REMEHA QUINTA PRO SELECTION, DESIGN AND INSTALLATION OF FLUE SYSTEMS High efficiency wall hung condensing boiler with ultra low NOx emission QUINTA PRO RANGE OUTPUTS QP30: 8.0 - 31.4 kW QP45: 8.0 - 43.0 kW QP65: 12.0 - 65.0 kW QP90: 14.1 - 89.5 kW QP115: 16.6 - 114.0 kW SEDBUK RATED (QP30, QP45, QP65) Selection, Design and Installation of Flue Systems The New Remeha Quinta Pro HIGH EFFICIENCY 110% NCV AT 40/30°C FULLY MODULATING BOILER CONTROL PREMIX BURNER CLEAN COMBUSTION ULTRA LOW NOx BREEAM EXCELLENT RECYCLABLE MATERIALS
28
Embed
The New Remeha Quinta Pro Selection, Design and ... · REMEHA QUINTA PRO SELECTION, DESIGN AND INSTALLATION OF FLUE SYSTEMS ... Selection, Design and Installation of Flue Systems
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
REM
EHA
QU
INTA
PR
O SELEC
TION
, DESIG
N A
ND
INSTA
LLATION
OF FLU
E SYSTEMS
High efficiency wall hung condensing boilerwith ultra low NOx emission
Quinta Pro Series flue optionsThe Quinta Pro series of boilers have fan assisted flues and are supplied as standard with a “concentric” flue outlet/air inlet which is used for room sealed operation or for open flue(room ventilated) applications. An optional twin pipe fitting is available for the room sealed“CLV” system.
The concentric system can be supplied for individual boilers for horizontal or verticalinstallation and because of the excess fan capacity of the boiler most flue lengths can be accommodated (depending on boiler model and actual route taken) which enables the installer to position the boiler almost anywhere in the building.
Open flue or room ventilated systems can be installed as individual or combined flues and should discharge vertically with the flue terminating in a optional tapered cone but c/w bird guard.
Care should be taken when siting the actual discharge point as a vapour plume will be visible
when the boiler is operating (max flue gas exit temperature will be less than 75°C) and it ispossible for water to drip to the ground from the terminal on horizontal installations whichcould turn to ice in freezing conditions.
RecommendationsRefer to latest relevant British Standards
(Ref BS 5440 - 2 : Specification for installation and maintenance of ventilation for gasappliances not exceeding 70kW) (1st, 2nd and 3rd family gases)
(Ref BS 5440 - 1 : Specification for installation of gas appliances to chimneys and formaintenance of chimneys not exceeding 70kW) (1st, 2nd and 3rd family gases)
(Ref BS 6644 : Specification for installation of gas-fired hot water boilers of rated inputsbetween 70kW to 1.8 kW)(net)( 2nd and 3rd family gases)
(Ref IGE/UP/10) Installation of flued gas appliances in industrial and commercial premises.
It is the responsibility of the installer to install the flue to comply with the current regulations and standards.
The data published in this leaflet is based on the latest information (at date of publication) and may be subject to revisions. Itshould be read in conjunction with the Quinta Pro Installation and Service Manual supplied with each boiler or available onrequest. We reserve the right to continuous development in both design and manufacture, therefore any changes to thetechnology or equipment employed may not be retrospective, nor may we be obliged to adjust earlier supplies accordingly. Fluecomponents are constructed from unpainted aluminium/steel. Flue Terminals are painted as detailed in terminal diagrams.Plume kit external components are aluminium or plastic and are painted black. All flue components are CE approved.
3
Quinta Pro Series Flue outlet / Air inlet detailsThe Quinta Pro Series boilers are supplied as standard with a Concentric Flue outlet / Airinlet connection which can be used for:
1. Room sealed operation using the concentric flue system (Flue within air duct)
2. Conventional/Open flue operation using single skin flue system connected to the innerconcentric connection with the air supply taken from the boiler house via the outerconcentric connection.
