THE GROVE www.olivewoodestate.com [email protected]| 087 350 4310 | Schafil Road, Chintsa, Eastern Cape Coast Experience the security and peace of mind that our Premier Estate has to offer. Discover a sense of freedom with units that provide tranquil surroundings and sea views. Suited to a range of homeowners, from families to young professionals and retirees. R2.8 MILLION FROM STARTING AT 270 SQUARE METERS Experience the benifits of fresh air and outdoor lifestyle Seven Units available with configuration of three or four bedrooms. Environmentally-friendly House Designs. Open-plan Living with double volume lounge option, plenty of natural light and increased airflow throughout.
4
Embed
The Grove - Microsoftprppublicstore.blob.core.windows.net/.../1181/pdf/the_grove.pdf · THE GROVE | OLIVEWOOD ESTATE 850 mm x 900 mm 425mm x 900mm 2540 mm x 900 mm 425mm x 2540mm
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Experience the security and peace of mind that our Premier Estate has to o�er. Discover a sense of freedom with units that provide tranquil surroundings and sea views. Suited to a range of homeowners, from families to
young professionals and retirees.
R2.8 MILLIONFROM
STARTING AT 270 SQUARE METERS
Experience the benifits of fresh air and outdoor lifestyle
Seven Units available with con�guration of three or four bedrooms. Environmentally-friendly House Designs. Open-plan Living with double volume lounge option, plenty of natural light and increasedair�ow throughout.
NGL110mm PVC drainage pipe to fall 1:60 minand 1:10 max all in accordance with the
SANS 10400 - Part P
IE1 IE2
9492094470
450
1:288266 15634 1034
IE3 IE4
DR
AIN
AGE
CO
N.
re
Connection as per civilengineer's drawings andspecifications
1:28 1:28 1:28
9490694425
481
9482094125
695
9444593558
887
94420934201000
rere
showerwc whb
ss1
shower
wc whbbath
whb
110vp
wc whb
ss2
bath
1253 156341:28
110mm PVC drainage pipe to fall1:60 min and 1:10 max all in
accordance with the SANS 10400- Part P
DISTANCE
GROUND LEVEL
DEPTHINVERT LEVEL
GRADIENT
NGL
DISTANCE
GROUND LEVEL
DEPTHINVERT LEVEL
GRADIENT
GROUND FLOOR LEVEL 10000 GROUND FLOOR LEVEL 10000
NGL
IE6
9477394323
450
IE5
DR
AIN
AGE
CO
N.
re
Connection as per civilengineer's drawings andspecifications
94420934201000
17711
9451993730
789
re
4857
IE4
re gully
SinkDWWM PrepTrough
re
110mm PVC drainage pipe to fall 1:60min and 1:10 max all in accordancewith the SANS 10400 - Part P
1:2810341:28
9444593558
887
1:281:2817711
110mm PVC drainage pipe to fall 1:60min and 1:10 max all in accordancewith the SANS 10400 - Part P
ERF 2919
All dimensions are given in millimeters, unless otherwise specified.All dimensions to be checked on site before constructioncommences. Contractors to adhere to all local authority'sregulations and requirements. Contractors to be a suitably qualifiedand registered participant in the construction industry as required byConstruction Regulation 2014. Drawings to be read in conjunctionwith the clients OHS (Occupational Health and Safety) file.All work to be done in accordance with the National BuildingRegulations SANS 10400. Before this drawing is priced it is thecontractor's responsibility to ensure he is familiar with the site. Alltrade names quoted may only be substituted by similar, subject toarchitect's approval. All materials to be installed in strictaccordance with manufacturer's specifications. All conduit work tobe SABS approved quality. All light fittings is to be fitted to complywith the relevant code of practice as specified in SANS 10400:Part O. All new work to be made good with existing. This drawingis not to be scaled. All dimensions not to be scaled from drawingsand heights to be checked on site. Any discrepancies shall bereported to the designer immediately. Top of foundations to be aminimum of 150mm below finished ground level. Minimum 100mmthick concrete surface bed as per Engineers drawings to be on"gunplas" ubs green damp proof membrane on 50mm sandblinding layer on well compacted fill. SABS Approved "gundle"375 mic. dpc under all walls, window cills and at changes in floorlevel. These architectural drawings to be read in conjunction withengineers and consultants drawings where applicable. All buildingwork to be carried out in accordance with the national buildingregulations. The contractor is responsible for all site visits by localinspectors and pay all fees in connection therewith. All drainagework to be carried out in accordance with the national buildingregulations. All roof measurements to be taken on site by roofspecialist prior to roof construction. All tile layouts to be confirmedwith architect prior to commencement of tiling. Any discrepanciesmust be clarified by the architect prior to commencement of work.Levels shown are relative to a benchmark at 100.00 msl of newfloor level. Msl is not the actual level but a benchmark to baseother heights of the building shown on the drawings. Contractor tokeep a full set of latest issued drawings on site. Contractor isresponsible for the correct setting out of the building on site withreference to the building line and boundaries. Contractor to takeresponsibility for all health and safety measures on site.
