The LBDS trigger and re- trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine
19

The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

Dec 13, 2015

Download

Documents

Ashley John Cox
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes

Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS)

A. Antoine

Page 2: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 2

Outline

• Definitions• LBDS Trigger Synchronization & Distribution• Trigger Synchronisation Unit• Re-trigger Unit• Power failure tests• Summary

Page 3: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 3

Definitions

• Fault tolerant:– Redundancy– Increasing availability and

productivity in case of a failure

• Fail-safe:– Safety functionalities– Known state in case of a

failure• Redundancy can be a part

of the Safety (SIL levels)

Fail-safe

Fault tolerant

Page 4: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 4

LBDS Trigger Synchronization & Distribution(Reminder)

Fault-tolerantFail-safe Re-trigger lines

A

B

A

B

Generator 1

… Generator 15

PTU

PTU

PTU

PTU

Power TriggerUnit

RTB

RTB

RTB

RTB

Re-trigger Box

RTB

TFOA

TFOB

Trigger Fan-out

Delay > 2 LHC Revolution

(2*89 s)

TSUA

TSUB

Client Interfaces

Frev

Trigger Synchronisation

Unit

Page 5: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 5

LBDS Trigger Synchronization & DistributionTSU - VME Crate

• CPU RIO 60xx• CTRV (2x)• Optical to Electrical converter• TSU & Interface – B • TSU & Interface – A• BLM board (Rear side)

+ BLM

INTERNALPOWER FAILURE

SOURCES

Page 6: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 6

Trigger Synchronization UnitMain Features

• Hardware– 2 VME TSU redundant boards– 2 VME signal interface boards– 1 VME backplane

• RF-signal recovery capability (DPLL)• Fault tolerant & Safe behaviour

(Redundancy + Sync. crosscheck)• Multiple Fail-safe Dump request client

detectors• Remote diagnostic (VME)• Injection Kicker AGK window

generation• Injection inhibit capability (BIS)

Page 7: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 7

Trigger Synchronization UnitBlock Diagram

Digital Phase Locked Loop

Dump Request Management

Beam revolution Frequency

Redundant TSU Communication

VME

Dump Request Client Interface

Digital Phase Locked Loop

Dump Request Management

Re-phasing

Beam Revolution Frequency

Redundant TSU Communication

VME

TFO-A

TSU-A

RBRF

TRGS

RBRF

TRGS

TSU-B

SBDT

TFO-B

SBDT

TFO-A

SBDT

TFO-B

SBDT

External Clients

External Clients

TriggerP

ulse

CurrentL

oop

FrequencyD

etector

Non-A

mbivalent

State R

elay

Non-A

mbivalent

State R

elay

Supervisory&

Diagnostic

Supervisory&

Diagnostic

CurrentL

oop

TriggerP

ulse

FrequencyD

etector

Re-phasingDump Request Client Interface

ABDT ABDT

DRBRFDRBRF

BRF BRF

Fail-safe

Page 8: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 8

TSU-A TSU-B Status Action Dump Type

OK OK All OK nothing Synchronous

OK FALSE TSU-B oscillator failure

TSU-A Dump immediatelyTSU-B disable its own dump

request Synchronous

FALSE OK TSU-A oscillator failure

TSU-B Dump immediatelyTSU-A disable its own dump

request Synchronous

FALSE FALSE Timing failureTSU-A & TSU-B dump

immediatly

SynchronousOr Asynchronous

Or Synchronous-Asynchronous

Trigger Synchronization UnitFail-safe

• Mainly Based on pulsed signals• Signals crosschecked used for failure detection:

– BRF (Beam revolution Frequency) – DRBRF (Delayed Recovered Beam Revolution Frequency)– Internal Status

• Discrepancy Detection Concept• Synchronisation failure between TSU-A & TSU-B

Page 9: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 9

Trigger Synchronization UnitDump Output Managment

• Different drivers – redundancy: Fault-tolerent• All dump trigger outputs checked for Diagnostics• Asynchronous line surveillance: Fault-tolerent

Common +12V

Page 10: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 10

Re-Trigger Unit Trigger Delay specifications

• Re-trigger unit is based on:– The trigger delay board:

• is a back-up system that generates an asynchronous dump trigger in case of problems with the synchronous dump trigger

• Exclusively based on analogue electronics• The trigger delay generates an output pulse 200μs after the input

trigger• Two internal 24V power supplies: Fault tolerant• If both power supplies fail or in case of mains failure, supply voltage

is maintained by internal capacitors: Fail-safe (Up to 30 min)

– The mains monitor board:• Input & output power supply survey• Asynchronous dump trigger capabilities

Page 11: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 11

Re-Trigger UnitTrigger Delay Interlock Management

• Interlock circuit:– Input disconnected– Output disconnected– Internal failure (low voltage of oscillator capacitor)– Generates an error signal for the PLC– NO DIRECT OUTPUT TRIGGER GENERATED

PLC(Slow control) TSU

RettriggerDelay

Interlock

Arming/Dump SynchronousTrigger

AsynchronousTrigger

Retrigger line

Power failure on +12V TSU – VME crate !

Page 12: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 12

Re-Trigger UnitMains Monitor

• The “Mains monitor” board:– Monitor mains 220V of the retrigger crate– Monitor +24V from the power supply– Generate an ASYNCHRONOUS dump in case of a failure– Adjustable Delay (hard coded: 20ms to 100ms)

PLC(Slow control)

RettriggerDelay

Interlock

Arming/Dump SynchronousTrigger

AsynchronousTrigger

Retrigger line

Mains Monitor

TSU

Page 13: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 13

Power Failure TestsCases

1 A real correct dump2 LHC: VME crate powering off from CCC3 Test bench: VME crate powering off locally

Page 14: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 14

Power Failure Test ResultsA correct system behaviour

DUMP REQUEST ON TSU-B

DUMP REQUEST ON TSU-A

SYNCHRONOUS DUMP TRIGGER

RE-TRIGGER (ASYNC)

RE-TRIGGER LINE

Page 15: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 15

Power Failure Test ResultsPowering off VME crate from CCC

DUMP REQUEST

SYNC. TRIGGER

BRF MISSING

ASYNC. TRIGGER

Page 16: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 16

Power Failure Test ResultsPowering off VME crate in the test bench

BRF DISAPEARINGPOWER FAILURE

DPLL UNLOCKED

SYNC./ASYNC. TRIGGER ASYNC. TRIGGER

Page 17: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 17

Power Failure TestsAnalysis

• General, in all cases:– TSU units issue synchronous & asynchronous trigger

• LHC: VME crate powering off from CCC:– BRF missing detection– Synchronous dump type

• Test bench: VME crate powering off locally– DPLL unlock detection– Synchronous-asynchronous dump type

• Test difference: the BRF optical to electrical translator seats outside the TSU-VME crate in our test bench

Page 18: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 18

Summary

• All power failure tests lead in the generation of SBDT and ABDT triggering signals. Unfortunately in some cases, SBDT signals can be asynchronous with the beam.

• There is still potentially dangerous common mode on the triggering paths induced by a permanent short-circuit on the +12V VME line.

• All asynchronous dump requests (mainly not executed but checked at each dump) are based on the TSUs, the only exception is a power failure of the re-trigger unit.

• A power cut on the TSU - VME crate generates a synchronous dump by the loss of the BRF signal (fail-safe approach).

Page 19: The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.

The LBDS trigger and re-trigger schemes 19

End

Questions ?