FLUE GAS
AIR IN
FLUE GAS
AIR IN
This shows the optional Twin pipe Flue outlet / Air inlet connection and is used for Room sealedoperation using the CLV flue system (air inlet and flue gas discharge from two pressure zones).
Using single skin, water and gas tight flue system with single skin air tight air inlet system.
4
Quinta Pro 30 and 45 - Room Sealed, 80/125mm Horizontal Concentric Flue Kit Option QP01
(For use when the boiler/s are mounted on and flued through a rear outside wall)Typical single boiler installation - can also be used for multiple boilers but each must have its own flue system at a min 530mm centres and never immediately above another.For two boilers only it is also possible to install the external terminal wall plates touchingeach other.
240mm
Sq.
4 x 5mm
Holes
204 Sq
Centre line of
Terminal 175mm
Clearance hole for
Terminal through
wall 130mm
Note:140mm diameter recess
15mm deep required from the
face of the inside wall face to
allow clearance for the bend
Cut Terminal on site
to suit wall thickness
Max 500mm
Min 150mm
Wall closure plate should be fitted
to terminal before passing
through hole in wall to ensure
correct positioning
Kit Parts – KT026 1 x Bend – MG87836 1 x Terminal – MG87980 2 x Wall plates – MG28926
HRS Room sealed terminal (80/125mm)
150-500
50mm insertion length
into mating socket
610
745
BS RAL
Colour 9016 / 7021
125 o/d
4 x 5mm
holes
204 Sq
240
Sq.
95
145
90° Boiler short bend (80/125)
80 o/d
110
Detail of the Horizontal 80/125mm Concentric Flue Kit Option QP01 (Part No KT026)
PLEASE NOTE: All dimensions are in mm.
5
250mm
Ad
ditio
nal com
ponen
ts
will
be
requir
ed
to s
uit s
ite
(w
ith
in
bo
iler
co
nstr
ain
ts)
Clearance hole for
Terminal through wall 130mm
188mm 240mm
Sq.
4 x 5mm
Holes
204 Sq
Max 500mm
Wall closure plate should be fitted to
terminal before passing through hole
in wall to ensure correct positioning
Kit Parts – KT027 1 x Bend – MG87843 1 x Terminal – MG87980 2 x Wall plates – MG28926
Quinta Pro 30 and 45 - Room Sealed, 80/125mm Horizontal Concentric Flue Kit Option QP02
(For use when the flue is discharged through a side wall left or right)
Typical single boiler installation - can also be used for multiple boilers but each must have itsown flue system and installed a Min of 530mm. centres horizontally and never immediatelyabove another. For two boilers only it is also possible to install the external terminal wallplates touching each other.
240
Sq.
158
80 o/d
208
50
188
90o
Bend (80/125) HRS Room sealed terminal (80/125mm)
150-500
610
745
125 o/d
4 x 5mm
holes
204 Sq
Detail of the 80/125mm Horizontal Concentric Flue Kit Option QP02 (Part No KT027)
PLEASE NOTE: All dimensions are in mm.
6
Kit Parts – KT031 1 x Vertical Terminal – MG87973 1 x Universal Roof seal Pack – VE001
QP30/45/65/90/115 =100mm
Weathering Slate
Suitable for flat or
pitched roof (60 o)
QP30/45 - 495mm
Additional components
required to suit site
details (within boiler
constraints)
rin
for fl
Additional components
required to suit site
details (within boiler
constraints)
Quinta Pro 30 and 45 - Room Sealed, 80/125mm Vertical Concentric Flue Kit Option QP03
(For use when the flue is discharged vertically through the roof)
Typical single boiler installation - can also be used for multiple boilers, but each must haveits own flue system and terminals separated a Min of 300mm if at the same height. Refer tothe relevant British Standard if this is not the case.