GENERAL NOTES:
COPYRIGHT:This drawing is subject to copyright, and may not be reproduced inwhole or part in any matter whatsoever without written permissionfrom DMV Architecture.
All dimensions are given in millimeters, unless otherwise specified.All dimensions to be checked on site before constructioncommences. Contractors to adhere to all local authority'sregulations and requirements. Contractors to be a suitably qualifiedand registered participant in the construction industry as required byConstruction Regulation 2014. Drawings to be read in conjunctionwith the clients OHS (Occupational Health and Safety) file.All work to be done in accordance with the National BuildingRegulations SANS 10400. Before this drawing is priced it is thecontractor's responsibility to ensure he is familiar with the site. Alltrade names quoted may only be substituted by similar, subject toarchitect's approval. All materials to be installed in strictaccordance with manufacturer's specifications. All conduit work tobe SABS approved quality. All light fittings is to be fitted to complywith the relevant code of practice as specified in SANS 10400:Part O. All new work to be made good with existing. This drawingis not to be scaled. All dimensions not to be scaled from drawingsand heights to be checked on site. Any discrepancies shall bereported to the designer immediately. Top of foundations to be aminimum of 150mm below finished ground level. Minimum 100mmthick concrete surface bed as per Engineers drawings to be on"gunplas" ubs green damp proof membrane on 50mm sandblinding layer on well compacted fill. SABS Approved "gundle"375 mic. dpc under all walls, window cills and at changes in floorlevel. These architectural drawings to be read in conjunction withengineers and consultants drawings where applicable. All buildingwork to be carried out in accordance with the national buildingregulations. The contractor is responsible for all site visits by localinspectors and pay all fees in connection therewith. All drainagework to be carried out in accordance with the national buildingregulations. All roof measurements to be taken on site by roofspecialist prior to roof construction. All tile layouts to be confirmedwith architect prior to commencement of tiling. Any discrepanciesmust be clarified by the architect prior to commencement of work.Levels shown are relative to a benchmark at 100.00 msl of newfloor level. Msl is not the actual level but a benchmark to baseother heights of the building shown on the drawings. Contractor tokeep a full set of latest issued drawings on site. Contractor isresponsible for the correct setting out of the building on site withreference to the building line and boundaries. Contractor to takeresponsibility for all health and safety measures on site.
GENERAL NOTES:
COPYRIGHT:This drawing is subject to copyright, and may not be reproduced inwhole or part in any matter whatsoever without written permissionfrom DMV Architecture.
NOTE: All plugpoints, lightfittings and cupboards to be demarcated on site and approved byclient/architect prior to installation.
GROUND FLOOR PLANSSCALE: 1:50
Kwikot Kwiksol indirect pump circulation split solar water heating system with two 2000 x 1000 x80mm high flat solar panel collectors (code: SOL-PANEL-2B), system to include 300 LitreSOL-300-IND round solar water heater complying with SANS 1307:2007, overall size 600mmdiameter x 1935mm long with 22mm copper pipe and operating at 400kPa with 400kPa KwikotMulti pressure control and expansion relief valve (Code: KHN3.214), 100KPa expansion reliefvalve, 20mm draincock and 22mm insulated pipe work including two Kwikot vacuum breakers(Code: KHN4.200CX) installed on hot and cold water supply, including all necessary brackets,Glycol, lagging, thermostatic mixing valve, 12V circulating pump, 12V PV panel and polyethylenedrip tray. Geyser to be installed horizontally in roof space with polyethylene drip tray with union andback nut connected to 40mm PVC overflow pipe taken out at eaves, all in accordance with SANS10254:2004 and SANS 10106:2006, connected to single phase electrical power supply withisolator 1m away from connection on geyser.
