Page 1
TEXCEL ENGINEERS PVT LTD(An ISO 9001:2015 Certified Company)
O Block, #1, Ganapathy Colony, Anna Nagar East,Chennai – 600 102
[Phone: +91 44 26221841/42/43] - [Fax: +91 44 26441844] - [E-Mail : [email protected] ]
TEXCEL CONTRACTING L.L.CP.O. box 114634 ABUDHABI, U.A.E
[Phone: +971 2 550 8509] – [Fax: +971 2 550 8519] – [E-Mail: [email protected] ]
Page 5
Contents
About us
Organization Setup
Achievements
Strong Fundamentals
Present and Future
Client List
Performance Awards
Safety Awards
Work Completion Awards
Page 6
About UsTexcel Engineers – the name is synonym for
Technical Excellence. Texcel Engineers has
been well established in India since late 80’s
and has been involved in successful
completion of vast range of turnkey contracts
in the infrastructure sector. By embracing
innovative ideas and adapting to the ever
changing industrial needs, Texcel has proved
time and again their mettle to execute a vast
range of turnkey contracts infrastructure
sector.
Texcel Engineers is managed by a Board of
Directors of eminent personalities known for
their education, enlightenment and integrity
along with a core team of Engineers and
Technicians
Our Services include:
Fabrication, supply and installation of structural steel.
Erection of complete conventional or waste heat recovery boilers.
Erection of equipment of power plants, chemical industry, refineries, petrochemical and gas plants.
Fabrication, erection, testing and commissioning of Power and Desalination, Oil and Gas, Petrochemical,
Cement plants.
Life extension projects (renovation and repair) of existing the power and Desalination, Oil and Gas,
Petrochemical plants.
Power Cycle Piping for Power Plants.
Shutdowns and maintenance works of boilers, turbines, mills and rotating equipment's like fans (ID & FD),
Air Preheater for power plants and oil and gas plants.
The experience and expertise of Texcel Engineers can be put at the services for execution of large and
sophisticated projects to achieve the highest level of quality yet maintaining price competitiveness.
Page 7
Organization Setup
Page 8
Planning
Engineer
Site Engineer
QA / QC
Manager
Admin
Manager
Accounts
Manger
Stores
Manager
Erection
Engineer
Site
Co-Ordinator
Erection
PipingErection
Structure
Erection
-Equip
Foreman Foreman Foreman
MD
Secretary
Director – Finance, HR
& Admin
Director -
Projects
Accounts
Manager
HR/Admin
Manager
Purchase
Manager
GM Projects
AGM Site
Const.
Manager
Admin
Assistant
Accounts
Assistant
Stores
Assistant
Accounts
Officer
HR Lead Purchase
OfficerHSE
Manager
Page 9
•Managing Director is a Post Graduate in Economics, (Nagpur University). He has hands on experience of about 32 years in Erection, testing and commissioning of Power Projects.
M.P. Sudhakaran
Email: [email protected] Ph. 044 -26221841
•BE (Mech.), MBA (London). He has worked in Field of Sales and Marketing in UK and Middle East before joining as director of the company. He is presently managing operations in India and UAE.
M.S. Abhilash
Email: [email protected] Ph. 044 -26221841
• B.E Industrial Engineering from Mangalore University and MBA from Meinders School of Business, USA. 12 Years of experience in corporate America. He has joined Texcel in August 2011 as Director and oversees Finance and resource Management
Jiji T SukumarEmail : [email protected]
Ph. 044- 26221841
• General Manager, Bachelor in mechanical engineering; has 37 Years’ experience in the field of construction works of power plants, ammonia plant, refinery, etc. in India and abroad.
C.E. SubramanianPh. 044 -26221841
• General Manager-Projects, 24 Years’ experience in Boiler, Heavy Equipment’s, Auxiliaries, Piping, etc.
Mathew Cherian+91 8827066382, +91 8103570390
• General Manager-Projects, 24 Years’ experience in Boiler, Heavy
Equipment’s, Auxiliaries, Piping, etc.L.Neelakantan
Email: [email protected] Ph. 044 -26221841
• Addl. General Manager-Projects, 36 Years’ experience in ESP, Boilers, Auxiliaries, Piping, etc.C.K. Sekharan
+91 9921280590, +91 9503897168
• Addl. General Manager-Projects, 22 Years’ experience in Boiler, Heavy Equipment’s, Auxiliaries, Piping, etc.
