The Lake Pontchartrain Forecast System Rick Luettich Jason G. Fleming Institute of Marine Sciences University of North Carolina.

Jan 18, 2018

Download

Documents

Interim Gated Structures
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

The Lake Pontchartrain Forecast System Rick Luettich Jason G. Fleming Institute of Marine Sciences University of North Carolina The Team University of North Carolina: Rick Luettich, Jason Fleming, Crystal Fulcher University of North Carolina: Rick Luettich, Jason Fleming, Crystal Fulcher Louisiana State University: Robert Twilley, Gabrielle Allen, Ed Seidel, Brett Estrade Louisiana State University: Robert Twilley, Gabrielle Allen, Ed Seidel, Brett Estrade University of Notre Dame: Joannes Westerink University of Notre Dame: Joannes Westerink US Army Corps of Engineers: Harley Winer US Army Corps of Engineers: Harley Winer Interim Gated Structures Mission Statement Provide real-time support for closure decisions for Orleans Parish outfall canals Provide real-time support for closure decisions for Orleans Parish outfall canals Predict stages in Lake Pontchartrain at the mouths of the outfall canals Predict wind speeds near the mouths of the canals USACE and LSU provide computing resources The Scope of Work Calculate storm surge and wind speed using ADCIRC Calculate storm surge and wind speed using ADCIRC 4 Day forecast completed in within 2 hours 4 Day forecast completed in within 2 hours Accurate wind conditions and storm surge from a tropical cyclone Ensemble of alternate cyclones that reflect a reasonable range of possible conditions LPFS in a Nutshell Rely on text advisories from NOAA NHC Rely on text advisories from NOAA NHC Automated software system to Automated software system to Download advisories Configure ADCIRC runs Compute wind fields on the fly Assemble output from ADCIRC and plot results at locations of interest graphs to decision makers and copy to redundant external websites Phase I Create mesh with 100k nodes Create mesh with 100k nodes Implement dynamic Holland wind model Implement dynamic Holland wind model Verify that we get within 10% of IPET for Katrina Verify that we get within 10% of IPET for Katrina Define ensemble of 5 members Define ensemble of 5 members Plot wind speed and water level at station locations Plot wind speed and water level at station locations The Grid Holland Wind Model Analytical Description Analytical Description Input data: Input data: Central pressure deficit Maximum wind speed Radius to maximum winds Ensemble Members 1. NHC Consensus storm, 5 day forecast 1. NHC Consensus storm, 5 day forecast 2. Storm with 20% higher wind speed 2. Storm with 20% higher wind speed 3. Storm with 20% slower forward speed 3. Storm with 20% slower forward speed 4. Storm that veers along right of cone of uncertainty 4. Storm that veers along right of cone of uncertainty 5. Storm that veers along left of cone of uncertainty 5. Storm that veers along left of cone of uncertainty Veer Right and Veer Left Examples of Early Warning Katrina: veer left storm Katrina: veer left storm Rita: veer right storm Rita: veer right storm Ernesto: threat yet or not? Ernesto: threat yet or not? Katrina Early Warning Veer Left Rita Early Warning Veer Right Rita Early Warning Ernesto Ernesto Nearest Forecast Phase II Modify Phase I to use hotstarting Modify Phase I to use hotstarting Completed during hurricane season 2006 Initiate daily runs forced by tides Initiate daily runs forced by tides Tides are relatively small Strategy change to increase speed Add any other meteorological products Add any other meteorological products Timeliness is main issue Ongoing search for speed and accuracy Coldstart system Hotstart System Lessons Learned Performance Performance Multi-machine development at LSU Added hotstart capability Generalized system for portability Turnaround times Turnaround times LSU: 17 hours initially USACE: minutes with real time queue Lessons Learned Resources Resources Priority access not guaranteed except at USACE Optimization needed for LSU hardware LSU and USACE machines operate redundantly Communications Communications Mirrored results at several redundant websites, including LSU and UNC Enhanced notifications to include attachments containing graphs of results Hurricane Season 2007 System oversight System oversight Systematically assess wave setup Systematically assess wave setup Compute proportionate effect in historical storms Use synthetic pack of storms to calculate a multiplier or; Integrate STWAVE into LPFS Modify storm ensemble Modify storm ensemble Hurricane Season 2007 Hotstart with tides Hotstart with tides Hotstart with background meteorology Hotstart with background meteorology Inclusion of land use characteristics Inclusion of land use characteristics Enhanced user interface Enhanced user interface Enhanced output Enhanced output Maximum Envelope Of Water (MEOW) Maximum of Maximums (MOM) across ensemble Maximum Envelope of Wind