GENERAL NOTESSOLAR GEYSER SYSTEM 1
THE UFFL OF 10 000 IS A GUIDELINE FOR ALL UNITS AND DOES NOT REFER TO THEACTUAL LEVELS ON-SITE.
175mm x 75mm x 20mm x 3mm galvanisedsteel cold-rolled lipped channels, as perengineer's drawings and specifications
Poly eave closures as per productspecifications
Purpose made 1mm aluminium gutter byspecialist
IPE180 as per engineer's drawings andspecifications
Purposed made aluminium flashing (to matchroof sheeting profile and colour) to be fixed byan approved roof specialist, all in accordancewith manufacturer manual
15465
DETAIL 3 / APEX FLASHING DETAILSCALE: 1:10
IPE180 as per engineer's drawings andspecifications
175mm x 75mm x 20mm x 3mm galvanised steelcold-rolled lipped channels, as per engineer'sdrawings and specifications
Purposed made aluminium flashing (tomatch roof sheeting profile and colour)
Fixing by approved roof specialist, all inaccordance with manufacturer manual
DETAIL 4 / BARGE FLASHING DETAILSCALE: 1:10
Purposed made aluminium flashing (tomatch roof sheeting profile and colour)
175mm x 75mm x 20mm x 3mm galvanised steelcold-rolled lipped channels, as per engineer'sdrawings and specifications
35
50
Fixing by approved roof specialist, all inaccordance with manufacturer manual
1 2
A A
B B
C C
D
E
270 270
1 2
GARAGESCREEDED46 sqm
COVERED PATIOEXPOSED AGGREGATE54 sqm
DININGPOLISH CONCRETE25 sqm
LOUNGEPOLISH CONCRETE25 sqm
KITCHENPolish Concrete15 sqm
BEDROOM 1CARPET16 sqm
BEDROOM 2CARPET16 sqm
DRESSER 2CARPET9 sqm
DRESSER 1CARPET8 sqm
EN-SUITETILES5 sqm
BATHROOMTILES6 sqm
WM TDTROUGH
SINK
FRIDGEPOS.
DW
PREPOven & Hob byapproved specialist
WHBWC
BATH
D11
D31
D41
D32
D42
D51
D61
D71
D81
D91
WHB
WCSH
LINTEL ABOVE
LINTEL ABOVE
LIN
TEL
ABO
VE
LINTEL ABOVE
LIN
TEL
ABO
VELI
NTE
L AB
OVE
LIN
TEL
ABO
VE
LINTEL ABOVE
3500mm X 2125mm
W32
W42
W52
W41
W31
W11
W21
W51
LIN
TEL
ABO
VELI
NTE
L AB
OVE
LIN
TEL
ABO
VED
UC
T
270
1260
2200
500
270
230
2540
230
895
425
230
770
850
850
890
425
265
3460
3000
110
1550
1620
270
1740
230
110
3000
270
860
2540
230
1399
042
30
1822
0
270
A
1000
mm
(H) b
alus
trade
as
per S
ANS
1040
0 - P
art D
830
265
340
265
2430
340100022951000
1500
1040
Counter by joinery specialist
Counter by joinery specialist
Cupboards above
LIN
TEL
ABO
VE
LINTEL ABOVE
1400mm Roofoverhang
4500
1250
Reinforced concrete staircase as per later detail, all in accordance withthe engineer's drawings and specifications
1
2
3
4
5
6
7
UP
270
805
270
900
700
270
5490
270
520
9710
IPE 180 Galvanised steel I-beam as per engineer's drawings and specifications
900
820
1550
230
270
1872
0
1870
1000mm Stainless SteelBraai Unit with Flue pipe andcowl to be installed by anapproved specialist. productof Exclusiv Design
Counter byspecialist
3500mm X 2466mm
730 1000 270 4865 3500 730
27042302707095270
4365270430
870
270
Counter by joinery specialist
IPE
180
Gal
vani
sed
stee
l I-b
eam
as
per e
ngin
eer's
dra
win
gs a
nd s
peci
ficat
ions
5640
mm
X 2
465m
m
1120
600
950
600
950
13909001040
1840110
785
900
110
900 220
1000
mm
RO
OF
OVE
RH
ANG
1865mm ROOF OVERHANG1865mm ROOF OVERHANG
500mm Roof overhang
47707365
Galvanised IPE 180 steel portal frame, all in accordance with the engineer's drawings and specifications
Galvanised IPE 180 steel portal frame, all in accordance with theengineer's drawings and specifications
Galvanised IPE 180steel portal frame, all inaccordance with theengineer's drawingsand specifications
Galvanised IPE 180 steel rafter, all in accordance with the engineer'sdrawings and specifications
4880
mm
x 2
125m
m
Reinforced concrete cantilever, all in accordance with the engineer's drawings and specifications
Rei
nfor
ced
conc
rete
can
tilev
er, a
ll in
acc
orda
nce
with
the
engi
neer
's d
raw
ings
and
spe
cific
atio
ns
3600
3600
mm
x 4
25m
m
3000
110
900
600
North S
W
E
gully1
s/s2
110mmvp
s/s1
x 10 000
x 10 000
x 10 000x 10 000
x 10 000 x 10 000
x 10 000
x 10 000
x 10 000
x 10 000
x 9 950