Ajith Krishandev
+91 9617948272
List of Key Personnel
Page 10
Achievements
Texcel had a humble beginning 30 years ago by Mr. M.P. Sudhakaran with a vision to
identify the power and construction sectors as central to nation building. Ever
since, Texcel has an impeccable track record. Initially operating as a Sole
Proprietor company, Texcel Engineers was incorporated as a Pvt. Ltd Company in
1987
Page 12
I. IBR WORKSSUMMARY
A. ERECTION OF BOILERS IN DIFFERENT STATES
States No. of units
800 MW
Gujarat 1 No
660MWUttar Pradesh 2 No
Tamil Nadu 1 No
Maharashtra 1 No
600 MW
Chhattisgarh 2 No
500 MW
Tamil Nadu 1 No
Maharashtra 1 No
Andhra Pradesh 1 No
Karnataka 1 No
Chhattisgarh 1 No
Bihar 1 No
350 MW
Gujarat 1 No
Karnataka 1 No
Bihar 1 No
270MW
Maharashtra 2 No
210 MW
Rajasthan 1 No
Orissa 1 No
Haryana 1 No
Uttar Pradesh 1 No
Kerala 1 No
Page 13
C. PIPING
States No. of units
685 MW
Chhattisgarh 1 No
500 MW
Tamil Nadu 3 No
Andhra Pradesh 1 No
Karnataka 1 No
Chhattisgarh 1 No
270MW
Maharashtra 2 No
II. TURBINESStates No. of units
800MW
Gujarat 1 No660MW
Uttar Pradesh 1 No600MW
Chhattisgarh 1 No
270MW
Maharashtra 1 No
150MW
Maharashtra 2 No
72MW
Gujarat 1 No
Page 14
III. ELECTRO STATIC PRECIPITATORS
States No.of units
800MW
Madhya Pradesh 1 No
IV.COAL BUNKERS
States No. of units
800MW
Tamil Nadu 1 No
660MW
Uttar Pradesh 1 No
500MW
Bihar 1 No
Page 15
Strong Fundamentals
LIST OF MACHINERY, MAJOR TOOLS AND PLANTS
All the pool of machines
and equipment's are well
maintained and equipped
in order to make them
work at any point of time
for which we have
dedicated team of well
qualified and experienced
machines / technicians
Heavy Cranes150 Ton Fuwa Hydraulic Crawler Crane 1
150 Ton IHI Crawler Crane 1
100 Ton Kobelco Crawler Crane 1
80 Ton Fuwa Hydraulic Crawler Crane 2
75 Ton Tata TFC Crawler Crane 3
70Ton zoomlion Crawler Crane 3
45 Ton NCK 41 B Crawler Crane 3
40 Ton Tyre Mounted TIL Crane 2
35 Ton P & H 655 Crawler Crane 2
35 Ton Fuwa Crawler Crane 4
25 Ton Tata TFC – 75 Crawler Crane 3
20 Ton Tata P & H 320 Crawler Crane 2
18 Ton Tata 320 Crawler Crane 4
Page 16
Mobile Cranes
18 Ton Hydra 4
14 Ton Hydra 8
12 Ton Hydra 17
11 Ton Hydra 2
10 Ton Hydra 3
08 Ton Hydra 3
Transport Vehicle
Tractor Hindustan, HMT 6
Trailer Ashok Leyland 9
Trailer with Horse 5
Mini Bus 5
Pick Van/Load King/Tata
Ace5
Jeep (Sumo, Bolero, Etc.) 13
Omini Ambulance 2
Heavy Equipments
Page 17
Lifting Equipment’s
Rack & Pinion Elevator PC 130-7
(Passenger Lift)4
Electrical Winches (1 Ton-15 Ton) 85
Chain Pulley Blocks (1 Ton-25 Ton) 786
Max Puller (Hook Chucks (1.6 Ton-
5Ton))81
Lathe Machine 1
Surface Grinder 1
Wire Rope Sling 90 MM X 16 Mtrs 2
Wire Rope Sling 80 MM X 18 Mtrs 6
Wire Rope Sling 80 MM X 16 Mtrs 6
Wire Rope Pulley 5 Sheave 50 Ton 12
Wire Rope Pulley 4/5 Sheave 25 Ton 24
Beam Lifting Clamps (3Ton- 10 Ton) 25
Scaffolding Materials
Pipes (assorted Lift) 6000
Right angle Couples 8000
Scaffolding Platform 1000
Beam Brackets 500
Swivel Couples 3000
Page 18
Other Major Equipment’sPipe Bending Machine Heavy Duty 6
Tube Bending Machine 4
Hydraulic Test Pumps Heavy Duty 4
Air Compressors 4
Electrode Backing Oven 21
High Intensity Illuminator 5
Impact Wrench GDS 30 8
MS Rail 33
Plasma Cutting Machine 4
Torque Wrench Assorted (750 LBS-2400 LBS) 44
Steel Containers (20 Ft-40 Ft with Furnished) 46
Texcel Engineers
Welding & NDT Equipment’s
Welding Generators (K-320/45) 66
Welding Rectifier 450/600A 361
Welding Transformer 400/6A 25
Diesel Power Generator 5
Welding Inverter 30
SR Panel Board 12
Temperature Recorder 19
Theodolite with stand 7
Hardness Tester 2
Induction Heat Machine ( Miller ) 5
Mig Welding Machine 08
Orbital Welding Machine 02
Page 19
PresentFuture
and
Page 20
List of Current Projects Under Execution
S.no Client Location Capacity Area Scope of workDate of
Start
Contract Value
(INR)
Present
Status
1
Bharat
Heavy
Electricals
Limited
Udangudi
STPP,
Tuticorin
District,
Tamil Nadu
2x660MW
Boiler/
ESP/
Bunker
Erection, Testing and assistance for
commissioning & Trial Operation including
application of Insulation, Refractory, supply &
touch-up painting of Boiler, ESP & auxiliaries,
Detailed engineering, fabrication, Erection of
Bunker along with Supply & installation of item
as per BOQ of UNIT#2 at 2x660 MW Udangudi
STPP, Tuticorin District,Tamil Nadu
21-08-19 83,34,05,300
7%
Completed
2
Bharat
Heavy
Electricals
Limited
Jharkhand 3x800MWBoiler
/Bunker
Erection, Testing and assistance for
commissioning & Trial Operation including
application of Insulation, Refractory, supply &
touch-up painting of Boiler & auxiliaries,
Bunker package at UNIT#2 at 3X800 MW PVUNL
PROJECT Patratu.
31-05-19 90,71,67,2608%
Completed
3
Bharat
Heavy
Electricals
Limited
North
Chennai,
Tamil Nadu
1x800MW STG
Handling of Materials at BHEL/Client’s
Stores/Storage Yard in one or more location
outside plant premises and transportation to
site of Erection, Erection, Testing &Assistance
for commissioning and Trial Operation including
supply and application of final painting of
Steam Turbine, Turbo Generator & its
auxiliaries including BOIs etc., at 1 x 800 MW
North Chennai TPS Stage III
2/1/2019 6,95,00,00075%
Completed
4
Doosan
Power
System
India(P)Ltd.
Jawaharpur,
Uttar
Pradesh,
2x660MW Boiler
/Bunker
Erection, Testing, Commissioning and handing
over of Unit #1 & 2 Boiler, Power Cycle Piping
package of 2x660MW Jawaharpur Super
Thermal Power Station, Uttar Pradesh.
