Page 2
The Corsican Defence
Page 3
Restoration of Martello Tower No.7
Killiney
Page 4
Killiney: the curve of the Bay
Page 6
Loughlinstown Camp – from Ferrar
Page 7
Henry Luttrel - 2nd Earl of Carhampton
Page 8
La Chaussée's Report
Page 9
La Chaussée – orders to determine troop deployment
Page 10
La Chaussée – a straight bay
Page 11
La Chaussée – map accompanying report
Page 13
2nd La Chaussée map – detailing coastal defence positions
Page 14
Interactive Map
La Chaussée Report
Building the Towers
Interactive Google Map - Killiney Bay 1793-1815
Page 15
No 7 Tower (south)
Page 16
Plan of Tower No.7 1831
Page 17
OS 25” Map c. 1900
Page 20
Du Noyer 1866 - detail
Page 22
Boundary marker at break in cliff at Military Road (Lime Kiln)
Page 23
Base of gunrail at No.8 incorporated in Underpass
Page 24
Dismantled versus Demolished - No.5 Battery c.1900
Page 25
Dismantled versus Demolished - No.5 Battery
Page 26
No5 Today – Community Youth Recreation Centre?
Page 27
No.5 – Cliff erosion since 1812.
Page 28
Public Private Partnership
Page 29
Military map 1883
Page 30
Killiney & Ballybrack UDC Town HallLeased Tower 1897: Bought 1909
Page 31
1940s – 1970s : Outbuildings (photo 1979) Rate Collector's Office & Legion of Mary Hall
Page 32
1969: Borough Engineer re use of Tower
Page 33
Killiney & Ballybrack Township Merryweather HoneycartFound in Storeroom at No.7 Tower in 1977
Page 34
Merryweather in Howth Transport MuseumNote “Killiney and Ballybrack UDC” on side
Page 35
Minister of State Barrett to the Rescue 1987
Page 36
Detail from Borough inspection
Page 38
RESTORATIONAll hands on Deck:- 250 people involved
Ridding the Rubbish: - 230 x 20 ton lorryloads @ €1,600 each = €368k
Total cost to date:- €2m
Page 39
Aerial 1968 – all the elements
Page 40
Aerial 1982 – some elements gone
Page 41
Aerial 1992 = Site at start of Restoration
Page 43
2002 Guardroom and Battery Wall
Page 44
Rebuilding the Battery Wall
Page 45
Coach House in Ruins
Page 46
Glacis - Boundary Stone No 3 – Sticks show Line of Former Wall
Page 47
Repairing the Roof
Page 48
Pointing the Tower and making New Granite Entrance
Page 49
Winter Snow Gunner's Cottage, Coach House, Tower & Artillery Room
Page 50
The Niallbarrow – Hands On
Page 52
Pattern for casting Cannon
Page 53
From the Movie: Casting
Page 54
From the Movie: Doug & Sylvia
Page 55
From the Movie: Niall post proofing
Page 56
From the Movie: Installing the Carriage
Page 57
From the Movie: Lowering the Cannon into place
Page 59
The Finished Product
Page 60
Dry Moat restored
Page 61
Machicolation and Restored Old Doorway
Page 63
Artillery Man's Gear
Page 64
Tackle for raising Cannon etc.
Page 65
View through Artillery Room Musket Loop
Page 66
24 pounder position from inside the Tower
Page 67
No.7 Tower – Boundary Marker No.5
Page 68
Surplus earth/rubbish gone – perimeter wall restored
Page 69
French in our Sights ?
Page 70
No.7 – Model - Overview
Page 71
No.7 – Model - Glacis
Page 72
Google satellite image of present site
Page 73
Bhfuil Cead Agam ...
(a little paperwork)
Page 74
Cannon Import Licence - elements
Page 75
Part of supporting documentation for licence to import cannon
Page 76
Licence to Keep a Cannon
Page 77
Permission to Make Noise
Page 78
Permit to hold Powder
Page 79
Garda General Firing Conditions
Page 80
Garda Authorisation for Blank Discharge of Muskets
Page 82
Inauguration / Firing
Page 83
Film of Firingwith music
no7_inaug-3shot-finale.wmv
Page 84
The Corsican Defence