Macedonian Power System 1 The Electric Power System - Republic of Macedonia -
18

The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

May 09, 2018

Download

Documents

dangtram
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 1

The Electric Power System

- Republic of Macedonia -

Page 2: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 2

Basic facts

Area: 25.713 km2

Population: ~ 2.069.172 Number of electricity consumers: 695.279 (DSO) Number of TSOs: 1MEPSO http://mepso.com.mk/

Number of DSOs: 2EVN Macedonia http://evn.mk/ELEM distribution http://elem.com.mk/

Peak load: 1507 MW (2014)

2

Page 3: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 3

Global map of the gridand of its interconnections

Source: ENTSO-E

3

Interconnectors with: Serbia Kosovo Greece

(2 interconnections) Bulgaria

Page 4: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 4

Grid facts and characteristics

Transmission system (TS) comprises of 400 kV and 110 kV transmission overhead lines and cables. Five 400/110 kV/kV substations connect the 400

kV and 110 kV networks TS is connected with the neighboring systems via

400 kV interconnections Total installed generation capacity in 2014 is 1857

MW (connected to the transmission grid), mainly shared among 580 MW of HPP-s (31%) and 1240 MW of TPP-s (67%).

4

Page 5: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 5

Structure of electrical power system

The 400 kV transmission lines are the backbone of the transmission grid in the Republic of Macedonia. They form a 400 kV ring comprised of three transmission lines connecting the largest consumption located in the northern part of the country with the largest production facilities located in the south-western part. Also, the 400 kV transmission lines are used for interconnection to the neighboring power systems. The 110 kV transmission grid connects the large hydro

power plants, all of the larger cities, as well as the industrial centers. The 400 kV and 110 kV transmission grids are coupled through five substations. A Project for reconfiguration of the 110 kV grid in the south-western part of the country is currently underway.

5

Page 6: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 6

Map of the high voltage grid6

GREECE

BULGARIA

SERBIA

ALBANIA

Kumanovo 1K.Palanka

Kratovo

Kocani

Delcevo

Berovo

Veles

Prilep 1

Gevgelija

Kicevo

Struga

Ohrid 1Resen Bitola 2 400

Bitola 2 110

Tetovo 2

Probistip

Negotino

Polog

Kavadarci

Kumanovo 2

Bunardzik

Stip 1 110Stip 1 400

Stip 2

M.Kamenica

Susica

Valandovo

Dubrovo 400

HPP Cebren

Feni

TPP NegotinoPrilep 3Prilep 2

Veles 2

O.Pole

Topilnica

Petrovec

Bitola 1

Suvodol

Bitola 4

Bitola 3

Sopotnica

Ohrid 2

HPP Globocica

HPP Spilje

Gostivar

Skopje 4 110Skopje 4 400

JugohromTetovo 1

Tearce

HPP Kozjak

Skopje 3

Chervena Mogila (Radomir)

Thesaloniki

Amindeo

Ferizaj

Skakavica

Petric

Nis

HPP Sv.Petka

Brod-Gneotino

Elbasan

HPP Vrutok

M A C E D O N I ASamokov

ZgropolciBucim Radovis

Centralna

New Kosovo

Nov Dojran

Dracevo

Rafinerija

Vinica

HPP Boskov Most

TE-TO

TIRZ Tetovo Kumanovo 3Skopje 1 110

Struga 2

Ohrid 3

Ohrid 400Ohrid 110

Krusevo

Dolneni

Gostivar 2

HPP Galiste

HPP TikvesHPP Gradec

WPP Bogdanci

WPP Sasavarlija 2WPP Sasavarlija 1

*

Source: mepso.com.mk

Page 7: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 7

Information on TSO(s)

Name: MEPSO Network length (km): 529 (400kV) & 1587 (110kV) Served area (km²): 25.713 Annual transmitted energy (TWh) ~ 7,403 (2015)

7

Page 8: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 8

Responsibilities of TSO & DSOs

MEPSO owns, maintains and expands the transmission network, operates the electricity power system of the country and secures interconnections with the neighboring transmission systems. MEPSO also acts as Market Operator.DSO owns, maintains and expands the distribution

network

8

Page 9: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 9

Power structure of the country9

Source: stat.gov.mk

Page 10: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 10

Installed capacity with reference to primary resources

Installed capacities (MW), year 2014 Gas 287 Hydro power 603 Lignite 800 Oil 210 Solar power 15Wind power 37

10

Source: erc.com.mk

Gas14%

Hydro33%

Lignite40%

Oil10%

Solar1%

Wind2%

Page 11: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 11

Energy production withreference to primary resources

Electricity generated (GWh), year 2014 Gas 190 Hydro power 1136 Lignite 3506 Oil 0 Solar power 14Wind power 70

11

Gas4%

Hydro23%

Lignite71%

Oil0%

Solar0%

Wind2%

Source: erc.com.mk

Page 12: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 12

Consumption per customer groups12

Source: erc.com.mk

Page 13: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 13

Location of renewable energy sources - solar

13

Source: Photovoltaic GeographicalInformation System (PVGIS),

Page 14: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 14

Location of renewable energy sources - wind

14

Source: AWS Truewind

Page 15: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 15

RES installed capacity since 2012

??

15

(MW) 2012 2015 2020

Wind 0 36 100

Small HPP 36 80 130

PVs 3.8 10 25

0

50

100

150

200

250

300

2012 2015 2020

PVsSmall HPPWind

Source: http://iceor.manu.edu.mk/

MW

Page 16: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 16

Price development for tariff customers

16

7,00

7,20

7,40

7,60

7,80

8,00

8,20

8,40

2012/13 2013/14 2014/15

EVN - average price for tariff customers

Source: erc.com.mk

EUR cents/kWh

Page 17: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 17

Electricity market organisation

17

Page 18: The Electric Power System - Homepage - Cigre Power System 6 Map of the high voltage grid 6 GREECE BULGARIA SERBIA ALBANIA Kumanovo 1 K.Palanka Kratovo Kocani Delcevo Berovo Veles Prilep

Macedonian Power System 18

Power balance in 2014

Generation 4982 GWh Consumption 7850 GWh Imports (physical) 5598 GWh Exports (physical) 2529 GWh Losses 201 GWh

18

Source: erc.com.mk