The Anatomy of a Stormwater Retention System

Jul 14, 2015

Download

Environment

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: The Anatomy of a Stormwater Retention System

1

Page 2: The Anatomy of a Stormwater Retention System

The purpose of a stormwater retention system is to retain as much of the rainwater in the native soil as possible while facilitating proper filtration of any excess runoff during storm events.More about this project is in this Facebook Album:

http://bit.ly/RBCTransport

2

Page 3: The Anatomy of a Stormwater Retention System

The retention system allows any excess runoff from the site’s parking lots during rain events to be filtered then directed to the city’s storm drain.

3

Page 4: The Anatomy of a Stormwater Retention System

At the recently completed project for RBC Transport Dynamics, the city storm drain empties into the Pacific Ocean.

This project has a bio-swale and permeable concrete. Permeable concrete is often referred to as “magic concrete."

4

Page 5: The Anatomy of a Stormwater Retention System

Part 1: Bio-Swale

5

Page 6: The Anatomy of a Stormwater Retention System

Step 1: Prepare Trench.This is the first cut of the bio-swale trench. In totality it's about 24" deep.

6

Page 7: The Anatomy of a Stormwater Retention System

Step 2: Line the Trench with Filter Fabric.Step 3: Place and connect 20' sections of pipe, then wrap with Filter Fabric, and place on top of Filter Fabric at the bottom of the trench.

7

Page 8: The Anatomy of a Stormwater Retention System

Step 4: Add Aggregate125 tons of aggregate is added to the trench and put on top of the wrapped perforated pipe. This aggregate filters the storm water before it is fed through the pipes that eventually end up into the ocean.

8

Page 9: The Anatomy of a Stormwater Retention System

Step 5: Add Dirt & Form the Bio-Swale.Dirt is gingerly placed, though with heavy equipment, on top of the aggregate. This is a delicate process as the filter fabric cannot be ripped or displaced during this step.

9

Page 10: The Anatomy of a Stormwater Retention System

Step 6: Plant Vegetation

The design-build landscape architect chose plants that are able to consume and filter much of the parking lot runoff before it enters the storm drain system.

10

Page 11: The Anatomy of a Stormwater Retention System

Part 2: Permeable Concrete

11

Page 12: The Anatomy of a Stormwater Retention System

Step 1: Prepare Trench.Step 2: Line Trench with Filter Fabric.Step 3: Place and connect 20' sections of unwrapped perforated pipe.

12

Page 13: The Anatomy of a Stormwater Retention System

Step 4: Connect small perforated pipe to the larger pipe which is the main drain pipe.The white perforated pipe receives water, filtered through the layers of aggregate, underneath the permeable concrete and feeds into the black pipe. The black pipe directs the water away from the catch basin shown in this photo, toward the east, connecting into a larger pipe that runs the length of the site.

13

Page 14: The Anatomy of a Stormwater Retention System

Step 5: Place Aggregate

This is a view of the #57 aggregate over the perforated pipe.

14

Page 15: The Anatomy of a Stormwater Retention System

Step 6: Measure Twice, Pour Once.The worker is standing on the 18" layer of #57 aggregate and he's showing there is 18" remaining. The next 6" layer will be of #8 aggregate followed by 6" of permeable concrete. That leaves 6" of concrete curb in this section of the parking lot.

15

Page 16: The Anatomy of a Stormwater Retention System

Step 7: Place 6" of #8 Aggregate.

16

Page 17: The Anatomy of a Stormwater Retention System

Step 8: Pour 6" of Permeable Concrete In this photo, the team is pouring permeable concrete, at a thickness of 6", over the #8 aggregate.

17

Page 18: The Anatomy of a Stormwater Retention System

Step 9: Power Screed, Add Control Joints, & Cover with Plastic

The plastic is laid out first and is placed over the screed (leveled) concrete once the control joints have been added. The plastic sheeting retains moisture within the permeable concrete while it cures for seven days.

18

Page 19: The Anatomy of a Stormwater Retention System

This is what finished permeable concrete looks like. Notice that it is porous, not troweled-tight like conventional concrete. This concrete should NEVER receive a slurry coating!!!

19

Page 20: The Anatomy of a Stormwater Retention System

Step 10: Stripe and Park

Once the permeable concrete has cured it is able to be striped along with the rest of the parking lot. After the paint dries, you're free to park your car.

20

Page 21: The Anatomy of a Stormwater Retention System