Top Banner
MB MB The Design, Construction The Design, Construction and Testing and Testing of a Human-Powered of a Human-Powered Moonbuggy Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers Univers January 31, 2000 January 31, 2000 Moon Buggy Moon Buggy Squad Squad Katie Baxter Thomas Malone II Teretha Blackburn Rob Hartelust
19

The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

Dec 14, 2015

Download

Documents

Roberto Sorrels
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

MBMB

The Design, Construction and Testing The Design, Construction and Testing of a Human-Powered Moonbuggyof a Human-Powered Moonbuggy

Faculty Advisor: Dr. Paul Shiue

Industry Advisors: Dr. Paul Shiue Christian Brothers University

January 31, 2000January 31, 2000

Moon Buggy SquadMoon Buggy Squad

Katie Baxter

Thomas Malone II

Teretha Blackburn

Rob Hartelust

Page 2: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

2MBMB

NASANASA - Authority in Space Research

NASA is deeply committed to spreading the unique knowledge that flows from its aeronautics and space research….

Page 3: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

3MBMB

NASA Sponsors

• High-school and college students develop a human-powered moonbuggy.

• Competitors engineer solutions to similar problems faced by NASA with the lunar rover.

Page 4: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

4MBMB

The Race Is ...

• At Marshall Space Flight Center in Huntsville, Alabama

• On April 8, 2000 (college division only)

• 1/2 Mile in Length with 15 obstacles

Page 5: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

5MBMBThe Course Has 15 Obstacles Around The Course Has 15 Obstacles Around

the Space Centerthe Space Center

Page 6: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

6MBMB

Race Conditions Simulate Lunar Surface

• Course consists of a rocky, dusty terrain with 180o

turns.

• Surface may include one or more of the following at each obstacle: – “Craters”

– “Lava” ridges

– Inclines (up to 30o)

– “Lunar” soil, crushed limestone gravel, sand or grass

Page 7: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

7MBMBNASA Presents

Design Constraints for Moonbuggy

• Max dimensions unassembled: 4’ X 4’ X 4’

Lunar Rover

• Maximum dimensions assembled: 1.) 4’ width

2.) 15” clearance from passenger to ground

Page 8: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

8MBMBThe Moonbuggy Constraint List

Continues

• Maximum allowable turning radius: 20ft

• Seat restraints for each passenger

• No sharp edges or protrusions

• Features: – Simulated T.V. Camera

(2”x3”x6”)

– Simulated electronic controls-radio & display console (1 cubic ft combined)

– Two simulated batteries (4”x6”x8” each)

– 2’ satellite dish

– U.S. flag

– Moon dust abatement device(s)

Page 9: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

9MBMB

Ergonomics Is Addressed

• Combined weight of racers = 350 lbs.

• Max carry capacity per person = 75 lbs.

• Vehicle weight alone = 150 lbs. max

GoalGoal: :

Max combined weight of moonbuggy + racers = Max combined weight of moonbuggy + racers = 500 lbs.500 lbs.

Page 10: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

10MBMB

Scattered Puzzle Pieces

• Chassis Structure

• Drivetrain

• Steering

• Pedals & Seats

Page 11: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

11MBMB

Frame and Chassis Must be Simple but Effective

• Easy to Assemble and Take Apart

• Gear and Drive Train Protection

• Maintain Structural Integrity

Page 12: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

12MBMB

Chassis Material Specified

• Performed static and dynamic loading on chassis component under highest stress (seat support)

• Determined that 2” x 2” x 1/4” 6061-T6 aluminum square tube can withstand these stresses with a safety factor of 10

Page 13: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

13MBMB

Folded Moonbuggy Fits Volumetric Constraint

• After viewing footage from previous races, the necessity of quick race time construction became apparent.

• Moonbuggy squad has developed a way for the chassis to fold in two.

• Caused some design modifications.• Will limit race-time construction to unfolding and putting together chains.

Page 14: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

14MBMB

Internally Geared Hub Chosen Over Derailleur Style Gear

• Internal Hub– chain length remains constant

– housed gears are not exposed to the environment

– easier to mount

– possible to attach brake to exterior of hub

– can shift at a standstill

• Derailleur system– gears are exposed to environment

– chain alignment is very important and difficult to maintain

– interferes with ground clearance

Page 15: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

15MBMB

Total Cost Estimate

• Parts : $1800• Chassis Material : $300 (6061 T-6 Al)

• Labor : $50/hr (2hr w/ certified welder)

• Travel Expenses : $700• Total Cost : $3000

Page 16: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

16MBMB

Short Term Goals Set

• Seek more sponsors• Continue to acquire parts • Finish modeling prototype in ProEngineer• Acquire aluminum tubing and begin chassis

construction

Page 17: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

17MBMBTimeline Is Intact For 2000

MonthWeek 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Gain Corporate Sponsors

Prototype Design & Evaluation

Parts Acquisition & Construction

Working Prototype Evaluation

Prototype Modification

Final Presentation Creation

Race Preparation

Competition Day

Poster

Report Apr 25

April 17

January February March April

April 8

Mar 25

Page 18: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

18MBMB

For Updates on The Moonbuggy Squad

Go to the following url:

1.) http://www.cbu.edu/~tmalone/moon.html

Page 19: The Design, Construction and Testing of a Human-Powered Moonbuggy Faculty Advisor: Dr. Paul Shiue Industry Advisors: Dr. Paul Shiue Christian Brothers.

19MBMB

Any Questions or Suggestions?