YARDTO BE CONFIRMED25 sqm
x 9 830 STEP
x 9 950
x 9 950
x 10 000
x 10 000
x 9 950
x 10 000
x 9 950 x 10 000
x 9 950
x 10 000
GD
GD
Gar
age
door
cle
aran
ceG
arag
e do
or c
lear
ance
BIC as per joineryspecialist
BIC as per joineryspecialist
IE1
RE
BULKHEAD @ 2466mm above UFFL
Cou
rtyar
d w
all @
180
0mm
in h
eigh
t as
per
spec
ifica
tions
Cla
ddin
g ab
ove
rein
forc
ed c
oncr
ete
cant
ileve
r
Galvanised IPE 180steel portal frame onreinforced concretestub column, all inaccordance with theengineer's drawingsand specifications
BALCONY ABOVE
windowabove door
RE
13425
2455
2560
3860
4760
110
500
Aluminium GasCabinet by specialist
New gas line by
approved specia
list
1120
5000L water harvesttank (1820mm ∅)
900mm x 2125mm
900mm x 2125mm
900mm x 2125mm
x 9 950x 9 950
Floo
r to
fall
away
from
build
ing
Floo
r to
fall
away
from
build
ing
x 10 000
x 9 950
1560
Step 1Risers: 170mmTreads: 300mm
300
300
300
300
300
300
300
300
300
12mm Nutec fibre cementcladding fixed to 38mm x38mm SA Pine substructure.15mm spacing betweenboards. painted as perfinishing document
B.O.E aboveB.O.E above
BRAAI
230
1000
665
1101120 3000
750
600
490
330230
Galvanised IPE 180 steel portal frame on reinforcedconcrete stub column, all in accordance with theengineer's drawings and specifications
All dimensions are given in millimeters, unless otherwise specified.All dimensions to be checked on site before constructioncommences. Contractors to adhere to all local authority'sregulations and requirements. Contractors to be a suitably qualifiedand registered participant in the construction industry as required byConstruction Regulation 2014. Drawings to be read in conjunctionwith the clients OHS (Occupational Health and Safety) file.All work to be done in accordance with the National BuildingRegulations SANS 10400. Before this drawing is priced it is thecontractor's responsibility to ensure he is familiar with the site. Alltrade names quoted may only be substituted by similar, subject toarchitect's approval. All materials to be installed in strictaccordance with manufacturer's specifications. All conduit work tobe SABS approved quality. All light fittings is to be fitted to complywith the relevant code of practice as specified in SANS 10400:Part O. All new work to be made good with existing. This drawingis not to be scaled. All dimensions not to be scaled from drawingsand heights to be checked on site. Any discrepancies shall bereported to the designer immediately. Top of foundations to be aminimum of 150mm below finished ground level. Minimum 100mmthick concrete surface bed as per Engineers drawings to be on"gunplas" ubs green damp proof membrane on 50mm sandblinding layer on well compacted fill. SABS Approved "gundle"375 mic. dpc under all walls, window cills and at changes in floorlevel. These architectural drawings to be read in conjunction withengineers and consultants drawings where applicable. All buildingwork to be carried out in accordance with the national buildingregulations. The contractor is responsible for all site visits by localinspectors and pay all fees in connection therewith. All drainagework to be carried out in accordance with the national buildingregulations. All roof measurements to be taken on site by roofspecialist prior to roof construction. All tile layouts to be confirmedwith architect prior to commencement of tiling. Any discrepanciesmust be clarified by the architect prior to commencement of work.Levels shown are relative to a benchmark at 100.00 msl of newfloor level. Msl is not the actual level but a benchmark to baseother heights of the building shown on the drawings. Contractor tokeep a full set of latest issued drawings on site. Contractor isresponsible for the correct setting out of the building on site withreference to the building line and boundaries. Contractor to takeresponsibility for all health and safety measures on site.
