

power technology CAP1400 with independent intellectual

property and build the demonstration project.

Progress in China’s CAP1400 Project

16

Page 18: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Phase I

Phase IIPhase III

As the site of the CAP1400 demonstration project, Rongcheng in Shandong plans to build 6 units with 2 units in phase I.

Progress in China’s CAP1400 Project

17

Page 19: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

CAP1400 fully draws the accumulated

30-year experience of PWR

technology R&D, design, construction

and safely operation.

Absorbs the advanced technology of

AP1000 and the experience and

lessons learned from the first AP1000

units construction in the world.

Adopts nuclear safety margin

enhancement measures based on the

Fukushima nuclear accident.

Main technical indicators

CAP1400

CDF<10-6

Availability factor

>93%

Thermal Margin >15%

Thermal Power(Electric power)

4058MWth(1530MWe)

Response time 72 hours

Constructioncycle

48 months

Main technical characteristics of CAP1400

Progress in China’s CAP1400 Project

18

Page 20: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

The basic design was completed in 2011 and approved by the

government in Jan 2014.

Construction design has completed more than 67% and satisfied the

requirement of starting construction.

Design

Progress in China’s CAP1400 Project

19

Page 21: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Key tests supporting nuclear safety review and

design validation have basically completed, the

results of the experiments verifies the safety of

CAP1400.

ACME CERT Hydraulicsimulation

Flow introducedvibration

IVR

SG

TEST

Progress in China’s CAP1400 Project

20

Page 22: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Crane

SG

PZR

Turbine

Generator

MSR

RCP

RPVACCCMT

CV

The order contracts of 25 long cycle equipments out of 29 have been

signed.

Long cycle equipments

Progress in China’s CAP1400 Project

21

Page 23: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

The nuclear safety regulator of China

has basically finished the safety review

of CAP1400, it has fulfilled the technical

requirement for construction.

The site

Progress in China’s CAP1400 Project

Nuclear Island location

22

Page 24: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

CONTENTS

1. Overview of Nuclear Power Development in China

2. Progress in the AP1000 Project

3. Progress in China’s follow-up AP1000 projects

4. Progress in China’s CAP1400 Project

5. Overview of SNPTC

23

Page 25: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

The Task

Introducing the AP1000 3rd generation advanced nuclear power

technology.

Leading the PWR major project of CAP1400.

Forming China’s proprietary brand of nuclear power technology.

Overview of SNPTC

24

Page 26: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

The mission Spearhead nuclear power technology, develop clean energy and

mitigate global warming.

The vision Striving to build an innovative modern state-owned enterprise

boasting leading-edge core technology and representing national

nuclear capacity.

Overview of SNPTC

25

Page 27: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Technical professionals of SNPTC dominate more than 80%.

Attained the competence in nuclear power, normal power, equipment

and material.

Gained capability of R&D, design, construction,operation

management and full cycle service.

Nuclear power

Equipment Material

R &D

Design

ConstructionOperationmanagement

Full cycle service

Overview of SNPTC

Normal power

26

Page 28: The Nuclear Power Development in China - PBNC - 2014pbnc2014.org/plan_present/wei_The Nuclear Power Development in... · The Nuclear Power Development in China. WEI Suo. Senior Vice

Thank you!