18-08-18 1,320,000,00045%
Completed
5
Bharat
Heavy
Electricals
Limited
Ennore SEZ
Tamil Nadu2x660MW Boiler
Erection, Testing and assistance for
commissioning & Trial Operation including
application of Insulation, Refractory, supply &
touch-up painting of Boiler & auxiliaries, etc.,
of UNIT-1 of 2x660MW Ennore SEZ Super
Critical Thermal Power Project.Thiruvallur Dt,
Tamil Nadu.
21-02-18 36,25,00,00080%
Completed
Page 21
S.no Client Location Capacity Area Scope of workDate of
Start
Contract Value
(INR)
Present
Status
6
Bharat
Heavy
Electricals
Limited
Wanakbori,
Gujrat1x800MW FPS
Handling at site stores / storage yard,
transporting to site inspection, pre-assembly,
erection, alignment, welding, NDT, fixing of
hangers & Supports, water flushing, hydro
testing, surface finish, supply & application of
primer & Finish paints, Wrapping & coating
including labeling & Flow direction on the
equipment’s, piping & hangers and Supports,
pre-commissioning, commissioning, trial
operation & handing over to customer for
piping of Fire Protection System and Fire Water
Pump house Equipment etc. 1x800MW,
Wanakbori TPS Unit#8
21-12-17 2,93,70,52097%
Completed
7
Bharat
Heavy
Electricals
Limited
North
Chennai,
Tamil Nadu
1x800MW ESP
Erection and Commissioning of Electrostatic
Precipitator and it’s Auxiliaries,That includes
handling of materials at BHEL \client’s
stores\storage yard, transportation to site of
Erection, Erection, Testing & Assistance for
commissioning and Trial Operation, including
supply and application of final Painting of ESP
and its Auxiliaries, Ducts& Dampers, duct
support structure etc..
31-07-17 10,70,00,00095%
Completed
8
Gujrat State
Electricity
Corporation
Wanakbori,
Gujrat1x800MW STG
Collection of Material from BHEL/ Clients
Stores/ Storage yard; Transportation to site;
Erection testing & commissioning, Trial
Operation and handing over of steam turbine,
Generator set, Integral Piping, HP/LP Heaters,
Tanks & vessels, DG set, Pumps & Other BOI,
Insulation, including supply and application of
Final Painting ETC for 1x800MWGSECL
Wanakbori Project at 1x800MW GSECL
Wanakbori Project In Gujarat State.
10-10-17 7,47,00,00099.5%
Completed
9 NTPCAllahabad,
UP2x660MW ESP
Material handing & Unloading, Erection, Testing
commissioning & final painting of ESP for
2x660Mw for MUNPL, Meja Thermal Power
Project, Allahabad, UP.
18-12-13 27,37,41,00099%
Completed
Page 22
Sl. No. Client and Project
Location Scope of Work Duration Client End User
1 ADGAS, DAS IslandOverhauling of
Compressor
From 28/03/2016 to
03/05/2016ADGAS ADGAS
2 GASCO ASAB Major Inspection 191-CT-
101
From 30/03/2016 to
13/04/2016Masood John Brown GASCO
3 ADGAS, DAS IslandLG 6 Major Inspection From 23/03/2016 To
23/04/2016Masood John Brown ADGAS
4 ADGAS, DAS IslandOverhauling of
Compressor OAG Train 1
From 02/02/2016 To
22/02/2016ADGAS ADGAS
5 ADGAS, DAS IslandOverhauling of
Compressor OAG
From 27/01/2016 To
16/03/2016ADGAS ADGAS
6 ADGAS, DAS Island
Overhauling of
Compressor OAG & LNG
Tr 2
From 26/01/2016 To
26/02/2016QCON ADGAS
List of Shutdown Project
UAE
Page 23
Sl. No.
Client and
Project Location Scope of Work Duration Client End User
7 Dubai AluminumOverhauling of Gas &
Steam turbines
From 09/01/2016
To ongoingDubal Dubal
8 ADGAS, DAS IslandOverhauling of
Compressor
From 25/12/2015
To 15/01/2016ADGAS ADGAS
9 ADGAS, DAS IslandOverhauling of
Compressor LTPI
From 24/12/2015
To 26/01/2016ADGAS ADGAS
10 ADGAS, DAS IslandLG 6 Major Inspection From 12/12/2016
To 17/01/2016Masood John Brown ADGAS
11
Shuweihat CMS
International Power
Company, Abu Dhabi
Overhauling of Valve
,Pumps and Compressor
From 30/11/2015
to 30/03/2016
Shuweihat CMS
International Power
Company,
Shuweihat CMS
International
Power Company,
12 Dubai AluminumOverhauling of Gas &
Steam turbines
From 24/11/2015
To 18/12/2015Dubal Dubal
13 ADGAS, DAS IslandOverhauling of
Compressor
From 11/05/2015
To 31/05/2015ADGAS ADGAS
14 Dubai AluminumOverhauling of Gas &
Steam turbines
From 22/03/2015
To 30/04/2015Dubal Dubal
Page 24
Sl. No.
Client and Project
Location Scope of Work Duration Client End User
15 GASCO - ASABOverhauling of Gas
turbine GE Frame
From 16/03/2015-
04/04/2015Masood John Brown GASCO
16 ADGAS, DAS IslandOverhauling of
Compressor
From 10/01/2015 To
02/03/2015ADGAS ADGAS
17 Dubai Aluminum
Overhauling of Gas &
Steam turbines – GE
frame
From 06/01/2015 To
06/02/2015Dubal Dubal
18 ADGAS, DAS IslandOverhauling of Gas
turbine GE Frame
From 12/12/2014 to
29/01/2015Masood John Brown ADGAS
19
Shuweihat CMS
International Power
Company, Abu Dhabi
Overhauling of Valve
,Pumps and Compressor
From 13/11/2014 to
25/03/2015
Shuweihat CMS
International Power
Company,
Shuweihat CMS
International
Power Company,
20 ADGAS, DAS IslandOverhauling of Gas
turbine GE frame
From 10/08/2014 To
25/08/2014ADGAS ADGAS
21 ADGAS, DAS IslndOverhauling of Gas
turbinesFrom 25/04/2014 Masood John Brown ADGAS
22ADMA OPCO, Offshore
Rig
Overhauling of
GeneratorsFrom 22/04/2014 Alstom Middle East ADMA OPCO
23 ADGAS, DAS Island Maintenance workFrom 22/04/2014 to
04/05/2014ADGAS ADGAS
Page 25
Sl. No.