(57m
m)
10
RA
L -
9016
RA
L -
7021
(1364m
m)
(30
0m
m)
Dn80
Dn125
1
600mm X 500mm
Cut down to suit dia.
of Terminal in use
80m
m a
ppro
x
Can be cut down on site
to a minimum of 150mm
Retain the difference
between inner and outer
Cut down to suit dia.
of Terminal in use
Can be cut down on site
to a minimum of 150mm
Retain the difference
between inner and outer
Detail of the Vertical 80/125mm Concentric Flue Kit Option QP03 (Part No KT031)
Detail of Standard weathering plate for 100mm to 150mm flue (Part No VE001) flat or pitch roofs up to 60°
7
Quinta Pro 30 and 45 - 80/125mm Room Sealed Calculation data to determine max flue runs
(Calculation data based on flue products supplied by Remeha)
Maximum overall flue run Metres 20 16
Reduction Length for each 45° bend
Metres 1 1
Reduction Length for each 90° bend
Metres 2 2
Quinta Pro 3080/125mm
Quinta Pro 4580/125mm
80 o/d
125 o/d
'L'
50
80 o/d
125 o/d
110
14
5
95
80 o/d
125 i/d
80 o/d 50
20
8
188
80 o/d 50
131
111
90o
Bend
Part No MG87843
45o
Bend
Part No MG87842
90o
Boiler short bend
Part No MG87836
Cuttable length
Part No MG87818
Standard length (cannot be cut)
'L' = 1000mm Part No MG87812
'L' = 500mm Part No MG87811
'L' = 250mm Part No MG87810
60 ctrs
210
126 i/d
Wall bracket
Part No MG87863
115
Clamp band
Part No MG8765
(one supplied with
each component
except MG87836)
136 offset
158
100 m
in
500 m
ax
Re
tain
20
mm
diff.
Internal Seal (80mm)
Part No MG87181
80/125mm Concentric flue system Components for Room Sealed Operation
PLEASE NOTE: All dimensions are in mm.
8
Quinta Pro 30 and 45 - Room Sealed, 100mm Two zone CLV Flue Kit Option QP04
(For use when the air inlet is drawn from low level and flue outlet discharged vertically in a different pressure zone).
Typical single boiler installation - can also be used for multiple boilers, but each must haveits own flue system.
Please ensure that the overall route does not exceed the Max values.
Fall to boiler T<36m
Air
inlet
Fall from boiler
100 / 80mm Reducers to adapt
boiler to suit 100mm system
if required.
100mm Aluminium single wall
flue and air inlet system
Flue outlet
Quinta Pro 30/45 two pipe adaptor plate is
required to replace standard concentric fitting
Kit Parts – KT032 1 x Flue connection – S100250 2 x Flue adaptor 80/100 –
MG87127
1 x Flue terminal – PU001 1 x Air inlet – PU002
80mm
Two pipe adaptor
plate
100-80mm Reducer x2Air inlet Guard
Flue terminal
c/w bird guardOnly parts named are in the kit
additional 100mm single wall pipe
and bends, shown dotted will be
needed to suit site requirements
(overall length to be within boiler
constraints)
80mm
Detail of the 100mm Two Zone CLV Flue Kit Option QP04 (Part No KT032)
9
Quinta Pro 30 and 45 - Two zone 100mm Room Sealed Calculation data to determine max flue runs
For calculation data in regards to CLV (different pressure zones) installations please contact ourtechnical department.
100mm single wall aluminium flue system components
'L
'
101 i/d
100 o/d
Standard length
'L'= 1000mm Part No. MG87062
'L'= 500mm Part No. MG87061
'L'= 250mm Part No. MG86060
105
105
90o Bend
Part No. MG87113
45o Bend
Part No. MG87103
76
76
125
101 i/d
80 o/d
Reducer 80mm spigot to 100mm socket
Part No. MG87127
Must be used on the Q30/45 flue
connection to adapt to 100mm
system
Silicon seal ring
Part No. MG87186
50
Mountng Bracket
Part No. MG87193
8mm x 45mm
Screw thread
25-55 mm
Note:
2 x 45 bends will off
set to 71mm centres
101 i/d
95
30
20
Flue terminal c/w bird guard
Part No. PU001
Air Inlet guard
Part No. PU002
10
10
200
60
101 i/d
T
PLEASE NOTE: All dimensions are in mm.
