Top Banner
European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 The Fukushima nuclear accident What happened? Consequences? JRC involvement? Marc Noël Joint Research Center – Institute for Energy [email protected] https://clearinghouse-oef.jrc.ec.europa.eu/
40

The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

Sep 17, 2018

Download

Documents

phungthuy
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1

The Fukushima nuclear accident

What happened? Consequences? JRC involvement?

Marc NoëlJoint Research Center – Institute for Energy

[email protected]://clearinghouse-oef.jrc.ec.europa.eu/

Page 2: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 2

Initiating event : magnitude 9,0 earthquake

What happened at the Fukushima Daiichi Nuclear Power Plant on 11 March 2011?

Page 3: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 3

NPP affected by the earthquake

Page 4: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 4

Tsunami generated by the earthquake

Page 5: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 5

Many significant aftershocks

Page 6: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 6

The Fukushima Daiichi site

Source: AREVA.

Page 7: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 7

Page 8: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 8

Before / after tsunami Tank displaced?

Many structures facing the bay are destroyed

Missing tanks

Shared spent fuel storage

Page 9: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 9

Page 10: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 10

Page 11: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 11

« GE Mark I » design

Page 12: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 12

Event sequence (1)

• Diesel generators start.• Plant is in a stable state.

Page 13: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 13

Event sequence (2)

• Reactors 1-3 are cut-off from any kind of heat removal.

Page 14: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 14

Event sequence (5)

• Core starts to be exposed

Page 15: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 15

• Cladding temperature rises• At 900°C: balooning, cladding breaking• At 1200°C: exothermic reaction Zr+2H2OZrO2+2H2• At 1800°C: melting of fuel cladding and steel structures.• At 2500°C: breaking of the fuel rods, debris bed inside the core.

• Pressure increase inside containment up to 8b->venting• Supply of seawater to the reactor stops the core melt

H2

H2

>900°C >1200°C >2500°C

N2

Event sequence (6)

Page 16: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 16

Event sequence – Units 1&3

Page 17: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 17

Service floor (top of the reactor building)

Page 18: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 18

Event sequence – Unit 2

Page 19: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 19

After the Hydrogen detonations

Page 20: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 20

Unit 4

Unit 3

After the Hydrogen detonations

Page 21: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 21

Fuel storage issue? (units 1 to 4)

Unit 3: Fuel stored in the pond not visible beneath a mass of steel beams, concrete, dust and rebar from the explosive destruction of the reactor building roof. Concrete dust appeared thick on the surface of flat objects and specks of dust were circulating in the warm water of the pond. [WNN]

Unit 4: a visual inspection by remote controlled camera has shown no significant damage to the spent fuel pond.

Page 22: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 22

Example of recovery actions (1)

Page 23: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 23

Example of recovery actions (2)

Page 24: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 24

Example of recovery actions (3)

Water spray SFP4 using mobile truck

Temporary shelter (unit1, in project)

Page 25: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 25

Summary of the situation

Unit 1 2 3 4 5 6Core and fuel integrity (loaded fuel assemblies)

Damaged most part

Damaged most part

Damaged most part

No fuel in the reactor

Not Damaged

Not Damaged

Reactor Pressure Vessel Integrity

Damage and leakage

estimated

Damage and leakage

estimated

Damage and leakage

estimated

Not Damaged

Not Damaged

Not Damaged

Containment IntegrityDamage and

leakage estimated

Damage and leakage

suspected

Damage and leakage

suspected

Not Damaged

Not Damaged

Not Damaged

Reactor building integrity Severely Damaged

Slightly Damaged

Severely Damaged

Severely Damaged

Vent hole opened on the rooftop for avoiding hydrogen explosion

Water injection to core Continuing (Freshwater)

Continuing (Freshwater)

Continuing (Freshwater)

Not necessary

Not necessary

Not necessary

Water injection to Containment Vessel Feed water Feed water

(planned)Feed water (planned)

Not necessary

Not necessary

Not necessary

Fuel integrity in the spent fuel pool (Stored fuel assemblies)

Unknown(292)

Unknown(587)

Damage suspected

(514)

Damage suspected

(1331)

Not damaged

(946)

Not damaged

(876)

Electric power supply off-site grid available

off-site grid available

off-site grid available

off-site grid available

off-site grid available

off-site grid available

Page 26: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 26

What are the radiological consequences?