Client and Project
Location Scope of Work Duration Client End User
24 GASCO, Habshan Shutdown JobFrom 20/04/2014 to
25/05/2014Alstom Middle East GASCO
25ADMA OPCO, Offshore
Rig
Overhauling of
Generators
From 29/03/2014 to
17/04/2014Alstom Middle East ADMA OPCO
26 ADGAS, DAS IslandOverhauling of Gas
turbines
From 24/03/2014 to
15/04/2014Masood John Brown ADGAS
27 ADGAS, DAS IslandOverhauling of Gas
turbinesFrom 14/03/2014 ADGAS ADGAS
28 ADGAS, DAS Island Maintenance workFrom 14/03/2014 to
27/03/2014ADGAS ADGAS
29Dubai Petroleum
offshore Rig
Overhauling of
Generators
From 18/02/2014 to
22/02/2014Masood John Brown Dubai Petroleum
30 Shuweihat Power PlantOverhauling of
Generators
From 10/02/2014 to
31/03/2014
Shuweihat O & M
Limited
Shuweihat Power
Plant
31ADMA OPCO, Offshore
Rig
Overhauling of
Generators
From 18/01/2014 to
14/02/2014Alstom Middle East ADMA OPCO
32 GASCO, Buhasa Maintenance workFrom 12/01/2014 to
24/01/2014Masaood John Brown GASCO
33 DUBAL, Jebel Ali Shutdown JobFrom 04/01/2014 to
20/04/2014Dubal Dubal
Page 26
Sl. No.
Client and Project
Location Scope of Work Duration Client End User
34ADMA OPCO, Offshore
Rig
Overhauling of
Generator
From 16/11/2013 to
27/12/2013Alstom Middle East ADMA OPCO
35Dubai Petroleum
offshore Rig
Overhauling of
Generators
From 04/11/2013 to
20/12/2013Masood John Brown Dubai Petroleum
36 ADGAS, DAS IslandOverhauling of Gas
turbines
From 23/10/2013 to
12/11/2013ADGAS ADGAS
37Dubai Petroleum
offshore Rig
Overhauling of
Generators
From 09/10/2013 to
25/10/2013Masood John Brown Dubai Petroleum
38ADMA OPCO, Offshore
Rig
Overhauling of
Generator
From 24/04/2013 to
30/06/2013Alstom Middle East ADMA OPCO
39 ADGAS, DAS IslandOverhauling of Gas
turbines
From 09/04/2013 to
12/05/2013Masood John Brown ADGAS
40 GASCO, HabsanOverhauling of Gas
turbines
From 16/03/2013 to
25/03/2013Masood John Brown GASCO
41 ADGAS, DAS IslandOverhauling of Gas
turbines
From 14/03/2013 to
28/03/2013Masood John Brown ADGAS
42Umm Al Nar Power
Plant, Abu Dhabi
Overhauling of Gas
turbines
From 25/02/2013 to
27/03/2013Quartzelec Ltd
Umm Al Nar Power
Plant
43 GASCO, AsabOverhauling of Gas
turbines
From 15/02/2013 to
18/03/2013Masood John Brown GASCO
Page 27
Sl. No.
Client and Project
Location Scope of Work Duration Client End User
44 ADGAS, Das IslandOverhauling of Gas
turbines
From 05/02/2013 to
05/03/2013NuovoPignone S.P.A ADGAS
45 ADGAS, DAS IslandOverhauling of Gas
turbines
From 22/01/2013 to
31/01/2013GE Oil & Gas ADGAS
46 GASCO, AsabOverhauling of Gas
turbines
From 11/01/2013 to
14/02/2013Masood John Brown GASCO
47 ADGAS, DAS IslandOverhauling of Gas
turbines
From 05/01/2013 to
05/02/2013Masood John Brown ADGAS
48 ADGAS, DAS IslandOverhauling of Gas
turbines
From 19/11/2012 to
24/12/2012GE Oil & Gas ADGAS
49 DUBAL, Jebel Ali Shutdown JobFrom 04/11/2012to
30/12/2012Dubal Dubal
50 ADGAS, DAS IslandOverhauling of Gas
turbines
From 03/11/2012 to
15/11/2012Masood John Brown ADGAS
51 DUBAL, Jebel AliOverhauling of Gas
turbines
From 30/10/2012 to
06/12/2012Alstom Middle East Dubal
52 ADGAS, DAS IslandOverhauling of Gas
turbines
From 28/08/2012 to
25/09/2012Masood John Brown ADGAS
53 ADGAS, DAS IslandOverhauling of Gas
turbines
From 10/07/2012 to
25/07/2012Masood John Brown ADGAS
Page 28
Sl. No.Client and Project
LocationScope of Work Duration Client End User
54 GASCO, AsabOverhauling of Gas
turbines
From 26/05/2012 to
07/06/2012
Masood John BrownGasco
55 ADGAS, DAS IslandOverhauling of Gas
turbines
From 23/02/2012 to
09/04/2012Masood John Brown ADGAS
56 ADGAS, DAS IslandOverhauling of Gas
turbines
From 13/10/2011 to
05/01/2012Masood John Brown ADGAS
57 ADGAS, DAS IslandOverhauling of Gas
turbines
From 23/05/2011 to
03/08/2011Masood John Brown ADGAS
58 ADGAS, DAS IslandOverhauling of Gas
turbines
From 25/03/2011 to
28/04/2011Masood John Brown ADGAS
59 ADGAS, DAS IslandOverhauling of Gas
turbines
From 22/01/2011 to
29/02/2011Masood John Brown ADGAS
60 ADGAS, DAS IslandOverhauling of Gas
turbines
From 03/11/2010 to
23/11/2010Masood John Brown ADGAS
61 ADGAS, DAS IslandOverhauling of Gas
turbines
From 12/07/2010 to
20/07/2010Masood John Brown ADGAS
62 RAK CEMENT FACOTRY Shutdown Job From 12/05/2010 to
29/05/2010RAK CEMENT FACOTRY
RAK CEMENT
FACOTRY
63 ADGAS, DAS IslandOverhauling of Gas
turbines
From 05/03/2010 to
10/04/2010Masood John Brown ADGAS
64ADNOC, Mubarraz
Island
Overhauling of Gas
turbines
From 22/01/2010 to
02/02/2010Masood John Brown ADNOC
Page 29
Sl. No.Client and Project
LocationScope of Work Duration Client End User
1QCV- Qatar Vinyl
Co., Qatar
Overhauling of
Generators
From 31.01.2015 To
15/03/2015Alstom Middle East QVC
2MESSAIEED NGL 3 –
QATAR
Overhauling of
Gas turbines
From 16/04/2010
to 05/05/2010Masood John Brown Qatar Petroleum
QATAR
Sl. No.Client and Project
LocationScope of Work Duration Client End User
1YLNG Shutdown,
YemenShutdown Job
From 15/03/2014
06/04/2014
General Electric
International Inc.
