The Grove GTK1100 Crane arrives in a field in Germany carried on four trailers
16

The Grove GTK1100 Crane arrives in a field in Germany carried on four trailers

Jan 01, 2016

Download

Documents

The Grove GTK1100 Crane arrives in a field in Germany carried on four trailers. The crane has to be assembled before it can begin the task of installing a 2KW wind turbine First The Outriggers are lifted into place. The hook block is reeved. The superstructure is raised. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The Grove GTK1100 Crane arrives in a field in Germany carried on four trailers

Page 2: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The crane has to be assembled before it can begin the task of installing a 2KW wind turbine

First The Outriggers are lifted into place

Page 3: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The hook block is reeved

Page 4: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The superstructure is raised

Page 5: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

...and lowered into place

Page 6: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

Up goes the mast

Page 7: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

..which locks into the vertical position

Page 8: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The pendant supports are then lifted into place

Page 9: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The mast is telescoped

Page 10: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The pendants are tensioned and the crane is ready to work

Page 11: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The tower mast is in 3 sections weighing 62 tonnes, 53 tonnes and 45 tonnes respectively.

Here the second tower section is lifted into place

Page 12: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The top section weighing 45 tonnes is located

Page 13: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

Next the 70 tonne nacelle, the heaviest single load, is lifted

Page 14: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

…and placed on to the 70m mast

Page 15: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The Grove GTK 1100 lifts an eight tonne blade in tandem with a mobile crane, assembling the propeller module on the ground

Page 16: The Grove GTK1100 Crane  arrives in a field in Germany carried on four trailers

The blade and hub assembly weighing 42 tonnes is liftedinto place