This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
HelpThe following help is provided to aid in the successful operation of the spreadsheet.
Only change cell values marked yellowChanging non-yellow cells could disrupt normal calculation processProcedure
Press New Problem buttonEnter values for yellow cells and proceed through sheets by pressing NextPress the Generate button where availablePress Initial button on Consolidation sheet to initializePress Calculate button to begin calculationsPress the Stop button to stop calculationsView results on the GraphPWP sheet
Nodes
Page 4
Node GenerationThe number of nodes to be used in the solution must be input. A greater number of nodes willyield a more accurate solution but will slow computations. A minimum of 11 nodes and a maximum of 680 nodes are allowed.Stresses are calculated at the nodes while soil properties are based on the space between the nodes.
25 : Number of Nodes
Valid number of nodes
Elements are regions between nodes1
2
3
Nodes
Page 5
The number of nodes to be used in the solution must be input. A greater number of nodes willyield a more accurate solution but will slow computations. A minimum of 11 nodes and a maximum of 680 nodes are allowed.Stresses are calculated at the nodes while soil properties are based on the space between the nodes.
InitialPWP
Page 6
Pore-Water PressuresThis defines the initial pore-water pressure distribution.
Boundary ConditionsThe boundary conditions for the top and bottom of the soil layer must be specified.
0.00 : Pressure Head (m)
0.00 : Pressure Head (m)
25 : Expected # of nodes25 : Actual # of nodes
OK
Top Boundary
Bottom Boundary
Boundaries
Page 8
: Expected # of nodes: Actual # of nodes
Boundaries
Page 9
Pressure head = constantflux = zero
1
Pressure head = constantflux = zero
1
document.xls
Page 10
On/Off 1Height Increment 0.5 mNumber of nodes 25
Max Time Inc. 100,000,000 s 1,157.4 days 3.17 yrsCalc Time Inc. 18,111 s 0.2 days 0.00 yrsAct. Time Inc. Err:523 s Err:523 days Err:523 yrs
Unit Wt. of Water 9.81 kN/m^3Initial Void Ratio 0.30 0.23 porosity, n
Coeff. of Compressibility, av 1.00E-04 1/kPaCoeff. of Permeability, k 5.00E-09 m/s
Coeff. of Consolidation, cv 6.63E-06 m^2/s Calculated - if the manually input cv cell is blank, this one will be usedCoeff. of Consolidation, cv m^2/s Manually input - to use calculated, clear contents of this cellCoeff. of Consolidation, cv 6.63E-06 m^2/s This is the Coefficient of Consolidation that will be used for calculations
Beta 0.48 < 0.5 SafeMax Time 157,784,630 s 1,826.2 days 5.00 yrs
Current Time Err:523 s Err:523 days Err:523 yrsCounter Err:523
Max Iterations 1Iteration Err:523
Update Values (1/0) Err:523
Water Flow PastHeight Initial Pressure (kPa) Pressure (kPa) Node Cutoffs Err:523 : total flow (m^3)
(m) Pore-water Pressures t t+dt (+=up) m^3 2.769 : water available for flow (m^3)0.00
Calculated - if the manually input cv cell is blank, this one will be usedManually input - to use calculated, clear contents of this cellThis is the Coefficient of Consolidation that will be used for calculations
Note: Hit 'Esc' twice after starting Excel iterating (Ignore error and press enter)
: total flow (m^3): water available for flow (m^3)
#########
Finite Difference Solution to Terzaghi's Consolidation