Yemen LNG
Company
2YLNG Shutdown,
YemenShutdown Job
From 04/05/2013
to 27/05/203
General Electric
International Inc.
Yemen LNG
Company
YEMEN
Page 30
Sl. No.Client and Project
LocationScope of Work Duration Client End User
1 All Mussiab, Iraq
Renovation &
modification of
HP\LP Bypass
System.
From 12/01/2019
to 20/01/2020Siemens Germany ALM Iraq
2Khor Al Zubar Power
Plant, IRAQ
Erection of Gas
turbines &
Generators
From 27/01/2014 to
30/03/2014Alstom Middle East KAZ Power Plant
3Khor Al Zubar Power
Plant, IRAQ
Erection of Gas
turbines &
Generators
From 18/03/2013 to
06/06/2013Alstom Middle East KAZ Power Plant
IRAQ
Sl. No.Client and Project
LocationScope of Work Duration Client End User
1Holmore Power Ltd.
Punjab – PakistanShutdown Job
From 24/05/2013 to
06/06/2013GE Oil & Gas
Holmore Power
Generation Co.
2Saif Power Ltd.
Punjab, PakistanShutdown Job
From 21/01/2013 to
28/01/2013GE Oil & Gas Saif Holding Ltd.
PAKISTAN
Page 31
Sl. No.Client and Project
LocationScope of Work Duration Client End User
1Kelanitissa CCPP,
Colombo, Sri Lanka
Overhauling of
Gas turbines
From 12/10/2009 to
15/12/2009Masood John Brown Kelanitissa CCPP
SRI LANKA
NIGERIA
Sl. No.Client and Project
LocationScope of Work Duration Client End User
1Elvaton Project,
Nigeria
Overhauling of
Gas turbines
From 09/10/2012
to 19/10/2012Masood John Brown
Elvaton Nigeria
Limited
Page 32
List of Major Projects Executed
Sl.
No
Client and Project
LocationScope of Work
Date of
award
Contract
value INR
1
Gujrat State Electricity
Corporation, Wanakbori,
Gujrat
Collection of Materials at BHEL/client's storage yard/stores,
Transportationto site, Erection, testing & assistance for
commissioning, trail operation and handing over of boiler and its
auxilliaries,APH,ducts&dampers,Fuel piping, boiler integral piping &
associated valves SP,fans,power cycle piping, Coal mills & coal
feeders,Insulation,final painting etc
5-5-2016 47,93,11,352
2 NTPC,Gadarwara, MP
Erection Alignment & Welding, Testing, Painting and Handing over of
Bunker structure, Raw coal bunkers, Transfer points, trestles and
conveyer galleries and miscl, Civil Works for unit-1 2x800MW
13-07-15 11,76,51,858
3NTPC,Gadarwara, MP
Supply of Materials for the works of MS embedment’s, Doors,
Windows, Glazing, Roofing / Side Cladding, Rain Water Down Take
Pipes, Structural Steel Painting, Gratings, Mild Steel Bolts, High
Strength Structural Bolts, PTFE Bearings, MS Hand Railings, Concreting
for Bunker Structures, Raw Coal Bunkers, Coal Handling Transfer
Points for Unit-1 2x800MW
13-07-15 7,43,91,176
4 Lanco,Wardha, Maharashtra
Erection, Testing, Commissioning of 2X660MW (Unit 1&2) Boiler &
Auxiliaries at Lanco vidharbha Thermal Power Project, Mandhva
village, wardha dist. Maharashtra.09-09-15 71,04,52,710
5Visa power Raigrah,
Chattisgarh
Erection, Testing, & Commissioning, Trial Operation and Handing over
of Boiler and its Auxiliaries including ESP, Air Pre heaters, Ducts and
Dampers, Fans, Fuel Piping, Boiler Integral Piping, Power cycle piping,
Chemical dozing system, Lining & Insulation, Final painting, etc of
Unit 1
27-07-11 61,73,65,000
6Sintex Infra Project Ltd,
Shindke, Maharashtra
Erection, Testing, Commissioning and handing over of Steam turbine,
Turbo Generator, Condenser, TG Integral Piping,HP & LP Heaters,
Deaerator, with associated Equipments/Tanks/Vessels, FST &
Deaerator, LP Bypass system with associated platform, power cycle
pumps & auxiliaries in Unit 1 & 2
26-02-14 5,18,59,128
7
Rattan India
Nasik Power Ltd. Nasik,
Maharashtra
Receipt of Materials form BHEL/Storage yard, Handling at stores, site
of work, Erection, Testing & commissioning of Steam Turbine and
Auxiliaries etc Including bought items of 5x270MW, Nasik Thermal
Power Project, Nasik, Maharashtra.