Page 27: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 27

Page 28: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 28

• 11/03: evacuation inside 3km. • 12/03 (increase RCV pressure

venting): evacuation inside 10km. • 13/03 (explosion @ unit1): evacuation

inside 20km (170000 residents) + iodine prophylaxis. 25 detected contaminated and decontaminated.

• 15/03: sheltering 30km + no fly zone.• 31/03: significant radioactivity level

detected in a village at 40km• CIPR recommends to “take protective

measures” when the yearly estimated dose is > 20-100 mSv.

• Based on local monitoring, extension of the evacuation zone decided. The new evacuation zone match +- the 20mSv yearly dose zone.

Page 29: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 29

Page 30: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 30

• blabla

Page 31: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 31

Page 32: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 32

Example of food bans

Page 33: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 33

Page 34: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 34

Page 35: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 35

High Level EC Task Force for the follow-up of the EU answer to the nuclear accident in Japan

• Created on 30/05/2011 (SEC(2011) 706)Main objectives :• To oversee the implementation of the stress tests, with a view to reporting on

the process to the next European Council meeting of 9/12/2011.• To analyse the radiation protection measures taken so far and propose

corrective measures if needed.Membership:• Chair: the DG of DG ENER. Vice-Chair: the DG of DG JRC• ENER, JRC, SANCO, TAXUD, MOVE, RTD, DEVCO, SG, others…Key milestones:• KoM of the High Level EC Task Force on 08/06/2011.• 15 Sep: national progress reports from the national Regulators sent to EC • 15 Nov: EC viewpoint on the process – draft report for the European Council• 9 Dec: European Council• End of 2011: final national reports – opening the door for the peer reviews• 30 April 2012: completion of peer reviews.• June 2012: consolidated EC report to the Council.

Page 36: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 36

The European Clearinghouse on Operational Experience Feedback for NPP

The European Clearinghouse for NPP OEF :a centralized initiative aiming at strenghtening OEF in the EU,to the benefit of the participating EU Safety Authorities,

in close collaboration with and their Technical Support Organisations (TSOs).

EU NPP safety assessments: JRC role?

Main role: support to the EC High Level Task Force(expertise in nuclear safety)

Page 37: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 37

Organisation

OEF Clearinghouse Centralized Office (JRC)

Coordination & CommunicationTechnical & Scientific workOE knowledge repository

EU Safety Authorities

EU TechnicalSupport Organizations

IRSN, GRSBel-V

International Community

IAEA

OECD-NEA

MembersFinland Hungary Lithuania

The Netherlands Romania Slovenia

Switzerland

Main deliverables:-Topical reports- Quarterly reports on events- Improved draft IRS reports

+ Areva

ObserversBelgiumBulgaria

Czech Republic France

GermanySlovakiaSpain

SwedenUnited Kingdom

Page 38: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 38

Role of the JRC in the EU NPP « stress tests »

• Expertise of the JRC in the field:• JRC has a long tradition of providing technical support in nuclear safety

(TACIS-INSC, PHARE-IPA, EURATOM art.41-45 for new NPPs, OSART missions, design review in Ukraine, …)

• JRC has expertise on the different types of power reactors being operated in the EU (PWR including VVERs, BWRs, CANDU, ...).

• Through the European Clearinghouse, JRC has the expertise of the analysis of nuclear events and accidents. In full cooperation with the EUMS nuclear Safety Authorities and TSOs.

• The JRC has expertise in the assessment of seismic and flooding hazards.

Page 39: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 39

Role of the JRC in the EU NPP « stress tests »

• JRC gives its full support to the stress tests

• JRC has contributed to the definition of the scope and methodology for the stress tests and will further contribute to:

• the definition of common criteria• the peer-reviews. (reminder: 1 peer review team per EU MS operating NPP; 7

experts per team: 6 from MS safety authorities + 1 from EC-JRC).

• JRC will collect all the national reports for the EC

• JRC will contribute to the report of the EC to the European Council (see conclusions of the European Council of 24-25th March 2011)

• The JRC can/will support any international safety and risk analysis in neighboring countries, in partnership with the IAEA.

Page 40: The Fukushima nuclear accident - European Parliament · European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 1 • The

European Clearinghouse on OE – Presentation to ITRE on the Fukushima nuclear accident – 12/07/2011 - Brussels 40

SOURCES: GRS, IRSN, TEPCO, NISA, MEXT, AREVA, ASN, IAEA, VGB, US-NRC,JAIF.