Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Apr 30, 2018

Download

Documents

lyngoc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Thailand PBN ImplementationLessons Learned

Page 2: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Outline

• Introduction: Challenges & Motivation

• PBN Implementation as Response to Challenges

• Supporting Elements for PBN Implementation

• Summary & Conclusion

Page 3: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Introduction:Challenges & Motivation

Page 4: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Thailand Air Traffic Demand Growth

831,910910,315

1,268,399

1,701,380

709,030776,374

1,087,193

1,465,627

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

1,800,000

2,000,0002

00

6

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

20

26

Historical Forecast

Flig

ht

Mo

vem

en

t

Fiscal Year

Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015

Forecast Annual Traffic Volume - Fiscal Year 2016-2026

Overfly

Domestic

International

Total TrafficVolume

RevenueGeneratingFlights

%AAGR 2006-2015 = 8%

%AAGR 2016-2026 = 7%

Note: Assumed GDP growth rate in 2016 of 3.5% per year and GDP growth rate in 2017-2026 at 3.8% per year

Page 5: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Limited Access to Airports

• Many of the runway ends do not have straight-in instrument approaches.

• Some of those airports have high demand for air traffic, for example, for the top 4 provincial airports:

– Phuket

• Offset ILS

– Samui

• No ILS

– Chiang Mai and Hat Yai Airports

• ILS only at one runway end.

Page 6: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

ICAO Assembly Resolution A37-11

• States to complete a PBN implementation plan by 2009 to achieve:-

– Implementation of RNAV and RNP operations (where required) for en-route and terminal areas according to established timelines and intermediate milestones; and

– Implementation of Approach Procedures with Vertical guidance (APV) (Baro-VNAV and/or augmented GNSS)for all instrument runway ends, either as the primary approach or as a back-up for precision approaches.

• 30% by 2010; 70% by 2014, and 100% by 2016

Page 7: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Fleet Capability (2016)

• Navigation capability of aircraft operating in Thailand is quite advanced.

Page 8: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

PBN Implementation as the Response to Challenges

Page 9: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

• A Working Group was founded in May 2007

• To foster collaboration stakeholders in the implementations of PBN and GNSS

• Planning and implementation activities involve participations from

– Department of Civil Aviation (Regulator) [now the Civil Aviation Authority of Thailand (CAAT)]

– Aeronautical Radio of Thailand Ltd (ANSP)

– Thai Airline Operators (Airlines)

– Thai Pilots Association (Pilots)

– Airports of Thailand Public Company (Airport Operator)

National Working Group for PBN and GNSS

Page 10: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

• In June 2009, the Working Group approved the first Thailand PBN Implementation Plan.

• To provide stakeholders with appropriate guidance and timelines for PBN implementation

• The Plan was aligned with the APAC Regional PBN Implementation Plan developed by ICAO APAC PBN Implementation Task Force and the 2007 ICAO Assembly Resolutions.

• The Plan was revised in 2017 to be aligned with APAC Seamless ATM Plan Version 2.0

Thailand PBN Implementation Plan

Page 11: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

PBN Procedure Design Process

Page 12: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

PBN Procedure Design Process

Process complied with

all activities

Doc 9906 Vol. 1

Page 13: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

PBN Approach Implementation

Page 14: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

• February 2009, the Department of Civil Aviation has approved full operation of PBN Approach Procedures for Phuket International Airport.

• These procedures enhance safety and efficiency in the approach operation by providing straight-in approaches for the two runway ends

First PBN Approaches in Phuket

Page 15: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Phuket RWY 27: LLZ (1.4-deg Offset) vs PBN

Page 16: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Phuket RWY 09: VOR (5-deg offset) vs PBN

Page 17: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

PBN Approach Implementation Progress

(Total 37 airports / 67 runway end)

Domestic

12 airports / 21 runway end(being designed)

International & Domestic

• 25 Airports / 46 runway end with PBN Approach in 2016• Expected to be fully completed by 2018