19-02-16 3,97,40,000
INDIA
Page 33
8
Rattan India
Nasik Power Ltd. Nasik,
Maharashtra
Handling collection of Materials at BHEL/client's storage yard/
stores, Transportation to site Erection, testing & assistance for
commissioning, trail operation and handing over of boiler and its
auxiliaries, APH, ducts dampers, Fuel piping, boiler integral piping
& associated valves, ESP, fans, power cycle piping, Coal mills &
coal feeders, insulation ,final painting etc of Unit #4 of 5X270MW
Nasik TPS
25-01-16 22,12,95,045
9Gujrat State Electricity
Corporation Wanakbori, Gujrat
R & M Dismantling of exiting ESP Internal & other components from
BHEL/ customer storage to site of work and carring out
modification as required Erection, Testing & Commissioning and
application of Insulation / Cladding for the work Renovation &
Retrofitting of exiting ESP & Ducts for Unit #1 210Mw, Wanakbori
03-11-16 3,99,00,000
10 MahaGenco Maharashtra
Material handling&unloading,Erection, testing & commissioning of
completed boiler structures, pressure parts,ESP,fans,PCP,Coal
mills& feeders insulation &final painting of Unit 9,2x500MW23-01-10 48,94,40,923
11Lalitpur Power Generation
Company Ltd Lalitpur, UP
Erection, Testing, Commissioning, Trial operation and handing over
of steam turbine generator and its auxiliaries & piping etc. for
package-B(Unit-2)16-12-13 13,67,49,997
12Krishak Bharati
Cooperative Ltd. Surat, Gujarat
Erection, Testing, Commissioning, Piping and final painting work
for 1x72MW unit and Application of Thermal Insulation, Piping and
Painting for 1x190 TPH Heat Recovery Generator.03-10-12 11,35,00,000
13
NTECL Vallur Thermal Power
Project Kuruvimedu Village
ponneri Taluk, Tamilnadu.
Erection, Testing, Commissioning & handing over of complete Power
Cycle piping supplied under SG&TG packages, Insulation work of
Boiler, Esp. & Piping, accessories, associated equipment’s/systems,
final painting for Phase 2 , Unit-3 1 x 500 MW
21-12-12 113,500,000
14
Eleana Power & Infrastructure,
5x270MW, Amravati,
Maharashtra.
Erection, Testing, commissioning and Handing over of Ducting,
Rotating & Coal Piping of Unit – 5, 5x270MW, Amravati,
Maharashtra.30-10-14 77,004,997
15
Eleana Power & Infrastructure,
5x270MW, Amravati,
Maharashtra.
Erection, Testing, commissioning and Handing over of power cycle
piping and final painting of Unit -5, 5x270MW Amravati,
Maharashtra.24-09-14 90,465,605
16
Doosan Power Systems India
Private Ltd,2x685 MW Chhattisgarh Thermal Power Project Raipur Dst Chhattisgarh
Critical Piping Erection, Testing and commissioning of complete
and application for Units 1 and 2 of 2x685 MW Set 23.07.12 194,757,215
Page 34
17Korba West Power Company Limited, 1X600 MW
KWPCL Avanta , Raigarh District. Chhattisgarh.
Erection, Testing & Assistance for
commissioning, Trial Operation and Handing over of Steam Turbine and Generator Set and its Auxiliaries, HP/LP Heater and Painting,
etc., of 1 X 600 MW
06.12.11 69,400,000
18 Dainik Bhaskar Power Limited Unit 1 of 2x600 MW
DBPL, Janjgir, Champa District. Chhattisgarh.
Erection, Testing, & Commissioning, Trial
Operation and Handing over of Boiler and its
Auxiliaries including ESP, Air Preheaters, Ducts
and Dampers, Fans, Fuel Piping, Boiler Integral
Piping, Power cycle piping, Chemical dozing
system, Lining & Insulation, Final painting, etc.
of Unit 1 of 2 X 600 MW
18.02.11 571,297,500
19NTECL Vallur Thermal Power Project Kuruvimedu
Village Ponneri Taluk, Tamilnadu.
Erection, Testing, Commissioning & handing
over of complete Power Cycle piping supplied
under SG&TG packages, accessories,
associated equipment’s/systems, final painting
for Unit 1&2 of 2 x 500 MW
15.07.10 216,864,000
20 NTECL Vallur Thermal Power Project
Kuruvimedu Village Ponneri Taluk, Tamilnadu.
Erection, Testing, and commissioning of
complete Boiler Structures, pressure parts, Non-Pressure parts , Rotating Machines including supply and Application of Final
Painting for Unit # 2 of 2x500 MW set
20.05.09 313,974,140
21 Gujarat State Energy Generation Ltd., Near
Hazira, Village Mora, Dist. Surat , Gujarat .
Erection, Testing, Commissioning, Final
Painting and Handing over of 1 x 292 TPH HRSG and its auxiliaries, Steel Stack, Piping etc., for 1x350 MW combined Power Plant at
GSEG, Hazira ,Dist. Surat, Gujarat
18.03.09 82,034,029
22
National Thermal Power Corporation / Korba
super Thermal Power Station Korba,
Chhattisgarh.
Erection, Testing, Commissioning and handing
over of complete Power cycle Piping including
P-91 Material Piping etc., for Unit # 7 Stage III
of 1 X 500 MW at Korba Super Thermal Power
Station, NTPC, Korba ,Chhattisgarh.
05.01.2009 8,70,10,170
23 Kakatiya Thermal, Power Project,
Bhoopalapalli, Warrangal, Andhra Pradesh
Erection, Testing and Commissioning of Power
Cycle Piping of Unit 1x500 MW Boiler 02.06.2008 9,87,81,800
24National Thermal Power Corporation / Korba
super Thermal Power Station Korba,
Chhattisgarh
Erection, Testing & Commissioning of Boiler
and its auxiliaries, Rotating Machines
including Mills and Fans, Duct, Fuel Piping
etc., for Unit 7 of 1x 500 MW.
