Testing of Engineering Projects / Plants following Construction Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli
24

Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

Jun 19, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 1Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Testing of Engineering Projects / Plants following Construction

Testing of Engineering Projects / Plants following ConstructionIMIA WGP 82

24th September 2013 Delhi Conference

Roman Beerli

Page 2: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 2Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Work group members

Chairman:Roman Beerli, Infrassure Ltd

IMIA EC Sponsor:Michael Robertson, Liberty

Team Members:Andy Hottinger, AXIS ReThomas Gebert, ZurichDario Popovic, Infrassure Ltd Wolfgang Voelcker, Munich Re

Page 3: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 3Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Table of content

• Risk Assessment

• Management, operator experience, contractor/subcontractor

• Risk share, handover and insurance requirements in construction

contracts

• Specific Perils and Vulnerabilities of Project Components

• The soft factor issue: human errors

• Policy cover

• Conclusion

Page 4: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 4Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Management, operator experience, contractor/subcontractor

Complex facility construction projects

Testing and commissioning, design errors

Experience of Commissioning Engineers

Tight project time schedule

Page 5: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 5Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Management, operator experience, contractor/subcontractor

Complex facility construction projects

Testing and commissioning, design errors

Experience of Commissioning Engineers

Tight project time schedule

Page 6: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 6Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Management, operator experience, contractor/subcontractor

Complex facility construction projects

Testing and commissioning, design ….errors

Experience of Commissioning Engineers

Tight project time schedule

Page 7: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 7Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Management, operator experience, contractor/subcontractor

Complex facility construction projects

Testing and commissioning, design errors

Experience of Commissioning…Engineers

Tight project time schedule

Page 8: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 8Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Management, operator experience, contractor/subcontractor

Complex facility construction projects

Testing and commissioning, design errors

Experience of Commissioning Engineers

Tight project time schedule

Page 9: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 9Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Risk sharing, handover and insurance requirements in construction contracts

Contractors and subcontractors

Loss of profit

Construction period vs. Maintenance period

Handover

Page 10: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 10Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Specific Perils and Vulnerabilities of Project Components

Location and layout of a construction site

Cold testing & Hot testing and commissioning

FLEXA

NATCAT

Special Scenario

Page 11: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 11Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Specific Perils and Vulnerabilities of Project Components

Location and layout of a construction site

Cold testing & Hot testing and commissioning

FLEXA

NATCAT

Special Scenario

Page 12: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 12Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Specific Perils and Vulnerabilities of Project Components

Location and layout of a construction site

Cold testing & Hot testing and commissioning

FLEXA

NATCAT

Special Scenario

Page 13: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 13Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Specific Perils and Vulnerabilities of Project Components

Location and layout of a construction site

Cold testing & Hot testing and commissioning

FLEXA

NATCAT

Special Scenario

Page 14: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 14Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Specific Perils and Vulnerabilities of Project Components

Location and layout of a construction site

Cold testing & Hot testing and commissioning

FLEXA

NATCAT

Special Scenario

Page 15: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 15Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• Specific Perils and Vulnerabilities of Project Components

Location and layout of a construction site

Cold testing & Hot testing and commissioning

FLEXA

NATCAT

Special Scenario

Page 16: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 16Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• The soft factor Issue: human errors

Why does it still fail?

Feedback processes in other industries

Safety culture

Interaction between involved parties

Page 17: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 17Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• The soft factor Issue: human errors

Why does it still fail?

Feedback processes in other industries

Safety culture

Interaction between involved parties

Page 18: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 18Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• The soft factor Issue: human errors

Why does it still fail?

Comparison with other industries

Safety culture

Interaction between involved parties

Page 19: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 19Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• The soft factor Issue: human errors

Why does it still fail?

Comparison with other industries

Safety culture

Interaction between involved parties

Page 20: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 20Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Risk Assessment

• The soft factor Issue: human errors

Why does it still fail?

Comparison with other industries

Safety culture

Interaction between involved parties

Page 21: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 21Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Policy cover

• There are 3 main criteria to be considered:

Definition for the testing and commissioning period

Duration

Fulfillment of criteria

Different conditions

Extensions

Page 22: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 22Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

Conclusion

• The testing and start up phase is the most critical time during an erection project

• Time schedules are an important tool to evaluate critical path and potential buffer zones

• Test and commissioning period is to be defined clearly in the insurance contract

• Due to higher exposure and live feed to the equipment the conditions have to pay credit to this changing environment

• Experienced contractor with good procedures in place combined with a policy wording based on risk sharing can mitigate the overall exposure

Page 23: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

| 23Infrassure Ltd. Roman Beerli – Testing following construction - 24th September 2013

“ It is not the beauty of a building you should look at; its the construction of the foundation that will stand the test of time.

Dave Allan Coe

“ If a building looks better under construction than it does when finished, then it’s a failure.

Doug Coupland

Any questions?

Page 24: Testing of Engineering Projects / Plants following …...Testing of Engineering Projects / Plants following Construction IMIA WGP 82 24 th September 2013 Delhi Conference Roman Beerli

Infrassure Ltd., Uetlibergstrasse 134A, P. O. Box 5089, CH-8045 Zürich, Switzerland www.infrassure.com

Thank You