Top Banner
15

The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

Mar 29, 2015

Download

Documents

Josue Gobble
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.
Page 2: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six patrol boats.

2013 years prototype is builted and tested, and complies with all European and ASME standards

Rektor 40ft mobile LNG container tank are certified for all modes of transport (road, rail and maritime) and were approved by Bureau Veritas (Paris, France).

All components of the LNG tank are from world renowned manufacturers.

Rektor 40ft mobile LNG container tank particular stands out with high grades in crash tests (Piacenza,Italy), as well as long holding time.

Page 3: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

Company headquarters is located in Rijeka.

Ribarska 4,51 000 Rijeka,[email protected]

Factory for the production of LNG container tanksis located in Galizana, 5 km from Pula.

Page 4: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

DESIGNED LNG TANK- according with requirements of:

- ASME (Boiler and Pressure Vessel Code-BPVC),section VIII Division 1 - EN 13530-22:2002 Cryogenic vessels- Large transportable vacuum insulated vessels

The product satisfactory:

RID - International Regulations for the carriage of Dangerous Goods by train ADR - European Agreement Concerning the International Carriage of Dangerous Goods TPED- Transport Pressure Equipment Directive 2008/68/EC UIC - International Union Of Railways IMDG- International Maritime Dangerous Goods CSC - Container Safety Convention

Page 5: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

- TYPE OF PRODUCT: - Transport of liquidfied natural gas (LNG)

UNT 75

- SIZE : - 40 ft

- THE MAX. GROSS WEIGHT: - 30580 kg( in accordance with ISO 668;1995)

- TARE WEIGHT: - 14780 kg

- MAX LOAD: - 15280 kg

- DIMENSIONS: - In accordance with ISO 668;1995 1AA

- POSITION EQUIPMENT FLANGES: - Front size for easy connection and

accessibility of valves

- NOMINAL VOLUME: - 35 000 liters

Page 6: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

INTERNAL PRESSURE VESSEL:

- MATERIAL : - Stainless steel X6CrNiTi18-10 / EN 10028-7

AiSi 321 / 1.4541

- DESIGN TEMPERATURE : - -196°C to + 50°C

- DESIGN PRESSURE : - 7,6 bar

- SURGE PLATES: - 5 transversal surge plates

EXTERNAL PRESSURE VESSEL:

- MATERIAL: - Carbon steel P355 NL2

- DESIGN PRESSURE: - +/- 1,0 bar

Page 7: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

INSULATION: - TYPE OF INSULATION: High vacuum with multi-layer insulation reflection foil - HEAT INPUT: 255 W - HOLDING TIME: 60 days

FRAME STRUCTURE: - SIZE: - 40 ft ISO container - MATERIAL: - Carbon steel S355 J2H - STACKING LOAD: - 5xtank container on top ( summary 6xTC )

EQUIPMENT: -PIPING MATERIAL: - Stainless seamless steel X6CrNiTi 18-10 - VALVES TYPES: - Globe type operation valves –Vacuum gate valves - TYPE OF CONNECTIONS:- Dry quick coupling with dry emergency release

OPTIONS: - PUMPING SYSTEM: Optional to facilitate rapid discharge of product - ALUMINUM EVAPORATOR- heater - FLOW METER IN DELIVERY LINE

Page 8: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.
Page 9: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

T E S T I N G

- TEST IN: - Piacenza collaudi & manutenzioni ( PCM ) - Italy

- Test report: - 348/13

TEST REPORT issued on basic of CSC; UIC; ADR; RID; IMDG Code

- IMPACT TEST- carried out according to IMDG Code ( par. 6;7;2;19.1 ) and manual of test and criteria ( part IV, section 41)

TEST APPROVAL : BUREAU VERITAS-Industry division

Page 10: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

CERTIFICATE OF PROTUTYPE- BUREAU VERITAS

Page 11: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

Application 40ft LNG tank container:     1.-Transport by land - over 1,000 miles       -transport by sea    

Page 12: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

LNG CONTAINER WITH

STANDARD EQUIPEMENTCONSUMERS

EVAPORATOR

SMAL CONSUMER

2. Useful for small consumers- container is transported by land transport and it is set into place, combined with the installation and after consumed gas is replaced with new container ( for schools, hospitals…)

Page 13: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

LNG CONTAINER WITH

STANDARD EQUIPEMENTCONSUMERS

EVAPORATOR STATION

3. Useful for big consumers – connecting on gas piping line (small town,big factories…)

Page 14: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

4. LNG FUEL TANK CONTAINER FOR SHIPS - the Alternative to conventional LNG bunkering - project up to 90 days unattended holding time

Page 15: The company is built on the foundations of two companies that are engaged in shipbuilding and making patrol boats. In 2007 the company has produced six.

Visit us on our website www.rektor.hr

Or contact us on:

E-mail: [email protected]

Rektor Ltd,Ribarska 4,51000 Rijeka,Croatia

Thank you for your attention!