19.02.2007 17,24,93,240
Page 35
25Kakatiya Thermal Power Project, Bhoopalapalli,
Warrangal, Andhra Pradesh
Erection, Testing and Commissioning of
complete Boiler Structure, Pressure Parts,
Boiler Auxiliaries, Electrostatic Precipitator,
Rotating Equipment’s, including supply and
application of final Painting for Unit1x500MW
05.02.2007 22,94,63,960
26Karnataka Power Corporation Limited / Bellary
Super Thermal Power Project, Karnataka.
Erection, Testing and Commissioning of Power
Cycle Piping of 1x500 MW Boiler 15.08.2006 3,91,54,140
27National Thermal Power Corporation /
Kahalgaon Super Thermal Power Project, Bihar
Erection, testing & commissioning and handling
over of Electrostatic Precipitator of 1 x 500
MW Unit No. 5
22.12.2004 4,34,86,652
28Karnataka Power Corporation Limited / Bellary
Super Thermal Power Project , Karnataka
Erection, Testing and Commissioning of
Structures, Pressure Parts, Non-Pressure Parts,
Air Pre-heaters, Ducts Boiler for 500MW
04.09.2004 11,55,30,632
29National Thermal Power Corporation /
Kahalgaon Super Thermal Power Project, Bihar
Erection, testing & commissioning and handling
over of Boiler and its auxiliaries including its
Rotating machines, Ducts and Fans of 1x500
MW Unit No.6
21.06.2004 21,18,15,100
30National Thermal Power Corporation / Korba
Super Thermal Power Station, Chhattisgarh
Overhauling of Boiler pressure parts, high
pressure valves in Boiler area Stage-I & II &
repair of Boiler tube failure and overhauling of
soot Blowers of 3 x 500 MW
25.03.2004 55,09,786
31 Tamilnadu Electricity Board / Kuttalam
Mayiladuthurai Taluk, Tamilnadu
Erection, testing & commissioning, application
of insulation of Heat Recovery Steam
Generator and its auxiliaries, Piping of 101 MW
Combined Cycle
03.01.2003 1,28,39,650
32 Aditya Cement / Shambhupura Dist. Chittorgarh
Rajasthan
Erection, testing & Commissioning of 1x105
TPH AFBC Boiler and its Auxiliaries including
Electrostatic Precipitator and 1x23 MW Steam
Generator and its Auxiliaries and Piping etc.
16.03.2002 1,36,18,098
33 National Thermal Power Corporation / Talcher
Super Thermal Power Project, Orissa
Erection, testing & commissioning of Boiler for
Stage II Unit – V of 4 x 500 MW
06.08.2001 11,24,40,704
34 Hasdeo Thermal Power Station, CS Electricity
Board, Korba West
Overhauling of coal mills, raw coal feeders,
coal bunkers, cleaning & servicing of Mill lube
oil system, servicing of Mill gear box, Nitrogen
Panels etc. of 2x210 MW boilers of unit no.3&4
16.06.2001 27,40,175
Page 36
35 Hasdeo Thermal Power Station, CS Electricity
Board, Korba West
Overhauling of ID, FD & PA fans of 2x210 MW
ABL make boilers of Unit 3 & 4
02.06.2001 4,58,640
36 Korba Super Thermal Power Station, NTPC,
Korba
Repair of boiler tubes and overhauling of
soot blowers
12.03.2001 10,34,550
37 Korba Super Thermal Power Station, NTPC,
Korba
Lowering of LTSH and other associated jobs
in Unit VI,500 MW boiler
12.06.2000 15,04,000
38 Haryana State Electricity Board / Faridabad
Combined Power Plant, Haryana
Erection, testing & commissioning, trail
operation & handling over of 2x230 TPH
HRSGs
15.04.1999 5,69,48,700
39Haryana State Electricity Board / Panipat
Thermal power station, Haryana
Erection, testing, commissioning of 1 x
210 MW Unit VI Boiler 24.08.1998 6,96,16,020
40
Uttar Pradesh Electricity Board / Feroze
Gandhi Thermal Power Station Unchahar,
Rai-barelley, U.P.
Erection, testing, commissioning & trail
run of 2 x 210 MW boiler 21.01.1997 3,19,20,000
41Hindustan Newsprints Limited / Kottayam,
Kerala.
Erection, testing & commissioning of
1x140 TPD chemical recovery boiler 04.11.1996 78,02,020
42Gujarat Electricity Board / Wanakbori
Thermal Power Station, Gujarat
Erection, testing & commissioning of
Boiler, Electrostatic Precipitator and
their auxiliaries 1 x 210 MW boiler
17.06.1996 6,38,55,700
43 Madras Refineries Ltd., Manli, Madras Erection, Testing and commissioning of
2x20 MW TG Sets and Auxiliaries 02.09.1993 37,50,000
44 Cochin Refineries Ltd., Cochin, Kerala
Fabrication & Erection of Piping &
Equipments for Capacity Expansion
Projects at CRL, Kerala.
06.04.1993 1,36,00,000
45Dahanu Thermal Power Project,
Maharashtra, BSES, Mumbai Ltd.
Erection, testing, commissioning &
completion of trial operation of
Electrostatic Precipitators for 2 x 250 MW
17.04.1992 2,49,31,800
46Talcher Super Thermal Power Project,
Kaniha, NTPC
Erection, testing, commissioning &
completion of trial operation of complete
non-pressure parts like external
structures, flue gas ducts, dampers,
expansion joints in Unit I & II of 2 x 500
MW Boiler
10.04.1992 1,36,62,500
Page 37
47Talchar Super Thermal Power
Project, Kaniha, NTPC
Handling at Site Stories / Storage Yard,
Transportation to Site of Work, pre-assembly,
erection, testing, commissioning & completion of
trial operation of rotating machines and its
auxiliaries for Unit I of 2x500 MW Boiler.
