The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26 th January, Szeged Lajos Fülöp
20

The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Apr 30, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

The Integrated ControlSystem and Scientific IT of ELI-ALPS

Workshop on Large Scale Tomography

26th January, Szeged

Lajos Fülöp

Page 2: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

• Control System: TANGO• prototypes and designs

• Scientific IT and ELITrans

Agenda

Page 3: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Control System:

TANGO, designs, prototypes

Page 4: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Buildings

Building A hosts lasers, secondary sources, experiments (data sources)

Building B hosts data centre, HPC cluster (among others, labs, offices, etc.)

Page 5: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Building A – layout

Planned layout of laser sources (boxes in the middle), beam transport (lines connecting lasers to secondary sources),

secondary sources (yellow boxes in the left and the top) and control rooms (blue boxes)

Data Centre

in Building B

Page 6: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Schema

Secondary Sources

Page 7: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

• 15 (25) years old

• Synchrotrons• ESRF, ALBA, ELETTRA, DESY, MAX-IV, SOLEIL,

SOLARIS, ANKA, …

• Laser sites• APOLLON, LMJ, ELI-Beamlines, ELI-NP, FERMI

• Companies• Thales: 10PW ELI-NP laser with TANGO

• CosyLab, Nexeya, Observatory Sciences, …

• TANGO lectures at University of Szeged since

2014

TANGO Community

Page 8: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Simulation

"The use of simulation systems to test configurations and applications

early has enabled more mature applications to be available before first

commissioning with real hardware. As a result the commissioning of the

Diamond Control System went very smoothly with a high level of

functionality available for day one commissioning with beam.„

Heron et al.: THE DIAMOND LIGHT SOURCE CONTROL SYSTEM 10th

European Particle Accelerator Conference, 2006

Goals:

• Prototyping, proof of concept

• Device naming convention

• Gain experiences

Long term:

• Prediction of events?

Page 9: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Prototype based on CDRs: 5 lasers, 10 secondaries, 700 sim. devices

Page 10: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

TANGO – AstorControl system management

Page 11: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Prototype: Beam alignment with Tango

Page 12: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Prototype: First stabilization beam spot

Page 13: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Prototype: Final stabilized beam spot

Page 14: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Systems and subsystems

Page 15: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Publications, posters: ICALEPCS

Page 16: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

Scientific IT and ELITrans

Agenda

Page 17: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

ELI pillars

• ELI-Beamlines

• ELI-ALPS

• ELI-NP

Page 18: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

What is ELITrans?

ELI-PPESFRI

ELI-NP

ELI-Beamlines

ELI-ALPS

joint operationinitiation

20172011 2013

ELI-DC International Association

parallel implementation

2008

ELI

ELI- ERIC

ELI

initiationinitiationparallel

implementationinitiationjoint

operationinitiationjoint

operationinitiationjoint

operationinitiation

PP MoU ELI- ERIC

By W.Sandner ELITrans

Page 19: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

ELITrans: Data, Computing, Management

Page 20: The Integrated Control System and Scientific IT of ELI-ALPS€¦ · The Integrated Control System and Scientific IT of ELI-ALPS Workshop on Large Scale Tomography 26th January, Szeged

THANK YOU FOR YOUR ATTENTION!