GENERAL NOTES:
COPYRIGHT:This drawing is subject to copyright, and may not be reproduced inwhole or part in any matter whatsoever without written permissionfrom DMV Architecture.
NOTE: All plugpoints, lightfittings and cupboards to be demarcated on site and approved byclient/architect prior to installation.
GROUND FLOOR PLANSSCALE: 1:50
Kwikot Kwiksol indirect pump circulation split solar water heating system with two 2000 x 1000 x80mm high flat solar panel collectors (code: SOL-PANEL-2B), system to include 300 LitreSOL-300-IND round solar water heater complying with SANS 1307:2007, overall size 600mmdiameter x 1935mm long with 22mm copper pipe and operating at 400kPa with 400kPa KwikotMulti pressure control and expansion relief valve (Code: KHN3.214), 100KPa expansion reliefvalve, 20mm draincock and 22mm insulated pipe work including two Kwikot vacuum breakers(Code: KHN4.200CX) installed on hot and cold water supply, including all necessary brackets,Glycol, lagging, thermostatic mixing valve, 12V circulating pump, 12V PV panel and polyethylenedrip tray. Geyser to be installed horizontally in roof space with polyethylene drip tray with union andback nut connected to 40mm PVC overflow pipe taken out at eaves, all in accordance with SANS10254:2004 and SANS 10106:2006, connected to single phase electrical power supply withisolator 1m away from connection on geyser.
GENERAL NOTESSOLAR GEYSER SYSTEM 1
THE UFFL OF 10 000 IS A GUIDELINE FOR ALL UNITS AND DOES NOT REFER TO THEACTUAL LEVELS ON-SITE.
175mm x 75mm x 20mm x 3mm galvanisedsteel cold-rolled lipped channels, as perengineer's drawings and specifications
Poly eave closures as per productspecifications
Purpose made 1mm aluminium gutter byspecialist
IPE180 as per engineer's drawings andspecifications
Purposed made aluminium flashing (to matchroof sheeting profile and colour) to be fixed byan approved roof specialist, all in accordancewith manufacturer manual
15465
DETAIL 3 / APEX FLASHING DETAILSCALE: 1:10
IPE180 as per engineer's drawings andspecifications
175mm x 75mm x 20mm x 3mm galvanised steelcold-rolled lipped channels, as per engineer'sdrawings and specifications
Purposed made aluminium flashing (tomatch roof sheeting profile and colour)
Fixing by approved roof specialist, all inaccordance with manufacturer manual
DETAIL 4 / BARGE FLASHING DETAILSCALE: 1:10
Purposed made aluminium flashing (tomatch roof sheeting profile and colour)
175mm x 75mm x 20mm x 3mm galvanised steelcold-rolled lipped channels, as per engineer'sdrawings and specifications
35
50
Fixing by approved roof specialist, all inaccordance with manufacturer manual
1 2
A A
B B
C C
D
E
270 270
1 2
GARAGESCREEDED46 sqm
COVERED PATIOEXPOSED AGGREGATE54 sqm
DININGPOLISH CONCRETE25 sqm
LOUNGEPOLISH CONCRETE25 sqm
KITCHENPolish Concrete15 sqm
BEDROOM 1CARPET16 sqm
BEDROOM 2CARPET16 sqm
DRESSER 2CARPET9 sqm
DRESSER 1CARPET8 sqm
EN-SUITETILES5 sqm
BATHROOMTILES6 sqm
WM TDTROUGH
SINK
FRIDGEPOS.
