Top Banner
SIRA S.r.l. EMS Energy Manager System Tests and Results
17

Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

Mar 16, 2018

Download

Documents

builiem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

SIRA S.r.l.

EMS Energy Manager System Tests and Results

Page 2: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

EVOLUTION OF THE CONCEPT

2

• In recent years, systems have begun to be disseminated to improve the use of energy both in traction and in traditional areas of production and use of electricity.

• The CODLAG systems (COmbined Diesel-eLectric And Gas) have been used in the field of ship propulsion. These are hybrid systems for the propulsion of large ships (Queen Mary 2)

• .... and therefore, hybrid cars like the Toyota Prius. • With the introduction of renewable energies, the concept of

hybrid systems has been extended to the production and use of electricity for more conventional uses.

• The fundamental paradigms have become commonly used concepts.

Page 3: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

MICROGRID

• In recent times, the study of activities related to the new concepts called Micro-grid and Smart

Grid have begun.

• The Micro-grids are a LOCAL GROUP OF SOURCES OF ELECTRICITY, ACCUMULATION AND USE that

normally work connected and in synchronization with the electrical network but that can be

disconnected and operate independently.

• Its goal is to increase:

• the ability to self-repair;

• resistance to attacks and greater resilience;

• improve the quality of energy;

• the increase in the efficiency of the energy system (losses in the network);

• make possible the high penetration of alternative energy sources (electric mobility);

reducing the cost of energy at the same time. 3

Page 4: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

ENERGY PROBLEMS IN “BAD GRID O OFFGRID“ AREAS

• Loadshedding or rolling blackout, browning (spikes) causes a lot of problems with the power

supply, making it necessary to deploy and use diesel generators.

• The need for the use of diesel generators results in numerous other problems:

• The cost of gas oil and all the complex, costly, insecure and even uncertain logistics chain

for its supply;

• The cost and logistics of maintenance of the generators themselves;

• a low resilience caused by the only available source;

• the inability to manage "INTELLIGENT" electrical loads.

4

Page 5: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

SIRA EMS (ENERGY MANAGER SYSTEM)

The SIRA solution for Micro-grids is called EMS.

• EMS monitors all the significant parameters of the various energy and load sources in order to optimize their use and increase their resilience.

• Typically Micro-grid consists of energy production groups: Electricity grid; Solar panels; Wind turbines; Batteries; Generators.

• Supervision and control is extended to loads to feed, to handle them as efficiently and resiliently as possible.

5

Page 6: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

RMCS

6

RMCS (Remote Monitoring and Command System) is a platform that allows remote monitoring of the capabilities of the EMS system and its components.

Based on Google Earth, it gets general information about the system's efficiency.

Normally EMS takes its decisions automatically and autonomously.

If necessary, they can be sent from the Control Center to specific commands.

With a bidirectional communication link, in order to send to Telemetry to the Center and receive commands.

To this end, it is obviously necessary to ensure total security of communications.

RMCS's communication channel, while protected by traditional system solutions, features a 256-bit AES-based END-TO-END encryption.

Page 7: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

SIRA ANTI-THEFT RACK FOR BATTERIES

7

• Internal hinges;

• Galvanized steel plate 2 mm;

• Embedded closet door;

• Anti tamper sensor;

• Vibration sensor;

• Electronic block operated by EMS with PIN or

NOC via remote control;

• Thermal insulation 50 mm;

• DC air conditioning with replaceable filters

from the outside;

• Internal protection grille.

Page 8: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

EMS MOBILE TELECOMMUNICATIONS RESULTS IN

ONGRID AND OFFGRID SITUATIONS

8

Page 9: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

Diesel Generador 30 KW Tank 2.500 Liters

9

Nokia Networks

Load 1 x 3G BTS & 2 MW: 2 KW

Pre-existing configuration EXISTING but INSTALLABLE NETWORK (15 hour of loadshedding per day)

EMS ONGRID OUTDOOR with loadshedding BTS Nokia Siemens 2KW, Doha Qatar

Page 10: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

10

EMS ONGRID OUTDOOR with loadsheddingBTS

Nokia Siemens 2KW, Doha Qatar

• Previously the working of the diesel generator were hours 15 per day. • With EMS, the diesel generator's operating hours went to ZERO. • Saving 100%.

