Top Banner
TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities Infrastructure and Revitalization Plan Workshop April 20 th , 2007
24

TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

Jan 18, 2016

Download

Documents

Cornelia Logan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Basin Environmental Improvement Project Commission

Coeur d’Alene River Basin Communities

Infrastructure and Revitalization Plan

Workshop

April 20th, 2007

Page 2: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• Section Overview– “Infrastructure”– What makes a “Project” for the IRP?– Process of identifying projects

Page 3: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Infrastructure

"the substructure or underlying foundation, especially the basic installations and facilities on which the continuance and growth of a community or state depends".

– Webster’s New World Dictionary

Page 4: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Silver Valley Infrastructure Systems

• Drinking Water Supply and Treatment

• Wastewater Collection, Treatment, Disposal

• Streets

• Stormwater Drainage

• Flooding

Page 5: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Silver Valley Infrastructure

• What we know– Infrastructure projects cost money– Infrastructure in the Silver Valley is old– Varying amounts of knowledge about

systems– Competing interests & priorities– Opportunities for alliances

Page 6: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Upper Basin Communities Infrastructure Value

Osburn, Silverton, Wallace, Mullan

Quantities Value

Sewer Mains 190,420 lf $14,300,000

Water Mains 44,760 lf $3,000,000

Streets 308,700 lf $30,870,000

Page 7: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Upper Basin Communities

• Asset Value/Replacement Cost

Pumping -$ Wastewater Treatment -$ Water Storage -$ Flood Control -$ Storm Drainage -$ Curb & Gutter -$ Total -$

Page 8: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Infrastructure Projects

Soft Costs& Projects

GreenInfrastructure

TraditionalInfrastructure

IRPProjects

Page 9: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Traditional Infrastructure

Page 10: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Green Infrastructure

• Streams, wetlands, etc.

Page 11: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Soft Costs & Projects

THIS IS THE GAP BETWEEN THE IRP & CONSTRUCTION

• Facilities Plans

• Condition Assessments

• Monitoring

• Surveying

• O&M Equipment, Training, Staff

Page 12: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Steps for Identifying IRP Projects• Starts with an inventory of what you have

– Baseline Maps

• Capture your knowledge of the systems

• Incorporate typical & industry data

• Determine what you do not know

• Identify what you want

Page 13: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• The easy ones

Page 14: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• Ones in question

Page 15: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• Ones you found and proved

Page 16: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• Ones you deal with all the time

Page 17: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

• More difficult ones

Page 18: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Identifying Projects

Take Away Points:

• We need your help to identify the projects & understand needs

• Think beyond “traditional” and “quick-fix”

Page 19: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

• How to do it– Communicate– Identify Projects– Prioritize– Build support– Invest in critical projects

Developing Projects

Page 20: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

Page 21: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

Considerations Unique to the IRP

• The IRP crosses political and geographic boundaries

• The IRP includes multiple types of infrastructure

• Priorities change

Page 22: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

Steps

• Define Common Goals

• Develop criteria to evaluate projects against the goals

• Rate, weight, rank projects

Page 23: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

• Examples of Goals“Protect existing investment”

“Provide expected level of service to customers”

“Comply regulations and avoid fines”

“Safeguard the environment”

“Protect remedy”

Page 24: TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.

TerraGraphics

Prepared By:

Infrastructure Revitalization Plan

Prioritizing Projects

BREAK OUT SESSION

Goals