10
Fall to boiler
100 / 80mm Reducer to adapt
boiler to suit 100mm system
100mm Aluminium single wall
flue system.
Flue outlet
Air from
plant room
600mm X 500mm
Cut down to suit dia.
of flue.
80m
mappox
T<Max 36m
Quinta Pro 30 and 45 - 100mm Conventional or Open Flue Systems
Typical single boiler installation - can also be used for multiple boilers with each boilerhaving its own flue system. Please ensure that the overall route does not exceed the maxvalues in table on page 11.
Detail of Standard weathering plate for 100mm to 150mm flue (Part No VE001) flat or pitch roofs up to 60°
11
'L'
101 i/d
100 o/d
Standard length
'L'= 1000mm Part No. MG87062
'L'= 500mm Part No. MG87061
'L'= 250mm Part No. MG86060
105
105
90o Bend
Part No. MG87113
45o Bend
Part No. MG87103
76
76
125
101 i/d
80 o/d
Reducer 80mm spigot to 100mm socket
Part No. MG87127
Must be used on the QP30/45 flue
connection to adapt to 100mm
system
Silicon seal ring
Part No. MG87186
50
Mountng Bracket
Part No. MG87193
8mm x 45mm
Screw thread
25-55 mm
Note:
2 x 45° bends will off
set to 71mm centres
101 i/d
95
30
20
Flue terminal c/w bird guard
Part No. PU001
Air Inlet guard
Part No. PU002
10
10
200
60
101 i/d
Top
Quinta Pro 30 and 45 - 100mm Conventional or Open Flue Systems
(As the Boiler is fan assisted it makes no difference if the run is horizontal or vertical but shouldterminate vertically as shown on page 10).
(Calculation data based on flue products supplied by Remeha).
Quinta Pro 30 100mm
Maximum overall flue run Metres 40 40
Reduction Length for each 45° bend
Metres 1.4 1.4
Reduction Length for each 90° bend
Metres 4.9 4.9
Quinta Pro 45 100mm
NOTE: Table shows max length of flue (using 100mm) — Greater distances can be achieved by using larger diameter flue - please refer to Remeha for further details.
PLEASE NOTE: All dimensions are in mm.
12
Quinta Pro 30
80/125mm 80/125mm
Maximum overall flue run Metres 37 23
Reduction Length for each Metres 1.96 1.96
Reduction Length for each Metres 2.25 2.25
Quinta Pro 45
45° bend
90° bend
QP05 Part No. KT00302 PMK-Horizontal Terminal Kit
1. PMK Wall terminal2. Boiler bend - not illustrated3. Wall plates4. 1000mm flue extension (80mm)5. Support bracket (80mm)6. 90° bend (80mm)7. Flue outlet (80mm)8. Bird guard
Note: The horizontal terminal unit must be installedwith the outlet pointing vertically upwards.External components are constructed of black PP (plastic).
1
3
3
5
5
6
7
8
4
Horzontial terminal kit installed
Remeha Quinta Pro 30 & 45 Plume Kits80/125mm Flue Kit Option QP05(Calculations based on products supplied by Remeha)
Core Drill Wall - 130mm Dia. Min
150
mm
N
ote:
Can
be
exte
nded
with
ext
ra p
arts
see
tabl
e.
Flue can be taken directly through rear
outside wall or discharged through a side wall left
or right, both must be within the constrains in the
table below.
Wall Depth - Max 500mm - Min 150mmTerminal inner and outer can be cut to suit.
Note1: 140mm diameter recess 15mm deep requiredfrom the face of the inside wall face to allow ifclearance for the bend.Note2: Both the air intake and flue outlettermination postions must comply withcurrent regulations and British Standards.
