THE LIVERPOOL PROJECT
THE LIVERPOOL PROJECT
WELLINGTON DOCK April 2012
WELLINGTON DOCK APRIL 2013
3D MODEL FLY THROUGH
PRIMARY/SAS SLUDGE PROCESSING
BUILDING
THICKENED SLUDGE BLENDING
TANKS
INTERCONNECTION CHAMBER
SAS BUFFER TANK
HI DIST
CHAMBER
LO DIST
CHAMBER
B
L
O
W
E
R
S
SBR 1
SBR 4
SBR 6
SBR 8
SBR 7
SBR 5
SBR 3
SBR 2
SBR 11
SBR 13
SBR 15
SBR 9
SBR 10
SBR 12
SBR 14
SBR 16
FINAL EFFLUENT CHAMBER
SBR PIPE & SERVICES GALLERY
SBR FEED PUMPING STATION
SCREENS &
SLUDGE TANK
PRIMARY DRUM THICKENER PUMP STN
UNSCREENED SLUDGE
TANK
PRIMARY BUFFER TANK
SAS TRANSFER PUMPING STATION
R
I
V
E
R
“By employing BIM, GCA have cultivated a collaborative working environment
throughout the supply chain ensuring that everyone is focussed on
achieving best value on the project to take it forward through it’s lifecycle”
Neil Colman – Engineering and Capital Delivery Director for United Utilities