Yucca Mountain Status• Draft EPA standards:
– 15 mrem/yr individual dose standard for up to 10,000 years– 350 mrem/yr individual dose standard for 10,000 - 1 million
years
• Waiting for new YM schedule due summer 2006– At least, 5 years till construction begins
• Change to use “clean” loading facility on site• Domenici Bill
– Permanent land withdrawal (147,000 acres)– Repeal 70,000 MT capacity limit– Allow DOE to undertake rail line construction
The Numbers
• Capacity of Yucca Mountain– Legislated: 70,000 MT
• 63,000 MT spent fuel
• 7,000 MT high-level waste from nuclear complex
• DOE’s estimate of capacity of YM– 119,000 MT maximum
• Assumes 105,000 MT spent fuel & 12,000 MT HLW
Projected HLW Amounts
• DOE High Level Waste– DOE estimate: 12,000
MT
– Includes spent nuclear fuel and vitrified high-level waste
• Civilian Spent Fuel– Current inventory
• ~52,000 MT by end of 2005
• Grows by ~2,000 MT annually
– If no license extensions, total ~80,000 MT
– If all ~100 reactors get license extensions, then would have ~120,000 MT
– New reactors - ?
Constraints on Yucca Repository Capacity
• Waste Itself– Volume– Heat (age, burn-up)– Radioactivity
• Geology of the Site– Distribution of faults/fractures
• 2 effects: mining ease and fast water pathways
– Volcanism– Water table
• Increases in elevation to N/NW
– Lithological variation• Repository unit thins to N/NE and WNW (must be >200m)• Presence of Lithophysae (need <15-20% lithophysae)
• Land ownership/Mineral rights
300 m
300 m
Tiva Canyon welded tuff
Paintbrush nonwelded tuff
Topopah Spring welded tuff
Calico Hills nonwelded tuff
Lower welded tuff units
Water Table
Repository Level
W E
Ghost Dance fault Bow Ridge fault zone
Solitario Canyon fault
Global Nuclear Energy Partnership Proposal
• Phase 1– Treat Spent fuel with UREX+ to separate materials
into different waste streams
• Phase 2– Use MOX fuel in LWRs (Pu+Np, Pu+Np+Am)
• Phase 3– Treat LWR spent fuel with UREX+– Transmute transuranics in fast reactors– Treat fast reactor fuel with pyroprocessing
UREX+ waste streams
• Uranium
• Technetium
• Cesium + Strontium
• Transuranics (Plutonium, Neptunium, Americium, Curium)
• Fission Products
Waste streams for 2,000 MT spent fuel input
No reprocess-
ing
PUREX UREX+ Pyroprocess
High-level waste
2,000 MT 490 MT glass
1,900 MT U+Tc
230 MT glass
490 MT ceramic
Intermediate-level waste
0 175 MT ? ?
Low-level waste
0 1,050 MT 2,560 MT 2,360 MT
Waste Streams with successful GNEP (complete fuel cycle)
• High-level waste– Glass- and ceramic-containing fission products– Technetium-99 - go to a repository in a suitable waste
form– Wastes in “storage” for 300 years [geologic storage?]
• Cesium-137/Strontium-90
• Low-level waste: large quantities• Other wastes?
– Raffinates with trace amounts of radionuclides– Spent radioactive solvents
Success with GNEP means
• UREX+ works at high efficiencies (not there yet)• LWRs are adapted for MOX use• Significant number of new LWRs built• Pyroprocessing works at high efficiencies (not
nearly there - not certain it will)• Fleet of fast reactors is built and operate
(unproven; these are paper reactors now)• = High risk endeavor
Impacts if fuel cycle is not completed
• It stops with Phase 1 (UREX+ only): Large Impact– Large increase in low-level waste (requires shallow
burial - but where?)– High-level waste : Tc, Cs/Sr, Pu+Np, other actinides,
fission products• Same heat and radioactivity as spent fuel
• More waste - now have to find a waste form for each of these streams
Impacts if fuel cycle is not completed
• It stops with Phase 2 (UREX+ MOX fuel)– Large increase in low-level waste– High-level waste streams
• Tc, Cs/Sr, other actinides, fission products• MOX spent fuel to dispose of - hotter than LWR spent
fuel - needs more repository space• Separated Pu to dispose of
– Probably would not be able to use all separated Pu in MOX fuel» National Academy estimated it would take 70% of US
reactors 30 years to irradiate 600 MT plutonium - that’s longer than the life of the reactors!
Do we need more repositories?
• Part of GNEP justification is to reduce waste volume to maximize Yucca Mt space to accommodate waste from new fleet of reactors– Few (1+) repositories if GNEP works perfectly; otherwise,
we’ll need more repositories– Will definitely need a number of low-level waste sites
• Part of justification is to accommodate new EPA standards which go out to 1 million years– >50,000 years, Tc-99 and Np-237 dominate dose– This is because Yucca provides an oxidizing environment
• If it were reducing, the Tc-99 especially would not be an issue - under reducing conditions, Tc-99 is insoluble and won’t move
What to do?
• The best solution to the problem of nuclear waste is geologic repositories– They provide lowest risk option for most protection
from radionuclides for longest time– Doesn’t depend on unproven technologies– Probably least costly– Multiple barrier concept: the waste form, the
engineered canister, the surrounding geology provides defense in depth
What to do? (2)
• First, decide whether Yucca Mt is a good enough site– Complex geology
– Very long standard
– Limited ability of performance assessment to evaluate the site
• Decide Yucca Mt by comparing to other investigated sites
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
What to do? (3)
• Even if Yucca okay, capacity there is limited by the geology
• If the US experiences an expansion in nuclear power, there will likely be a need for additional repositories
What to do? (4)
• There are plenty of good sites in the US - use IAEA criteria
• Long-term (millions of years) geologic stability - no seismicity or volcanism
• Low groundwater content and flow at repository depths - stable for tens of thousands of years
• Stable geochemical or hydrochemical conditions at depth, mainly described by a reducing environment
• Good engineering properties that readily allow construction of a repository
What to do? (5)
• Many decent sites in US, including East– BUT - Nuclear Waste Policy Act Amendments
of 1987 forbid study of crystalline rock - which underlies much of the eastern half of the US
• Process for selecting future repository sites must be perceived to be fair