The table shows the maximum lengths allowed which includes both the internal concentric80/125mm and the external 80mm. The bend from the top of the boiler and the external 80mmbend have already been taken into account. Any bends used must be taken from the total using the table above, this applies to the internal 80/125mm and the external 80mm.The maximum horizontal run is 6metres.
80/125mm Plume Management details
80/125mm Plume Management Kits
13
PMK-HorizontalTerminal - not supplied as a separate component
Quinta Pro 30/45 Multi boiler Installation connected to a common header and riser in
Total 2 to 4 5 to 8 9 to 12 13 to 16 17 to 20
kW “D” Header and Riser diameter in mm
56 2 x QP30 115 110 110 115 115
84 3 x QP30 160 150 145 145 145
112 4 x QP30 185 175 170 170 170
80 2 x QP45 130 125 125 130 130
120 3 x QP45 180 170 165 165 165
160 4 x QP45 220 205 195 195 195
“ H” Height of riser in Metres
Quinta Pro 30 and 45 - Multi boiler Installation on a combined header
(For Conventional or Open Flue Systems).
Typical multi boiler installation with the flue combined into a single header and riser.
NOTE: Using 90° boiler connections into the header may result in larger headers and risers beingrequired. Other multi boiler flue combinations for the Quinta Pro 30/45 may be available to suitdifferent site conditions — for further information please consult our technical department —contact details can be found on our web site www.remeha.co.uk
15
30mm
D
Bellmouth
2 x D + 50mm
Opening in
duct 2 x D
Typical Duct entry Detail
Drain
80mm Boiler
connections
Quinta Pro 30 and 45 - Multi or Single boiler Installation on a Flue Dilution system
NOTE:Remeha Commercial are unable to offer a flue dilution system and recommends that theinstaller contacts a flue specialist to design and manufacture the system in accordance withthe requirements of the British Standards and to comply with the guidelines illustrated below.
Typical multi boiler installation for a flue dilution flue system showing the flue breaknecessary for all pre-mix boilers to prevent the dilution fan affecting the gas/air ratio controlsystem in the boiler.
Detail of the 100/150mm Horizontal Concentric Flue Kit Option QP06 (Part No KT206)
4 x 5mm
holes
204 Sq
150-500
800
600
HRS Room sealed terminal
100/150
50mm insertion length
into mating socket
90o Boiler Short bend
100/150
115
100 o/d
15
0
10
0
240
Sq.
BS RAL
Colour 9016 / 7021
150 o/d
Wall closure plate should be fitted
to terminal before passing
through hole in wall to ensure
correct positioning
Centre line of
Terminal 175mm
Clearance hole for
Terminal through wall 155mm
Note:170mm diameter recess
20mm deep required from the
face of the inside wall face to
allow clearance for the bend
4 x 5mm
Holes
204 Sq
240mmSq.
Cut Terminal on site
to suit wall thickness
Max 500mm
Min 150mm
Kit Parts – KT206 1 x Bend – MG87631 1 x Terminal – MG87990
2 x Wall plates – MG28927
16
Quinta Pro 65, 90 and 115 - Room Sealed, 100/150mm Horizontal Concentric Flue KitOption QP06
(For use when the boiler/s are mounted on and flued through the outside wall).
Typical single boiler installation - can also be used for multiple boilers but each must have itsown flue system. At a min 530mm centres and never immediately above another.
For two boilers only it is also possible to install the external terminal wall plates touchingeach other.
PLEASE NOTE: All dimensions are in mm.
17
260
Ad
ditio
na
l co
mp
on
en
ts
will
be
re
qu
ire
d to
su
it s
ite
(with
in b
oile
r constr
ain
ts
se
e t
ab
le o
n p
ag
e 1
9)
Clearance hole for
Terminal through wall 155mm
208 240mm
Sq.
4 x 5mm
Holes
204 Sq
Max 500mm
Wall closure plate must be fitted to
terminal before passing through hole
in wall to ensure correct positioning
Detail of the 100/150mm Horizontal Concentric Flue Kit Option QP07 (Part No KT034)
240
Sq.
