Page 1: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Page 2: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

CONTENTS:

1) COMMUNICATION 2) CONFIGURATION

1. COMMUNICATION

a. Click ‘ZIV’ icon in Desktop

B. Then Give user name and password

User name :zivercom

Password :ziv

Page 3: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

C.Click The IEDs and go to installations:

Page 4: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

D.Click sub_pruebas.sbs and goto Edit:

E. Select communication port, Data bits and stop bits:

Page 5: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

F.Click sub_pruebas.sbs and go to communication:

G.Select Address 0 and click OK:

Page 6: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

2) CONFIGURATION

A. Click test:

B. Click setting:

Page 7: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

C.Click Normal setting and change the voltage, frequency and current:

D.click Voltage regulator Configuration and units in main display Set secondary:

Page 8: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

F.Click voltage Regulator control and change Dead band,Time delay type and T1,T2 Time:

G.Click Compensations and change Line drop compensation Type selector,R parameter and X parameter:

Page 9: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

Line drop compensation LCD R/X Calculate Having one Formula:

LCD R=Vnominal+ ( ILOCAL/ Inominal)*R*cosϕ

LCD X=Vnominal-(ILOCAL/ Inominal)*R*sinϕ

Example:

LDC-R = 6 V ; LDC-X = 0V ; ϕ=0º ; Vn = 120 V ; In = 5 A ; ILOCAL = 2 A VCOM = 120 + (2/5) * 6*cos0º = 122.4 V

So, Now our Nominal Voltage is 122.4V

Our Dead band is 1%

So, lower operate 123.6V

Raise operate 121.2V

H.Goto user’s setting and click ANALOGS and Set Under, over voltage and over current level:

Page 10: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

I.Click Time and Set Under, over voltage and over current time:

J.Click configuration and open Edit:

Page 11: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

K. Click I/O logic and open output:

L.Configure Digital Output:

1.Digital Output 1:

Page 12: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

2.Digital Output 2:

3.Digital Output 3:

Page 13: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

4.Digital Output 4:

M. Click I/O logic and open LEDs:

Page 14: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

N.Configure Led:

1.LED 1:

2.LED 2:

Page 15: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

3.LED 3:

4.LED 4:

Page 16: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

5.LED P1 Red:

6.LED P1 Green:

Page 17: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

7.LED P2 Red:

8.LED P3 Red:

Page 18: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

O. Click I/O logic and open input:

P.Configure Digital input:

1.Digital Input 1:

Page 19: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

2.Digital Input 2:

3.Digital Input 3:

Page 20: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

4.Digital Input 4:

5.Digital Input 5:

Page 21: TESTING PROCEDURE FOR ZIVERCOM 6RTV RELAY

Prepared by: Karunamoorthy, Testing Engineer Date: 20.10.2012

6.Digital Input 6:

Q.Send the data to Relay: