Yi Feng Jan. 23 rd 2014 Manufacturing process for Impeller Housing Part 1: Casting Process Part 2: Machining Process (to follow) The Federal Group Copyright 2014 • All Rights Reserved • The Federal Group 21421 Hilltop Street Southfield, MI 48033 248-545-5000 [email protected]www.tfgusa.com
11
Embed
The Federal Group USA - Investment Casting Process for Impeller Housing
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Yi Feng
Jan. 23rd 2014
Manufacturing process for Impeller HousingPart 1: Casting Process
Part 2: Machining Process (to follow)The Federal Group
Copyright 2014 • All Rights Reserved • The Federal Group
Running Time line: 4.25 Hours totalCopyright 2014 • All Rights Reserved • The Federal Group
4Step 3: Assemble runner system
1 2 3
4
1. Assemble mold gate system2. Assemble whole runner system3. Total time is about 0.5 hour
Running Time line: 4.75 Hours totalCopyright 2014 • All Rights Reserved • The Federal Group
5Step 4: Apply 1st Layer of hard shell
1 2
34
1. Immerse assembly in slurry2-3. Spray with fine sand 4. Allow to dry for more than 12 hours
Running Time line: 17 Hours totalCopyright 2014 • All Rights Reserved • The Federal Group
6Step 5: Apply 2nd ~10th layer of hard shell
1 2
34
1. Immerse assembly in slurry2. Spray with fine sand 3-4. Allow to dry for more than 12 hoursApply 8 additional hard shell layers to each part. Total 10 layers when complete.
Running Time line: 126.5 Hours total
Copyright 2014 • All Rights Reserved • The Federal Group
7Step 6: De-wax
1 2
3
Run 5-6 pcs at a time through the De-way process
Running Time line: 129.5 Hours totalCopyright 2014 • All Rights Reserved • The Federal Group
8Step 7: Casting of product
1 2
34
Smelt raw material 1. Bake shell2. Pour melting material 3. Solution treatment4. Remove Shell
Running Time line: 133.5 Hours totalCopyright 2014 • All Rights Reserved • The Federal Group
9Step 8: Cut off and clean
1 2
34
1. Cut runner system with plasma cutting2-4. Ready part to be cleaned with high temperature liquid
Running Time line: 142 Hours totalCopyright 2014 • All Rights Reserved • The Federal Group
10Step 9: Clean and Inspect process
1 2
34
1. Shot blasting 2. If needed repair with
welding3. If needed clean and grind
welded area4. Inspect part
Final Running Time line: 148 Hours total for each part to complete the casting process.