The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars
26

The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

Dec 17, 2015

Download

Documents

Loraine Lawson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

The ecar Ireland Project

Smart Grid Technology Watch EventSeptember 18th 2014

John Whelan, ESB ecars

Page 2: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

2

www.esb.ie/ecars

Agenda

• The ecar Ireland Project – Conception

• Electric Vehicles in Ireland

• Charge Point Infrastructure

• Charge Point Management System

• Grid Impacts

Page 3: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

3

www.esb.ie/ecars

Agenda

• The ecar Ireland Project – Conception

• Electric Vehicles in Ireland

• Charge Point Infrastructure

• Charge Point Management System

• Grid Impacts

Page 4: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

4

www.esb.ie/ecars

• Government targets 2020

- 10% of all vehicles electric

- 10% of all road energy transport

will be renewable• Early supply of electric cars

- MOU signed with Mitsubishi, Renault-Nissan and Toyota

• Government incentives - €5000 grant- Zero VRT- Lowest road tax band- Accelerated Capital Allowance

(Businesses)- Government taskforce to deliver

other incentives• ESB is rolling out the infrastructure

Ecar Ireland Program

Page 5: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

5

www.esb.ie/ecars

• Large wind penetration

• Limited range between cities

• Type of homes

• Good climate for batteries

• Single network company

Ireland as a Test Bed for Electric Vehicles

Page 6: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

6

www.esb.ie/ecars

50 g/km

0 g/km

130 g/km

150 g/km2010

130 g/km2015

WIND

GAS

COAL

End of chain emissions

Electricity Generation

CO2 Emissions

Internal Combustion Engine

Page 7: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

7

www.esb.ie/ecars

Agenda

• The ecar Ireland Project – Conception

• Electric Vehicles in Ireland

• Charge Point Infrastructure

• Charge Point Management System

• Grid Impacts

Page 8: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

8

www.esb.ie/ecars

Electric Vehicles in ESB’s Fleet

Old Electric Vehicles from 1950 - 1970

Current Electric Vehicles – Allied Peugeot / Micro-vett Fiat Fiorino / Smiths Edison

Page 9: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

9

www.esb.ie/ecars

Nissan Leaf

Renault Kangoo

Electric Vehicles Available in Ireland

Mitsubishi iMiEV

Renault Zoe

Mitsubishi Outlander

BMW i3

Page 10: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

10

www.esb.ie/ecars

Other Electric Vehicles in IrelandSmiths Newton (Celtic Linen)

Smiths Newton (Grange Builders Providers)

Smiths Newton (OPW)

Page 11: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

11

www.esb.ie/ecars

All Major Car Manufacturers Have EV Programs

Page 12: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

12

www.esb.ie/ecars

EV Components

Battery Pack

Charger + DC-DC Converter

Inverter

AC Motor

Page 13: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

13

www.esb.ie/ecars

Agenda

• The ecar Ireland Project – Conception

• Electric Vehicles in Ireland

• Charge Point Infrastructure

• Charge Point Management System

• Grid Impacts

Page 14: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

14

www.esb.ie/ecars

HOME / WORK PUBLIC FAST

6 – 8 hours 1 – 2 hours 80% in 20 minutes

Charging Infrastructure

Page 15: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

15

www.esb.ie/ecars

Home Charge Points

First 2000 installed for free

16/32 amps, single-phase

Fed from customer distribution board

Page 16: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

16

www.esb.ie/ecars

Public AC Charge Points

22kW double socket (three-phase 32 amps)

RFID card reader

GPRS communications with back office

Internal MID metering

Page 17: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

17

www.esb.ie/ecars

Fast Charge Points

DC – CHAdeMO 50kW

DC/AC – CCS 50kW

Fast AC – 44kW

Page 18: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

18

www.esb.ie/ecars

Ireland’s Current Charge Point Network

851 – Domestic and Commercial Charge Points

805 – AC Public Charge Points

61 – Fast Charge Points

1717 - Total

Page 19: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

19

www.esb.ie/ecars

Agenda

• The ecar Ireland Project – Conception

• Electric Vehicles in Ireland

• Charge Point Infrastructure

• Charge Point Management System

• Grid Impacts

Page 20: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

20

www.esb.ie/ecars

Back Office

Page 21: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

21

www.esb.ie/ecars

Agenda

• The ecar Ireland Project – Conception

• Electric Vehicles in Ireland

• Charge Point Infrastructure

• Charge Point Management System

• Grid Impacts

Page 22: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

22

www.esb.ie/ecars

Power Quality Measurements

Page 23: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

23

www.esb.ie/ecars

Charging Profiles (Slow AC) – Nissan Leaf

Current Profile

0

4

8

12

16

20

10:30 11:56 13:22 14:49 16:15 17:42

Time

Cu

rren

t (A

)

Power Factor Profile

0.9

0.92

0.94

0.96

0.98

1

10:30 11:56 13:22 14:49 16:15 17:42

Time

Voltage Harmonics Profile

1

1.2

1.4

1.6

1.8

2

10:30 11:56 13:22 14:49 16:15 17:42

Time

Vo

ltag

e T

HD

(%

)

Current Harmonics Profile

-4

0

4

8

12

16

10:30 11:56 13:22 14:49 16:15 17:42

Time

Cu

rren

t T

HD

(%

)

Page 24: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

24

www.esb.ie/ecars

Charging Profiles (Fast DC) – Nissan Leaf – DBT FCP

Current Profile

0

10

20

30

40

50

60

70

15:12 15:23 15:35 15:46 15:58Time

Cu

rren

t (A

)

I1 I2 I3

Current Harmonics Profile

0

5

10

15

20

25

30

15:12 15:23 15:35 15:46 15:58Time

Cu

rren

t T

HD

(%

)

I1 I2 I3

Power Factor Profile

0

0.2

0.4

0.6

0.8

1

15:12 15:23 15:35 15:46 15:58Time

Po

we

r Fa

cto

r

Reactive Power Profile

-10000

-5000

0

15:12 15:23 15:35 15:46 15:58Time

Rea

ctiv

e P

ow

er (

Var

)

Page 25: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

25

www.esb.ie/ecars

Macro Level Grid Impacts

Page 26: The ecar Ireland Project Smart Grid Technology Watch Event September 18 th 2014 John Whelan, ESB ecars.

Thank You