Top Banner
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013
10

The Corporation of the Town of Amherstburg Public Works Department

Dec 30, 2015

Download

Documents

Stephen Hunter

The Corporation of the Town of Amherstburg Public Works Department. 2013. CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013. ROADS DEPARTMENT. Texas Road Reconstruction – 2 Year Program $ 6,000,000 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Corporation of the Town of Amherstburg Public Works Department

The Corporation of theTown of Amherstburg

Public Works Department

2013 CAPITAL BUDGET

Presented to:

The Heavy Construction AssociationMarch 20, 2013

Page 2: The Corporation of the Town of Amherstburg Public Works Department

ROADS DEPARTMENT• Texas Road Reconstruction – 2 Year Program $ 6,000,000• Sandwich Street Surface Asphalt Rehabilitation $ 615,000• 6th Conc. North Resurfacing – Phase 2 of 2 $ 387,500• 2013 Tar & Chip Program $ 200,000• County Wide Active Trail System Contribution $ 110,000 • Roads Needs Study Update $ 75,000• Sandwich Street Alignment of Lanes & Line Painting $ 40,000• Traffic Signal Control Cabinet Replacement Program $ 25,000• Tree Inventory Update $ 20,000

$ 7,472,500

Page 3: The Corporation of the Town of Amherstburg Public Works Department

ROADS DEPARTMENT - BRIDGES

• Bi-Annual Bridge Inspections – Engineering

$ 20,000• Bridge over Sucker Creek at 8th Conc. - Structural Investigation

$ 4,120

$ 24,120

Page 4: The Corporation of the Town of Amherstburg Public Works Department

ROADS DEPARTMENT – MUNICIPAL DRAINS• North Townline Drain Culvert Replacements $ 180,000• Dufour Drain Improvements $ 150,000• Leo Beaudoin Drain Culvert Replacements $ 85,000• Major Drain & Extension Culvert Replacements $ 36,000• 8th Concession Road Drain Culvert Replacements $ 30,000• Collison Drain – New Access Culvert $ 16,900• George Anderson Drain Culvert Replacement $ 16,230• Hamel Drain – New Access Culvert $ 14,960

$ 529,090

Page 5: The Corporation of the Town of Amherstburg Public Works Department

SANITARY SEWER COLLECTION SYSTEMS

• King Street Sanitary Sewer Renewal – Phase 2 From Gore to Richmond $ 350,000

$ 350,000

Page 6: The Corporation of the Town of Amherstburg Public Works Department

SANITARY TREATMENT SYSTEMS• Amherstburg Wastewater Treatment Plant• Connection of Edgewater Lagoon System to Plant $ 1,600,000

• Boblo Wastewater Treatment Plant• Standby Generator – Portable Unit $ 50,000

• Big Creek Wastewater Treatment Plant• Sewage Pump Replacement – Pump 1 of 2 $ 10,000

$1,660,000

Page 7: The Corporation of the Town of Amherstburg Public Works Department

WATER DISTRIBUTION SYSTEM

• Riviera Place/Drive Watermain Upgrade $ 225,000• 6th Concession North Watermain Upgrade $ 220,000• Hamilton/Wilkinson Court Watermain Upgrade $ 190,000• Automatic Radio Meter Reading Program $ 97,500• Redevelopment of Old Water Tower Site at Alma & Venetian $ 30,000

$ 762,500

Page 8: The Corporation of the Town of Amherstburg Public Works Department

AMHERSTBURG WATER TREATMENT PLANT

• Construction of New Clarifier – 2-year project (2013 funds) $ 262,000• SCADA System Implementation $ 100,000

$ 362,000

Page 9: The Corporation of the Town of Amherstburg Public Works Department

MISCELLANEOUS EQUIPMENT

• 8-Ton Dump Truck w/ Salter, Plow & Wing $ 225,000• 1-Ton Dump Truck w/ Salter & Plow $ 75,000• General Maintenance Pickup Truck $ 40,000• Sewer & Water Locates Pickup Truck $ 40,000• Weather Stations (2 per year) $ 3,500

$ 383,500

Page 10: The Corporation of the Town of Amherstburg Public Works Department

2013 CAPITAL PROJECTS• Roads Division $ 8,025,710• Wastewater Division $ 2,010,000• Water Division $ 1,124,500• Miscellaneous Equipment $ 343,500

Total 2013 Capital $ 11,503,710