DW
PREPOven & Hob byapproved specialist
WHBWC
BATH
D11
D31
D41
D32
D42
D51
D61
D71
D81
D91
WHB
WCSH
LINTEL ABOVE
LINTEL ABOVE
LIN
TEL
ABO
VE
LINTEL ABOVE
LIN
TEL
ABO
VELI
NTE
L AB
OVE
LIN
TEL
ABO
VE
LINTEL ABOVE
3500mm X 2125mm
W32
W42
W52
W41
W31
W11
W21
W51
LIN
TEL
ABO
VELI
NTE
L AB
OVE
LIN
TEL
ABO
VED
UC
T
270
1260
2200
500
270
230
2540
230
895
425
230
770
850
850
890
425
265
3460
3000
110
1550
1620
270
1740
230
110
3000
270
860
2540
230
1399
042
30
1822
0
270
A
1000
mm
(H) b
alus
trade
as
per S
ANS
1040
0 - P
art D
830
265
340
265
2430
340100022951000
1500
1040
Counter by joinery specialist
Counter by joinery specialist
Cupboards above
LIN
TEL
ABO
VE
LINTEL ABOVE
1400mm Roofoverhang
4500
1250
Reinforced concrete staircase as per later detail, all in accordance withthe engineer's drawings and specifications
1
2
3
4
5
6
7
UP
270
805
270
900
700
270
5490
270
520
9710
IPE 180 Galvanised steel I-beam as per engineer's drawings and specifications
900
820
1550
230
270
1872
0
1870
1000mm Stainless SteelBraai Unit with Flue pipe andcowl to be installed by anapproved specialist. productof Exclusiv Design
Counter byspecialist
3500mm X 2466mm
730 1000 270 4865 3500 730
27042302707095270
4365270430
870
270
Counter by joinery specialist
IPE
180
Gal
vani
sed
stee
l I-b
eam
as
per e
ngin
eer's
dra
win
gs a
nd s
peci
ficat
ions
5640
mm
X 2
465m
m
1120
600
950
600
950
13909001040
1840110
785
900
110
900 220
1000
mm
RO
OF
OVE
RH
ANG
1865mm ROOF OVERHANG1865mm ROOF OVERHANG
500mm Roof overhang
47707365
Galvanised IPE 180 steel portal frame, all in accordance with the engineer's drawings and specifications
Galvanised IPE 180 steel portal frame, all in accordance with theengineer's drawings and specifications
Galvanised IPE 180steel portal frame, all inaccordance with theengineer's drawingsand specifications
Galvanised IPE 180 steel rafter, all in accordance with the engineer'sdrawings and specifications
4880
mm
x 2
125m
m
Reinforced concrete cantilever, all in accordance with the engineer's drawings and specifications
Rei
nfor
ced
conc
rete
can
tilev
er, a
ll in
acc
orda
nce
with
the
engi
neer
's d
raw
ings
and
spe
cific
atio
ns
3600
3600
mm
x 4
25m
m
3000
110
900
600
North S
W
E
gully1
s/s2
110mmvp
s/s1
x 10 000
x 10 000
x 10 000x 10 000
x 10 000 x 10 000
x 10 000
x 10 000
x 10 000
x 10 000
x 9 950
YARDTO BE CONFIRMED25 sqm
x 9 830 STEP
x 9 950
x 9 950
x 10 000
x 10 000
x 9 950
x 10 000
x 9 950 x 10 000
x 9 950
x 10 000
GD
GD
Gar
age
door
cle
aran
ceG
arag
e do
or c
lear
ance
BIC as per joineryspecialist
BIC as per joineryspecialist
IE1
RE
BULKHEAD @ 2466mm above UFFL
Cou
rtyar
d w
all @
180
0mm
in h
eigh
t as
per
spec
ifica
tions
Cla
ddin
g ab
ove
rein
forc
ed c
oncr
ete
cant
ileve
r
Galvanised IPE 180steel portal frame onreinforced concretestub column, all inaccordance with theengineer's drawingsand specifications
BALCONY ABOVE
windowabove door
RE
13425
2455
2560
3860
4760
110
500
Aluminium GasCabinet by specialist
New gas line by
approved specia
list
1120
5000L water harvesttank (1820mm ∅)
900mm x 2125mm
900mm x 2125mm
900mm x 2125mm
x 9 950x 9 950
Floo
r to
fall
away
from
build
ing
Floo
r to
fall
away
from
build
ing
x 10 000
x 9 950
1560
Step 1Risers: 170mmTreads: 300mm
300
300
300
300
300
300
300
300
300
12mm Nutec fibre cementcladding fixed to 38mm x38mm SA Pine substructure.15mm spacing betweenboards. painted as perfinishing document
B.O.E aboveB.O.E above
BRAAI
230
1000
665
1101120 3000
750
600
490
330230
Galvanised IPE 180 steel portal frame on reinforcedconcrete stub column, all in accordance with theengineer's drawings and specifications
Galvanised IPE 180 steel portalframe on reinforced concretestub column, all in accordancewith the engineer's drawingsand specifications
1560
4901101120270
95110
1780
1215115
W111
1963 270
270
7270
270
1420
4230250 2210
150317815031781501560
2060
150
925
150
27500
4880
IE5
REVISION NO.