10.02.1992 47,63,920
48National Aluminum Company / Angul,
Orissa
Erection, testing, commissioning and completion
of trial operation of Electrostatic Precipitator,
Rotating machines etc.
04.10.1991 38,67,500
49
Tamil Nadu Electricity Board / North
Madras Thermal Power Project, Tamil
Nadu
Erection, testing and completion of trial
operation of Electrostatic Precipitators and its
auxiliaries, Rotating Machines, ducts, dampers
for the first two units of 2 x 210 MW
06.03.1991 1,15,78,500
50Engineers India Limited / Cochin
Refineries Ltd. Kerala.
Erection, testing & commissioning of 1 x 60 T/H
Heat Recovery Steam Generator including
insulation of Cochin Refineries Ltd.
14.03.1990 39,07,750
51
National Thermal Power Corporation
/ Korba Super Thermal Power
Project, Chhattisgarh
Erection, testing & commissioning of mills, fans
& other auxiliaries & fuel piping of Unit VI of
3 x 500 MW.
09.03.1988 34,76,295
52
National Thermal Power Corporation
/ Ramagundam Super Thermal Power
Station, Andhra Pradesh
Erection, testing & commissioning of
Electrostatics Precipitator galleries & stairways
of Unit VI of 3 x 500 MW
20.11.1987 48,65,000
53
Sathavahena ISPAT Ltd.
Haresamudram Village, Anantapur,
A.P.
Unloading, stacking, transportation, erection,
testing & commissioning of 1 x15 TPH BF gas
fired boiler.
20.09.1987 53,44,400
54
Tamil Nadu Electricity Board /
Mettur Thermal Power Project,
Mettur, Tamil Nadu
Erection, testing & commissioning of
Electrostatics Precipitator, Rotating machines,
ducts & dampers of Unit I, II & IV of 2 x 210 MW
12.09.1984 1,09,32,916
Page 38
U.A.E
S.No Client and Project Location Scope of WorkContract value
(AED)
1 Larsen & Toubro Limited, E&C Division,
Borouge III, P3B Plant at Ruwais, Abu
Dhabi
Fabrication & Erection of Carbon Steel and Stainless Steel
Piping at P3B Plant at Ruwais, Abu Dhabi 3,384,000
2L&T/Naphtha Hydro Theater Plant/
U.A.E
Erection of Structures for of Compressor shed 08
&10 and associated Sheeting.500,000.00
3 Dewa / U.A.ESupply, Fabrication and Erection of Demister
Structure For L2 Power Station.150,000.00
4 Jan De Nul /U.A.E Supply, Fabrication and Erection of Dredging Pipes 200,000.00
5L&T / Naphtha Hydro Treater Plant/
U.A.E
Fabrication & Erection of SS and CS Piping For
Naphtha Hydro Theater Plant At Enoc Refinery250,000.00
6L&T / Naphtha Hydro Theater Plant/
U.A.E
Erection and alignment of E.O.T Cranes for Enoc
Refinery100,000.00
7Emaar/ District cooling plant 03 Burj
Dubai/U.A.E
Fabrication & Erection of Chilled water piping for
Cooling Plant 03.200,000.00
8 L & T/ Enoc Refinery Expansion Modification and Rectification of Existing Pipe Rack
Structures and replacement with new structure.200,000.00
9Al Ghurair Iron and Steel Plant / Abu
DhabiErection Of Equipments for acid regeneration plant. 230,000.00
10 Voltas Limited/Abu Dhabi Erection Of Equipments- Generators 92,000.00
11 Mubadala Development /Abu Dhabi Erection of steel structure 260,000.00
12 SEWA /CH2MHILL Fabrication and Erection of GRP Pipes for
Desalination plant.550,000.00
Page 39
OMAN
Sl.
No.Client and Project Location Scope of Work
Contract value
(AED)
1 Vale/steel plant/ OMAN Erection of Structures for of Steel plant . 800,000.00
2. PDO/OGS plant/OMAN
Fabrication & Erection of oil piping for PDO.
300,000.00
3. Vale/steel plant/ OMAN
Fabrication & Erection of utility piping for vale.
1,200,000.00
Page 40
Financial Turnover
0
10
20
30
40
50
60
70
80
90
37.07
60.88
74.06
82.2977.86
38.11
66.31
49.6752.74
58.40
AM
OU
NT IN
CR
OR
ES(I
NR
)
YEAR
Page 42
Sintex Infra
Project Ltd
Aditya Cement Andhra Pradesh Power
Generation Corp Ltd
Bharat Heavy
Electricals Limited
Chhattisgarh State
Electricity Board
Chennai Petroleum
Corporation Limited
Gujarat State
Electricity Board
Cochin Refineries
Limited
Dainik Bhaskar
Power Limited
Larson & Toubro (L&T) Gujarat State
Energy Generation
Ltd
Haryana Electricity
Board
Hindustan
Newsprint Limited
Sharjah Electricity
& Water Authority
Petroleum
development of
oman
Jindal Power
Limited
Karnataka Power
Corporation Ltd
National Aluminium
Company
National Thermal
Power Corporation
Ltd
NTPC TamilNadu
Energy Company
Ltd
Masood John
Brown
Dubai Electricity &
Water Authority
Tamil Nadu
Electricity Board
Thiru Arooran Sugars
Limited
Uttar Pradesh
Electricity Board
Fisia Italimpianti.
Gruppo Impregilo
Gasco Jindal Strips
Limited
Neyveli Lignite
Corporation Limited
Maharashtra State
Power Corp. Ltd
Reliance Energy
Limited
VISA Power Avanta Power Doosan Power
Systems India Pvt Ltd
Lalitpur Power
Generation
Company Limited
KC Cottrell
Page 43
Awards and Accolades
Page 44
Performance Awards
Page 53
Work Completion certificates