BS RAL
Colour 9016
150 o/d
4 x 5mm
holes
204 Sq
150-500
800
600
HRS Room sealed terminal
100/150
50mm insertion length
into mating socket
90o Bend
100/150
228
50
100 o/d
208
Kit Parts – KT034 1 x Bend – MG87890 1 x Terminal – MG87990
2 x Wall plates – MG28927
mm
mm
Quinta Pro 65, 90 and 115 - Room Sealed, 100/150 Horizontal Concentric Flue KitOption QP07
(For use when the flue is discharged through a side wall left or right).
Typical single boiler installation - can also be used for multiple boilers but each must have its ownflue system and installed a minimum of 530mm. centres horizontally and never immediately aboveanother. For two boilers only it is also possible to install the external terminal wall plates touchingeach other.
PLEASE NOTE: All dimensions are in mm.
18
Kit Parts – KT038 1 x Vertical Terminal – MG87969 1 x Universal Roof Seal Pack – VE001
QP65/90/115 = 100mm
Weathering Slate
Suitable for flat or
pitched roof
QP65/90/115 - 615mm
Additional components
required to suit site
details (within boiler
constraints)
Quinta Pro 65, 90 and 115 - Room Sealed, 100/150mm Vertical Concentric Flue KitOption QP08
(For use when the flue is discharged vertically through the roof).
Typical single boiler installation - can also be used for multiple boilers but each musthave its own flue system and separated a Min of 300mm if at the same height.Refer to the relevant British Standard if this is not the case.
600 X 500
Cut down to suit dia.
of Terminal in use
80 a
ppro
x
VRS Room sealed terminal 100/150mm
(65)
10
RA
L -
9016
RA
L -
7021
(1735)
(58
0)
Dn100
Dn150
1
Can be cut down on site
to a minimum of 150mm
Retain the difference
between inner and outer
All dimensions in mm
Detail of the Vertical 100/150mm Concentric Flue Kit Option QP08 (Part No KT038)
19
Quinta Pro 65 100/150mm
Maximum overall flue run Metres 13 13
Reduction Length for each 45° bend
Metres 1 1
Reduction Length for each 90° bend
Metres 2 2
7
1
2
100 o/d
150 o/d
'L'
50
100 o/d
500
100 o/d 50
228
208
100 o/d 50
147
128
90° Bend
Part No MG87890
45° Bend
Part No MG87891
Cuttable length
Part No MG87886
Standard length
'L' = 1000mm Part No MG87883
'L' = 500mm Part No MG87882
'L' = 250mm Part No MG87881
60 cts
210
151 i/d
Wall bracket
Part No MG87915
115
Clamp band
Part No MG8765
(one supplied with
each component
except MG87631)
Silicon seal ring
(flue side)
Part No MG87186
148.5 o/d
150 Offset
115
150 i/d
100 o/d
90° Boiler short bend
Part No MG87631
(clamp band not required)
150
100
Quinta Pro 90 100/150mm
Quinta Pro 115 100/150mm
All dimensions are in mm
Quinta Pro 65, 90 and 115 - 100/150mm Room Sealed Calculation data to determine max flue runs.
(Calculation data based on flue products supplied by Remeha).
100/150mm Concentric flue system Components for Room Sealed Operation
20
Fall to boiler
Air inletFall from boiler
100mm Aluminium single wall
flue and air inlet system
Max length see boiler technical booklet
Flue outlet
Kit Parts – KT030 1 x Flue connection – S101626 1 x Flue terminal – PU001 1 x Air inlet – PU002
T< 36m
Quinta Pro 65, 90 and 115 - Room Sealed, 100mm Two zone CLV Flue Kit Option QP09
(For use when the air inlet is drawn from low level and flue outlet discharged vertically in a different pressure zone).