DRAWING NO.
DRAWN BY:
PRINT DATE:
CHECKED BY:
12 July 2018
DMV / NF
20180703_OLIVEWOOD_MS09
0
DMP
17 - Olivewood Cluster_Unit 1PROJECT NO.
A
2148
2460
400
430
400
430
400
925
Fenced-off duct as per planby specialist
3110
LIN
TEL
ABO
VE
425m
m x
900m
m85
0mm
x 9
00m
m
ERF 2919
All dimensions are given in millimeters, unless otherwise specified.All dimensions to be checked on site before constructioncommences. Contractors to adhere to all local authority'sregulations and requirements. Contractors to be a suitably qualifiedand registered participant in the construction industry as required byConstruction Regulation 2014. Drawings to be read in conjunctionwith the clients OHS (Occupational Health and Safety) file.All work to be done in accordance with the National BuildingRegulations SANS 10400. Before this drawing is priced it is thecontractor's responsibility to ensure he is familiar with the site. Alltrade names quoted may only be substituted by similar, subject toarchitect's approval. All materials to be installed in strictaccordance with manufacturer's specifications. All conduit work tobe SABS approved quality. All light fittings is to be fitted to complywith the relevant code of practice as specified in SANS 10400:Part O. All new work to be made good with existing. This drawingis not to be scaled. All dimensions not to be scaled from drawingsand heights to be checked on site. Any discrepancies shall bereported to the designer immediately. Top of foundations to be aminimum of 150mm below finished ground level. Minimum 100mmthick concrete surface bed as per Engineers drawings to be on"gunplas" ubs green damp proof membrane on 50mm sandblinding layer on well compacted fill. SABS Approved "gundle"375 mic. dpc under all walls, window cills and at changes in floorlevel. These architectural drawings to be read in conjunction withengineers and consultants drawings where applicable. All buildingwork to be carried out in accordance with the national buildingregulations. The contractor is responsible for all site visits by localinspectors and pay all fees in connection therewith. All drainagework to be carried out in accordance with the national buildingregulations. All roof measurements to be taken on site by roofspecialist prior to roof construction. All tile layouts to be confirmedwith architect prior to commencement of tiling. Any discrepanciesmust be clarified by the architect prior to commencement of work.Levels shown are relative to a benchmark at 100.00 msl of newfloor level. Msl is not the actual level but a benchmark to baseother heights of the building shown on the drawings. Contractor tokeep a full set of latest issued drawings on site. Contractor isresponsible for the correct setting out of the building on site withreference to the building line and boundaries. Contractor to takeresponsibility for all health and safety measures on site.
GENERAL NOTES:
COPYRIGHT:This drawing is subject to copyright, and may not be reproduced inwhole or part in any matter whatsoever without written permissionfrom DMV Architecture.
