Page 1: The Cahill Expressway Passenger Lifts

The Cahill Expressway Passenger Lifts

The construction of Sydney’s

newest landmark……….

Page 2: The Cahill Expressway Passenger Lifts

•Tourist exposure demanded shortest possible construction time,

•Difficult access due to expressway,

•Equipment exposure to weather,

Major Project Constraints:

Page 3: The Cahill Expressway Passenger Lifts

The Solution…

Construct the Lift Cars and the Lift Shafts...

SIMULTANEOUSLY

Page 4: The Cahill Expressway Passenger Lifts

The logistical process commences with the procurement of the equipment within our NSW store...

Page 5: The Cahill Expressway Passenger Lifts

Pre-assembly of the lift cars in our Matraville store

Page 6: The Cahill Expressway Passenger Lifts

In our controlled store environment assembly perfection was achieved…

Page 7: The Cahill Expressway Passenger Lifts

Pre-assembly of entire lift car including buttons & air conditioning…

Page 8: The Cahill Expressway Passenger Lifts

Meanwhile...on the other side of Sydney, construction of the lift shaft continues…

Page 9: The Cahill Expressway Passenger Lifts

Precise planning was necessary from both Reed Constructions & Liftronic...

Page 10: The Cahill Expressway Passenger Lifts

Taking shape...

on multiple work faces...

Page 11: The Cahill Expressway Passenger Lifts

The busy Cahill Expressway remained open throughout construction process...

Page 12: The Cahill Expressway Passenger Lifts

Completed lift cars exit our Matraville Store...

Page 13: The Cahill Expressway Passenger Lifts

Transporting the completed lift cars from Matraville to site was a delicate operation...

Page 14: The Cahill Expressway Passenger Lifts

Night installation of the lift cars reduced inconvenience to city traffic…

Page 15: The Cahill Expressway Passenger Lifts

Final Commissioning...

Page 16: The Cahill Expressway Passenger Lifts

A team effort between Reed Constructions and Liftronic resulted in Sydney’s new landmark…

Page 17: The Cahill Expressway Passenger Lifts

The Cahill Expressway Passenger Lifts.

Page 18: The Cahill Expressway Passenger Lifts

A world renowned tourist destination…

... made even better.

Page 19: The Cahill Expressway Passenger Lifts

Project Details: Cahill ExpresswayClient: Road Traffic Authority (NSW) Architect: Noel Bell Riddley & PartnersBuilder: Reed Constructions Pty. Ltd

Lift Specification:Type: UNITRONIC II PASSENGER LIFTSLoad: 1360 KG (20 PERSONS)Speed: 1.0 m/sControl: V.V.V.F. DuplexTravel: 16.3mFloors: 2

Page 20: The Cahill Expressway Passenger Lifts

Another successful lift installation completed by LIFTRONIC PTY LIMITED

The Largest Australian OwnedLift Company