Page 1: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

The BoNuS Detector

Concept

Design

Status

Howard Fenker March 11, 2005

Page 2: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Detector Concept

Page 3: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Detector Parameters

• Geometric Acceptance– Sensitive over 148 deg. In phi, 20cm in Z.

• Momentum Acceptance– Protons from ~70 MeV/c

• Proton Identification (next slide)

• Vertex Z resolution <~ 10mm• Track Momentum Resolution • Track E information from dE/dx - studying

• Rate & Timing Issues

Page 4: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Proton ID by dE/dx & Curvature

100 MeV/c pion 100 MeV/c proton

Page 5: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Detector Parameters

• Rate & Timing Issues– Track latency in sensitive gas: 1-2 us– Electronic memory prior to trigger: 1.5 us– Event Size: 0.5 – 10 kBytes (background?)– Deadtime

• Trigger: ~= charge collection interval. ALTRO is ready for new trigger immediately afterwards.

• Data Readout Rate: > 20 Mbytes/second• Expected event rate capability: 2 kHz

Page 6: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Detector Development

• Prototype – flat, ‘standard’ GEMs• Test• Prototype – curved, ‘standard’ GEMs• Test• Prototype – flat, custom GEMs• Test• Production – curved, custom GEMs• June test run in CLAS

Page 7: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Prototypes

Page 8: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Production Model: Exploded View

Page 9: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Production Model

Page 10: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

BoNuS Target (11/04)

Page 11: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

BoNuS in CLAS

Page 12: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Electronics Development

• Commercial CAMAC Modules – 8 ch.

• Test the whole concept– Cosmic / Source / TUNL Run1

• ALTRO Test Board – 16 ch.– Cosmic / Source / TUNL Run 2

• ALTRO Production System – 128 ch.– Cosmic / Source / TUNL Run 3

• Final ALTRO System – 3200 ch.

Page 13: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

BoNuS Signal Readout System

Page 14: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

ALICE and BoNuS Readout System

BoNuS Carrier Card

ALICE FECALICE RCU

RibbonsToRTPC

Page 15: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

pRTPC w/ Inverter/Driver Cards

RibbonsToReadoutSystem

Page 16: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Detector System Tests

• Readout – 128 channel tests – Analog Electronics

• Prototype test results. – Software– Straight tracks– dE/dx

Page 17: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Proton Tracks at TUNL

Page 18: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

dE/dx Analysis from TUNL

Page 19: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

dE/dx Analysis from TUNL

Page 20: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

dE/dx Analysis from TUNL

Page 21: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Detector Status (1/2)

• Detector Module – Parts Fabrication complete by 4/1– Assembly Complete by 5/1

• Electronics– ALTRO working. Needs faster microcode– $40K fabrication order going out next week

• Uncertain how much available for June test• 6% (256 ch) available on prototypes NOW

Page 22: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Detector Status (2/2)

• Target, Support & Alignment System– Design nearing completion– Fabrication needed by 5/1

• Infrastructure– Gas Lines & Cables pulled in Hall-B– Power available– Need slow controls, DAQ Interface– Detector / Target Gas Panels by 5/1

Page 23: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Bonus Detector Outlook

• Detector Parts Delivery 4/1• Detector Assembly 4/1-5/1• Electronics Fabrication 3/15-5/1-??• Assemble Detector, Target, Support, Readout

5/1-5/15• Checkout: 5/15 – 5/30• Hall-B Install & Test 5/31 – 6/8• Physics Run October 20 – December 22

Page 24: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

Software Needs Work, too!• DAQ: Interface w/CLAS data structure• Event visualization – OK and improving• Track Fitting - Straight Tracks OK and

improving

• Need to incorporate– Vdrift(R) (ongoing)– B-Field– Lorentz angle

• Need Simulation and Simulated Data

RHIT vs. Time Bin(Vdrift varies with R)

Curved e- DriftN.B.: nonuniform B

Page 25: The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.

BoNuS Detector

• Much done.

• .

• .

• .

• Plenty to do.