The Hias Process: Next Generation EBPR Anders T. Øfsti General Manager Hias How2O AS
10

The Hias Process: Next Generation EBPR...The Hias Process Demonstration Plant since 2016 The operational biology: PAO- Phosphorous Accumulating Organisms Regular bacteria contains

Jan 31, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • The Hias Process: Next Generation EBPR

    Anders T. ØfstiGeneral ManagerHias How2O AS

  • Phosporus Removal: The Hias Process

    Phosphorus Recovery: The Struvite Pathway

  • Phosporus Removal: The Hias Process

    Inlet: 7,0-8,0 mg PO4-P/l

    Outlet: 0,17 mg PO4-P/l

  • The Hias Process

    • MBBR + EBPR

    • Continuous flow system

    • No pumping

    • Lean design

  • Vtot: 730 m3

    Q: 55-165 m3/h

    Capacity, pe: 10 000

    Load:

    7,0-8,0 mg TP/l

    ~800 mg COD/l

    Out:

    PO4-P: 0,17 mg/l (97%)

    TP: 0,25 – 0,70 mg/l (> 90%)

    The Hias ProcessDemonstration Plant since 2016

  • The operational biology:PAO- Phosphorous Accumulating Organisms

    Regular bacteria

    contains 1-2 % P

    PAO bacteria

    contain up to 30 % P

  • The Hias Process: Performance

    0

    10

    20

    30

    40

    50

    60

    70

    30.5.16 7.9.16 16.12.16 26.3.17 4.7.17 12.10.17 20.1.18 30.4.18 8.8.18 16.11.18

    PO

    4 (m

    g/l

    )

    Dato

    mg/l PO4 In

    PO4 Ana3

    PO4 Out

    Avg. PO4-P out: 0,17 mg/l

  • Phosphorus Recovery: Struvite pathway

    Primary sludge Bio-P sludge

    P-releaseCambi THP

    +

    Anaerobic

    digestionStruvite-reactor Struvite

    PO4

    NH4PO4

    Class A

    Biosolids

  • The WWTP goes WRRF (Water Resource Recovery Facility)

    WRRF: 4 corner stones

    1) The Hias Process – Next Generation EBPR

    2) The Nutrient Recovery Plant

    3) The Cambi THP

    4) The Biogas Upgrade Plant

  • Thank you!

    Contact:Anders T. ØfstiGeneral ManagerEmail: [email protected]: +47 47 32 70 92