THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

Mar 12, 2018

Download

Documents

dinhngoc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

Drycleaner sites constitute one of the largest segments of contaminated sites in BC

THE DIRTY SIDE OF A CLEAN

SUIT

Page 2: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

Drycleaner sites constitute one of the largest segments of contaminated sites in BC

THE DIRTY SIDE OF A CLEAN

SUIT

Page 3: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

58 58

CSAP PD Workshop

The Dirty Side of a Clean Suit October 28, 2015

Lesley Reid, M.Eng.,P.Eng.,CSAP Christine Patterson, P.Eng.

Page 4: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

59 59 59

History • Petroleum based solvent < 1950s • Chlorinated based solvent > 1950s • Current solvent of choice

- Perchloroethylene - Tetrachloroethylene - PERC - PCE

Page 5: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

60 60 60

The Equipment • Four Basic Components

- Holding Tank (solvent) - Pump - Filter - Basket

Page 6: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

61 61 61

Equipment Evolution

• First Generation (Transfer) • Second Generation (Dry to Dry)

- Air discharged to atmosphere with or without a carbon adsorber

• Third Generation (Dry to Dry Closed) - Refrigerated condenser (primary control)

Page 7: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

62 62 62

Equipment Evolution

• Fourth Generation - Refrigerated condenser and carbon adsorber (secondary control)

• Fifth Generation - Monitoring of vapours at end of cycle

Page 8: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

63 63 63

The Equipment

• First Generation banned January 2004 • Second Generation banned August 2005 • Third and Fourth Generation most common

Page 9: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

64 64 64

The Process

• “Washing Phase” - Constant flow of clean solvent - Spent solvent cleaned via filter - 1,500 gallons of solvent/hour

Page 10: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

65 65 65

The Process

• “Extraction Phase” - Solvent physically captured - Solvent in air vapourized and condensed - Solvent distilled and water and vapours separated - Clean solvent returned to tank

Page 11: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

66 66 66

What is the big deal?

• All a matter of the nature of the contamination • PERC is a Dense Non-Aqueous Phase Liquid

(DNAPL) • DNAPLs are heavier than water

Page 12: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

67 67 67

What is the big deal?

• Migration governed by gravity and geological stratigraphy

• Low solubility • A little goes a long way • Source of environmental, health & financial liability

Page 13: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

68 68 68

LNAPL vs DNAPL

Page 14: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

69 69 69

Primary Degradation Products

Page 15: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

70 70 70

Site Visit Tips

• Configuration of space • History of operations • Generation of equipment • ASTs • Waste management (back door dumping)

Page 16: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

71 71 71

Site Visit Tips

• Floor anchors/bolts • Missing floor tiles or damaged flooring • Location of floor drains • Chemical storage • Waste management

Page 17: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

72 72 72

Site Visit Tips Always Ask How Can The Operations Impact The Environment? • Operation History • Waste Management - Filters - Sludge - Wastewater

Page 18: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

73 73 73

Site Visit Tips

• Chemical Usage/Storage - Volume of solvent/1000 kg of clothing • Drains • PERC resistant drain plugs - Equipment - Secondary Containment (size, construction, material)

Page 19: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

74 74 74

Dry Cleaning Fluid Added

Rag Storage

Page 20: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

75 75 75

Filters on Closed Loop Systems

Wastage during adding/removing Fluids

Page 21: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

76 76 76

Staining on Tile

Waste Storage

Page 22: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

77 77 77

Waste Handling

Page 23: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

78 78

Challenges with Chlorinated Solvent Sites

Page 24: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

79 79 79

Delineation

• Good CSM

• Large Plumes • Deep Depths

• DNAPL (Chemical compatibility)

CSR Schedule 6/10 Commercial

Drinking Water (µg/L)

PCE 30 TCE 5 VC 2

Page 25: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

80 80 80

Successful Remediation

• Adequate Delineation • Understanding Technology Limitations on Target

• Remediation Timelines

Page 26: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

81 81 81

Typical Remedial Strategies Advantage Disadvantage

Excavation • Quick timeframes

•Removal of DNAPL and high source areas

•Can provide access for insitu phase

•Visual of contamination

• Limited impact on residual gw

•Limitations near/under building

•Not practical for large area deep plumes which are typical

DPE/ MPE (high vacuum)

• can address gw, vapour, and soil at one time

•Can be installed under buildings

•Mitigate vapour migration during active remediation

•Longer timeframe

•Limitations to reach low level concentrations (DW PCE 30 ug/L)

•Requires pilot scale for final design High operating costs (electrical $$$)

Page 27: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

82 82 82

Advantage Disadvantage Insitu (ISCO or Bio)

• an be used at operating sites as limited site disruption

•Can be used on deep contamination plumes where there are limited options.

• ISCO requires direct contact with contaminants •Bio degradation can cause increase in more harmful contaminates (VC)

• tight geology

•bench and pilot scale testing

•Higher Risk for clients due to uncertainty on cost and timeline

•Utilities

•NOD can limited applicability

Typical Remedial Strategies (Cont.)

Page 28: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

83 83

Innovative Integrated Strategies for Sites

Page 29: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

84 84 84

Risk Assessment Approach

• Human Health - Drinking Water Exclusion Zone - Vapours – RA or control • Eco – Biochlor to Model impact to Environment • Administrative - NOMs

Page 30: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

85 85 85

Criteria- Groundwater

CSR Schedule 6/10 Commercial Drinking

Water (µg/L)

From EPA IRIS DW Unit Risk

(µg/L)

PERC 30 200 TCE 5 5 VC 2 0.48 EPA IRIS risk level E-5 (1 in 100,000) Lifetime exposure during adulthood

Page 31: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

86 86 86

Criteria- Vapours

CSR Schedule 11 Commercial (µg/m3)

From EPA IRIS RfC (µg/m3)

PERC 2000 120 TCE 0.5 6 VC 3.5 7 EPA IRIS risk level E-5 (1 in 100,000) Commercial Exposure factor of 0.33 as per BC MOE CSR CSST lLifetime exposure during adulthood

Page 32: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

87 87

Summary

Page 33: THE DIRTY SIDE OF A CLEAN SUIT Drycleaner sites … Schedule 6/10 Commercial Drinking Water (µg/L) PCE 30 ... Advantage . Disadvantage . Excavation • Quick timeframes •Removal

88 88

Questions?