EMS installation

Page 11: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

BTS 2G OUTDOOR OFFGRID HUAWEI BTS3900, ALI MASJID, FATA, PAKISTAN

11

Pre-existing configuration: batteries, tank 500L, diesel generator 27 KVA. Generator on for 24 hours a day.

Page 12: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

• With the Sira EMS Micro-grid, diesel generator operating hours have been reduced to 2.1 hours per day (2.5 in winter and 1.5 in summer): in the situation found, the generator worked 24/7.

• Saving 91.5% in the use of the diesel generator.

EMS SYSTEM CONFIGURATION AND PERFORMANCE BTS 2G OUTDOOR OFFGRID HUAWEI BTS3900 - ALI MASJID, FATA, PAKISTAN

12

Instalación EMS

Page 13: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

COMPARISON COMPETITORS SOLUTIONS WITH SIRA’S SOLUTION (SAME LOAD)

13

SIRA’S SOLUTION

It is evident the number of photovoltaic panels used by SIRA's competitors, for the same load.

Page 14: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

INDOOR SITE WITH 2 BTS AND 5 MW LINKS ISLAMABAD - PAKISTAN

Diesel Generator 27 KVA 2 x 2 Ton A/C HOW WE HAVE INTERVENED:

• realizing Energy Conservation measures to reduce BTU / hour and keep electronic systems and batteries at the required

temperature (ceiling thermal insulation, air loss reduction, etc).

• New batteries are able to operate at higher temperatures.

• Replaced 24,000 BTU conditioners with 12,000 BTU conditioners directly managed by EMS, with proprietary algorithm to

minimize the power required for performance equal.

• Refrigeration is constantly monitored and adapted to the external situation.

• Overvoltage and spikes have been eliminated. 14

Pre-existing configuration

Page 15: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

Total hours In%

Grid usage 500 69.30%

EMS Usage 215 hrs 10 min 30%

DG Usage 4 hrs 50 min 0.66%

Trial total time 720

Testing period from 18 June to 17 July Total test time 720 hours Initial generator size 2.709 hours Final generator measurement 2.714 hours Total genset hours 4h 50m Initial electrical measurement 94.090 Final electrical measure 95.869 Total KWH used 1,778 KWH

EMS CONFIGURATION AND RESULTS

15

SAVING WITH EMS:

Generator only used for 0.6% of trial duration.

Generator on only for periodic monitoring and recharging of its battery.

Savings on the Diesel Generator 98% compared to the pre-existing situation.

Page 16: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

EXAMPLE OF CONFIGURATION

16

EMS solution • EMS with rectifiers and solar regulator • Batteries • 4.08 KW solar panels • 2 outdoor rack • Diesel Generator 15 KVA

Target: diesel generator use 2.8 hours per day;

estimated consumption of 10.8 liters / day.

About 4 fuel deliveries per year for a 1,000 liter tank. ENERGY RELIABILITY 100%

EMS solution • EMS with rectifiers and solar regulator • Batteries • 6.8 KW solar panels • 2 outdoor rack • Diesel Generator 25 KVA

Target: diesel generator use 6 hours per day;

estimated consumption of 18 liters / day.

About 6,5 fuel deliveries per year for a 1,000 liter tank. ENERGY RELIABILITY 100%

2 KW OFFGRID OUTDOOR 4 KW OFFGRID OUTDOOR

Page 17: Tests and Results - sira.net · PDF filebts 2g outdoor offgrid huawei bts3900 - ali masjid, fata, pakistan 12 instalación ems. comparison competitors solutions with sira’s solution

THANKS FOR YOUR ATTENTION