Typical single boiler installation - can also be used for multiple boilers, but each must haveits own flue system. Contact our technical department for details.
100mm Air inlet Guard
Flue terminal
c/w bird guardOnly parts named are in the kit
additional 100mm single wall pipe
and bends, shown dotted will be
needed to suit site requirements
(overall length to be within boiler
constraints)
100mm
Two pipe adaptor
plate
Detail of the 100mm Two Zone CLV Flue Kit Option QP09 (Part No KT030)
21
'L'
101 i/d
100 o/d
Standard length
'L'= 1000mm Part No. MG87062
'L'= 500mm Part No. MG87061
'L'= 250mm Part No. MG86060
105
105
90° Bend
Part No. MG87113
45° Bend
Part No. MG87103
76
76
125
101 i/d
80 o/d
Reducer 80 spigot to 100 socket
Part No. MG87127
Must be used on the QP30/45 flue
connection to adapt to 100mm
system
Silicon seal ring
Part No. MG87186
50
Mountng Bracket
Part No. MG87193
8mm x 45mm
Screw thread
25-55 mm
Note:
2 x 45° bends will off
set to 71mm centres
101 i/d
95
30
20
Flue terminal c/w bird guard
Part No. PU001
Air Inlet guard
Part No. PU002
10
10
20
060
101 i/d
Top
All dimensions are in mm
Quinta Pro 65, 90 and 115 - Two Zone Room Sealed Calculation data to determine max flue runs
For calculation data in regards to CLV (different pressure zones) installations please contact ourtechnical department or refer to the installation and service manual.
100mm single wall aluminium flue system Components
22
Fall to boiler
100mm Aluminium single wall
flue system.
Flue outlet
Air from
plant room
Quinta Pro 65, 90 and 115 - 100mm Conventional or Open Flue Systems QP10
Typical single boiler installation - can also be used for multiple boilers with each boilerhaving its own flue system.
600mm X 500mm
Cut down to suit dia.
of Flue in use and seal
with silicone supplied
80 a
ppro
x
Detail of Standard weathering plate for 100mm to 150mm flue (Part No VE001)
23
Quinta Pro 65 100mm
Maximum overall flue run Metres 27 24
Reduction Length for each 45° bend
Metres 1.4 1.4
Reduction Length for each 90° bend
Metres 4.9 4.9
19
1.4
4.9
Quinta Pro 90 100mm
Quinta Pro 115 100mm
'L'
101 i/d
100 o/d
Standard length
'L'= 1000mm Part No. MG87062
'L'= 500mm Part No. MG87061
'L'= 250mm Part No. MG87060
105
105
90° Bend
Part No. MG87113
45° Bend
Part No. MG87103
76
76
125
101 i/d
80 o/d
Reducer 80mm spigot to 100mm socket
Part No. MG87127
Must be used on the QP30/45 flue
connection to adapt to 100mm
system
Silicon seal ring
Part No. MG87186
50
Mountng Bracket
Part No. MG87193
8mm x 45mm
Screw thread
25-55 mm
Note:
2 x 45° bends will off
set to 71mm centres
101 i/d
95
30
20
Flue terminal c/w bird guard
Part No. PU001
Air Inlet guard
Part No. PU002
10
10
200
60
101 i/d
Top
All dimensions are in mm
Quinta Pro 65, 90 and 115 - 100mm Conventional or Open Flue Systems
(As the Boiler is fan assisted it makes no difference if the run is horizontal or vertical but shouldterminate vertically as shown on page 22) (Calculation data based on flue products supplied byRemeha).
NOTE: Table shows max length of flue (using 100mm) — Greater distances can be achieved by usinglarger diameter flue – please refer to Remeha Commercial technical department for further details.
100mm single wall aluminium flue system Components
24
1. PMK Wall terminal 2. Boiler bend - not illustrated3. Wall plates4. 1000mm flue extension (100mm)5. Support bracket (100mm)6. 90° bend (100mm)7. Flue outlet (100mm)8. Bird guard
Note1: The horizontal terminal unit must be installedwith the outlet pointing vertically upwards.