Page 18: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

RNP AR APCH Implementation

• To improve accessibility to airport with terrain issues:-

- Hat Yai INTL (RWY 08)

- Krabi (RWY 14)

- Samui (RWY 17)

• By coordination with:-

- Regulator (Civil Aviation Authority of Thailand)

- Airline (Thai Air Asia / Bangkok Airways)

- Air Navigation Services Provider (AEROTHAI)

VTSS VTSG

VTSM

Page 19: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

PBN Terminal Area Implementation

Page 20: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

• Since the opening of Suvarnabhumi Airport (VTBS) in 2006, the SID/STAR for Bangkok TMA were designed to support single-airport operation.

• With re-openning of Don Mueang Airport (VTBD) in 2007, there was a need to redesign the SID/STARs of Bangkok TMA to accommodate dual-airport operation.

PBN Terminal Area Example: BKK TMA

Page 21: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

• New RNAV 1 SID/STARs for Bangkok TMA since 2016 to accommodate the dual-airport operation for both Suvarnabhumi and Don MueangAirports.

• The design and implementation required collaboration efforts between air traffic control units, airlines, procedure designers and regulator.

• Improve safety, efficiency and capacity for Bangkok TMA

PBN in Terminal Area Example: BKK TMA

Page 22: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Bangkok TMA SID STAR (Before April 2016)

Orange: Arrival

Yellow: Departure

Page 23: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Bangkok TMA SID STAR (After April 2016 )

Pink: Arrival

Blue: Departure

Page 24: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Terminal Area Implementation Progress

International Airport Implementation Status

1. Phuket INTL (VTSP)RNAV 1

SID/STAR Completed (2013)

2. Chiang Mai INTL (VTCC)RNAV 1 and RNP 1

SID/STAR Completed (2013)

3. Chiang Rai INTL (VTCT)RNP 1

STAR Completed (2013)

4. Suvarnabhumi INTL (VTBS)RNAV 1

SID/STAR Completed (2016)

5. Don Mueang INTL (VTBD)RNAV 1

SID/STAR Completed (2016)

6. U-Thapao INTL (VTBU)Being Designed (Target 2018)

7. Hat Yai INTL (VTSS)Being Designed (Target 2018)

Remarks:-• RNAV 1 in Surveillance environment.• RNP 1 in Surveillance and Non-Surveillance environment.

Page 25: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

PBN En-RouteImplementation

Page 26: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

PBN En-route Example: Y13-Y16 (2016)

Improve Flow Capacity East of BKK TMA

Page 27: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Thailand En-route implementation Progress

Asia Pacific Seamless ATM Plan Phase 1 Phase 2

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

En-Route

RNAV 5

RNAV 2

Possible RNP 2

• 20 RNAV 5 Routes (17 domestic, 3 international) established

• More RNAV 5 international routes planned for 2017 based on Flexible Use of Airspace (FUA) concept via Civil Military Air Traffic Management Coordination (CMAC)

• Two new RNAV 2 routes planned for 2017 – 2018

• RNP 2 in 2020-2022 timeframe

Page 28: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Supporting Elements for PBN Implementation

Page 29: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Training for PBN Implementation Personnel

• Flight Procedure Designers

• Flight Validation Pilots & Engineers

• Air Traffic Controllers

Pilot Simulator ATC Simulator

AutomationDesign Tools

Page 30: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Flight Procedure Designer Training

Flight Procedure Designers

• 10 procedure designers trained in Basic PANS-OPS and PBN

[ICAO FPP Beijing / ENAC France/ SAA Singapore]

• 10 procedure designers trained in Advance PBN (Baro-VNAV & RNP AR APCH)

[In-house by Air Navigation Institute (ANI)]

Page 31: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

• Ab initio Training– Basic Aviation course– AIS Cartography

• Initial Training– Basic PANS-OPS– PBN

• Recurrent Training• Refresher Training• On-the-job Training

(OJT)– In-house OJT

• Advanced Training– RNP AR APCH

Flight Procedure Designer TrainingFlight Procedure Designer Training

Doc 9906 Vol. 2

Page 32: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Flight Validation Crew Training