Galvanised IPE 180 steel portal frame, all in accordance with theengineer's drawings and specifications Galvanised IPE 180 steel portal frame, all in accordance with the engineer's drawings and specifications
Galvanised IPE 180 steel portal frame, all in accordance with the engineer's drawings and specifications
1 2
A A
B B
C C
D
E
1 2
A A
2100
270
270
3180
5740
270
270
1870
9710
7140
1000
394
STUDYPOLISH CONCRETE8 sqm
EN-SUITETILES4 sqm
DRESSER 3CARPET6 sqm
MAIN BEDROOMCARPET13 sqm
BALCONYTILES7 sqm
DOUBLE VOLUME
Galvanised IPE 180 steel portal frame, all in accordance with the engineer's drawings and specifications
9
10
11
12
13
14
15
16
BIC
BIC
W43
W53
IPE 180 Galvanised steel I-beam as perengineer's drawings and specifications
3500mm X 2550mm
3500mm X 2466mm
1000mm (H) balustrade as per SANS 10400 - Part D
W61
D33
WHB
WC
SH
W71
W81
LIN
TEL
ABO
VELI
NTE
L AB
OVE
1000
mm
(H) b
alus
trade
as
per S
ANS
1040
0 - P
art D
Galvanised IPE 180steel portal frame,all in accordancewith the engineer'sdrawings andspecifications
SAFLOK 410 colorplus roof sheeting (colour as per finishingdocument) @ 10° roof angle on 150mm x 50mm galvanisedsteel cold-rolled lipped channels on Sisalation FR405 ongalvanised steel IPE 180 portal frame, all in accordance withthe engineer's drawings and details. Ceiling to be 6.4mmskimmed Gypsum ceiling boards fixed to 38x38mm branderingat max 400mm c/s with 135mm ISOVER Aerolite insulationbetween portal frame on top of ceiling. All flashings and Polyeave closures as per product specifications.
CHIMNEY
Flue pipe and cowl of JetmasterCorner 650 Slow Combustion Stove
1000mm (H) balustrade asper SANS 10400 - Part D
LINTEL ABOVE900mm x 2125mm
1500
mm
x 2
125m
mLI
NTE
L AB
OVE
Floo
r to
fall
away
from
bui
ldin
g
Floo
r to
fall
away
from
bui
ldin
g
screed to fall away from building
scre
ed to
fall
away
from
bui
ldin
g
x 12 670
x 12 720
x 12 670
12mm Nutec fibre cement cladding fixedto 38mm x 38mm SA Pine substructure.15mm spacing between boards. paintedas per finishing document
110mmvp
s/s1
1000
COURTYARDBELOW
1330 270 730 230 1000 270 4865
73651600
166
13425
103
A1
600
950
Galvanised IPE180 steel portalframe, all inaccordance withthe engineer'sdrawings andspecifications
Galvanised 80mm x 80mm structural square steel tubing, all in accordancewith the engineer's drawings and specifications
Galvanised 80mm x 40mm structural rectangular steel tubing, all inaccordance with the engineer's drawings and specifications
NOTE: All plugpoints, lightfittings and cupboards to be demarcated on site and approved byclient/architect prior to installation.
Kwikot Kwiksol indirect pump circulation split solar water heating system with two 2000 x 1000 x80mm high flat solar panel collectors (code: SOL-PANEL-2B), system to include 300 LitreSOL-300-IND round solar water heater complying with SANS 1307:2007, overall size 600mmdiameter x 1935mm long with 22mm copper pipe and operating at 400kPa with 400kPa KwikotMulti pressure control and expansion relief valve (Code: KHN3.214), 100KPa expansion reliefvalve, 20mm draincock and 22mm insulated pipe work including two Kwikot vacuum breakers(Code: KHN4.200CX) installed on hot and cold water supply, including all necessary brackets,Glycol, lagging, thermostatic mixing valve, 12V circulating pump, 12V PV panel and polyethylenedrip tray. Geyser to be installed horizontally in roof space with polyethylene drip tray with union andback nut connected to 40mm PVC overflow pipe taken out at eaves, all in accordance with SANS10254:2004 and SANS 10106:2006, connected to single phase electrical power supply withisolator 1m away from connection on geyser.
GENERAL NOTESSOLAR GEYSER SYSTEM 1
THE UFFL OF 10 000 IS A GUIDELINE FOR ALL UNITS AND DOES NOT REFER TO THEACTUAL LEVELS ON-SITE.
SITE LEVELS
PLUGS, LIGHTS, CUPBOARDS
6600
SAIA - EASTERN CAPEA REGION OF THESOUTH AFRICAN INSTITUTE OF ARCHITECTS
175mm x 75mm x 20mm x 3mm galvanisedsteel cold-rolled lipped channels, as perengineer's drawings and specifications
Poly eave closures as per productspecifications
Purpose made 1mm aluminium gutter withreturning strap by specialist
IPE180 as per engineer's drawings andspecifications
Purposed made aluminium flashing (to matchroof sheeting profile and colour) to be fixed byan approved roof specialist, all in accordancewith manufacturer manual
Reinforced concrete beam as per engineer'sdrawings and specifications
Drip flashing by approved roof specialist as permanufacturer's manual