1
3
3
5
5
6
7
8
4
Note2: The external components are constructed of black aluminium
PMK - Horizontal Terminal Kit Installed
Wall Depth - Max 500mm - Min 150mmTerminal inner and outer can be cut to suit.
Note1: 170mm diameter recess 15mm deep requiredfrom the face of the inside wall face to allowclearance for the bend.Note2: Both the air intake and flue outlettermination postions must comply withcurrent regulations and British Standards.
Core Drill Wall - 155mm Dia.
Min
150m
m
Note
: C
an b
e e
xte
nded w
ith e
xtr
a p
art
s
see t
able
.
Flue can be taken directly through rear outside wall
or discharged through a side wall left or right both
must be within the constrains in the table below.
Remeha Quinta Pro 65, 90 & 115 Plume Kits100/150mm Flue Kit Option QP11(Calculation based on products supplied by Remeha)
The table shows the maximum lengths allowed which includes both the internal concentric100/150mm and the external 100mm. The bend from the top of the boiler and the external100mm bend have already been taken into account. Any bends used must be taken from thetotal above, this also applies to both the 100/150mm internal and 100mm external flue.The maximum horizontal run is 6metres.
100/150mm Plume Management details
100/150mm Plume Management Kits
QP11 Part No. KT00303 (Rear and left or right exit)
PMK-Horizontal Terminal Kit
Quinta Pro 65 100/150mm
Maximum overall flue run Metres 20 17
Reduction Length for each 45° bend
Metres 1.2 1.2
Reduction Length for each 90° bend
Metres 2.8 2.8
11
1.2
2.8
Quinta Pro 90 100/150mm
Quinta Pro 115 100/150mm
25
PMK-HorizontalTerminal - not supplied as a separate component
kW Combination “D” Header and Riser diameter in mm
122 2 x QP65 155 145 145 145 150
183 3 x QP65 220 200 195 190 190
244 4 x QP65 265 240 230 225 225
168 2 x QP85 175 165 160 160 170
252 3 x QP85 250 225 215 215 210
336 4 x QP85 305 270 255 250 245
“H” Height of riser in Metres
214 2 x QP115 200 185 180 180 180
321 3 x QP115 285 255 240 235 235
428 4 x QP115 345 305 285 275 275
Quinta Pro 65, 90 and 115 - Multi boiler Installation on a combined header
(For Conventional or Open Flue Systems).
Typical multi boiler installation with the flue combined into a single header and riser.
Quinta Pro 65, 90 and 115 Multi boiler Installation connected to a common header and riser inSeries Open Flue
NOTE: Using 90° boiler connections into the header may result in larger headers and risers beingrequired. Other multi boiler flue combinations for the Quinta Pro 65, 90 and 115 may be available tosuit different site conditions — for further information please consult our technical department —contact details can be found on our web site www.remeha.co.uk
27
30mm
D
Bellmouth
2 x D + 50mm
Opening in
duct 2 x D
Typical Duct entry Detail
Drain
100 mm Boiler
connections
Quinta Pro 65, 90 and 115 – Multi or Single boiler Installation on a Flue Dilution system
NOTE:Remeha Commercial are unable to offer a flue dilution system and recommends that the installercontacts a flue specialist to design and manufacture the system in accordance with therequirements of the British Standards and to comply with the guidelines illustrated below.
Typical multi boiler installation for a flue dilution flue system showing the flue break necessary forall pre-mix boilers to prevent the dilution fan affecting the gas/air ratio control system in the boiler.
The data published in this technical sales leaflet is based on the latest information (at date of publication)and may be subject to revisions. It should be read in conjunction with our full technical brochure (availableon request). We reserve the right to continuous development in both design and manufacture, thereforeany changes to the technology or equipment employed may not be retrospective, nor may we be obligedto adjust earlier supplies accordingly. Issue 1 date: 01/03/11sj