Flight Validation Crew

• 4 Pilots trained in PBN Flight Validation

[ICAO FPP Beijing]

• 2 Engineers trained in Basic PANS-OPS and PBN

[ICAO FPP Beijing]

• 2 Engineers trained in Advance PBN (RNP AR APCH)

[Air Navigation Institute (ANI)]

Page 33: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

ATC Training

Air Traffic Controllers

• ATC trained in PBN concept overview

• ATC trained in PBN operational procedures and real-time ATC Simulator before implementation (Typically 1-2 Days)

Page 34: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Procedure Design Automation Tools:-• 2 PANADES• 3 FPDAM and 1 AeroDB (AIXM database)

Design Reporting Tool:-• Spread Sheet (Excel)

Charting Tool:-•AutoCAD Civil 3D

Ground Validation tool:-•Universal Avionics Flight Planning

Procedure Design Support Tools

Page 35: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Flight Validation Fleet

Pre-Flight Validation

Form

Flight Validation and Data Recorder

Post-Flight Validation

Form

• Beechcraft Super King air 350 x 2

- Supporting for PBN Flight Validation

- En-route (RNAV 5 / RNAV 2 / RNP 4 / RNP 2 )

- Terminal (RNAV 1 / RNP 1)

- Approach (RNP APCH with Baro VNAV)

• More aircraft is under procurement process to support GBAS flight validation capability.

Page 36: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

GNSS Monitoring Stations

• GNSS Monitoring Stations (7 Stations)

- Chiang Mai

- Phitsanulok

- Bangkok

- Suratthani

- Hat Yai

- Udonthani

- Ubon Ratchathani

Page 37: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

GPS RAIM Prediction Website

• GPS RAIM Prediction Service within Bangkok FIR

- www.netra.aero

Page 38: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

GPS RAIM Outage Prediction NOTAM

• GPS RAIM Outage Prediction NOTAM

- Provide for all airport with PBN Procedures (RNP APCH)

BCP0717 302202KK VTBBZRZP302200 KLAXXAAWGXXXX/YY NOTAMR

Q) VTBB/QGAXX/I/NBO/A/000/999/1957N09952E025A) VTCT B) 1507010000 C) 1507022359E) GPS RAIM PREDICTION FOR:TSO-C129 FAULT DETECTIONNO GPS RAIM OUTAGES

TSO-C146A FAULT DETECTION ONLYNO GPS RAIM OUTAGES

TSO-C146A FAULT DETECTION WITH EXCLUSION20150701 0047 TIL 20150701 005820150701 0134 TIL 20150701 0139GPS RAIM UNAVAILABLE FOR RNP APPROACH

Page 39: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Summary & Conclusion

การประเมนิผลกระทบทางเสยีงจากอากาศยาน

Page 40: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

Thailand PBN Implementation Milestones:2007 PBN Working Group founded - collaboration

2009 First PBN Approach published

First Implementation Plan submitted to ICAO

2008-2017 Continuous Process of Capability Building– Personal Training

– Design Supporting Tools

– Flight Validation Fleet

2016 Assembly Resolution 37-11 fulfilled

2017 Revised Implementation Plan submitted to ICAO

-----------------

2018 New IFP and PBN Regulations promulgation

2019 All Runways Ends with PBN APCH

Summary

Page 41: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...

• PBN provides benefits to airspace users and the aviation community.

• PBN implementation is not hard, but need collaboration and efforts from stakeholders.

• With airspace users are ready to utilize their fleet capabilities, ANSPs and regulators should deliver and drive for performance-based services.

• APAC states should work together on PBN implementation to improve connectivity and enhance capacity within the region.

Conclusion

Page 42: Thailand PBN Implementation Lessons Learned - … · Historical Annual Traffic Volume in Bangkok FIR Fiscal Year 2006-2015 ... •States to complete a PBN implementation plan by ...